Totem Ocean Trailer Express

Similar documents
LNG AND THE FUTURE AAPA MARINE TERMINAL MANAGEMENT TRAINING PROGRAM ANTHONY CHIARELLO PRESIDENT & CEO TOTE

NASSCO Shipbuilding & LNG Propulsion. Kevin Mooney, VP of Programs September 18, 2013

LNG as a marine fuel in BC. West Coast Marine LNG Workshop 26 th June 2012

LNG BUNKERING. Advancements & Challenges. HHP Summit Jay Gottlieb Houston, TX USA. President Sept 2012 Argent Marine Companies

Prospects for LNG in the South Baltic Sea Region

LNG as a Marine Fuel. Cliff Gladstein President Gladstein, Neandross & Associates

Who is WesPac Midstream?

AIR ACTION PROGRAM. Overview of Port Metro Vancouver Air Initiatives. Metro Vancouver Sustainability Breakfast June 04, 2014

NORWAY: A Look at Recent LNG Marine Fuel Developments. Dr. Michael Parsons with support from Randolph Helland and Carol Wolosz

Dr. Konstantinos Galanis

The MAGALOG Project LNG-fueled shipping in the Baltic Sea

Investor Presentation February 2018 Slide 1. Investor Presentation February 2018

Paul F. Richardson-Short-Sea Shipping Session. Marine Board Spring Meeting-May Short-Sea Shipping.

WÄRTSILÄ CORPORATION

Port of Vancouver USA Clark College Business Advisory Committee May 9, 2017

Introduction of Gas Turbine- Powered, LPG Fueled Ship. Byeongyeol Baek Advanced Lead Engineer GE s Marine Solutions March 6 to 7, 2018

Select U.S. Ports Prepare For Panama Canal Expansion

Port of Hamburg: Heading into the future with smartport

Investor Presentation November 2017 Slide 1. Investor Presentation November 2017

Costs and benefits of LNG-fuelled container vessels

WWL Environmental Profile Shipping & Environment Conference, Bremmerhaven. September 12 th 2013 Roger Strevens, WWL

Matthias Ritters

NATIONAL PORT STRATEGY

Inland Waterways Conference

Liquefied Natural Gas As Marine Fuel. April 04, 2017

Vision of the Future Ship

Green ports policies, coastal shipping and inland waterways November, 2013 Incheon

RESOLUTION NO

TRANSPORTATION 101 Today and Tomorrow. Moving People and Goods

LNG in Figures (Economic Overview on the use of LNG as marine fuel)

PUBLIC WORKSHOP May 2017

Energy Efficiency EEOI

LNG-fuelled deep sea shipping

Dual Fuel Container Feeder

Maritime Administration

House Select Committee on Strategic Transportation and Long Term Funding Solutions. November 6, 2017

The PHA s desire to develop an implement an EMS was driver by the following factors: Potential to improve environmental performance

La tutela ambientale sui mari internazionali (Environmental Regulations of the Shipping Industry)

Kristin Decas Port of Hueneme Executive Director

Conventional vs. LNG Fuelled RoPax - Case Study -

Forecasting the Future of Marine Fuel

Inside the Port of Long Beach: Challenges & Opportunities

AAPA Port Real Estate Seminar December 10, 2015 Kristin Decas, CEO and Port Director

PORT OF VANCOUVER USA Strategic Plan

By Captain John C. Farmer Presented to: Knoxville Regional Transportation Planning Organization Technical Committee meeting January 10, 2017

Introduction: Jason Giffen, Assistant Vice President, Planning and Green Port

An Outlook for the Maritime Industry Towards 2020

Alaska LNG Concept Information. Alaska LNG. Overview. October

NATURAL GAS IN COOK INLET

Are We Prepared for the Energy Movements? JEANNIE BECKETT THE BECKETT GROUP ENERGY EXPORT PERMITTING IN THE NW JUNE SEA-TAC CONFERENCE CENTER

Terminal Opportunities & Challenges. Peter I. Keller NYK Line April 24, 2006

22nd Annual Decisionmakers Conference Bay Planning Coalition

Wallenius Wilhelmsen Logistics

Port of Los Angeles Presentation to the Los Angeles Investors Conference March 19, 2018

INTERMODAL THE PRESSURE IS ON

Port of Baltimore and Economic Development

Port of New Bedford. AAPA Commissioners Seminar May 17, 2011 Prosperity through Economic Development Opportunities

84 th International Propeller Club Convention Fundamental Changes to a Traditional Transportation Paradigm. October 7, 2009

