SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

Similar documents
SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION FLEXIBLE PAVING

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG):

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas.

SECTION A1 EXCAVATION AND BACKFILL GENERAL

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

SECTION BITUMINOUS CONCRETE PAVEMENT

Student Services & Classroom Addition

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

REQUEST FOR PROPOSAL Asphalt & Concrete Repair

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction

550 Surface Treatments

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

PERMEABLE INTERLOCKING PAVERS

Section 505. CHIP SEALS

CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

Municipality of Waterville Public Sidewalk Repair Policy

A. Testing Laboratory Services: Section B. Excavation, Site Fill and Rough Grading: Section Sub-Base Course Material (If requested).

Asphalt Paving

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

S-1 (2356) BITUMINOUS SEAL COAT REVISED 9/26/07 SP Mn/DOT 2356 is deleted and replaced by the following:

Municipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL

BID # REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER

BASE CONSTRUCTION MATERIALS A Aggregate

2014 Capital Project Phase 3 Grand Island Central School District Cannon Design Project No SECTION PAVING PART 1 - GENERAL

Section 25 Aggregate Subbase

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING)

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

SPECIFICATIONS FOR NEW WORK CHIP SEAL

Table of Contents for Guide Specifications

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

NYSDOT TRANSPORTATION MAINTENANCE DIVISION PAVING PROJECT QUALITY ASSURANCE ASSESSMENT Rating Guidelines (Revision #1)

Section 508. CHIP SEALS Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal.

CONSTRUCTION SPECIFICATION FOR KEYHOLE EXCAVATION AND PERMANENT REINSTATEMENT OF KEYHOLE CORES TABLE OF CONTENTS

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

SPECIFICATIONS FOR SAND SEAL

IGGA Guide Specification: Conventional Diamond Grinding for Pavement Preservation Introduction

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL

Cement Stabilized Soil (CSS) (Portland cement)

Maintenance & Rehabilitation. Treatments. Crack Sealing. Sealant Types. Asphalt Pavement Preservation: Identification of Alternative Treatments

INVITATION TO BID ON TOWN PAVING PROJECTS

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 600 ASPHALTIC CONCRETE CONSTRUCTION

SECTION 23 ASPHALT CONCRETE TABLE OF CONTENTS

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

TRANSPORTATION & PUBLIC WORKS DEPARTMENT TECHNICAL STANDARDS

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

Bituminous Concrete Base Course (Type HB, Black Base, B-25.0, and B-37.5)

Select Subgrade Material, Compacted

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

GWINNETT COUNTY STORM SEWER PIPE STANDARDS

SECTION TRENCHING & BACKFILLING

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

PROPOSAL PACKET CITY OF MASCOUTAH HUNTERS TRAIL PAVING. BID DATE: 9:00 a.m., August 31, 2017

SECTION 23 - ASPHALT CONCRETE TABLE OF CONTENTS

CITY OF FARGO SPECIFICATIONS CONCRETE SIDEWALKS AND DRIVEWAYS

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS.

SECTION 7 STREET DESIGN

4-07 Asphalt Treated Permeable Base (ATPB)

DIVISION 32 EXTERIOR IMPROVMENTS

MIDLAND COUNTY ROAD COMMISSION

Construction Specification for Utility Cut and Restoration

BITUMINOUS MIXTURE # 13A BID SHEET

A. Submittal Procedures: See Article 13 of the General Conditions.

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method

SECTION UNCLASSIFIED EXCAVATION AND GRADING

MISSISSIPPI DEPARTMENT OF TRANSPORTATION

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

PERMIT TO EXCAVATE IN HIGHWAY CHESHIRE, CONNECTICUT

KANSAS CITY METROPOLITAN CHAPTER OF THE AMERICAN PUBLIC WORKS ASSOCIATION

Sidewalk Replacement Criteria The following are the criteria used to determine if sidewalk needs to be replaced in the City of Watertown:

Curb Ramps [ 4.7.3] [ 4.7.2; 4.8.2; 4.1.6(3)(a)] [ 4.3.7] ADA Accessibility Survey Instructions Curb Ramps Page 1 of 6

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

Town of Wascott Advertisement for Bids ROAD MAINTENANCE PROJECTS

January 2008 No. 700

Construction Specification for Concrete Unit Pavers

SECTION MEASUREMENT AND PAYMENT

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES

Manual of Infrastructure Standards

5. Partially filled fuel tanks within the building shall be pumped empty. The oil and tanks shall be removed and deposed of in a legal manner.

