LOCATED IN WASHINGTON COUNTY LAND AREA: 8.75 SQ. MI. POPULATION: 14, C/L MILES ODOT DISTRICT 10 CONTAINS 5 STATE ROUTES 1ST SETTLEMENT IN THE

Similar documents
GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

Maintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

NYSDOT Roadway Inventory. Both On and Off the State System

ODOT ADA Program 10/31/2017. Recent ADA outcomes. What you need to know. Settlement Agreement approved. Updated Transition Plan

FINAL INSPECTION OF CONSTRUCTION PROJECTS

NJDOT: Asset Management Strategies and Tools

Roadway Data Extraction Technical Assistance Program (RDETAP) Traffic Safety Conference College Station, June 2016

Alder Drive / Blair Road Bridge Replacement Projects

ROADSIDE SAFETY BARRIER ELEMENTS Module 3

ASSET MANAGEMENT GUIDE

Types of Data. Features. Getting Started. Software Suite

CITY OF LOS ANGELES Sidewalk Repair Program. Amber Elton, PE

REQUEST FOR PROPOSALS (RFP) MUNICIPAL TRAFFIC ENGINEERING SERVICES. Borough of Phoenixville. May 17, 2016

Final CIP Update Joint Board presentation. June 19, 2017

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

NYSDOT TRANSPORTATION MAINTENANCE DIVISION PAVING PROJECT QUALITY ASSURANCE ASSESSMENT Rating Guidelines (Revision #1)

Selecting a Method to Comply with the Requirements for Traffic Sign Retroreflectivity

Asset Management and Data Collection using Digital Video / GPS Data Extraction Techniques

Measures for Highway Maintenance Quality Assurance

Pavement Management Systems PMS PAVEMENT MANAGEMENT SYSTEMS OVERVIEW. Dr. Nick Vitillo

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

NCDOT s Performance Based Contracting Experience in Charlotte. Jennifer Brandenburg, PE State Road Maintenance Engineer July 21, 2009

Performance Based Practical Design (PBPD)

TxDOT Houston District Permit Requirements (Information contained herein is subject to change)

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

Session A: Inventory, Level of Service and Condition Assessment

Designing and Implementing a GIS- Centric Pavement Management System for the City of Alexandria, VA

Minnesota s Transportation Asset Management Plan (TAMP) SASHTO 2014 Tuesday, August 26, 2014

OPEN DATA & PROJECT TRACKER. Michael Chamberlain TPP, Data Management

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

Presented by Henry L. Barbaro Stormwater Management Unit Supervisor MassDOT Highway Division

Automated Permitting and Routing for OS/OW. GIS-T, 2010 Session Jay Adams - Oklahoma DOT

Highway Engineering. 3 _ 2/2 Lecture/Laboratory Hours

Using Random Samples to Assess Roadway Condition. Faith Johnson GIS Specialist, NCDOT

TRANSPORTATION IMPACT STUDIES

MONITORING IMPLEMENTATION AND PERFORMANCE

APPENDIX A: USER S MANUAL RSAP Version 3.0.0

HIGHWAY ENGINEERING II

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

GUARDRAIL WARRANTS FOR LOW VOLUME ROADS

Adaptation to Extreme Weather Events and Climate Change

TxDOT Chip Seal Over Geotextile Fabric. Research Project

Safety. Introduction. Total System

Quotation for Professional Services

MSE Walls Problems and Solutions

LOCATION AND DESIGN DIVISION

Chapter URBAN & RURAL FREEWAY DESIGN

USING REMAINING SERVICE LIFE AS THE NATIONAL PERFORMANCE MEASURE OF PAVEMENT ASSETS

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

State Highway 10A Improvements (from the SH-10 junction extending 6.18 miles east to the SH-100 junction, Muskogee and Sequoyah Counties, Oklahoma)

GIS-Centric Asset Management System (AMS) Promotes GIS. City of Augusta, Georgia

CONTINUOUSLY REINFORCED CONCRETE AND UNPAVED ROADS CONDITION SURVEY FIELD MANUAL PUBLICATION 343 APRIL 2017 PUB 343 (4-17)

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

U.S. Army Corps of Engineers Permit Application Tips

RAC Focus Group Priorities Agency Wide 2013 Question Is there a Better Way?

