DALLAS FLOODWAY PROJECT

Similar documents
Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

Lower San Joaquin River Feasibility Study PLAN FORMULATION ADDENDUM

Hydrology and Flooding

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report

APPENDIX A. Project Scoping

Holly Swartz and Jason Shirey

CHAPTER 9 DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS

SECTION 7.0 PROJECT FEASIBILITY, ENGINEER S RECOMMENDATION AND DESIGN ISSUES NEEDING RESOLUTION

US Army Corps of Engineers

Concept, Feasibility & Mobility Studies. Southport Connector Expressway

Distribution Restriction Statement

Hydrologic and Ecologic Impacts from the CERP Indian River Lagoon South Project

PREFACE PREFACE. Red Rock. Project. Master Plan Project. Master Plan 2015

U.S. Army Corps of Engineers Permit Application Tips

SEATTLE DISTRICT CIVIL WORKS PROGRAM

SECTION 11: REGULATORY FLOODWAYS

Fargo-Moorhead Metropolitan Area Flood Risk Management Project

Will be modified map from GIS 6/16 EOD

Marysville Levee Commission

US Army Corps of Engineers

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY

REVIEW PLAN. Trinity Parkway, City of Dallas, Texas Section 408 Submittal. Ft. Worth District

RIVERSIDE OXBOW FORT WORTH, TEXAS CHAPTER 3 IDENTIFICATION OF PROBLEMS AND OPPORTUNITIES

Notice No Closing Date: May 12, 2017

WATERSHED MANAGEMENT INITIATIVE: GOALS & IMPLEMENTATION OBJECTIVES, JULY 26, 1999

Santa Clara River Watershed Feasibility Study. Information Meeting City of Santa Clarita August 16, 2007

LOWER BOISE RIVER INTERIM FEASIBILITY STUDY

Greenfield Pond B Rehabilitation

NOTICE OF PREPARATION

Blanche Park Reservoir Decision Notice and Finding of No Significant Impact

Phase II Report on Hydrology, Hydraulics, and Low Water Dams

New Castle County, DE. Floodplain Regulations

CHAPTER 7. San Dieguito River Flooding Adaptation

PRESENTERS. Contact Information: RW Armstrong Union Station, 300 S. Meridian St. Indianapolis, IN

Freight Street Development Strategy

J O I N T P U B L I C N O T I C E

Environmental Information Worksheet

Port of Camas/Washougal Levee Recertification and Engineering Analysis Request for Proposal May 3, 2011

Sovereign Lands and Great Salt Lake

Chapter 11 Culverts and Bridges

LOWER CACHE CREEK, YOLO COUNTY WOODLAND AREA FEASIBILITY STUDY

PUBLIC NOTICE LOS ANGELES DISTRICT. APPLICATION FOR PERMIT Port of Los Angeles Berths : Wilmington Waterfront Promenade

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives. December 14, 2017

Willamette National Forest McKenzie River Ranger District

Folsom Dam Water Control Manual Update

FINDINGS: Olsson used a three-step analysis strategy to develop a benefit cost ratio that would indicate the relative feasibility of this project.

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

Chehalis Basin Strategy Programmatic SEPA Draft EIS

RECORD OF DECISION MAY RIO GRANDE FLOODWAY, SAN ACACIA TO BOSQUE DEL APACHE UNIT FLOOD RISK MANAGEMENT PROJECT SOCORRO COUNTY, NEW MEXICO

APPENDIX F. SECTION 404(B)(1) EVALUATION SHORT VERSION. Herbert Hoover Dike Dam Safety Modification Study

Appendix D - Evaluation of Interim Solutions

Agency Scoping Meeting

Community. Restoration. Prevention.

