While underfloor air. Learning objectives

Similar documents
DISPLACEMENT VENTILATION

Underf loor For Schools

Evaluation of Underfloor Air Distribution

MEP's Letter of Assurance

Chilled Beams. The new system of choice?

ASHRAE 62.2: What s New in 2016

LEED And Your Indoor Environment

IECC Commercial Significant Changes Summary Tier I

LEED v4 Building Design and Construction Quiz #8 EQ

YORK UNITIZED ENERGY RECOVERY VENTILATOR (ERV) Superior air-flow 300 6,200 CFM

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection

Energy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort

Insulation, Fireblocking, Draftstopping and Crawl Space Requirements REVISION DATE: JANUARY 2017

Crawl Space Moisture Control

Achieving acoustical standards in the classroom Study of HVAC systems and classroom acoustics

Questar ThermWise Duct Technical Specifications

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

WHITE PAPER. HVLS Industrial Fans Evaluation Guide: 7 Defining Application Design Factors That Will Add Up to a Smart Investment

2001 National Workshop on State Building Energy Codes July th, 2001 Burlington, Vermont

Hardin County Planning and Development Commission

MSC Guidelines for Review of Ventilation System Plans

McCarran International Airport Terminal 3

Chapter 2: Foundation

A. This Section includes ceiling- and wall-mounted diffusers, registers, grilles and louvers.

SECTION AIR DUCT CLEANING

Optimizing Indoor Environments for Occupant Satisfaction. Presented by: Kelli Goldstone April 2016

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters

Dyno Test Rooms Professional Chassis, Engine & Specialty Test Rooms for the PowerSports & Product Testing Market

Construction Indoor Air Quality (IAQ) Management Plan

PRODUCTS DISPLACEMENT VENTILATION ADVANCING THE SCIENCE OF AIR DISTRIBUTION. Redefine your comfort zone.

Is Yours? Homes Across Missouri are Being Built to the Latest National Energy Efficiency Standards

780 CMR: 9 th Edition Massachusetts State Building Code. Presented to: BSA Codes Committee. DATE: January 20, 2016

ACBC Floor Mounted Active Beam

Boulder City NV Prepared by (Print Name) Signature Date

Insight. The Hollow Building. By Joseph W. Lstiburek, Ph.D., P.Eng., Fellow ASHRAE

General Specifications for HVAC System Cleaning

New Montgomery County Elementary School. Construction Indoor Air Quality Management Plan IEQc3.1 IAQ Plan During Construction

WEST VIRGINIA UNIVERSITY ALUMNI CENTER Morgantown, West Virginia

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

A/E Design Deliverable Checklist

PREP + INSULATION. DISCLAIMER: These tools are for illustrative purposes only and

IntelliPak Ton and IntelliPak II Ton Rooftops

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

IRC 2012 Key Changes

Crawl Spaces and Basements: Defining the Building Envelope

A LOOK INTO THE 2015 IECC RESIDENTIAL PROVISIONS. Presented by: Shaunna Mozingo, Colorado Code Consulting

MEP Engineer's Letter of Assurance

SAN MIGUEL COUNTY & TOWN OF MOUNTAIN VILLAGE BUILDING DEPARTMENTS PRESCRIPTIVE ENERGY CODE & GREEN BUILDING STANDARD

15020 LABORATORIES. C. Section Building Automation and Control System Guidelines

Milwaukee, WI. Darron Rempel

DESIGNING COMMERCIAL SUB-SLAB DEPRESSURIZATION SYSTEMS

ANSI/ASHRAE STANDARD , METHODS OF TESTING CHILLED BEAMS

Fundamentals of Test & Balance for Engineers, Cx & Energy Providers Course Number: CXENERGY1619

Inspection of New One- and Two- Family Dwellings

ARPAN JOHARI. Architect. 13/08/10 AW Design. Ahmedabad

FEDERATION TOWER MOSCOW DIFFERENT ROOM CLIMATES UNDER ONE ROOF

BUILDING DESIGN FOR HOT AND HUMID CLIMATES IMPLICATIONS ON THERMAL COMFORT AND ENERGY EFFICIENCY. Dr Mirek Piechowski 1, Adrian Rowe 1

MEP's Letter of Assurance

One and Two Family Additions

Manitoba Energy Code for Buildings. Part 3 Building Envelope

APPROVED. Acceptable to the code official for compliance with the provisions of the applicable Code or referenced Standard.

