GENERAL GUIDELINES FOR WRITING AND EDITING SPECIFICATIONS (CSI) III. GENERAL GUIDELINES FOR WRITING AND EDITING SPECIFICATIONS (CSI)

Similar documents
ARTICLE 4 SPECIFICATIONS AND SCOPES OF WORK

Request for Proposals Worksheet

Construction Contract Basics

Best practice for drafting GS1 standards

EJCDC Contract Documents for America s Infrastructure Buy online at

CIPS Exam Report for Learner Community:

Eastern Michigan University

IFAC Board. Policy for Translating Publications of the International Federation of Accountants

22 January Division of Dockets Management (HFA 305) Food and Drug Administration 5630 Fishers Lane, rm Rockville, MD 20852

U.S. Technical Advisory Group to ISO/Technical Committee 207 Clarification of Intent of ISO 14001

Chapter 6. Competitive Sealed Bidding: Elements of an Invitation for Bids

Higher National Unit specification: general information

Request For Proposal Of Printing and Design Services. Marketing Department

Table of Contents. National Research Council Canada Canadian National Master Construction Specifications (NMS)

ISA 230, Audit Documentation

REQUEST FOR COUNCIL ACTION

POLICY AND ADMINISTRATIVE PROCEDURE PROCESS

LFN Update on Implementing Energy Savings Improvement Programs. June 16, 2011

VOLUNTARY LABOR ARBITRATION TRIBUNAL FEDERAL MEDIATION AND CONCILIATION SERVICE. Holiday Pay Grievance DECISION AND AWARD

Crafting Your MBA-level Resume

Invitation to Negotiate

POLICY ON MANAGING POLICIES, PROCEDURES AND GUIDANCE DOCUMENTS

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

SECTION CONTRACTOR QUALITY CONTROL

Bank Guidance. Policy and Procedure Framework. Bank Access to Information Policy Designation Public. Catalogue Number LEG4.01GUID.

This document has been formatted for on line posting. It was signed by Commissioner Hofmann, October 13, 2005, effective October 20, 2005

INTERNATIONAL STANDARD ON AUDITING (IRELAND) 210 AGREEING THE TERMS OF AUDIT ENGAGEMENTS

REQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT

Commentary on AIA Document B Table of Contents

Sample Social Clauses to Encourage Community Benefits from Waste

QUESTIONS AND ANSWERS

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Audit Documentation. HKSA 230 Issued February Effective for audits of financial information for periods beginning on or after 15 June 2006

Acknowledgement of Aramco Overseas Company BV. Supplier Code of Conduct

API Comments on OSHA Guidance Document on Process Safety Management Guidelines for Small Business Compliance September 29, 2016

INDEX EXHIBIT A SCOPE OF SERVICES FINANCIAL PROJECT NUMBER

IAASB Main Agenda (December 2009) Agenda Item. Engagements to Compile Financial Information Issues and IAASB Task Force Proposals I.

DATA ITEM DESCRIPTION TITLE: TRAINING EVALUATION DOCUMENT Number: DI-PSSS-81524C Approval Date:

ZOLL Document Number: 90E0004 Page 5 of 15 Maintenance of Quality Records

2 nd consultation draft - Terms of Reference for the System Council s Strategic Impact, Monitoring & Evaluation Committee

VICTOR VALLEY COLLEGE COOPERATIVE WORK EXPERIENCE EDUCATION CLASS. Homework Assignment #1 Resume & Cover Letter

RFP EVALUATORS GUIDE

Document B101 TM. Standard Form of Agreement Between Owner and Architect

July 12, James Dalkin, Director Financial Management and Assurance U.S. Government Accountability Office 441 G Street, NW Washington, DC 20548

Elements of abnormally low tenders: A comparative analysis of EU procurement directive and case law

OKDHS: is revised to: (1) change the name from Publications Section to Design Services; and (2) reflect current Design Services procedures.