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 9, 2018

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

Field Guide on. Safe Maintenance and. Work Zone Operations

Intro. ADA Operations Contact Info

Management. VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2015 REVISIONS

Ian Kidner, GISP GIS Systems Administrator Office of Technical Services

Annual CSAH Needs Update for 2017

ODOT Asset Management Plan 0

500 Interchange Design

Computer-Aided Maintenance Management

ODOT Design & Construction Requirements for MSE Walls

Section 1 - Introduction Introduction Policy on Use of AASHTO Standards Reference Publications... 2

200 SIGNS Traffic Engineering Manual. TABLE OF CONTENTS Part 2 - SIGNS

A SunCam online continuing education course HIGHWAY ENGINEERING

Conditions of Paved Roads in Carbon County, Wyoming

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

THE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY

COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS

PennDOT s Road Closure Reporting System ( )

2012 PAVEMENT CONDITIONS & SCENARIOS

About Me: Started at Pennington County Highway Department as a Seasonal Flagger while going to college. Graduated from college in 1999 at B.H.S.U.

Smart Cities Start with Smart Streetlighting

Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Implementation of a Pavement Marking Management Program in Florida

Technical Memorandum MULTIMODAL NEEDS. Prepared for: Oklahoma Department of Transportation. Prepared by:

I-91 Viaduct Public Information Briefing

2017 Highway Safety Improvement Program Call

PUBLIC HEARING LOOP 9

I-81 Exit 114 Bridge Replacement Project RFQ Information Meeting

Can You See The Signs? GIS Solutions for Sign Inventory & Retroreflectivity

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

An Introduction to the. Safety Manual

Chapter 5: Highway Investment Direction and Plan

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Riverside County Transportation Department Summary of Bids

Transcription:

LOCATED IN WASHINGTON COUNTY LAND AREA: 8.75 SQ. MI. POPULATION: 14,085 88 C/L MILES ODOT DISTRICT 10 CONTAINS 5 STATE ROUTES 1ST SETTLEMENT IN THE NORTHWEST TERRITORY WOOD-WIRT-WASHINGTON INTERSTATE PLANNING COMMISSION (CITY OF MARIETTA S MPO) HOME OF MARIETTA COLLEGE PIONEERS

Roadway Feature Inventory Deficiency Inventory Track Deficiency Reduction Trends Create City Work Plan Create Maintenance Budgeting Tool Provide Maintenance Record Database Create a Repository for Information Begin Utilizing GIS Better Management of City Assets

Qualifications Based Selection Short List Written Project Approach (LOI Format) Previous Relevant Experience Proposal and approach for ease of updating data set Ease of use Non-proprietary software Engineering expertise & judgement

VAR Marietta Asset Management Inventory (PID 97967) Surface Transportation Program Funding ODOT & Triple W 60% of total project cost Limited to Federal Aid Routes Utilized Toll Credits to fund 100% of Federal Aid Route (0% Match) Local Funding 40 % of total project cost All local roadways

Required for many types of funding Comparison of number & condition of assets to similar sized cities Billing accurately based on assets in service (ex. Street Lights) Budgeting for replacements (ex. Scheduled Sign Replacements) Planning to meet new requirements (ex. Countdown Ped Heads) Liability reduced if plan is in place Awareness of current assets (Miles of Guardrail, # of Signs) Credit Rating Asset considered by Municipal Bond Companies Repository for Information Management

New Funding Requirements: ADA Transition Plan FHWA Curve Safe Mandate Sign Changes to Clearview Font Sign Retroreflective Requirements

CONDITION CATEGORY LOW PCI VALUE HIGH PCI VALUE Excellent 92 100 Very Good 82 91 Good 68 81 Fair 50 67 Poor 35 49 Very Poor 20 34 Failed 0 19