Advanced Ventilation for Residential applications FBC Res 2010.

WP5.5: Product concepts for high efficiency step by step retrofits

1.02 Related Sections A. Section Heating, Ventilation and Air Conditioning (HVAC). C. Section Pneumatic and Electric Control HVAC.

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

Lock In Energy Savings For Life

ABSTRACT I. INTRODUCTION II. METHODS AND MATERIAL

HCM UNIVERSITY OF ALASKA FAIRBANKS Building Challenges in Alaska UNIVERSITY OF ALASKA FAIRBANKS

Planning for Biomed Facility Puts Energy Efficiency Under Microscope

CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION

Application of Advanced Energy Technologies

Insulation Technologies and Installation Specifications for Better Energy Performance of Commercial Buildings

Can you Believe Energy Savings Forecasts

Rhode Island Commercial Codes FAQs

1. Frozen food warehouses used solely for storage of Class I and II commodities where protected by an approved automatic sprinkler system.

Quality Control Inspection of Homes with Thermal Imaging

You Can Help the Environment with Green Building Technology

Design & Construction Standards, Revised January

Core Building Advances: Introduction to Sustainable Building & Building Science

Michigan Energy Code Training and Implementation Program

2012 Fiscal Impact International Mechanical Code

B. ASHRAE 1991 HVAC Applications Handbook: Chapter 34--Testing, Adjusting and Balancing.

Energy-efficient weatherization

A/E Design Deliverable Checklist

Building & Fire Appeals Board

General Residential Code Requirements

Corridor Pressurization System Performance in Multi-Unit Residential Buildings

AIRCOOL VENTILATORS FURTHER INFORMATION

DIVISION 11 - EQUIPMENT FOOD SERVICE EQUIPMENT LABORATORY FUME HOODS. A. Design Considerations

Using a Aerosol Sealant to Reduce Multifamily Envelope Leakage

Ceiling Radiant Cooling Panels

Encapsulated, Sealed & Closed Crawlspace Installation Manual

Valent Packaged Rooftop Units A Fresh Choice for High-Percentage Outdoor Air Designs. Valent is a business of Unison Comfort Technologies.

Mechanical Product Overview

Office of Design & Construction State University Plaza Albany, New York

INTERIOR ENVIRONMENT

Commissioning for Energy Savings

Radon Vent Pipe System. Labeling Performance Indicators

EADQUARTERS. Thesis Revised Proposal. Stephanie Kunkel Mechanical Option

NEW HOMES PROGRAM 2017 PROGRAM GUIDE

Transcription:

Displacement ventilation best practices Displacement ventilation (DV) is a low-velocity, non-turbulent cooling system for commercial buildings that is not always fully understood. Learn when and where these DV systems can be best used. BY STEVEN M. DAILEY, PE, LEED AP, Harley Ellis Devereaux, Southfield, Mich. Learning objectives Examine the important, yet not always apparent, best practices of displacement ventilation systems. Classify the architectural and mechanical best practices of designing such systems. While underfloor air distribution (UFAD) and displacement ventilation (DV) have had a place in industrial and commercial service for many years now, how many designs have been completed and operated with that if I only knew about that feeling while commissioning the system? DV is a delivery system where non-turbulent air is delivered at or near floor level at higher temperatures than overhead mixing-type systems. It achieves its cooling effects for occupants by the cooler air at floor level contacting the heat sources (people or equipment) in the room, allowing a thermal plume rising at the heat source and it is the driving force in transferring heat from the source via the plume. The heat is carried up to a higher stratified level at the ceiling of the space being cooled, then returned to the air handler from this higher level. All this is accomplished at a very low velocity, typically at 40 ft/min, providing a comfortable, non-turbulent environment. Where DV is often provided from a raised floor system, it should not be confused with a UFAD system common in office buildings and data centers, with this type of system being generally turbulent (highly mixing) in nature. A UFAD system, while sharing aspects of DV, has different design objectives not shared with DV systems. DV systems offer benefits of modularity and flexibility in the workplace, reduced energy costs, reduced particulate contaminates in the occupied spaces, and individual user control of the workplace ventilation. A DV system is a good choice if: The contaminants are warmer and/ or lighter than the room air Supply air is cooler than the room air The room height is 9 ft or more Low noise levels are desired. Consideration of a traditional overhead mixing-supply system may be more advantageous if: Ceiling heights are 8 ft or lower Disturbances to room airflow are strong Contaminants are colder and/or denser than the ambient air Cooling loads are high and radiant cooling is not an option. DE-1 Consulting-Specifying Engineer OCTOBER 2015 www.csemag.com

