The bridge over the Georges River at Alfords Point has been duplicated with a new incrementally launched bridge.

Similar documents
Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Management of Half Joints in RTA Bridges Amie Nicholas, Project Engineer, NSW Roads and Traffic Authority

Principal Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE

Design of Steel-Concrete Composite Bridges

MIDAS Training Series

SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit

CityLink Tulla Freeway Widening Project Widening of Existing Moonee Ponds Creek Bridges

CHAPTER 17 - SPECIALIST CONSTRUCTION SYSTEMS

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc.

DESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY

Design & Seismic Detailing of Nonstandard Deep Precast Concrete Box Girders For Long Span Railroad Bridges By:

Modjeski and Masters, Inc. Consulting Engineers 04/18/06 St. Croix River Bridge 3D Analysis Report Introduction

Progressive Erection Applied to Box Girder with Strutted Wing Slab

RESILIENT INFRASTRUCTURE June 1 4, 2016

Design and Construction of the Nan-Tien Pedestrian Bridge, a Continuous Super-T Bridge over Princes Motorway.

Bridge articulation No. 1.04

Blaxland's Crossing Bridge, Wallacia NSW Bearing Replacement

Concrete Bridge Design and Construction series

MARTA Rapid Transit Bridges

Launching Bridges in to the Future. CBDG Annual Conference. Simon Bourne Managing Director. 26 June 2008

ST7008 PRESTRESSED CONCRETE

Concrete Bridge Design and Construction series

The New, Balanced Cantilever, Bridge over Acheloos River in Greece

VIADUCTS BY PUSHING: INCREMENTALLY LAUNCHED BRIDGES

Bridge (East) Street Rail Underbridge Replacement for the Albury Wodonga Hume Freeway Project

Steve Haines, P.E., Parsons, (303) , James Studer, Kiewit, (926) ,

ASSIGNMENT 1 ANALYSIS OF PRESTRESS AND BENDING STRESS BFS 40303

The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure

Bijan Khaleghi, Ph, D. P.E., S.E.

Griffith University Cable Stayed Pedestrian Bridge

Challenging Skew: Higgins Road Bridge over I-90

Ironton Russell Bridge Project

Modeling and Design of Bridge Super Structure and Sub Structure

The content for this class has been provided by the following PB employees: With assistance from: Martine Klein, P.E. Narration by Greg Metzger, PB

Shelly Beach Overbridge Modification, Auckland

The World s First RPC Road Bridge at Shepherds Gully Creek, NSW

ESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA

SOFiSTiK. for BRIDGES Company presentation. Georg Pircher SOFiSTiK International sales

PRECAST CONCRETE GIRDER ERECTION

Chapter 2 Notation and Terminology

AUGUST 2016 LRFD BRIDGE DESIGN 3-1

2014 HDR, all rights reserved.

EXPERIMENTAL INVESTIGATION ON THE INTERACTION OF REINFORCED CONCRETE FRAMES WITH PRECAST-PRESTRESSED CONCRETE FLOOR SYSTEMS

Accelerated Bridge Construction in USA

EGCE 406: Bridge Design

Appendix A Proposed LRFD Specifications and Commentary

BRIDGE GIRDERS TECHNICAL GUIDE

BS EN :2004 EN :2004 (E)

SOME FRP STRENGTHENING PROJECTS IN AUSTRALIA

Monitoring of External Prestressing Tendons Construction Process of Jiamusi Highway Prestressed Concrete Bridge during Strengthening in China

This paper will also report on the methodology of various strengthening concepts that were developed and tested using these models.

INSTALLATION MANUAL FOR MODULAR EXPANSION JOINT (LG SYSTEM)

OXFORD ENGINEERING COLLEGE (NAAC Accredited with B Grade) Department of Civil Engineering LIST OF QUESTIONS


Hyperstatic (Secondary) Actions In Prestressing and Their Computation

Highway Bridge Structure Components

Contents. Foreword 1 Introduction 1

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

Construction and design features of the Bridge over the Danube River. Bulgaria

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

LRFD Bridge Design Manual Changes

B R I D G E O F F I C E

Blaxland Bridge Bearing Replacement

B R I D G E O F F I C E

Precast Prestressed Segmental Elevated Urban Motorway in Italy

SUMMARY SHEETS OF INTEGRAL CONNECTIONS

The Europe Bridge in Portugal: concept and structural design

Release Note DESIGN OF CIVIL STRUCTURES. Release Date : SEP. 1, 2015 Product Ver. : Civil 2016 (v1.1)

DESIGN OF THE MAIN SPANS OF THE CHONGQING CAIYUANBA BRIDGE

John James Audubon Bridge

THE EUROPE BRIDGE, IN PORTUGAL: THE CONCEPT AND STRUCTURAL DESIGN

Launching technique for the Viaduc de Millau

BRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E.

