PRESENTATION THE AUGMENTATION OF WATER SUPPLY TO THE CENTRAL AREA OF NAMIBIA AND THE CUVELAI: THE WATER SUPPLY SITUATION IN:

Similar documents
Water Issues in Cyprus

Phil Mashoko(Pr Eng) Director: W & S City of Cape Town South Africa

TECHNICAL SUMMARY OF WATER ACCOUNTS

Colorado River Challenges Impacts to Southern Arizona

Africa Adaptation Project Namibia

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project

NAMIBIA: Assessing Recharge to the Southeast Kalahari Artesian Basin

IUCN WATER DEMAND MANAGEMENT COUNTRY STUDY NAMIBIA

Key Challenges Facing Water Resource Management in South Africa

Water Account, Mauritius 2013

INTEGRATED WATER RESOURCES MANAGEMENT PLAN FOR NAMIBIA AUGUST 2010 PREPARED FOR:

Botkin & Keller: Environmental Science: Earth as a Living Planet, 8th Edition APES- Chapter #18- Water Supply, Use and Management.

University of Milan Department of Agricultural and Environmental Sciences Production, Landscape, Agroenergy

WATER MANAGEMENT STRATEGIES FOR RIBEIRAS DO ALGARVE, PORTUGAL

CFWI STORMWATER SUBTEAM PROJECTS REPORT. Steering Committee Meeting

UrbanSAT- Urban System Analysis Tool : For delivering urban water balancing and reporting

South Florida Water Management District Future Directions. Melissa Meeker, Executive Director

Session 3: Water accounts

Issue paper: Aquifer Water Balance

STORMWATER HARVESTING FOR ALTERNATIVE WATER SUPPLY IN VOLUSIA COUNTY, FLORIDA

John M. Stomp III, PE

Good practices in water reuse governance

Cape Town water outlook 2018

A regional public water supply scheme for the Mekong Delta Design in phases of a transmission-distribution network

Predicting Unmet Irrigation Demands due to Climate Change An integrated Approach in WEAP

Tel-Aviv - City Background

Amortized annual capital cost ($) + Annual Operating Cost ($) = Unit Cost ($/acre-foot) Annual beneficially used water production in acre-feet (AF)

The Impacts of Climate Change on Portland s Water Supply

Tweed Shire Demand Management Strategy & Water Supply Augmentation Options Study A Brief Technical Review

Water Crisis! What Water Crisis?

Desalination Plans to Solve Water Scarcity

Country Profile - Republic of Korea INFORMATION

Introduction of Chinese Cooperation Initiatives on Scientific Research under CEWP. Sun Yan Research Coordinator, MWR 20 June, 2013 Brussels

Questions and Answers about the Water Supply and Water Quality bond act for the November, 2018 ballot. Updated November 17, 2017

ABDULRAHMN ALDAKHEEL. King Saud University Riyadh, Saudi Arabia

POTABLE WATER ELEMENT

Non-Conventional Resources for Irrigation Water Demand in Egypt

HYDROLOGY, IRRIGATION DEMAND AND SUPPLY: AN INTEGRATED MODELLING APPROACH USING MATLAB

ROLES AND EFFORTS OF THE IRRIGATION SECTOR IN MYANMAR AGRICULTURE PRACTICE

Zambezi River Basin Challenges and Issues

Section 5 Packages. 5.1 Package Development Problem Statements A 5-1

PASO ROBLES GROUNDWATER BASIN: WATER SUPPLY FRAMEWORK, HISTORY, AND CURRENT CONDITIONS. CCVT Sustainable Ag Expo.

The State of the Colorado River

Water Management Plan

Supply and Use in SEEA Water account example. John Power Australian Bureau of Sta4s4cs Centre of Environment Sta4s4cs

MAJOR THEMES IN ARIZONA S WATER FUTURE

Hydraulic Policy in Spain Teodoro Estrela Deputy Water Director Ministry of Environment, and Rural and Marine Affairs Spain

SLIDES: Status of Southern Nevada Water Authority (SNWA): Third Intake into Lake Mead and Groundwater Project

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

NGWA INFORMATION BRIEF

Evaluation of Sustainable Water Demand in a Coastal Environment using WEAP Model

IMPLEMENTING WATER REFORM IN QUEENSLAND, AUSTRALIA CASE # 24

What is a representative pan factor value for the eastern Pilbara? Aditya Jha

Water resources management: case study of Sharkia governorate, Egypt

U.S. Water Budget. Figure Source:Data from The Nation s Water Resources , Vol. 1, U.S. Water Resources Council.