Considerations in designing a DV system include early upfront coordination with all design trades (architectural, mechanical, electrical, and structural) in addition to consideration of the construction of the facility itself. Only a contractor highly experienced in DV projects (particularly in a raised-floor delivery) should be selected. The contractor selected should present its own list of best practices in the bid submission for the contract. The quality of construction is paramount to the success of such a system. Note that DV is typically not the low-first-cost solution for a facility. Total mixing Architectural best practices If a raised floor system, the floor system should be chosen carefully with minimal leakage and quality seals fixed to the supports, without the ability for the seals to become dislodged if the floor panels are removed and replaced. Whereas DV can be accomplished without a raised floor, the cost of air-distribution material (minimal compared to above-floor delivery) in a raised floor is attractive, and the system is aesthetically concealed. The costs of a quality flooring system may run $8/sq ft to $10/sq ft. Underfloor DV systems are ideal for the open-floor-plan layout. Open-floor plans lend themselves to flexibility and renovation in the future. The engineer should plan for multiple air-delivery systems (e.g., 5,000 cfm to 8,000 cfm) throughout the floor plate creating multiple control zones. This not only adds a tighter degree of temperature control throughout the open space, but helps maintain compliance with ASHRAE Standard 90.1: Energy Standard for Buildings Except Low-Rise Residential Buildings for fanpower limitation. With similar sized and model air handlers, serviceability will be standardized through interchangeable parts (belts, fans, filters, etc.). Redundancy has now been built into the floor s systems by allowing the other units to ramp up temporarily to compensate for a down-blower unit. The use of vertical fan units in lieu of horizontal units can reduce floor space. Enclosed-space floor Figure 1: In this comparison of systems, the overhead mixing (top) uses supply air in the total volume space. Underfloor displacement ventilation (middle) crawls along the floor to reach heat sources. Turbulent underfloor air distribution (bottom) sends jets of air to mix with air from the floor. Courtesy: Price Industries plans require independent terminal zone control and dedicated ventilation measurement and control, more so than the open-floor space scenario, adding cost. If the floor space is comprised of mostly smaller offices or enclosed spaces, careful consideration should be given to a fully ducted centralized supply unit or an overhead mixing system instead. An open-floor layout aesthetically lends itself to an open-ceiling appearance. Whereas the Price Industries Engineering Guide to Displacement Ventilation indicates that a 9-ft ceiling height is minimum, remember how a DV system works: Colder air is introduced at floor level, it warms as the air rises across the heat source in a vertical fashion, and it www.csemag.com Consulting-Specifying Engineer OCTOBER 2015 DE-2