Bonner Bridge Replacement Update:

ICSS(4): A DESIGN APPLIED FOR A SUPER LONG MULTI-SPAN BRIDGE

A New Precast Concrete Deck System for Accelerated Bridge Construction

When building the arch, a provisional upright must be put on the pier placed on the roots of the arch.

The design of Padma Multipurpose Bridge challenges and solutions in design of the river spans

BRIDGES WITH PROGRESSIVELY ERECTED DECKS

Use of Externally Bonded FRP Systems for Rehabilitation of Bridges in Western Canada

2. Outline of the bridge 3-span continuous deck extradosed bridge Bridge length

CASE STUDY OF LONG SPAN STEEL BRIDGE STABILITY DURING DESIGN AND CONSTRUCTION

UPGRADING OF AN EXISTING CONCRETE-STEEL BRIDGE USING FIBRE REINFORCED POLYMER DECK- A FEASIBILITY STUDY

A Brief Overview Of Seismic Isolation Bridge Projects

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS

Ironton Russell Bridge Project

Appendix M 2010 AASHTO Bridge Committee Agenda Item

Ironton Russell Bridge Project

Class Topics & Objectives

Appendix D.2. Redundancy Analysis of Prestressed Box Girder Superstructures under Vertical Loads

Basarab Cable Stayed Bridge in Bucharest

STANDARDIZED CONCRETE BRIDGES IN TEXAS. John Holt, PE, Texas Department of Transportation Ronald Medlock, PE, Texas Department of Transportation

Design of the grade separation of Gippsland Railway at Narre Warren Cranbourne Road

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle

Highway Bridge Superstructure

3.4.2 DESIGN CONSIDERATIONS

Ironton Russell Bridge Project

Ministry of Forests & Range

Transcription:

The Design and Construction of Alfords Point Bridge Mark Bennett, Senior Bridge Engineer (New Design) RTA Harry Cheung, Project Engineer, RTA Trung Doan Project Engineer, RTA Synopsis The bridge over the Georges River at Alfords Point has been duplicated with a new incrementally launched bridge. The existing bridge was opened to traffic in 1973. Provision was made for its future duplication with the construction of the piles, pile caps and Abutments of the planned duplicate bridge when the original bridge was constructed. This paper describes the investigations, concept development and detail design of the new bridge. Existing Bridge The existing bridge is a twin concrete box girder, built by erecting precast concrete segments on false work trusses and casting 100 mm wide wet joints between segments and a longitudinal closure strip in the top flange between the box girders. The box girders are 2286 mm deep. The bridge has an 11.580 m wide traffic carriageway and a 1.2 m wide footway. Over recent years tidal traffic flow was implemented with 2 lanes in the peak flow direction and one lane in the counter flow direction. The box girders are prestressed longitudinally and the top flange is stressed transversely. Also near the Piers the webs are prestressed vertically. The substructure consisted of hollow Y shaped columns supported on pile caps in the river and spread footings at Piers 1 & 10. The pile caps were supported on four 1220 mm diameter permanently cased bored piles socketted into sandstone. The piles are raked 1 in 5. The Abutments consisted of large box chambers, partially filled with soil. Design & Construction of Alfords Point Bridge by Bennett Page 1 of 9

Figure 1 Existing Alfords Point Bridge The bridge was designed for HS20-44 truck and lane loading in accordance with NAASRA Highway Bridge Design Specification 1970. It was designed by the consultants Guyon, Schere, Harris & Sutherland in London and constructed by John Hollands Pty Ltd. As part of the investigations for the new bridge a condition assessment and structural assessment of the exiting bridge and piles and pile caps for the new bridge was carried out. The condition assessment indicated that the bridge is in very good condition with only minor damage and reinforcement corrosion in some precast skirting units of the pile caps. However, there have been a couple of maintenance issues with the bridge. The superstructure of the existing bridge was fixed at the northern Abutment with guided and free sliding pot bearings provided on the Piers and southern Abutment. The English designers had underestimated the long term creep and shrinkage of the box girder, so the fingers of the finger plate joints no longer overlapped, even in summer. The rideabilty of the joint was not a problem, but during the course of the construction of the new bridge one of the deck joint combs broke loose requiring one lane of the bridge to be closed while repairs were carried out. Also, the PTFE of the sliding contact surfaces of the original pot bearings had not been recessed. An earlier inspection had revealed that the PTFE was extruding, so the bearings had been rectified. The analytical structural assessment indicated that the superstructure of the existing bridge was not significantly over loaded for the SM 1600 traffic loading of AS 5100. At ultimate, it was slightly under capacity for positive bending moment near mid span. At serviceability, there were tension stresses of up to 4 MPa. Also, during construction of the new bridge it became apparent that the hollow low strength concrete stubs constructed to protect the column starter bars on the pile caps had not provided adequate corrosion protection to the reinforcement. There was some significant loss of cross sectional area of the reinforcement, especially on the northern wall of the stub due to the prevailing NE winds. Design & Construction of Alfords Point Bridge by Bennett Page 2 of 9

