Interim Interconnector Sewer Operational Plan

Similar documents
Hydraulic Modeling of Deep Tunnel Provides Cost Savings

Using SWMM 5 to Develop Wet Weather Operating Strategies in a Large Sewer System

Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel

City of Columbus Wet Weather Management Plan Update. Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage

City of Columbus Update

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

City of Gardiner, Maine Wastewater Committee Meeting. CSO Storage Tank & Screening Evaluation

Consent Decree Appendix 1. Control Measures and Performance Criteria

ENVIRONMENTAL ASSESSMENT

DOWNTOWN SHALL NOT FLOOD AGAIN

Executive Summary. Introduction

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by

Foster Park Retrieval Shaft

Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control. OWEA Conference June 29, 2016

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

Reducing Overflows using a Baffling Solution. OWEA AWWA 2014 Technical Conference & Expo August 28, 2014 Columbus, Ohio

The City of Baltimore Back River Wastewater. No more backups Reducing SSOs with headworks improvements in Baltimore

When confronted with increasing peaking. Managing the deluge

Baltimore City Department of Public Works

Maximizing Your Investment

IIoT Transformation of Cincinnati MSD Collection System

HIGH RATE TREATMENT AS PART OF THE SOLUTION FOR WET WEATHER FLOWS JUNE

Remote Headworks Upgrade. November 4, 2010

Dynamic Hydraulic Modeling of a Wastewater Treatment Plant. City of Fort Worth Case Study

HARTFORD METROPOLITAN DISTRICT (MDC) WET WEATHER EXPANSION PROJECT PHASE 1 NEW 200 HEADWORKS FACILITIES

Community Open House

Hartford WPCF Master Plan Clean Water Project. Executive Summary. February 2010

MEETING COLUMBUS S TREATMENT LIMITS

DC Clean Rivers Project

Improvements to the Missouri River Wastewater Treatment Plant- Schedule BProject. Public Meeting June 4, 2013 South Omaha Public Library

Long-Term CSO Control Plan for North Dorchester Bay and the Reserved Channel

Tapping into Available Capacity in Existing Infrastructure to Create Water Supply and Water Quality Solutions. Los Angeles Area Chamber of Commerce

Sanitary Sewer Rates Now and in the Future

Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River

Chapter 5: Conveyance Assessment 2020 Baseline Conditions

Wilmette - Background

Chapter 4 TMACOG Areawide Water Quality Management 208 Plan 4-116

Public Information Meeting Wastewater Master Plan

Bloomingdale Neighborhood Flooding Mitigation Washington, DC

Water and Sewer Infrastructure

Using SWMM EXTRAN to Simulate WWTP Hydraulics

HUBER Sewerage Program

The Wastewater Tsunami is Coming

Controlling CSO Discharges in the City of Toronto: Don River and Central Waterfront Project

Chapter 3 Previous Studies

NJ Future CSO Permittee Meeting

City of Hudson. Wastewater Treatment Plant Improvements. Columbia County, New York. Facility Plan. Delaware Engineering, P.C.

PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017

Technical Memorandum No. 1

Reliability & Redundancy for CSO Facilities Using GWWTS as a Case Study. By Jeffrey A. Lundt, P.E.

PLAN SHEET INDEX TYPICAL ARCHITECTURAL DETAILS - WINDOW SCHEDULE AND DETAILS

LIMITED ENVIRONMENTAL REVIEW

Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility

FY 2018 Proposed Capital Improvement Program

Storm Water and Sanitary Sewer

This page is blank to facilitate double-sided printing.

Meeting CSO Capture Requirements & Local Expectations in an Urban Environment Greening the Gray

Anacostia River Tunnel Briefing For: ANC 6B

LIMITED ENVIRONMENTAL REVIEW For. Northeast Ohio Regional Sewer District. Kingsbury Run Preliminary Engineering Early Action CSO CS

Here is a description of the City of Delphos collection system in its entirety and provide

The Case for Operational Optimization

WEF Collection Systems Conference 2017

CITY OF FALL RIVER STORMWATER UTILITY AND THE CSO PROGRAM. OCTOBER 22, 2015 Terrance Sullivan Administrator of Community Utilities

National Pollutant Discharge Elimination System (NPDES) Permit Program F A C T S H E E T

Metropolitan St. Louis Sewer District. CSO LTCP Update EXECUTIVE SUMMARY

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT

Table of Contents Chapter 1: Introduction Chapter 2: Description of Conveyance Facilities

Measure Twice, Cut Once Using Flow Monitoring Data to Re-evaluate Wet Weather Improvement Alternatives

Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment

Blueprint Columbus. Clean Streams. Strong Neighborhoods.