CITY OF SANTA ANA PROPOSAL PROJECT NO.: CHESTNUT AVE & BUSH/CYPRESS BIKE LANES FAID#: U58DP005861

SECTION 301 SELECTED MATERIAL SUBBASE DESCRIPTION

Transcription:

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Trench Restoration... 14.1 14-3.01.A Roadways with pavement less than 3 years old... 14.1 14-3.01.B Roadways with 3 to 5 year old pavement... 14.2 14-3.01.C Roadways with pavement greater than 5 years old... 14.2 14-3.02 Repair to areas damaged by Contractor s Operations... 14.2 14-3.03 Asphalt Concrete... 14.2 14-3.03.A Density requirements... 14.3 14-3.04 Seal Coats... 14.3 14-3.04.A Slurry Seal (Type 2)... 14.3 14-3.04.B Sand Seal... 14.3 14-3.05 Shoulders... 14.3 14-4 CONCRETE... 14.4 14-5 PAVEMENT MARKINGS... 14.4 14-6 TEMPORARY PAVING... 14.4 14-7 MEASUREMENT AND PAYMENT... 14.5

SECTION 14 RESTORATION OF SURFACES 14-1 GENERAL All existing curbs, gutters, sidewalks, driveways, road shoulders, pavement, and similar items removed, damaged or displaced during the Work must be restored by the Contractor. Restoration must be done using the same types of materials as in the original construction, and to not less than the original dimensions, subject to minimum requirements specified herein, as shown or as specified in the Contract, or as directed by Agency. All work must be constructed to match current standards and must match the appearance of the existing improvements. 14-2 PRIVATE ROADS Trench compaction must conform to the requirements in Section 19, Trench Excavation, Bedding and Backfill, of these Specifications. Where asphalt surfacing exists, the surface restoration must match the corresponding portions of the existing private road but not be less than 2 inches of asphalt concrete over 4 inches of Class 2 aggregate base. Aggregate base and asphalt concrete must be as specified in Section 14-3, Streets and Parking Lots, in this Section of these Specifications. Where gravel, stone, or crushed rock surfacing exists, surface restoration must match the existing surface of the private road but not be less than 4 inches of Class 2 aggregate base. The remaining gravel or stone roadway must be reshaped to preconstruction cross sections and given an application of a minimum of 2 inches of 3/4 inch maximum size gravel or crushed rock compacted into place. The restored surface of a private road must be at least equivalent to the preconstruction surface condition. 14-3 STREETS AND PARKING LOTS Attention is directed to the requirements in Section 12, Safety and Construction Area Traffic Control, of these Specifications. Subgrade preparation must be performed in accordance with Section 18, Earthwork, and the aggregate base materials and placement must meet the requirements of Section 22, Base Material, of these Specifications. Repaving of trenched areas must be in accordance with Section 23, Asphalt Concrete, and Standard Drawing 4-64, of these Specifications. 14-3.01 Trench Restoration Edges of trench restoration must be cut/ground so that edges are parallel or perpendicular to the centerline of the roadway. Sand/slurry/fog seal must be placed so that edges are parallel to or perpendicular to the centerline of the roadway. Edges of existing pavement that are broken or damaged must be removed and neatly trimmed back to stable and undisturbed base and surface materials. For locations where the existing pavement is severely fractured, remove loose asphalt to the nearest crack beyond the specified restoration limits, as directed by the Agency. Intermediate trench backfill, per Standard Drawing 4-64, must be in accordance with Section 19-2.03, Trench Backfill, of these Specifications. Repaving of trenched areas must be in accordance with Standard Drawing 4-64, including shallow, trench, deep trench, and earth saw trench details, with the following exceptions: 14-3.01.A Roadways with pavement less than 3 years old County Code Section 12.09.120 prohibits excavations in newly constructed or overlaid roadways for a period of 3 years. In circumstances such as emergency repair work where no other feasible options exist, the Sacramento County Dept. of Transportation may grant a waiver 14.1