Ch 7 - Account for Differences

DEPARTMENT OF DEFENSE HANDBOOK ACQUISITION OF SOFTWARE ENVIRONMENTS AND SUPPORT SOFTWARE

SA 210 (REVISED) AGREEING THE TERMS OF AUDIT ENGAGEMENTS (EFFECTIVE FOR ALL AUDITS RELATING TO ACCOUNTING PERIODS BEGINNING ON OR AFTER APRIL 1, 2010)

Construction Family of Documents

Job Board - A Web Based Scheduler

Back to TOC Channel Relationships

DEPARTMENT OF DEFENSE HANDBOOK GUIDANCE FOR ACQUISITION OF TRAINING DATA PRODUCTS AND SERVICES (PART 1 OF 5 PARTS)

How Construction Contracts Cause Litigation. By: Robert C. Epstein, Esq. 1

Performance Management Evaluation to Support FY19 Operating and Capital Budget Requests

NC State University OESAD GUIDELINES Contract Year

Request for Qualifications. Career Pathways for English Language Learners. April 21, 2014

DARPA-BAA MUSE Frequently Asked Questions. As of March 20, 2014

Readability in Proposals:

Contract and Procurement Fraud. Collusion Between Contractors and Employees

My writing almost always gets results. Indirect. Direct. Abrupt. Pleading, or timid, or apologetic. Stuffed-shirt (pompous) Formal.

Sawdey Solution Services

Casework Technical Support (Social Welfare - Project Management)

BID INSTRUCTIONS. Montour County Courthouse Retaining Wall Repair Project

P. 1. Identify the Differences between ISO9001:2000 與 ISO9001:2008 ISO9001:2008 ISO9001:2000 版本的異同. 5 January 2009 ISO 9000 SERIES

Division of Materials and Waste Management. Response to Comments

Procurement Guidelines

CUSTOMER NAME Security Awareness Education Request for Proposal. Program Content & Hosting Services Date

Self-Assessment of the Intern

) ) ) ) ) ) ) ) ) ) ) ) PCAOB Release No June 9, 2004

Assessment of the Intern

600 - Phase C Intermediate Review Checklist for the Architect- Engineer

SECTION DEFIBRILLATOR CABINETS

PHR Process Hazard Review

Chapter 2 GALP Implementation Assistance

Responding to RFPs. Slide 1 Responding to RFIs and RFPs Welcome this module on responding to RFIs and RFPs.

Municipalité d Otter Lake Municipality

Indiana University. Vice President for Capital Planning and Facilities

SHDHD Branding Strategy South Heartland District Health Department Branding Strategy

Competitive Procurement Evaluation Process Audit

SECTION NETWORK ANALYSIS SCHEDULES (NCA)

This policy will outline the requirements for competitive bids on goods and services purchased by the College.

LAKE BARRINGTON COMMUNITY HOMEOWNERS ASSOCIATION 64 Old Barn Road Lake Barrington, Illinois Phone: Fax:

REQUEST FOR EXPRESSIONS OF INTEREST 5006 EOI DETERRENT PROGRAM FOR SNOW GEESE CONTROL

Document B252TM 2007

RFP # Request for Proposal Branding Services. Date: January 12, Proposals must be submitted by 3:00 PM: February 10, 2017

LEARNING RESOURCE CENTRE AYRSHIRE COLLEGE MICROSOFT WORD USEFUL ESSAY FEATURES

SRTA Solicitation No RFQC for Customer Service System and Operations March 13, 2017

overview Mission Peachtree is a community of Jesus followers inviting people to follow God in heart, mind and strength.

Section 08 CONSTUCTION DOCUMENTS TABLE OF CONTENTS

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

Master's Degree Program in Technical and Scientific Communication (MTSC)

ICCPC INTERNATIONAL CODE COUNCIL PERFORMANCE CODE FOR BUILDINGS AND FACILITIES

PLANNING AND EVALUATION PRELIMINARY DESIGN

davidbaileyfcca finance development consultancy Winning NHS Tenders What Is A Tender? Winning NHS Tenders

CONTRACT MANAGEMENT POLICY CITY OF BEACONSFIELD

APPENDICES DESIGN REQUIREMENTS. Appendix A. Performance Criteria for Design Projects

Compilation Engagements

Compilation Engagements

62 POTOMAC STREET WEST ROXBURY, MA 02132

Transcription:

III. FORMAT REQUIREMENTS Prepare Specifications as recommended by the Construction Specification Institute's (CSI) Manual of Practice, including spacing, indentation, headings and general arrangement. Provide complete Technical Specification Index. Specification Page Format: 1. Page Size: 8-1/2" x 11" 2. Print (Font) Style and Size: Times New Roman, Size 12 (text). 3. Margins: 1" left and 3/4" right, mirrored on the even pages if using double sided reproduction and binding 4. Single-sided pages are required (for reproduction to two-sided pages in bid document). 5. Each Specification Section is to start with page one on the right hand side. 6. Footer: Division and Section numbering and paragraph numbering shall be consistent with the CSI format. The section number and page is to be numbered at bottom. The words "End of Section" are to appear immediately below the end of text on the last page of each section. 7. Header: Each specification page is to be identified by "University of Alaska Fairbanks", project title and project number (project name and number to be furnished by UAF Facilities Services) in the upper left hand corner. Each specification page is to be identified by Section Number and Section Title in the upper right hand corner. Completed Specifications are to be provided in the form of a printed master copy (collated for two-sided reproduction) suitable for direct use by photocopy reproduction, and on disk compatible with Microsoft Word. In addition to the format recommended by the CSI, the following items are set forth for emphasis: 1. Do not repeat requirements covered in the Instructions to Bidders, General Conditions, or Special Conditions in the specifications. This is to avoid conflict. 2. Avoid duplication and conflict between the various drawings and specifications sections. Revised November 2006 1 of 6 Design Standards III