Omaha CSO Program and the South Omaha Industrial Area Lift Station, Force Main and

Combined Sewer Overflow Long Term Control Plan Update. March 21, 2017

Background Where did CSO systems begin? Combined Sewer Overflow (CSO) Control. Background. Background. Background

Meadowbrook-Limestone (MBLS) Wastewater Treatment Plant. Wet Weather Operating Plan

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY

The Brightwater Influent System

ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS

Vulnerability of Metro Vancouver Wastewater Infrastructure to Climate Change

Technical Memorandum - Final

The Indianapolis Deep Tunnel Surge Analysis: Debugging Future Operational Issues in the Present

Suburban CSO Basins in the DWSD Service Area

Minne Lusa Basin Technology Screening TM

LIMITED ENVIRONMENTAL REVIEW. Northeast Ohio Regional Sewer District, Southerly Electrical Infrastructure Improvements SEII/1401A

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

The South Hartford Conveyance and Storage Tunnel

Customer Conference Speedway, IN 46224

Wet Weather Planning for Wastewater Treatment Plants

Refinement Task 19 Minne Lusa Basin Search for Hybrid Alternatives

ENGINEERED SOLUTIONS. Wastewater Solutions

Technical Memorandum. Prepared for: Mid-Ohio Regional Planning Commission Project Title: Sustaining Scioto Project No.:

LEHIGH COUNTY REGIONAL SEWER SYSTEM

EX. 24" G RAV ITY PRO P. GRAVITY S FISHER PARK PUM P STAT IO N EX. PUMP STATION TO BE REMO VED PRO P. F.M. PRO P. S.W. M AST ER PUM P STAT IO N RHODES

Omaha s Combined Sewer Overflow Control Program. May 17, 2007 Lewis & Clark Middle School

Long-Term Control Plan Orientation. July 1, 2009

CHAPTER 4 DESCRIPTION OF EXISTING FACILITIES

OEPA CSO Overflow Reporting

City of Ames. Water Pollution Control. Long Range Facility Plan

Hydraulic Challenges of Designing for a High-Capacity and. High-Head Pump Station

Oak Orchard Wastewater Treatment Plant. Wet Weather Operating Plan

Chapter 10: Conveyance Recommended Plan

Transcription:

Interim Interconnector Sewer Operational Plan Gary Hickman Plant Manager Jackson Pike Wastewater Treatment Plant Jeff Hall Assistant Plant Manager Southerly Wastewater Treatment Plant

Columbus Area Collection System Overview JPWWTP SWWTP

Interim Interconnector Sewer Operational Plan (2003) History 1986 Project 88 Reduced JPWWTP design to 60 MGD 1991 Start-up of the Interconnector Sewer between JPWWTP and SWWTP 1994, 1995 Max Wet Weather Flow Analysis JPWWTP Anytime Flow: 70MGD, Ideal 115 MGD SWWTP Anytime Flow: 130MGD, Ideal 180 MGD 1996 Interconnector System and Stormwater Control Program Plan of Operations

Interim Interconnector Sewer Operational Plan 2003 Purpose: To provide for the necessary uniform combined sewer overflow (CSO) control/separate sanitary sewer overflow (SSO) control operating strategy as well as to account for the operation of the West Columbus Local Protection Project (WCLPP) and its downstream interior drainage features.

Before System Improvements Scioto River OSIS Whittier St. STORM TANK 3 STORM TANK 2 STORM TANK 1 OVERFLOW DSR 83 FRANKLIN MAIN DESHLER TUNNEL WEST SIDE SEWERS Big Run GRIT TANKS FDS RENICK RUN PUMPS FCS IPS JPWWT P BIG WALNUT INTERCEPTOR SEWER OVERFLOW SWWTP

Interim Interconnector Sewer Operational Plan (Update) Major Operational Components Jackson Pike WWTP Whittier Street Storm Tanks Grit Chamber Inlet Gate Old Renick Run Pump Station Flow Diversion Structure Flow Control Structure Southerly WWTP Interconnector Pump Station

Jackson Pike Wastewater Treatment Plant Old Grit Removal Facility Removed

Jackson Pike Wastewater Treatment Plant Old Renick Run Storm Sewer Pumping Station Old Pump Station New Pump Station

Plant Capacity Improvements Scioto River OSIS Whittier St. STORM TANK 3 STORM TANK 2 STORM TANK 1 OVERFLOW DSR 83 FRANKLIN MAIN DESHLER TUNNEL WEST SIDE SEWERS Big Run FDS JPWWTP 150 MGD OVERFLOW SWWTP 330 MGD BIG WALNUT INTERCEPTOR SEWER BWARI

Interim Interconnector Sewer Operational Plan Update Major Operational Components Jackson Pike WWTP Whittier Street Storm Tanks Flow Diversion Structure Southerly WWTP Interconnector Pump Station (level sensor)

Jackson Pike Wastewater Treatment Plant OSIS BRS SMRS FDS OARS S-2 OARS S-1 IC New Grit Facility FCS (Weir Removed)