to this restriction. If a waiver is granted, the applicant must be prepared to meet more stringent restoration requirements than those in these Specifications. 14-3.01.B Roadways with 3 to 5 year old pavement For cuts in pavement that have been constructed or overlaid within 3 to 5 years, grind a minimum of 1-1/2 inches from lane line to lane line or edge of pavement/lip of gutter and overlay with asphalt concrete. The 1-1/2 inch grind depth is a minimum. The grinding must produce a stable surface for new pavement material. A seal coat is not required. 14-3.01.C Roadways with pavement greater than 5 years old 14-3.01.A(1) Minor Roadways Alternate 1 Eliminate the tee portion of asphalt restoration shown on Drawing 4-64, and limit the extent of paving to the projected area above the trench. Follow the trench paving with a minimum 1-1/2 inch grind and overlay from center of roadway to edge of pavement/lip of gutter. The 1-1/2 inch grind depth is a minimum. The grinding must produce a stable surface for new pavement material. Alternate 2 Slurry or sand seal from edge of pavement/lip of gutter to centerline of roadway and a minimum of 2 feet beyond the trench paving limits. Limit sand seal applications to 250 square feet or less or as directed by the Agency. 14-3.01.A(2) Roadways With 2 or More Lanes in Each Direction or 45 MPH or Greater Posted Speed The 1-1/2 inch deep grind must be from lane line to lane line or edge of pavement/lip of gutter. The 1-1/2 inch grind depth is a minimum. The grinding must produce a stable surface for new pavement material. A seal coat will not be required. 14-3.02 Repair to areas damaged by Contractor s Operations Areas of existing asphalt surfaces damaged during construction must be removed and replaced to a depth equal to the existing asphalt but not less than 4 inches on collector and minor roadways and 6 inches on major roadways. The top 4 inches of base material below the damaged asphalt must be re-compacted to a minimum relative compaction of 95 percent. Base or underlying material that is wet, loose, or otherwise unsuitable for supporting new paving must be removed to a maximum depth of 12 inches below the bottom surface of the new asphalt pavement section and replaced with aggregate base material per the requirements of Section 22, Base Material, of these Specifications. Aggregate base material must be compacted in layers not exceeding 6 inches in depth to a minimum relative compaction of 95 percent. If unsuitable materials exist below this depth, an approved geotextile fabric must be installed prior to placing the aggregate base. 14-3.03 Asphalt Concrete The asphalt concrete must conform to requirements specified in Section 23, Asphalt Concrete, of these Specifications. If the existing pavement surfacing is rubberized asphalt, the top layer of new asphalt surfacing must also be rubberized. Special attention should be given to section 23-3.02, Binders, of these Specifications, which specifies that Conventional dense graded asphalt used on on-ramps, off-ramps, arterial streets and thoroughfare streets must use PG70-10 binder. An asphalt paving machine must be used for placing the finish lift of asphalt concrete paving on all trench restorations. Limited areas inaccessible to mechanical spreading and compaction equipment or where irregularities or unavoidable obstacles exist may be spread, raked and luted by hand tools or other methods approved by the Agency. Final pavement surface for trenches greater than 3 feet in width and mostly parallel to the centerline of the street must not vary from the edge of a 10 foot straight edge (placed parallel and perpendicular to the trench) by more than 3/8 inch, except at intersections or changes in 14.2