PAVEMENT AREA (SQ FT) LANE MILES 60 50 40 CONDITION BY LANE MILES 49 57 42 30 20 10 6 10 21 25 0 FAILED VERY POOR POOR FAIR GOOD VERY GOOD CONDITION CATEGORY EXCELLENT 3,500,000 3,000,000 2,500,000 CONDITION BY PAVEMENT AREA 3,014,837 2,596,416 2,191,265 2,000,000 1,500,000 1,000,000 500,000 1,105,198 326,132 531,813 1,343,041 0 CONDITION CATEGORY

NETWORK CONDITION 100 BENCHMARKING AVERAGE NETWORK CONDITION BY AGENCY 90 80 70 60 57 59 64 70 72 50 40 30 20 10 0 ZANESVILLE COSHOCTON MARIETTA PICKERINGTON WESTERVILLE AGENCY NAME

Locations, Condition and Assessment of the Following: Guardrail Inventory and Inspection Pavement Condition Pavement Marking Study Signs & Supports Inventory and Inspection Roadside Hazard Inventory

Locations, Condition and Assessment of the Following: Ball Bank (Safe Curve Speed) Study No Passing Zone Curb Ramps Speed Zone Bridges Inspection and Inventory Traffic Signals Inventory Time Frame Work completed in June 2016

Collected more than 15,000 features in approx. 6 months (94 centerline miles of city road) 146 Guardrail Segments 4,478 Pavement Markings 4,902 Signs 3,235 Sign Supports 952 Curb Ramps 37 Signalized Intersections Maintenance Items 35 Signs 20 Sign Supports 15 Guardrail Issues 205 Unprotected Hazards

Location information was collected for each asset Street Name, Offset, Nearest Intersection, Nearest Address, Lat/Long, Easting/Northing, Google Maps Link Guardrail Signs Type, Length, Height from Pavement, Purpose, Field Photo, Maintenance Type, Condition, Height from Pavement, Retro, Field Photo, Associated Support, Street Name, Sign Compliance

Ball Bank Per ODOT Traffic Engineering Manual, Section 1213-2 Curves with Advisory Speeds or Unmarked Curves Recommend Addition/Change/Removal of Sign Hazards Ditches, Embankments, Shoulder Width, Overhead, Obstructions (Rocks, Trees, Structures, Poles, etc.) Offset, Description, Recommendation, Field Photo

Microsoft Access Customized Forms Customized Reports Easy to Search/Filter

Standards set for each asset e.g., Pavement Condition Index Allows for Tracking of Annual Inspection

Planning for future needs Track asset costs

Module Created to Determine Compliance with ADA Standards Inspection performed by City Pictures and Geographic Location collected by TEC Reporting available for noncompliant curb ramps

Pavement Marking Paint Type, Condition, Reports Containing Replacement Date Traffic Signals Location, Controller/Cabinet Info, Signal Head Info, Pole Types Culvert Size, Material, Pictures, Inlet/Outlet Elevation, ODOT Culvert Management Manual Bridge Based on ODOT s Bridge Inspection Report Speed Zone Studies Location, Results, Pre/Post Study Speed

Field Data Entry Associated roadway item information (sign, guardrail) Work required Completion Data Field Photo Tracks History

Follow-up Work Query data to provide decision information Develop initial maintenance plans

Most Difficult Part of Database Who will update? Field Techs vs. Office Staff Update Methods: Paperwork Field Data Entry Laptop, Tablet Geo-coded Picture

Determine information required Reports, Queries Maintenance Ensure database management Develop Work Plan Address Hazards, Sign Maintenance, Guardrail Maintenance, Curve Signs Evaluation of Effectiveness- Annual Reporting Determine Need for Funding Requests

For additional information, contact: Joseph Tucker, PE Marietta City Engineer (740) 373-5495 joetucker@mariettaoh.com Edward Williams, PE, PTOE Vice President TEC Engineering, Inc. (513) 771-8828 ewilliams@teceng.com