Displacement ventilation accumulates at the top of the space at a much higher temperature where it is then returned. A 9-ft lay-in ceiling height, with a 3- to 4-ft-high plenum space above, may accomplish this adequately, but what about the open-ceiling scenario? A 13- to 14-ft-high floor-to-deck height is recommended for the open-ceiling configuration. Return air should either be ducted to the air-supply blowers spaced throughout the floor, or point returns can be used as high as possible from each blower system as long as the distance from the return inlet to the exterior wall is no more than 40 ft to 50 ft. This point-return layout should be analyzed to ensure noise is not transmitted from the fan room into the space, with consideration of using silencers to mitigate possible noise. In either ceiling scenario, provide insulation on a floor deck above a DV-serviced floor. An uninsulated floor deck will allow heat in the stratified hot air to migrate to the floor above. This can cause nuisance higher temperatures in the floor above in a traditional overhead mixing system, and can wreak havoc in attempting to control an underfloor DV system if above such a DV system below. Insulation types such as foam, board, or batt are economical and effective when used for a concealed, droppedceiling plenum, but an open-ceiling system may require a more attractive solution. Experience has lent to using an epoxy spray-on mixture that, while more costly than traditional insulating materials (approximately $3.80/sq ft at 30-mil to 35-mil thickness), provides an R-0.08 insulating value, is paintable, and does not disrupt the appearance or texture of the finished deck. It certainly is not as effective as traditional insulating materials, but provides some insulating value with a clean finish. Figure 2: Multiple air handlers located on a floor space (at left) is an effective supplyair strategy. Service clearance is important in design consideration (right). Courtesy: Harley Ellis Devereaux Open-communicating stairways between floors should be avoided. The supply air, delivered at floor level in a DV system, is colder than the median room temperature and crawls across the floor and right down the stairwell. A glassed-in enclosure with a door at the landing is an alternative to help contain the supply air on the floor it is serving. Column enclosures should start at the floor slab and extend through the panel with the floor panel sealed to the column enclosure. The enclosure should have an airtight seal at the top and bottom. Construction tightness with a raisedfloor system is very important; without positive seals at the top and bottom of a column enclosure, the whole assembly could act as an air duct allowing the pressurized supply air to escape the underfloor plenum. Wet areas designed within a raisedfloor area should be identified early in the design as monuments, and the floor slab height raised to match the proposed raised floor height. Any moisture spilled into a plenum from a kitchen or toilet area could breed biological growth unwanted in any airstream delivery system. Raise the height of the slab in these areas and supply with low-mounted wall-type DV diffusers. If solid slab, avoid floor-sill exterior glass. Raise fenestration above the floor at least a foot and seal the foot or knee wall extremely well. In a raised-floor design, use a second plenum wall construction immediately adjacent to the exterior wall that can effectively stop infiltration (or exfiltration) from the plenum. Considerations of operable sash areas in a DV-supplied building are complex. If an operable sash is a desirable aspect to your design, limit the areas to small enclosed spaces, rather than open-floorplan areas; carefully seal the floor, walls, and ceiling above and below the raised floor (if present); and provide high-quality, very tightly sealed, shut-off dampers (automatically actuated based on sash switches) within metal transfer ducts to effectively isolate these areas from the rest of the DV system. DE-3 Consulting-Specifying Engineer OCTOBER 2015 www.csemag.com

Exterior wall Interior wall Through exterior walls to outside Slab edges at perimeter Through conduits and junction boxes Wall bases and penetrations Figure 3: Sealing underfloor plenum space is important to maintain supply air pressure to outlets. Courtesy: Price Industries A thermograph study of the enclosure of the building is highly recommended prior to the fit-out of the mechanical systems during the enclosure construction phase. The thermograph, performed on the building s enclosure using temporary air delivery, will identify trouble spots on the building enclosure that could hinder a raised-floor plenum performance. This is especially critical if the discussion is made to retrofit an existing building with a DV system. Mechanical best practices A thorough commissioning process is essential for a DV system. All trades should be involved in the commissioning process. It should be identified that the contractor is responsible for the tightness of the plenum, sealing every single penetration through the raised floor tile and through the slab/structure. Sealing should be carefully observed through the construction process, especially in the core, mechanical rooms, electrical rooms, etc. Remember, this system is not a lowfirst-cost solution and offers performance obstacles if not constructed correctly. Figure 4: A sill-isolation wall can aid in eliminating infiltration. Courtesy: Harley Ellis Devereaux www.csemag.com Consulting-Specifying Engineer OCTOBER 2015 DE-4

Displacement ventilation All floor penetrations must be carefully sealed around an insulated duct at each penetration in a raised-floor system. If solid-slab (non-raised floor) is chosen, coordinate with the architect whether supply air will be ducted from ceiling space below the floor slab or within the same floor level from above. Supply air ducts to the DV diffusers are recommended to come from above in the same floor space. Allow for chases or thickened wall profiles at each drop. Do not place diffusers where items such as rack storage (or file cabinets) or other obstacles will block the airflow from reaching the heat sources (building occupants). Consider final furniture layouts (if known) early in your layout, wall space isn t always available or close enough to the occupants. Raised-floor systems are advantageous because of the flexibility to place the floor outlet at the occupant s location. Final furniture location is not as important in the raised-floor scenario at the early design stage. The final furniture layout is seldom known at an early design stage (or could Locate the perimeter zones and the heating elements far enough so as not to mix with interior cooling zones. change soon after occupancy). Establish load-based criteria for how many outlets should be provided per control zone. Indicate cubic foot/minute range per outlet, document it on drawings, and instruct the contractor to install immediately prior to move-in. Airflow balancing and adjustments should be made during the commissioning phase. Specify a number of spare floor panels (generally 5% additional of anticipated outlets), with precut holes accepting the specified floor outlets. Most floor diffuser outlet manufacturers can provide both a polymer-based outlet for lighter loads such as normal walking, or aluminum construction for heavier rolling loads such as carts or rolling furniture systems. Consider pencilproof and/or high-heel-proof openings. Always select an outlet with a collector cup under the outlet ring. It is not desirable to collect a 32-oz soda (or two) in the plenum space. Carefully select a displacement-type outlet, rather than a turbulent diffuser that would throw the air too high and cause a mixing effect. Manually controlled floor-mounted outlets can be cost-effective for large open spaces, allowing the occupants to customcontrol their comfort zone. Floor outlets should be specified with minimal limiting controls to ensure minimum ventilation rates are provided. In perimeter heating, place fan-powered variable-air-volume (VAV)-controlled heating terminals around the perimeter of the space within the raised floor in areas where access can be afforded (hallways or traffic paths) located out from under proposed furniture locations. Locate the perimeter zones and the heating elements far enough so as not to mix with interior cooling zones. A perimeter zone is typically 15 ft from the exterior glass with no Figure 5: Direct jets of air to remote terminal intakes at the perimeter. Courtesy: Price Industries DE-5 Consulting-Specifying Engineer OCTOBER 2015 www.csemag.com