DIVISION 1 Certain Division 1 Sections are furnished by UAF Facilities Services. UAF Facilities Services is responsible for the final edit of these Sections, and the Consultant is responsible to assure that the Technical Specifications conform with, and do not conflict with, these sections. Draft Division 1 Sections, to be finalized by the FS/DDC Project Manager during the development of bid documents, shall be provided to the consultant prior to any specification development. These are furnished to the Consultant for their use in assuring conformance within the bid documents. Other required Division 1 Sections, are to be prepared by the Consultant, in consultation with the FS/DDC Project Manager. SPECIAL INSPECTIONS The consultant shall coordinate requirements for IBC Special Inspections with the UAF FS/DDC Project Manager. Some inspection services are provided by Facilities Services and others shall be provided by the consultant or separate contract. STYLES Command Sentences The CSI specifications use command type sentences extensively. All directives are assumed to be addressed to the Contractor (or in the case of design guidelines, any member of the design team). In a few instances it may be necessary to address other members of the construction team but these are exceptions. Note that no sentence begins with the tedious "The Contractor shall " or " Except as otherwise directed " or the designer shall specify that the contractor shall Verbs The key to this style of writing is to make most sentences begin with a verb. Verbs are the action words of the English language and, when used, automatically require use of the active voice rather than the passive voice. These kinds of sentences tend to be shorter, clearer and more direct. It would be difficult indeed to misunderstand a sentence such as, "Stake and flag locations of known utilities." Better yet is to avoid complete sentence structure, using an item description followed by a colon, followed by the requirement. E.g. Data outlets: 6 per room. Useful Phrases Clearly, the CSI format and style lends itself well to brevity. Many of the sections consist of only phrases. Meaning can be conveyed without the need to write complete sentences. Again, this is the result of understanding that all sections are meant to be directives to the contractor, eliminating the need to repeatedly refer to him or her. Other ways the CSI style helps is by defining several repetitious phrases up front. Examples include: Revised November 2006 2 of 6 Design Standards III

"as shown" which always means as shown on the plans, drawings, shop drawings or other graphical elements of the contract documents. "as directed" always means as directed or ordered by the Architect or Engineer. "as required" always means as required by some other part of the contract documents which may include reference specifications or manufacturer s recommended practice. Confusing and Unnecessary Phrases Specifications all too often contain confusing phrases easily misunderstood or simply wasteful of everyone s time. An example might be the phrase, unless otherwise shown or directed". After reading this phrase, the typical bidder will immediately ask him or herself what it means. Does it mean there is some detail of the plans which is different than all the other similar details? Does it mean that the architect may arbitrarily require some construction different from that shown or specified? Does the bidder have to hunt through all the documents looking for such exceptions to the general rules? If the bidder doesn t find the exception because there are no such exceptions, everyone s time is wasted with unnecessary questions. Phrases which create doubt in the mind of the bidder/contractor will always cause confusion and usually lead to higher costs or requests for change orders later. In extreme cases they can lead to lawsuits. Prescriptive vs. Objective Both kinds of specifications may be used on any particular project, although objective specifications should be favored. Prescriptive Example Remember, however, that even when a prescriptive specification is used it is a good idea to avoid lengthy explanations and background information which is of no use to the contractor. You want to tell the Contractor what he is to do not why he is to do it. Such details tend to add "word weight" to the specifications without adding clarity. Specifications which require not only that some work be done, but which also detail the means for accomplishing that work are prescriptive. Such specifications are appropriate in some cases, however. For example, the specifications for pressure testing a water main are usually written this way. The water supplier, in order to be consistent on all projects, will usually provide this test procedure. The procedure will ordinarily have been developed over many years and be pretty close to a standard. Objective Example Generally it is a good idea to give the contractor as much freedom as possible in performing the work. Doing so will almost always result in lower costs and good contractors can be very innovative in devising ways to get the work done. For this reason, it is a good idea to specify the results desired without dictating procedures. Most specification sections can be written this way, and should. Revised November 2006 3 of 6 Design Standards III