grade. Final pavement surface for trenches 3 feet or less in width, bore holes having an area less than 50 square feet, and trenches of any width not mostly parallel to the centerline of the street must match the smoothness of the existing pavement and the final pavement surface grade must not be greater than 3/8 inch above a line between the existing pavement surface at each edge of the excavation. Final pavement below this line is not acceptable. Pavement not meeting the above requirements must be removed to a minimum depth of 1-1/2 inch for the full width of the trench and replaced. The minimum length of removal along the trench is 4 feet beyond the ends of the non-conforming areas but must not exceed the limits of the original pavement repair. 14-3.03.A Density requirements The density of the asphalt pavement must be between 92 and 97 percent. Densities between 90 and 92 percent may be considered acceptable on a case-by-case basis at the descretion of the County Department of Transportation. The Agency may require testing of the asphalt concrete used in pavement restoration to verify that the materials being placed conform to these specifications. Density of asphalt concrete for quality control purposes may be determined in accordance with Section 23-8.05.A, Density Requirements, of these Specifications. At the Agency s request, the Contractor must provide quality assurance testing per Section 23-9, Asphalt Concrete Placement Acceptance Testing, of these Specifications. Asphalt not meeting the above-specified compaction requirements will be rejected on a lot basis. 14-3.04 Seal Coats 14-3.04.A Slurry Seal (Type 2) Slurry seal must be furnished and placed as specified in the State Specifications, except that the requirement for a tack coat is waived. The final product must be 1 layer between 1/8 and 1/4 inch thick. 14-3.04.B Sand Seal Sand seal must be furnished and placed as specified in the State Specifications, except that the asphaltic emulsion and aggregate must be as follows: The asphaltic emulsion for sand seal must conform to the requirements in Section 50-17, Asphalt, Liquid Asphalt, and Asphaltic Emulsion, of these Specifications. The asphaltic materials must be CRS 1. The rate of application of CRS 1 must be between 0.08 and 0.15 gallons per square yard as directed by the Agency, depending upon the surface condition and weather. Aggregate for sand seal must conform to the State Specifications, and must be spread at the rate of 6 to 10 pounds per square yard or as directed by the Agency. Preparation of seal coat, applying bituminous binder, spreading, and finishing must be in accordance with the State Specifications, with the exception that steel wheeled rollers for sand seal may be eliminated and the pneumatic roller used for all seal operations. Asphaltic emulsion must be applied by a distributor truck. 14-3.05 Shoulders Surface restoration of trenches located in a shoulder within 6 feet of the traveled way must consist of a structural section equal to the original, or as shown on the Plans, but having a minimum of 6 inches of aggregate base compacted to a relative compaction of 95 percent of ASTM D-1557. 14.3

14-4 CONCRETE Repairs to concrete curbs, gutters, sidewalks, driveways, and other concrete surfaces must be made by removing and replacing the entire portions between joints or scores, except as follows: Curb and gutter must be replaced between saw cuts so that the remaining or new curb and gutter will not be less than 4 feet in length, measured from the saw cut to the nearest score mark, expansion joint, construction joint, or weakened plane joint. The entire width of sidewalk must be replaced between saw cuts for a length of not less than 4 feet providing the remaining sidewalk is not less than 4 feet in length, measured from the saw cut to the nearest score mark, expansion joint, construction joint, or weakened plane joint. Driveways must be replaced as directed by the Agency, either completely or partially, by saw cutting in the middle of the driveway. Existing driveways not in conformance with current ADA requirements must be completely removed and replaced to conform to current requirements. In accordance with section 4-18 of the County of Sacramento Improvement Standards and the American with Disabilities Act (ADA), California Code of Regulations, Title 24, and the California Manual on Uniform Traffic Control Devices, any modification of any portion of an intersection requires access improvements to all corners of that intersection. Re-construction of existing sidewalk ramps as a result of damage to the sidewalk ramp is considered a modification to a portion of the intersection. All existing corners of an intersection where sidewalk ramps are not in conformance with current ADA requirements must be completely removed and replaced to conform to current requirements. Curb dowels and reinforcing must be provided in accordance with Section 27-6 of these Specifications Replacement must be in accordance with the applicable requirements, including the placement of Aggregate Base Class 2 under the new concrete as specified in Section 27, Curbs, Gutters, Sidewalks, and Drainage Structures, of these Specifications, except provisions for payment, for the type and classification of work set forth in other Sections of these Specifications. Pedestrian access must be maintained in accordance with Section 12-2.02, Pedestrian and Bicyclist Access, of these Specifications. 14-5 PAVEMENT MARKINGS Except where specified otherwise in these Specifications or the Special Provisions, the Contractor must replace all crosswalks, legends, and other permanent pavement markings and raised markers that have been disturbed, destroyed, or covered by the Work. Damaged pavement legends must be completely removed, and crosswalks must be removed from edge of road to edge of road for minor streets or from edge of road to median or centerline for roadways with 2 or more lanes in each direction or 45 mph or greater posted speed in accordance with Section 13-2.09, Removal of Traffic Stripes and Pavement Markings, of these Specifications, and a sand seal or slurry seal conforming to section 14-3.03, Seal Coat, of these Specifications, must be applied. Seal coat must cover the entire pavement surface and extend a minimum of 6 inches past the areas where the legend has been removed. All edges of seal coat must be perpendicular or parallel to the centerline of the roadway. Pavement markings must then be replaced in accordance with Section 48-2, Thermoplastic Traffic Stripes and Pavement Markings, of these Specifications. 14-6 TEMPORARY PAVING Temporary paving must be placed and maintained at locations wherever excavation is made through pavement, sidewalk, or driveways, and as shown on the Plans or as directed by the 14.4