A large number of new starter bars had to be epoxied into holes cored into the pile caps. Figure 2 Existing bridge deck joints Figure 3 Column starter bars Concept Design Alternative superstructure types and construction methods were evaluated for the new bridge, including steel trough girders, match cast segmental span by span construction, cast-insitu box girder and incrementally launched box girder. To conform with current road design standards and the requirement for shared path the overall width of the new bridge is 15.36 m compared to 14.465 m for the existing bridge. A traffic carriageway 10.75 m wide and a 3.365 m wide shared path is provided on the new bridge. The span lengths of the bridge are 33.93 m, 9 @ 41.91 and 34.02m. From a structural engineering perspective, a single cell box girder would have been the optimal solution. This would have also allowed the adoption of a simpler pier column shape. However, the urban designers wanted the new bridge to replicate the appearance of the existing, with twin box girders and the Y shaped Pier columns. After much debate an incrementally launched twin concrete box girder, with a depth on 2.6 m was adopted as the preferred solution. While the cost of this option was estimated to be higher than a single cell box, a significant design issue became apparent during the course of the detail design which validated this decision. Design & Construction of Alfords Point Bridge by Bennett Page 3 of 9

Figure 4 General Arrangement Longitudinal Prestressing On recent design and construct contracts for incrementally launched box girders in NSW, some contractors had opted to eliminate the deflected web prestressing by increasing the amount of concentric launch prestressing to satisfy final in-service conditions. However, consistent with current German practice, it is RTA preferred practice to provide deflected web tendons in addition to the concentric prestress. The advantages are seen as follows: Reduced quantity of prestressing steel Due to the load balancing effect of the deflected tendons, the shear force to be carried by the concrete webs of the box girder is reduced As the eccentricity of the launching bearing reactions from the centreline of the webs must be minimised, reasonably thick webs needs to be provided. These webs can accommodate the deflected tendon prestressing ducts. Installing and stressing the web tendons can often take place while the diaphragms are being cast and the permanent bearings are being installed or adjusted, so there is no significant disadvantage in terms of construction time. Design & Construction of Alfords Point Bridge by Bennett Page 4 of 9

The hog due the deflected tendons at least partially compensates for the self weight deflection of the box girder. Method of Launching The bridge is straight and is located on sag curve between grades of -4.17% and 6.7%. The longitudinal grade at the launching Abutment B is 6.5% and at Abutment A -2.3%. The superstructure was launched from the southern (Menai) Abutment B end due to larger available working area. Also it allowed construction traffic to merge back into the traffic on Alfords Point Road at the top of the hill. Figure 5 Girder Launching Similar to the Woronora River Bridge, the launching system consisted of two pairs of heavy lift jacks travelling along two fixed tendons between the Abutment and the casting yard. The heavy lift jacks, arranged nose to nose to bear against a braking pin inserted through block outs in the top and bottom flanges of the box girders, travel along the fixed tendons. An outline of the system is shown in Figure 7. Figure 6 Launching jacks Design & Construction of Alfords Point Bridge by Bennett Page 5 of 9

Figure 7 Casting Yard Layout Excluding temperature effects the total maximum braking force of required during the launch is 4800 kn and the maximum jacking force is 2000 kn. Launching downhill appears to be a good option for the construction of incrementally launched bridges as the slope component of the bearing reaction and the friction force act in opposite directions and reduce the braking force and the longitudinal forces acting on the Piers. However, it is imperative that the during the casting and launching cycles the end of the completed superstructure is held stationary near the end of the casting yard to prevent cracking at the new segment interface. Thermal contraction can result in a superstructure being pulled uphill. An ultimate reduction in superstructure temperature of 12.5ºC during any launching cycle was adopted for design. This increases the braking force by 2300 kn. Two braking saddles were provided at the launching Abutment to assist in holding the end of the superstructure stationary between launches and while the heavy lift jacks and braking pins were relocated for the subsequent launch. The braking saddles operated by jacking a contact plate onto the soffit of the bridge superstructure to develop sufficient friction to hold the superstructure. A pair of launching noses was assumed for design. Design parameters for the launching noses were provided. A steel end frame was detailed to allow launching of last segment of the superstructure. Design & Construction of Alfords Point Bridge by Bennett Page 6 of 9