occupants within these 15 ft. Ductwork from the terminal unit to the floor outlets is required for this system. Extending duct from the underfloor discharge to within 10 ft to 15 ft of the intake to the terminal units will ensure enough air will reach these terminal boxes. Hard duct can be cumbersome to maneuver under a raised floor with the support stanchions associated with such a system. Flexible fabric ducts can be very forgiving in routing around the obstacles of floor supports. Alternately, condition the perimeter zone via linear troughs using either electric or hydronic heating elements. The natural convection from the troughs coupled with a night-setback control strategy (activating heating elements without air-terminal activation) can add efficiency to the overall system. Wall-mounted displacement diffusers with heating elements should be used in perimeter zones for solid-slab systems. Overhead radiant panels may not be as effective as air-based systems in the floor, but such water-based systems are generally more energy-efficient than air-based delivery systems. A finned-tube radiator integrated into the top of a wall-mounted DV outlet is a common configuration. Smaller enclosed spaces, such as conference rooms, require independent VAVbox control serving those spaces, with minimum settings to provide required ventilation rates and occupancy sensors to minimize or shut off air delivery when not in use. The decentralized air-handling blower units in the floor plenum spaces should be compact and accessible. Key components of the units are a supply fan with variable-speed control, primary cooling coil, MERV 8 filters (used with prefilters), control dampers for outside air and return air, and smoke detectors. A key component would be a bypass heating coil that performs the following: Keeps the plenum from super-cooling in a low-load condition Allows humidity control and keeps the plenum supply air from condensing. Figure 6: Enclosed spaces or perimeter zones require individually controlled terminal units. Courtesy: Price Industries Humidity control is an important design consideration in DV because ventilation of outdoor air can account for 50% to 80% of the building moisture load itself, and the occupants generate a lot of moisture. It is important not to let excess moisture into a plenum floor space to prevent unwanted biological growth. Over-ventilating the space with unnecessary outside air amounts is not a good practice in DV. An overhead mixing system is normally designed to induce the outside air into the entire volume of the space. An important aspect of DV is the ventilation air is designed for the breathing-zone space of the occupancy. Because of the buoyant aspect of the displacement delivery near or at the floor, it effectively moves contaminants up and away from the occupants, to the high-return grilles. Per the Engineering Guide to Displacement Ventilation: Typically, mixed-ventilation systems have an average effectiveness of e=0.9. DV systems have a ventilation effectiveness of at least e=1.2, and have the potential for greater ventilation effectiveness when used in combination with a dedicated outdoor air system and radiant heating/cooling systems. Best practice in any DV system lends itself to using a dedicated outdoor air system (DOAS). This provides measured, preconditioned outdoor air to the air blowers throughout the facility using DV. Drying the outdoor air first in the DOAS can aid in control of a desired 30% relative humidity (RH, or less) in the plenum space. By using a total enthalpy wheel in the DOAS (with or without a desiccant wheel for humidity removal) is a very efficient method of energy saving in a DV system. If these best practices are followed with careful design, a DV system can provide flexibility, excellent indoor air quality, energy efficiency, and redundancy that can fit the needs of most open-space occupancies. Steven M. Dailey is a principal and the mechanical engineering discipline leader at Harley Ellis Devereaux. www.csemag.com Consulting-Specifying Engineer OCTOBER 2015 DE-6