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017

Project Goals and Scoping

Outcomes. Kelly Karll-SEMCOG Margaret Barondess - MDOT

U. S. Army Corps of Engineers Charleston District Overview

STREAM RESTORATION PURPOSE, PRACTICE, AND METHODS. By Marcus Rubenstein, CPESC

Municipal Stormwater Management Planning

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

US Army Corps of Engineers and Stream Restoration Permitting

Municipal Class Environmental Assessment for Pottersburg Creek Slope Stability Study South of Hamilton Road, Schedule B

Detailed Project Report Menomonee River Section 206 Milwaukee, WI June 2014

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

Poly Met Mining, Inc. Antidegradation Review - Preliminary Determination for 401 Certification

Adjusted Flood Prone Acres

Constructed Wetland Pond T-8

South St. Vrain / Hall Meadows Restoration Planning August 20, 2015

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN

Doyle Park Reconstruction Project Improving Flood Control Facilities to Meet a TMDL

MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY?

WETLANDS AND OPEN WATERS Compensatory Mitigation Definitions of Factors

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

Appendix J Hydrology and Hydraulics

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Public Notice ISSUED: March 14, 2018 EXPIRES: April 13, 2018

HUNTING BAYOU FLOOD RISK MANAGEMENT, HARRIS COUNTY, TEXAS DRAFT GENERAL REEVALUATION REPORT AND INTEGRATED ENVIRONMENTAL ASSESSMENT

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

PUBLIC NOTICE. REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd 30 DAY NOTICE Littleton, CO FAX (303)

Requirements and Considerations for Non- Residential Floodproofing ASFPM 2014

Coastal Texas Protection and Restoration Project

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E.

Solano Multi-Species Habitat Conservation Plan

Initial Application of a Landscape Evolution Model to a Louisiana Wetland

UPPER MISSISSIPPI RIVER COMPREHENSIVE PLAN

LITTLE ROCK DISTRICT CORPS OF ENGINEERS WATER SUPPLY

REQUEST FOR STATEMENT OF QUALIFICATIONS SOQ #

HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification

SAN FRANCISCO DISTRICT

Public Notice. Applicant: Lennar Homes Project No.: SWF Date: October 29, Name: Mr. Darvin Messer Phone Number:

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS

KRISTOPHER J. KRZYSTON, CEI, CEM

15A NCAC 07H.0209 COASTAL SHORELINES (a) Description. The Coastal Shorelines category includes estuarine shorelines and public trust shorelines.

PUBLIC NOTICE. Dredging with ten-years maintenance, return flow to the waterway and upland placement. Georgica Cove, tributary of Georgica Pond

Transcription:

DALLAS FLOODWAY PROJECT DRAFT FEASIBILITY REPORT and DRAFT ENVIRONMENTAL IMPACT STATEMENT PUBLIC MEETING Rob Newman Director, Trinity River Corridor Project, Fort Worth District 8 May 2014 US Army Corps of Engineers 1

Purpose of This Public Meeting Describe the Proposed Action and the Recommended Plan for the Dallas Floodway Project to the public Summarize the potential impacts associated with the Project Solicit comments from the public on what clarification or revisions should be incorporated into the Final Environmental Impact Statement (EIS) and Feasibility Report 2 BUILDING STRONG

Two Documents: Environmental Impact Statement and Feasibility Report EIS Proposed Action Adheres to NEPA process Discloses impacts Facilitates design and construction under Section 408 permitting process Feasibility Report Recommended Plan Adheres to Corps of Engineers Civil Works Planning Process Formulates for maximum economic benefits Determines which actions suitable for federal support and sets project federal-local local cost-shareshare proportions 3

Proposed Action Presentation Overview Description of the Proposed Action contained in the Draft Environmental Impact Statement Impact Statement Results of the Impact Analysis Conclusions Opportunities for Ongoing Public Involvement 4

Proposed Action: Background The Proposed Action represents the culmination of decades of planning by the city and the citizens of Dallas. Since 2007, the U.S. Army Corps of Engineers has been a partner in the development and planning of the Trinity River Corridor features. 5

Proposed Action: Overview Flood Risk Management Ecosystem Restoration ti Recreation Enhancements Interior Drainage Improvements 6

Flood Risk Management (FRM) 4 Main Elements Levee raise AT&SF Bridge modification Levee flattening Nonstructural flood control improvements 7