Jackson Pike Wastewater Treatment Plant Whittier Street Storm Tanks

Jackson Pike Wastewater Treatment Plant Flow Diversion Structure (FDS)

Southerly Wastewater Treatment Plant Interconnecting Pump Station

Interim Interconnector Sewer Operational Plan Major Operational Components Jackson Pike WWTP Whittier Street Storm Tanks Flow Diversion Structure Southerly WWTP Interconnector Pump Station (Level Sensor)

Southerly Wastewater Treatment Plant Inter-Connector Sewer Big Walnut Outfall Big Walnut Augmentation/ Rickenbacker Interceptor

Interim Interconnector Sewer Operational Plan Normal Operations (JPWWTP): Keep FDS Interconnector Gates Closed Keep both Whittier Street OSIS Regulator Gates open 36 inches (100%) Maintain the Jackson Pike WWTP wet well between 6 12 feet. (USGS 682.0 688.0) Maintain JPWWTP treatment between 50 95 MGD

Interim Interconnector Sewer Operational Plan Normal Operations (SWWTP): Maintain an Influent Junction Chamber (IJC) level of between 2 and 5 feet. (USGS 653.5 656.5)

Interim Interconnector Sewer Operational Plan Wet Weather Operations If possible gradually increase treatment at Jackson Pike and Southerly while maximizing conveyance and collection system storage. Gradually bring JP wetwell up to 14 foot while increasing treatment to 100 MGD. (Continue to increase flow to 160 MGD.) Increase flow at SWWTP to 180 mgd while allowing IJC level to rise to capture first flush. Continue to increase SWWTP flow and bring additional equipment online until all equipment is in service and plant flow is 330 mgd prior to an 18 (USGS 669.5) IJC level.

JP FDS Interconnector Gate Operation Jackson Pike will maintain wet well elevation at ~ 14 feet by using FDS Interconnector Gate to Southerly to capture first flush.

Interconnector Sewer Profile JP to Southerly

Whittier Street Regulator Gates

Interim Interconnector Sewer Operational Plan Once JP treatment capacity is maxed out (160 MGD), additional flow cannot be conveyed to Southerly, and the JP wet well cannot be maintained below USGS 690 initiate pumped bypass. [Note: operate pumped bypass until the JP wet well can be sustained below USGS 688.

Interim Interconnector Sewer Operational Plan Update Flood Protection Measures: When the Scioto River reaches the 25-year elevation (USGS 706.2), as measured at the USGS Gauging Station located behind the Jackson Pike WWTP on the Scioto River or as predicted by the National Weather Service, close the Sluice Gate at the Scioto Main Flow Control Structure at Rhodes Park. Divert all flows at Jackson Pike WWTP to the Mechanical Bypass. Close FDS Gates to Interconnector. Pump up to maximum Headworks capacity (approximately 180 mgd) to the Scioto River.

Interim Interconnector Sewer Operational Plan How Has the Interim Interconnector Sewer Operational Plan Worked to Date?

Jackson Pike Wastewater Treatment Plant Hydraulic Performance 2005 to Present Jackson Pike Wastewater Treatment Plant Distribution of top 100 flows 2005 to Present 35 30 25 Occurences 20 15 10 5 0 2005 2006 2007 2008 2009 2010 2011 - YTD #/year 14 18 29 18 0 2 19

Southerly Wastewater Treatment Plant Hydraulic Performance 2005 to Present 35 Southerly Wastewater Treatment Plant Distribution of top 100 flows 2005 to Present 30 25 Occurrences 20 15 10 5 0 16 11 13 32 0 2 26 2005 2006 2007 2008 2009 2010 2011 YTD

Interim Interconnector Sewer Operational Plan Where Do We Go From Here?

Interim Interconnector Sewer Operational Plan Current and Future Projects Olentangy Scioto Interceptor Sewer Augmentation Relief Sewer (OARS) Tunnel Project Completion 2015 Will provide nearly 60 million gallons of deep tunnel wet weather flow storage ~23,400 feet long 20 feet in diameter, 165-180 feet deep.

Scioto River Future OARS Tunnel OSIS STORM TANK 3 STORM TANK 2 STORM TANK 1 OVERFLOW DSR 83 FRANKLIN MAIN DESHLER TUNNEL WEST SIDE SEWERS FDS JPWWTP 150 MGD BIG WALNUT INTERCEPTOR SEWER OVERFLOW SWWTP 330 MGD BWARI

Future SSO Mitigation Alum Creek Relief Tunnel (ART) - Start date 2015. Additional deep tunnel storage ~73,000 feet long, with tunnel diameter varying from 10 18 feet. Olentangy Relief Tunnel (ORT) Start date TBD. Additional deep tunnel storage ~58,000 feet long, with tunnel diameter of 14 feet.

Interim Interconnector Sewer Operational Plan Questions?