PRODUCTS The use of unusual materials or those not readily available on the local market shall be avoided without written approval of UAF Facilities Services. Where materials may not be well known, the name and address of either the manufacturer or local supplier(s) should be included in the Specifications. The Consultant is to verify that all products specified are of current manufacture. Consultants' record of time and date and written documentation as to the availability of the product or materials specified in conformance with the project schedule may be requested by the FS/DDC Project Manager or Facilities Engineer. Alaska Products Where practical, Alaska Products are to be specified pursuant to Alaska Product Preference requirements in AS 36.30 and AS 36.15. Alternate Brands / Substitutions As stated in the standard "Notice Of Invitation For Bids", the "University of Alaska has a procedure for accepting alternate products or systems prior to bid opening. Substitutions after award are limited." The intent is to establish the minimum quality of materials, and to effectively control the materials used in the actual construction, so that the University's needs are met and that the materials of construction presented by the Consultant during the design process, and reviewed by UAF Facilities Services, are placed in the work. The contractual procedures for the implementation process is given in the Instructions to Bidders and General Conditions. The use of the term "or Equal" in the bid document specifications shall be very limited. It is the UAF Facilities Services intent that it is only used when we want to consider Alternate Brands during the bidding process; therefore, its use should be expressly approved by Facilities Service during the design process. "Or Equal" is NOT to be used to mean that substitutions will be considered during construction. Per procurement regulations, "or Equal" is required to be used when only one brand name is listed AND no determination has been made by the responsible procurement officer allowing Brand Name Only. The Consultant is required (notwithstanding the requirement for specifying Alaska Products) to specify at least two (2) and preferably three (3) brand names as a standard for all materials and products specified, (exception - Case 5, Brand Name Only, see below). Products specified by reference standards, technical specifications, or by description only will only be considered for special purposes and approval must be given as an exception to the Specification Standards. Comment [c1]: Should we delete this section about Or Equal and just require products to be specified per case1-5?? CASE 1: Alternate Brand Request or Substitution Request not required: For materials, more typically of standard architectural materials, that are common and generic, and UAF Facilities Services has not developed a preference of manufacturers, then Part II of the technical specification shall state: "Acceptable Manufacturers include, but are not limited to, the following:" A. First Mfg identified by Consultant. B. Second... Revised November 2006 4 of 6 Design Standards III

C. Third... D. Any other manufacturer meeting the requirements of the contract documents. Alternate Brand Request or Substitution Request not required." CASE 2: Alternate Brand Request or Substitution Request required: For materials, more typically of mechanical and electrical components, that UAF Facilities Services has not developed a preference of manufacturers, then the Consultant shall list at least three acceptable manufacturers in Part II of the technical specifications and shall state: "Acceptable Manufacturers are limited to the following: A. First Mfg identified by Consultant. B. Second... C. Third... D. Alternate Brand Request or Substitution Request required. CASE 3: No substitutions: When preferred manufacturers are listed in the Design Standards, it is UAF Facilities Services intent to not entertain substitutions. Therefore, the following statement should be utilized in Part II of the Specification Section: "Acceptable Manufacturers are limited to the following:" A. First Mfg listed in Design Standards B. Second... C. Third... D. No substitutions. CASE 4: No substitutions: When one or two manufacturer(s) is listed in the Design Standards followed by the words "or equal", the Consultant is required to list one (1) and preferably two (2) additional brand names of equal products in the specification. The manufacturer(s) listed in the Specification Standards is preferred by UAF Facilities Services but it is not approved as Brand Name Only, (see Appendix for approved list). The specification shall then state: "Acceptable Manufacturers are limited to the following: A. Mfg from Design Standards B. Mfg identified by Consultant C. Mfg identified by Consultant D. No substitutions The use of the term "or equal" in the bid documents shall not be used for this situation. Revised November 2006 5 of 6 Design Standards III

CASE 5: No Alternate Brands; No Substitutions (Brand Name Only): The University has the authority to limit certain products to one or two brand names, without allowing Alternate Brands ("or Equal") or Substitutions. All of the approved Brand Name Only products are listed in an Appendix. When specifying these products the Consultant is to state in the Specification Section, Part II: "Acceptable Manufacturers are limited to the following:" A. Brand Name from Design Standards B. No Alternate Brands; No Substitutions. The use of the term "or equal" in the bid documents shall not be used for this situation. Revised November 2006 6 of 6 Design Standards III