CLASS I RAIL CSX & Norfolk Southern

The Economic Impacts of Virginia s Maritime Industry

TAPS Highlights. December 8, Alyeska Pipeline Service Company

Liquefied Natural Gas (LNG) for Commercial Applications. David Jaskolski Senior Account Manager Pivotal LNG September 2014

The Port Professional

Benefit Cost Analysis 2016 TIGER Grant Application Funding Opportunity #: DTOS59-16-RA-TIGER8

Distribution & Global Logistics

CNG/LNG/CRNG/LRNG as alternative fuels in heavy duty transportation - a techno-economic assessment

The New LNG Powered Ferry Generation

Alabama State Port Authority

Promoting Sustainable Development in the Arctic

Partnering Navigation with Diverse Stakeholders for a Sustainable Future. Dan Mecklenborg Senior Vice President

Wallenius Wilhelmsen Logistics

Item 3A Meeting: 8/17/17. Adopt Policy Resolution - Greenhouse Gas Reduction Resolution PT

Maritime Emissions & Impact on Air Quality

Green Port Cruise AIDA Cruises

A. THE PORT OF SEATTLE

Module 5: Ship-Port Interface and Energy Efficiency. IMO Train the Trainer Course. Energy Efficient Ship Operation

LNG bunkering Why, How and When. Nigel Draffin Technical Manager LQM Petroleum Services Inc.

NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS. OU Meteorology Field Trip October 20, 2017

Enter a world of efficiency Page 1

ICF International s Marine Related Projects. NEDC Goods Movement Work Group March 18, 2009

GIBRALTAR STRAIGHT GATEWAY / EXIT TO THE MED. Directly above Gibraltar Airport at 375kts sse dn

LNG Fuelled Vessels:

Presentation to: Washington Public Ports Association

Washington State Ferries Liquefied Natural Gas Project

LNG as Fuel for Ships: Why It s Happening in America

STRENGTHENING YOUR PORT S FINANCIAL STABILITY THROUGH DIVERSIFICATION

A Vision to the Future of Collaboration: Introducing XVELA

Expectations for Port Customers and Clients. Dan Sheehy -NYK Line AAPA Meeting October 23, 2008

Decision Making of Full Speed, Slow Steaming, Extra Slow Steaming and Super Slow Steaming using TOPSIS

CLEANSHIP. Move Forward with Confidence

By Sea, And by Air. Port Administration and Legal Issues Seminar. Brenda L. Enos, CHMM, REM Massachusetts Port Authority April 11, 2013

The Training Material on Multimodal Transport Law and Operations has been produced under Project Sustainable Human Resource Development in Logistic

Eric Thomas Benchmark River and Rail Terminals

The Leader in Shipping To, From and Within Alaska. Pioneering Alaska transportation solutions since The Lynden Family of Companies

Point Thomson Project

Environmentally Friendly & Superior Solution with LNG as Fuel

COMMISSION AGENDA Item No:

AIR QUALITY AND CLIMATE CHANGE EVALUATION GUIDANCE

GLE Position Paper: Overcoming barriers in the Small Scale LNG development

Transcription:

Totem Ocean Trailer Express

Saltchuk Resources, Inc.

Niche Ro/Ro Liner Service Speed-10 hour port turnaround Flexibility - all equipment types Vehicles

Dedicated Service Dedicated service between Washington and Alaska Highway and rail connections throughout greater Alaska and Lower 48/Canada

Vessel Profiles Original TOTE Ponce Class Ship Orca Class Ship

Vessel Comparison Orca Ponce Length 839 feet 790 feet Beam 118 feet 105 feet Speed 24 knots 24 knots Propulsion Diesel Electric Steam Turbine Cargo 550 trailers + 385 trailers + 300 autos 110 autos Internal Ramps 12 5

Orca Class Inboard Profile

TOTE Cargo Mix Flexibility Stretch Flatbed 70 foot Reefers 53 foot 48 foot 45 foot 40 foot Dry Cargo 53 foot 48 foot 45 foot 40 foot 30 foot Pups

Increased Control and Flexibility

Streamlined Operations Combined terminal and vessel operations Ship staffed by SSA, long-time partner Vessel maintenance done in-house Ship sails with Alaska pilot onboard Bridge electronic technician on staff No pre-stowing of cargo

Alaska Railbelt Freight 67% Liner Vessel 26% Barge 7% Overland

Alaska Transportation Challenges 1,450 nautical miles one way (Tacoma-Anchorage) Seas to 60 feet Wind gusts to 100 knots

Port of Anchorage

Ice Choked Harbor Cook Inlet Ice choked 6 to 7 months per year 36 foot tidal range