Water Management Representatives

Vision 2030: The resilience of water supply and sanitation in the face of climate change Chee-Keong CHEW 28 October 2009

STRAWMAN OUTLINE March 21, 2008 ISWS/ISGS REPORT ON THE OPPORTUNITIES AND CHALLENGES OF MEETING WATER DEMAND IN NORTH-EAST ILLINOIS

Stormwater as an Alternative Source of Water Supply: Feasibility and Implications for Watershed Management 1

Raw Water Supply Master Plan Development

NBI strategic water resources analysis Phase I findings

Watersheds and the Hydrologic Cycle

Reviews. Economic Evaluation of Stormwater Harvesting A Case Study. Dharmappa Hagare 1, Prasanthi Hagare 2 and Mikell Borg 3

Water Security for Sustainable Development: The challenge of Scarcity in the Middle East & North Africa

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge

City of Moscow University of Idaho Water Reclamation and Reuse Program

City of San Diego Pure Water Project October 2014

Paso Robles Groundwater Basin Management Plan A Focus on Voluntary Actions to Improve the Sustainability of Our Water Supply

Water Reuse: Orlando s Experiences & Perspectives. Rick Howard, PE Public Works Director

Environmental and Social Impact Assessment for Rogun Hydro Power Plant

THE CUVELAI-ETOSHA BASIN MANAGEMENT APPROACH: ASSESSING WATER RESOURCE MANAGEMENT IN THE IISHANA SUB-BASIN

Pasquia Area Drainage and Pumping System

Water Management in Phuket. Water Management in Phuket

Climate change and groundwater resources in Lao PDR

MMWD Drought Resiliency Committee Meeting

UNESCO EOLSS. The various methods available for the treating and disposing of treated sewerage in natural receiving water bodies are outlined.

MMEA, WP5.2.7 Mining Deliverable D

GROUNDWATER IN THE VOLTA BASIN

INTEGRATED ECONOMIC-ENGINEERING ANALYSIS OF CALIFORNIA'S FUTURE WATER SUPPLY EXECUTIVE SUMMARY

The Zambezi River Basin: Potential for Collaborative Water Resource Research

A Risky Climate for Southern African Hydro: Assessing hydrological risks and consequences for Zambezi River Basin dams

DRAFT Master Water Reclamation Plan. City Council Meeting March 28, 2017

Estimating Agricultural Water Consumption impacts on water level fluctuations of Urmia Lake, Iran

Colorado River Basin Water Supply and Demand Study. WRRC 2013 Conference University of Arizona Tucson, AZ March 5, 2013

DISCUSSION PAPER INTEGRATED WATER RESOURCES MANAGEMENT IN ISRAEL

OVERVIEW CAPACITY & CONDITION

ESTIMATION OF IRRIGATION WATER SUPPLY FROM NONLOCAL WATER SOURCES IN GLOBAL HYDROLOGICAL MODEL

Farzad Emami Manfred Koch

INVEST CAPE TOWN. Long Term Vision for the Water Sector. Presented by Lance Greyling Director: Enterprise & Investment

Fresh Water Treaty. International Setting and Issues in Water, Environment and Development

Climate Change and the Eastern Mediterranean Precipitation Regime

Climate Change Adaptation in Europe and Spain. Cities.

Developing Metrics & Indicators for the California Water Plan. CA Sustainability Indictors Symposium February 23, 2011

Pipelines to Nowhere? Structural Responses to Climate Change and Population

Desalination. Section 10 SECTION TEN. Desalination

1.6 Influence of Human Activities and Land use Changes on Hydrologic Cycle

ASSESSMENT OF SALINITY INTRUSION IN THE RED RIVER UNDER THE EFFECT OF CLIMATE CHANGE

John Anderson. Afton Water Solutions Australia

San Diego, A Cadillac Desert; Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager

Water Status in the Syrian Water Basins

Transcription:

PRESENTATION THE AUGMENTATION OF WATER SUPPLY TO THE CENTRAL AREA OF NAMIBIA AND THE : THE WATER SUPPLY SITUATION IN: THE AREA OF NAMIBIA & THE CENTRAL AREA OF NAMIBIA 1. PROJECT BACKGROUND 2. THE CENTRAL AREA 3. THE AREA 1 2 1. PROJECT BACKGROUND 1.1 PROJECT PRINCIPLES Separate consultancy teams: Engineering Component Environmental & Social Component Client liaison via the Project Steering Committee Long-term planning: Planning horizon: up to 2050 1 st Part of the Project: Desk study, pre-feasibility investigation 3 Phases to the Project: 1 st Phase: Assessment of the water demands and water resources 2 nd Phase: Yield assessments, concept schemes, public participation 3 rd Phase: Evaluation of schemes, public participation 1. PROJECT BACKGROUND 1.2 PROJECT OBJECTIVE Project objective: To examine all nominally feasible options for securing the long term water supply to the Central Area of Namibia and the Cuvelai area of Namibia where existing sources might become inadequate in the near future 3 4 Page 1

1. PROJECT BACKGROUND 1.3 PROJECT TEAMS Engineering Consultancy Team: Lund Consulting Engineers CC & Seelenbinder Consulting Engineers CC (JV) Environmental Engineering Services Manfred Redecker Consulting Engineer Pedro Maritz Civil Consultant Professional Environmental Technologies Dynamic Water Resources Management The Maproom AECOM Environmental & Social Consultancy Team: Sustainable Solutions Trust & Others Southern African Institute for Environmental Assessment 5 1. PROJECT BACKGROUND 1.4 PROJECT AREA 6 2. THE CENTRAL AREA OF NAMIBIA 1. The Central Area of Namibia (CAN) 2. Configuration of infrastructure and water sources in the CAN 3. Overview of population and growth rates, history of water supply, water supply infrastructure, economic importance, water demand projections: Details in Report 4. Water supply sufficiency: available resources and projected water demands 5. Water supply options 6. Water supply and demand modelling 7. Conclusions 8. Considerations and options 2. THE CENTRAL AREA OF NAMIBIA 2.1 THE CENTRAL AREA OF NAMIBIA Approximate extent of the Central Area of Namibia 7 8 Page 2

22 20 18 16 14 12 10 8 6 4 2 0 22 20 18 16 14 12 10 8 6 4 2 0 Sales Low Expected High Financial Year Sales Low Expected High Financial Year CONFIGURATION OF INFRASTRUCTURE & WATER SOURCES IN THE CENTRAL AREA OF NAMIBIA (CAN) CAN 2.4.2 Simplified Future Demand Scenario (1) 2013 SALES: 32.85 Mm 3 /a 2013 SOURCE ABSTRACTION: 36.68 Mm 3 /a Sales and Demand in Mm 3 /a 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044 2046 2048 2050 2050 Shortfall: 55 Mm 3 /a Likely Scenario Demands Resource Capacity: 31.45 34.11 Mm 3 /a Simplified Comparison: No hydrological variation! 9 10 THE AUGMENTATION NE OF Otjozondjupa WATER SUPPLY TO THE CAN AND : ADDITIONAL AREAS 1. 5. HISTORIC BRIEF WATER SUMMARY CONSUMPTION OF FINDINGS & WATER DEMAND PROJECTIONS Otjiwarongo (±2040) Omaruru (±2021) Legend: Local resources may become insufficient Areas not currently served Okondjatu Windhoek Otjinene (±2041) NE Otjozondjupa & N Omaheke Talismanis- Lister- Rietfontein CAN 2.4.4 Simplified Future Demand Scenario (2) Likely Scenario Demands Augmentation: Omaruru, Otjiwarongo & Otjinene NE Otjozondjupa & N Omaheke 2050 Shortfall: 76 Mm 3 /a Resource Capacity: 31.45 34.11 Mm 3 /a Sales and Demand in Mm 3 /a 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 Simplified Comparison: No hydrological variation! 2020 2022 2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044 2046 2048 2050 11 12 Page 3

