Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania

Similar documents
Informational Meeting- March 31, Boxelder B-2/B-3 Watershed Planning Study

Informational Meeting- July 21, Boxelder B-2/B-3 Watershed Planning Study

Notice No Closing Date: May 12, 2017

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

Visual Inspection Checklist

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

United States Army Corps of Engineers. Addicks and Barker Dam Safety Update

ROLES AND RESPONSIBILITIES Small Pond Approval. SWM MD-378 Pond Checklist Training 10/17/07. Exemptions EMBANKMENT HEIGHT. Height of Dam Weir Wall

Construction Inspection Checklists

Volume 2, Chapter 10 - Storage

V. DRAINAGE IMPROVEMENTS

Temporary Watercourse Crossing: Culverts

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

Rapid Drawdown at Embankment Dams, Is it a REAL Concern?

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION

Mill Pond Dam Modifications Feasibility Study

APPENDIX A EARTHEN EMBANKMENT. VERSION 1.0 March 1, 2011

DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety

Sediment Basin. Fe= (Depends on soil type)

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Chapter 11 Culverts and Bridges

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring

Water Control Structures Selected Design Guidelines Alberta Environment Page 17-1

Prepared for Urban Drainage and Flood Control District

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

TEMPORARY SEDIMENT TRAP CODE

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

POND CONSTRUCTION. Woodland Steward Series

New Castle County, DE. Floodplain Regulations

III. INVENTORY OF EXISTING FACILITIES

ARTICLE V: STORMWATER MANAGEMENT AND DRAINAGE SYSTEMS

RIPARIAN CORRIDOR STUDY FINAL CITY CREEK MANAGEMENT PLAN TABLE OF CONTENTS

Chapter 12 Storage. Contents. Overview... 1

TVA Colbert Fossil Facility Ash Disposal Pond 4

Lower San Joaquin River Feasibility Study PLAN FORMULATION ADDENDUM

Information for File # PRH

NOTICE OF PREPARATION

Filter Tube Barriers (Instream)

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

Dam Safety Inspection Checklist

Types of Inspections. Prior to Inspection. Types of Inspections. Typical Inspection Equipment. Embankment Dams

LOW WATER CROSSINGS, fords, or drifts, as they

Extended Detention Basin (EDB) Sedimentation Facility

DTE Energy St. Clair Power Plant

Holly Swartz and Jason Shirey

Coal Combustion Facility Assessment Report. October 20, 2010

9.2 STANDARD CONSTRUCTED WETLANDS

Constructed Wetland Pond T-8

Looking at Dam Safety from a Resiliency Perspective. February 23, 2017

Constructed Wetland Use in Nonpoint Source Control

q Item meets standard Project ID: X Item not acceptable Contractor: N/A Item not applicable Inspector: C Item requires engineer s cert.

Dam Failure Hazard Profile

SECTION 11: REGULATORY FLOODWAYS

Dam Safety & Planning: Examples of Collaboration and Lessons Learned

Kentucky Dam Safety and Floodplain Compliance

RIPARIAN CORRIDOR STUDY FINAL PARLEYS CREEK MANAGEMENT PLAN TABLE OF CONTENTS

DAM SAFETY INSPECTION REPORT GLENWOOD LAKE DAM CLASS B, INTERMEDIATE HAZARD DAM

SANTA ANA RIVER/ SAN TIMOTEO CREEK 1 LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #

Stormwater Local Design Manual For Houston County, Georgia

Green River Diversion Rehabilitation

June 22, Francis E. Borcalli, P.E.

Good morning, Chairman Yaw, Chairman Yudichak, Chairman Vulakovich, Chairman Costa,

In re: Town of Norwich Pool Dam Reconstruction, Stream Alteration Permit Application

MODEL Stormwater Local Design Manual. City of Centerville

Application for resource consent Form B Damming and diversion of water

SKAGIT COUNTY PLANNING AND DEVELOPMENT SERVICES FINDINGS OF FACT. APPLICATION NUMBER: Shoreline Substantial Development Application PL

Farmington Dam Repurpose Project

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

Honeysuckle Reservoir decommissioning

Appendix D - Evaluation of Interim Solutions

STREAMBANK RESTORATION DESIGN

Appendix J Hydrology and Hydraulics

Municipal Stormwater Ordinances Summary Table

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

Municipal Class Environmental Assessment for Pottersburg Creek Slope Stability Study South of Hamilton Road, Schedule B

Freight Street Development Strategy

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Table of Contents. 5-5 Release Rates Year Allowable Release Rate WQCV Release Rate EURV Release Rate...

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08

Table of Contents. Attachments Attachment A Photos Attachment B Site Map. Pages 3 of 9

Table of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10

Hydrology and Flooding

PRENTISS CREEK (SUB-E) KENSINGTON PLACE CONCEPT PLAN VILLAGE OF DOWNERS GROVE, ILLINOIS AUGUST, 2011

PAPERWORK REDUCTION ACT A. GENERAL

APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS

REROUTING DRAINAGE SYSTEMS

f) Culverts in series shall be spaced at least 20 feet between each other. 2.7 C Culverts

DRAFT GREATER MOOSES TOOTH TWO (GMT2) DEVELOPMENT PROJECT PERMITTEE RESPONSIBLE WETLANDS MITIGATION PLAN NATIONAL PETROLEUM RESERVE-ALASKA

Public Notice ISSUED: June 29, 2017 EXPIRES: July 31, 2017

a landowner whose parcel was subjected to the discharge of a neighbor's ditch which was being used to drain a swamp;

Will be modified map from GIS 6/16 EOD

Phase II Report on Hydrology, Hydraulics, and Low Water Dams

Dam Maintenance Fact Sheet

Stream Reaches and Hydrologic Units

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA

DIVISION 5 STORM DRAINAGE CRITERIA

Erosion and Sediment Control Plan for a Timber Harvesting Operation

Transcription:

Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania

Project Authorization USDA's Small Watershed Program is carried out under the authority of the Watershed Protection and Flood Prevention Act of 1954; Public Law 83-566. The watershed program helps communities meet local resource needs, including: Flood protection & Control for agricultural land and urban areas Fish and wildlife habitat Conservation practices & Water quality improvement Irrigation & Water supply Water-based recreation & Recreational areas Erosion and sediment control Project Program PL 106-472, the Small Watershed Rehabilitation Amendments of 2000, which amends PL 83-566, Watershed Protection and Flood Prevention Act.