FRM: Levee Raise 1500-year Flood Existing Levee Elevation 429.40 40 Trinity Parkway Flood Protected Elevation 419.06 100-year Elevation 417.06 Same as 1908 flood of record Ground Elevation about 400.00 May 1990 47-year Flood Elevation 415.24 June 2007 5-year Flood Elevation 408.38 Average low flow conditions that stay within the river channel of the Dallas Floodway Elevation 382.00 8

FRM: AT&SF Bridge Modification Remove embankments and remaining narrowly spaced wooden piers that block flood flows Retain a 350-foot section of historic wooden trestle associated with the Santa Fe Trestle Trail 9

FRM: Levee Flattening Modify the levees to a 4:1 slope Benefits of the shallower slope: safer mower maintenance, and reduced d risk of slides The excavation of material would double as the preliminary excavations for the West Dallas Lake 10

FRM: Nonstructural Improvements The City of Dallas currently has a very advanced effective warning system and Emergency Action Plan (EAP) Improved inundation mapping and data sharing can help improve EAP revision and implementation 11

Ecosystem Restoration and Recreation Enhancement Balanced Vision Plan Study Ecosystem Restoration and Recreation Enhancements West Dallas Lake Lakes Urban Lake Natural Lake River Relocation and Modification Wetlands Athletic Facilities General Features Interior Drainage Outfall Modifications Able Sump Ponds Marshlands Cypress Ponds Corinth Wetlands Potential Flex Fields Playgrounds River Access Points Parking and Public Roads Lighting Vehicle Access Pedestrian Amenities Restrooms Amphitheaters e Pump Station Outfalls Pressure Sewer Outfalls Recreation and Ecosystem Enhancements 12

Ecosystem Restoration and Recreation Enhancement: Lakes The Proposed Action includes three lakes: West Dallas Lake Urban Lake Natural Lake Rendering of rowing on the West Dallas Lake Rendering of Reunion entrance to the promenade and Urban Lake Rendering of view across the Natural Lake 13

Ecosystem Restoration and Recreation Enhancement: River 8 miles of the river channel would be modified River meanders would improve water quality and habitat 14

Ecosystem Restoration and Recreation Enhancement: Wetlands Rendering of Marshlands alongside Proposed Lake 3 main areas of wetlands: Marshlands Cypress Ponds Corinth Wetlands Rendering of Corinth Wetland 15

Ecosystem Restoration and Recreation Enhancement: Recreational Facilities Flex fields and playgrounds River Access Gathering and entertainment Venues Trails 16

Interior Drainage System Improvements Interior Drainage Plan Improvements East Leveeee West Levee Demolish Old Hampton Pump Station Construct New Hampton Pump Station Nobles Branch Sump Improvements Demolish Charlie Pump Station Construct New Charlie Pump Station Rehabilitate Existing Delta Pump Station Construct New Delta Pumping Station Eagle Ford and Trinity-Portland Sump Improvements Construct New Trinity-Portland Pumping Plant 17

Alternatives Considered No Action Alternative Alternative 2: Proposed Action with the Parkway Alternative 3: Proposed Action without the Parkway Notable Differences Feature Alternative 2 Alternative 3 Change (from 2 to 3) Bike Path 0 miles 3.4 miles + 3.4 miles Flex Fields 77.8 acres 88.1 acres + 10.3 acres Amphitheaters 2 3 + 1 Meadow 1,259.5 acres 1,230.0 acres - 29.5 acres Park Road 9.6 miles 11.8 miles + 2.2 miles Planter Boxes (raised vegetation) 4.9 acres 14.7 acres + 9.8 acres Secondary Pedestrian Path 17.5 miles 16.9 miles - 0.6 miles Wetlands 201.3 acres 206.7 acres + 5.5 acres Parking Area 17.75 acres 19.75 acres + 2 acres Number of Access Gateways 25 29 + 4 18

Cumulative Analysis As part of impact analysis, the Proposed Action is considered on its own, and in concert with other past, present, and reasonably foreseeable future projects. 19

Environmental Consequences 20

Environmental Consequences 21

Environmental Consequences 22

Environmental Consequences 23

Environmental Consequences Alternative 2 is the U.S. Army Corps of Engineers Preferred Alternative and has preliminarily determined it to be the Least Environmentally Damaging Practicable Alternative. ti 24