2. THE CENTRAL AREA OF NAMIBIA 2.5 WATER SUPPLY OPTIONS 1. Previous assessments: Covering the ENWC, abstraction from the Kunene / Orange Rivers 2. Not considered: Eiseb & Gobabis Aquifers, Zambezi River 3. Aquifers with insufficient information: Tsumeb & Kalahari Aquifers 4. Aquifers with insufficient capacity: Platveld, Otjiwarongo, Omaruru, Osona, Rehoboth, Nauaspoort - Oamites 5. Surface water sources: Friedenau, Oanob & Hardap Dams (insufficient capacity) 6. Okavango River, Desalination 13 CAN Scenario 3: 2.6.3 Results: Medium-Term Scenarios Reduce losses at Scenario 2: Upgrade Von Bach Water 95% Von Bach Water Treatment Plant: N$ 40 million (40) Treatment Plant: N$ 26 million (7) Scenario 5: Supply from Abenab Mine: N$ 518 million (518) Scenario 4: Complete the WMARS: N$ 688 million (545) Scenario 6: Upgrade Gammams & add. reclamation plant: N$ 788 million (605) Total: N$ 1.5 billion (1.2) 14 CAN 2.6 SUPPLY / DEMAND MODELLING 2.6.4 Long-Term Supply Options CAN 2.6.5 Results: Scenario 7 (Okavango) 1. No other water resources large enough within the CAN 99% Percentile Values 2. Only two supply options identified: a. Okavango River abstraction b. Desalinated sea water from the coast 3. Neither option can be fully implemented in less than 8 10 years? 4. Shortfalls can be expected until full implementation of one of these sources Design & Construct Supply Augmentation Scenario 6: all upgrades up to 2021/22: N$ 1.5 billion Scenario 7 Okavango River: Abstraction: 64.05 Mm 3 /a or 2.44 m 3 /s Scenario 8 Desalination: Abstraction: 57.07 Mm 3 /a or 1.54 m 3 /s 15 16 Page 4

2. THE CENTRAL AREA OF NAMIBIA 2.7 CONCLUSIONS Phase I (assessments of water resources & demands): complete Supply / demand modelling has been conducted using the CA-Model The CAN faces a major water supply problem: No inflow in 2015/16: Run-dry date: May / June 2016 Even with normal rainfall / runoff: Crippling water shortages are to be expected in future Medium-Term Strategy: Reducing the shortfalls up to 2022/23: N$ 1.5 billion Long-Term Strategy: Plan, Design & Construct long-term augmentation scheme to have water reach the CAN by May 2022 17 2. THE CENTRAL AREA OF NAMIBIA 2.8 CONSIDERATIONS & OPTIONS Environmental and social analyses: Scenario 3: VBWTP supernatant recycling to reduce losses Scenario 4: WMARS expansion Scenario 6: Waste water treatment & advanced reclamation Scenario 7: Okavango abstraction Scenario 8: Desalination? Further considerations: Additional demands of Omaruru, Otjiwarongo & Otjinene? Additional demand in Windhoek (+10% or +21%), NE areas? Water demands along possible pipeline routes Public participation Infrastructure upgrades required Costing and other evaluations: Phase 3 18 3. THE AREA OF NAMIBIA 1. The Cuvelai Area of Namibia 2. Overview of water supply in the Cuvelai area 3. Overview of population and growth rates, history of water supply, water supply infrastructure, economic importance: Details in Report 4. Water resources: Surface Water: Kunene River & Surface flow in the iishana Groundwater 5. Historic consumption: 2005/06 2012/13: 69% of abstraction at Calueque unaccounted for 6. Water demands & supply 7. Summary of current situation 8. Water supply options 3. THE AREA OF NAMIBIA 3.1 THE AREA OF NAMIBIA 19 20 Page 5

3. THE AREA OF NAMIBIA 3.1 THE AREA OF NAMIBIA 3. THE AREA OF NAMIBIA 3.1 THE AREA OF NAMIBIA Rivers, Basins, Pans and Lakes (Mendelsohn et. al., 2009) 2008 Population Densities (LCE, 2011) Population Density across Namibia (Mendelsohn et. al., 2009) 21 22 3. THE AREA OF NAMIBIA 3.2 WATER SUPPLY IN THE AREA 3. THE AREA OF NAMIBIA 3.2 WATER SUPPLY IN THE AREA 146 km of canals 5 Purification Plants, 37 Pump Stations (106 pump sets) 48 Reservoirs 1,359 km of Bulk (NamWater) Pipelines 4,873 km of Rural (DWSSC) Pipelines 23 24 Page 6