Project Location

Project Objectives Meet or exceed state and federal dams safety criteria. Maintain or enhance the current level of flood protection. Maintain or enhance water supply storage. Maintain the current recreation opportunities. Maintain aquatic wildlife and terrestrial wildlife habitat.

Project Purpose Maintain or improve the current level of flood damage reduction provided by the Core Creek Dam (PA-620) for public safety, bridges, roads, agricultural and other lands, buildings, structures, infrastructure, and other features. Maintain or improve the recreational and habitat values of Lake Luxembourg and adjacent riparian lands. Comply with current applicable design, performance and safety criteria for High Hazard Class dams. Maintain the water supply availability provided by the Core Creek Dam and Lake Luxembourg.

Project Need Continue providing flood damage reduction downstream from the dam and address applicable NRCS and Commonwealth of Pennsylvania standards and design criteria for public health and safety to reduce the risk of loss of human life. Continue supporting and improving the recreational uses and aquatic and terrestrial wildlife habitat directly dependent upon Lake Luxembourg and its surrounding riparian lands. Continue providing public water supply availability from Core Creek Dam and Lake Luxembourg.

Rehabilitation Planning Process Local input Sponsor determines objectives Public scoping meetings Establish problems and opportunities Detailed planning study Topographic Surveys Habitat assessments Sediment study Dam safety inspection Engineering analysis of structure and appurtenances Hydrologic and hydraulic modeling Water supply reviews Consideration of breach inundation studies Formulate alternatives Review local input

Alternatives Considered 1) No Action/Future without Federal project 2) Federal decommissioning with other downstream measures 4) Relocate the downstream structures potentially impacted 5) Floodproof downstream structures potentially impacted

Goals for Rehabilitation Rehabilitate the dam to current NRCS High Hazard Class dam design criteria. Extend the service life for at-least an additional 50 years. Enhance the current water supply storage. Comply with PA-DEP dam safety regulations.

Rehabilitation Alternatives Feature Existing Condition Alt. 1 Alt. 2 Alt. 3 Alt. 4 Alt. 5 Alt. 6 Alt. 7 Top of Dam Elevation (feet) 118.0 118.0 120.5 119.2 118.0 118.0 118.0 118.0 Maximum Water Surface Elevation (feet) Auxiliary Spillway Crest Width (feet) Auxiliary Spillway Crest Elevation (feet) Principal Spillway Conduit Length (feet) Estimated Percent of Least Cost Alternative 119.79 117.93 120.44 119.13 117.84 116.79 117.05 116.79 550 1,200 550 800 550 550 A 430 B 550 C 111.9 113.2 113.2 113.2 110.5 112.9 112.9 112.8 224.3 280.0 295.0 288.0 280.0 280.0 315.0 280.0 N/A 655% 123% 226% 144% 100% 203% 156% A Alternative 5 uses a labyrinth weir to provide a total crest length of 2,229 feet within the actual spillway width of 550 feet. B Alternative 6 uses a labyrinth weir to provide a total crest length of 2,540 feet within the actual spillway width of 430 feet. C Alternative 7 uses Fusegate (labyrinth style) to provide a similar flow capacity to a labyrinth weir option. The maximum WSEL is estimated based on the design for the Alternative 5 labyrinth weir. A more detailed design could be prepared in the future with the consultation of the Fusegate manufacturer, Hydroplus.

Rehabilitation Maintain existing dam at current location and crest Elevation 118.0. Extend the service life for an additional 57 years. Replace the Auxiliary Spillway control section with a labyrinth weir. Armor the Auxiliary Spillway downstream of the labyrinth weir with roller compacted concrete. Construct an upstream cutoff wall, downstream scour protection, and a riprap apron. Reinforce the downstream face of the embankment with fill at 3.75H:1V slope. Extend the existing Principal Spillway conduit and the existing toe drain conduits. Construct a new S.A.F. Basin at the outlet of the Principal Spillway conduit.

Rehabilitation

Rehabilitation

Rehabilitation to Current High Hazard Class Dam Criteria Feature Existing Condition Alternative 5 Top of Dam Elevation (feet) 118.0 118.0 Maximum Water Surface Elevation (feet) 119.79 116.79 Auxiliary Spillway Crest Width (feet) 550 2,229-foot weir length Auxiliary Spillway Type Vegetated Earth Labyrinth Weir Auxiliary Spillway Crest Elevation (feet) 111.9 112.9 Principal Spillway Conduit Diameter (inches) 60 60 Principal Spillway Conduit Length (feet) 224.33 280 Principal Spillway Riser Type Single Stage Single Stage Principal Spillway Conduit Type Reinforce Concrete Pipe Reinforce Concrete Pipe Estimated Installation Cost $6,187,500

Preferred Alternative Proposal for your consideration: Rehabilitate Core Creek Dam (PA-620) to current High Hazard Class dam design criteria. Extend the service life for an additional 57 years plus 3 years implementation time. Comply with PADEP dam safety regulations. Agenda