Agency. Temporary paving must be placed as soon as the condition of the backfill is suitable to receive it and must remain in place until the condition of the backfill is suitable for permanent resurfacing. Asphalt concrete Type "A, conforming to Section 23, Asphalt Concrete, of these Specifications, must be used as temporary paving on all roadways with 2 or more lanes in each direction or 45 MPH or greater posted speed. Temporary paving in all other paved areas may be asphalt plant-mix cutback, unless otherwise directed by the Agency. Thickness of temporary paving must be 1-1/2 inch unless otherwise shown on the Plans. In sidewalk areas, temporary paving must be at least 1 inch thick. Temporary paving must be maintained at the same level as the existing pavement until the permanent surfacing is placed. Temporary pavement must be replaced with permanent pavement within 30 Calendar Days of when it was first placed, unless approved in writing by the Agency. All temporary paving must be identified by painting the words TEMPORARY PAVEMENT along with the name of the contractor responsible for maintaining the temporary paving material and the date on which the material was placed. Painted text must be in white lettering at the beginning, ending, and along the length of the temporary paving at maximum intervals of 500 feet. The text must be neatly stenciled a minimum 5 inches in height and must be maintained in a neat and legible condition. Temporary pavement and/or portions of temporary pavement totaling 1000 feet or greater in length must also be identified with a construction sign placed along the edge of the roadway and constructed in accordance with Section 23 Asphalt Concrete of these Specifications. Temporary pavement signs must be 30 by 30 inches in a diamond configuration and must be orange with 5 inch black lettering. Signs must be installed at the beginning, ending, and at maximum intervals of 1000 feet and within the road right of way whenever possible. Signs must not be installed in a location that would obstruct visibility or create an obstacle for pedestrians. The property owner s permission must be obtained if signs are placed on private property. 14-7 MEASUREMENT AND PAYMENT The lump sum price paid for items of work included in the Contract for restoration of surfaces removed, damaged, or displaced by the Work includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved, complete in place, as shown or as specified in the Contract, specified in these Specifications, and as directed by the Agency. If no item is included in the Contract for restoration of surfaces, full compensation for conforming to the provisions in this Section, not otherwise provided for, is included in the prices paid for the various items of work involved, and no separate payment will be made. Temporary paving will be measured for payment by weight of asphalt concrete placed in the Work, in accordance with Section 23-11, Measurement and Payment, of these Specifications. The price paid per ton for temporary paving includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in temporary paving, complete in place, as shown or specified in the Contract, as specified in these Specifications, and as directed by the Agency. If there is no item in the Contract for temporary paving, full compensation for conforming to the provisions in this Section, not otherwise provided for, is included in the prices paid for the various items of work involved, and no separate payment will be made. 14.5