Recommended Plan Presentation Overview Review Flood Risk Management Plan Results of Comprehensive Analysis Overview of the Recommended Plan in the Draft Feasibility Report Feasibility Report Recommended Plan 25

Review of Flood Risk Management Plan U.S. Army Corps of Engineers and City of Dallas utilized an integrated approach for identifying a Flood Risk Management Plan for improving the levee system Utilized results from economic analyses and risk assessment Analyzed both structural and non-structural measures Feasibility Report Recommended Plan 26

Flood Risk Management Recommended Plan Identified Three (3) recommended actions: About $10 million dollars total AT&SF Bridge modifications/partial removal Raise the levees to contain a 277,000 cubic feet per second (cfs) flow This flow equates to a 2,500-year flood event Improvements to the City s Emergency Action Plan Feasibility Report Recommended Plan 27

Comprehensive Analysis The Water Resources Development Act in 2007 (WRDA 2007) directed the Corps to ensure that the Balanced Vision Plan and Interior Drainage Plan are technically sound and environmentally acceptable Technical soundness is determined by completing comprehensive analysis of hydrology and hydraulics* (H&H), geotechnical and civil design Environmental acceptability is determined by completing National Environmental Policy Act (NEPA) process *H&H analysis determines the amount of runoff, depth, extent, and velocity of the flood waters coming down the river Feasibility Report Recommended Plan 28

Comprehensive Analysis Conclusions Trinity Parkway, Balanced Vision Plan (BVP) and Interior Drainage Plan (IDP) features have been determined individually to be technically sound at current level of design Potential negative impacts related to deviations from 1988 Record of Decision (ROD) criteria are insignificant; a variance to ROD is currently proposed With slight modifications of the expected design refinements, all features would function on a comprehensive system wide level from a Corps Civil Works perspective Feasibility Report Recommended Plan 29

Recommended Plan WRDA 2007, Section 5141, authorized $459 million total budget for Recommended Plan Includes cost share of 65% federal and 35% non-federal The City can spend a portion of its cost share portion before the Corps begins spending money Feasibility Report Recommended Plan 30

Recommended Plan (Alternative 2) The cost share portion of the project cannot exceed the WRDA 2007 authorization of $459 million plus inflation The cost share portion includes flood risk reduction and ecosystem restoration Remaining BVP and IDP projects will be constructed by the City through the Section 408 process Accommodates Trinity Parkway construction by other entity Feasibility Report Recommended Plan 31

Recommended Plan (Alternative( 2) FLOOD RISK MANAGEMENT: Levees Raise levee low spots along 9.3 miles of levees to meet 277K flow Low spots to be filled from borrow area of future site of West Dallas Lake Modify AT&SF Bridge 3:1 to 4:1 slopes may be funded by City Interior Drainage Baker Pump Station Able Pump Station Hampton Pump Station ECOSYSTEM RESTORATION: River Relocation Adds meanders back to river Builds habitat pools to improve aquatic diversity Corinth Wetlands Expands existing wetland; Corps participates in excavation and plantings City may construct recreational features such as boardwalks and trails Feasibility Report Recommended Plan 32

Recommended Federal Plan (Alternative 2) 33 Feasibility Report Recommended Plan

Recommended Plan (Alternative 2) Cost Sharing Summary Total Cost: $529.1 million Federal Cost: $343.9 million Non-Federal Share: $185.2 million 5% cash on Flood Risk Management: $10.4 million Estimated Credit: $115.5 million Lands, Easements, Rights of Ways and Relocations: $59.3 million Bottom line for City: 10.4 million + $59.3 million = $69.7 million still needed Feasibility Report Recommended Plan 34

Public Involvement HOW TO PROVIDE COMMENTS The Draft EIS Public Review Period runs from Comments received here were incorporated into the Draft EIS April 18th to June 2. Comments are being taken here in writing and spoken to a recorder. Comments may also be emailed or via US Mail. Submit your comments We are here now no later than June 2 nd. For additional information June-Sept. 2014 on how to comment, visit Final opportunity to the sign in table. comment on the EIS September 2014 This is your best opportunity to be involved December 2014 the in final development of this action! 35