Casting Bed As the casting bed was to be located in a cutting on rock, the conforming design assumed continuous concrete spline beams under each web, similar to that used on the Woronora River Bridge and the twin T superstructure of the Seacliff Bridge. However, the Contractor opted for the more conventional discrete support casting bed with supports located under each web at the front face and middle of the bed, and at midway between the launching Abutment and casting yard to facilitate the launching of the first and last segments. The formwork was supported on longitudinal steel beams that spanned between the discrete supports. The superstructure was generally constructed with 2 segments per span. Each segment was poured in two or three stages: the bottom flanges and webs of each box girder and then the top flange. Detail Design Parameters The bridge was designed to AS 5100 Bridge Design for SM 1600 traffic loading. More conservative provisions than those required in AS 5100 were adopted for crack control during launching. No de-compression of the box girder was allowed due to self weight effects only during launching and a maximum tensile stress of 0.5 f c when considering additional effects of differential temperature and bearing level tolerances. Shear and torsion design for the box girder was carried out in accordance with the AASHTO LRFD Bridge Design Specification but with AS 5100 capacity reduction factors. The combination of transverse bending of the box girder cross section in combination with shear was considered when calculating the stirrup reinforcement requirements. As previously mentioned, a 12.5ºC reduction in temperature of the box girder was assumed during any one launching cycle for calculating the longitudinal forces on the Piers and the maximum braking force. Ultimate coefficients of friction of 0% and 4% were used to determine maximum launching and braking force and the longitudinal forces on the Pier during launching. Foundation Evaluation Detailed evaluation of the existing bridge foundations to support the heavier superstructure and higher traffic loadings was undertaken. New bore holes were drilled and the cores correlated to the original foundation logs to allow a more accurate assessment of the load carrying capacity of the existing piles. The new columns were made hollow to match the existing and minimize their weight. The walls of the hollow column sit directly over the piles, so no strengthening of the pile caps was required. Design & Construction of Alfords Point Bridge by Bennett Page 7 of 9

Bearing Design and Contractor Modifications For incrementally launched bridges, it is conventional practice to launch over temporary bearings and replace them with pot bearings on completion of launching. Following the success of launching over laminated elastomeric bearings on the Woronora River Bridge, elastomeric bearings were adopted for this bridge design. Launching over elastomeric bearings has the advantage that the longitudinal force acting on the Piers due to thermal contraction is reduced due to the low shear stiffness of the bearings. Also, in their final configuration it allowed the superstructure to be elastically fixed at Piers 4,5,6 & 7 with smaller deck joints required at each Abutment. At the Abutments and Piers, where the shear deflection capacity of the elastomeric bearings was not sufficient to accommodate the long term creep and shrinkage deflections and thermal movements, a stainless steel/ PTFE sliding contact surface was incorporated into the bearings. The typical elastically restrained bearing set under each web consisted of a pair of AS 09:12:07R bearings with associated attachment and keeper plates. The advantage of the twin box girder design alluded to above, is that with a single cell box girder the heavier reactions would not have allowed the use of elastomeric bearings. Figure 7 Launching over Elastomerics Figure 8 Permanent bearing arrangement The Contractor proposed several modifications to the conforming design. Rather than using a twin set of launching noses ( 4 girders), the contractor proposed to use an existing single launching nose with one steel girder attached to the inside web of each box girder. By strengthening and stiffening the end of the superstructure and modifying the attachment details, it was possible to use the existing launching nose. The footings at Piers 1 & 10 were at a considerable depth below existing ground level. To avoid the need for a large excavation at Pier 10, the contractor opted to Design & Construction of Alfords Point Bridge by Bennett Page 8 of 9

redesign the Pier with piles around the outside of the existing footing, a pile cap above the existing footing and a solid column. Also in lieu of cast-in-place concrete parapets the contractor adopted precast parapet shells filled with insitu concrete. All these modifications were checked and accepted by the RTA. Design Team The concept and detail design for the new bridge undertaken by Bridge Engineering in the RTA. An external proof check of the design was carried out carried out by Taylor & Herbert Consultants Pty Ltd. The Contractors design modifications undertaken by Maunsells Pty Ltd. The contractor, Abigroup Pty Ltd, regularly achieved a weekly cycle for the construction one superstructure segment, so that from the commencement of launching of the girder to completion of the bridge taking took less than 12 months. Figure 9 Completed bridge References Bennett M., Taylor A.J. (2002), Woronora River Bridge, Structural Engineering International, Volume 12, Number 1. Design & Construction of Alfords Point Bridge by Bennett Page 9 of 9