Low Tide

High Tide

Expansion Plans Extend Port 400 feet Diversify and expand business 10 years behind and $700 million over budget

Port of Tacoma

Port of Tacoma s Top Trading Partners (based on value of 2011 two-way trade, in U.S. dollars) 1. China/Hong Kong $14.9 billion 2. Japan $10.6 billion 3. South Korea $3.3 billion 4. Alaska $3 billion 5. Taiwan- $2.5 billion

Gateway to Alaska Trade with AK is about 1/3 of the Port of Tacoma s container business Port of Anchorage estimates that 90% of all goods used by Alaskans west of Cordova comes through Port of Tacoma 35% of all goods consumed in Alaska are shipped aboard TOTE vessels

TOTE Terminal

96% On Time Since 2003

Protecting Alaskan Waters

2009 Best Award Citizens for a Healthy Bay 2009, 2008 Environmental Excellence Awards for 3 vessels 2008 WA State Recycling Association Recycler of the Year 2007 14001:2004 Certification Completed 2007 Tahoma Environmental Award 2012 Puget Sound Champion - Puget Sound Partnership 2012 Port of Tacoma - Environmental Stewardship Award 2010 Port of Tacoma Community Vitality Partner Award 2010 Environmental Excellence Awards Midnight Sun, North Star, Westward Venture & Great Land - Chamber of Shipping of America 2005 WA State Governor s Award for Pollution Prevention and Sustainable Practices

Shorepower

Rain Gardens at Port of Tacoma

LNG The Future of Domestic Shipping

Low Cost Energy LNG costs 41% less than IFO-380 Stable Pricing Large fixed capital costs Low feed-stock costs Domestic sourcing reduces volatility from geopolitical impacts Benefits of LNG Clean Sulfur Oxide (SOx) emissions are 95% lower than ECA limits Reduces SOx, Particulate Matter (PM) and Nitrous Oxide (NOx) by almost 100% Safe Zero fatalities over the 40-year life of the industry

Project Overview First conversion in the world of vessels of this type Six MAN engines will be converted to dual fuel diesel LNG propulsion 5 year estimated timeline Estimated $80+ million budget

Phased Project 35-40% of work will be conducted underway, limiting the out of service time to regular dry docking schedule Structural components built during regulatory dry docking in Q1 2014 Use of regularly scheduled singlesailing weeks LNG available for in-port use in Q2/3 2014

EPA & USCG Partnership Aug. 2012 - limited waiver from North American ECA during conversion to LNG First permit issued under Annex VI, Reg. 3 Required completion Sept. 2016

Shoreside Capacity Project helps establish long-term supplies of LNG for use by other sectors of the transportation industry in the Puget Sound

Breaking Barriers Environmental benefits will extend throughout the region Break through supply barriers that have constrained the growth of LNG in the transportation industries

Commitment to Community 1% of gross revenues donated back to communities

Thank you Questions? Phil Morrell pmorrell@totemocean.com www.totemocean.com

LNG & the Future of the U.S. Domestic Maritime Industry Phil Morrell Vice President, Marine & Terminal Operations

LNG Conversion of Two Orca Class Vessels in Alaska Trade Two new 3100 TEU LNG-Powered containerships for the Puerto Rico Trade

The North American Emission Control Area Challenge and Opportunity

Possible Solutions Do nothing: Cost of 1% compliant IFO 380 is 30-40% higher with further increases expected in 2015 Install exhaust gas cleaning system: Scrubbers use existing fuel with added costs Convert to Natural Gas: Meet all current and future emissions requirements, cleanest of all options

Clean & Safe Fuel Conversion to natural gas will reduce ship emissions 95% below even the most world's most stringent air quality standards that are outlined in the North American Emissions Control Areas LNG will virtually eliminate Sulfur Dioxide (SOx), Particulate Matter (PM), Carbon Dioxide (CO2) and Nitrous Oxide (NO2) and far exceeds any other fuel source for environmental safety

Orca Conversion Built for Alaska Trade 33,000 MMBTU of LNG needed per week, per ship Dual fuel capable Bunker in Tacoma or Anchorage Minimal out of service time during conversion

New LNG Ships Puerto Rico service 3100 TEU First LNG container ships in the world Dual fuel capable Bunker in Jacksonville or San Juan First delivery in late 2015

Advantages Jones Act Playing a Significant Role in U.S. Maritime Innovation Dedicated trade lanes Long-term capital investments Consistent weekly bunkering requirements

Now is the Time Clear window of opportunity to develop LNG supply infrastructure for maritime industry For vessels spending a third of their time or more in the ECA, LNG is a viable alternative We predict a boom in the construction of dual fuel, LNG powered vessels