3. THE AREA OF NAMIBIA 3.2 WATER SUPPLY IN THE AREA 3. THE AREA OF NAMIBIA 3.6 WATER DEMANDS & SUPPLY Demand scenarios: Low likely, Likely, High Likely Population growth rates: Different for urban & rural Water demand norms and losses: Different for urban & rural Known future developments incorporated Details in the Urban water demands Report Rural water demands Irrigation water demands 1. Total water demands 2. Water demands per zone 3. Total abstraction requirements at Calueque 25 26 3.6 WATER DEMANDS & SUPPLY 3.6.1 Total Water Demands: Urban, Rural & Irrigation 3.6 WATER DEMANDS & SUPPLY 3.6.2 Water Demands per Supply Zone Supplied by the Oshakati Purification Plant 27 28 Page 7

3.6 WATER DEMANDS & SUPPLY 3.6.3 Abstraction Requirements at Calueque 189 Mm 3 /a 3. THE AREA OF NAMIBIA 3.7 SUMMARY: CURRENT SITUATION Phase I (assessments of water resources & demands): complete The Kunene River should have sufficient supply capacity: 2050 Required abstraction < 6 m 3 /s allowable 95% Yield: 19.3 m 3 /s Monthly flow has in the past been < 31.10 Mm 3 /m (6 m 3 /s x 2) (?) Need for storage provision (?) No redundancy of supply: Single point and source of supply Geopolitical concerns Future development unknown, water quality may deteriorate 29 30 3. THE AREA OF NAMIBIA 3.8.1 Groundwater in the Cuvelai Area 1. Groundwater resources to the east and west of the area 31 32 Page 8

3.8.1 Groundwater in the Cuvelai Area 3.8.1 Groundwater in the Cuvelai Area 2049/50: Zone 7: 103 BHs Zone 8: 131 BHs 2049/50: Zone 2: 229 BHs Zone 3: 621 BHs Zone 4: 276 BHs 33 34 3. THE AREA OF NAMIBIA 1. Groundwater resources to the east and west of the area: Insufficient 2. Water reclamation and reuse: Non-potable reuse 3. Surface water sources, incl. Lake Oponono: Not feasible 4. Desalination of saline ground water: Investigations underway 5. Ohangwena II Aquifer: Investigations underway 3.8.5 Ohangwena II Aquifer Extent BGR, 2014 35 36 Page 9

3.8.5 Ohangwena II Aquifer 3.8.5 Ohangwena II Aquifer Schematic Layout of the Ohangwena Aquifers (after BGR, 2013) Transmissivity (BGR, 2014) 37 38 3.8.5 Ohangwena II Aquifer 3.8.5 Ohangwena II Aquifer Specific Capacity (BGR, 2014) Water Quality for Human Consumption (BGR, 2014) 39 40 Page 10

3.8.5 Ohangwena II Aquifer (BGR, 2014 & 2015) 3.8.5 Ohangwena II Aquifer Supply Area: 5,170 km 2 Depth: 189 372 m below surface; average: 235 305 m Average thickness: 65 m Stored volume: 20.68 billion m 3 (40 m thickness) Potential sustainable abstraction: 6 Mm 3 /a ± 30 Boreholes @ 30 m 3 /h each; N$ 30 million (BHs only) Potable water demand: 2013: 16.68 (12.53) Mm 3 /a ~ 36% (47%) 2050: 29.15 (24.99) Mm 3 /a ~ 21% (24%) (Human demand only) Ohangwena II Aquifer supply: 6 Mm 3 /a 41 42 3.8.5 Ohangwena II Aquifer Supply 3. THE AREA OF NAMIBIA 1. Groundwater resources to the east and west of the area: Insufficient 2. Water reclamation and reuse: Non-potable reuse 3. Surface water sources, incl. Lake Oponono: Not feasible 4. Desalination of saline ground water: Investigations underway 5. Ohangwena II Aquifer: Investigations underway 6. Abstraction from the Kunene River at Ruacana: Investigations underway Ohangwena II Aquifer supply: 6 Mm 3 /a 43 44 Page 11

3.8.6 Abstraction from Ruacana 3.8.6 Abstraction from Ruacana 45 46 3.8.6 Abstraction from Ruacana 3. THE AREA OF NAMIBIA 1. Groundwater resources to the east and west of the area: Insufficient 2. Water reclamation and reuse: Non-potable reuse 3. Surface water sources, incl. Lake Oponono: Not feasible 4. Desalination of saline ground water: Investigations underway 5. Ohangwena II Aquifer: Investigations underway 6. Abstraction from the Kunene River at Ruacana: Investigations underway 7. Abstraction from the Okavango River (?) Public participation Infrastructure upgrades required Costing and other evaluations: Phase 3 47 48 Page 12