DESIGN AND FABRICATION OF FLEXIBLE RACK FOR LECTURER USE ABDUL ZARIF BIN ABDUL MALEK

Similar documents
EFFECTIVENESS OF CRM SYSTEM FOR CUSTOMER SERVICE REPRESENTATIVES (CSR) TRAINING AT TELEKOM MALAYSIA

INVENTORY MANAGEMENT AND CONTROL AT AN IN-FLIGHT CATERING COMPANY NOR LIAWATI BINTI ABU OTHMAN

DESIGN AND DEVELOPMENT OF LOW-COST FRICTION STIR WELDING AHMAD SYAZNI BIN ZAKARIA

DESIGN AND FABRICATE THE NEW GENERATION OF WORKING TABLE TENG BOON WUN

DESIGN AND FABRICATE ANTHEFT LOCK FOR MOTORCYCLE WAN MOHD HAZWAN BIN WAN ARIFF

STUDY ON IRON AND MANGANESE REMOVAL IN RIVER WATER FOR TEXTILES INDUSTRY USAGE ZAITON BIN SAMAD UNIVERSITI TEKNOLOGI MALAYSIA

FLOOD DAMAGE ASSESSMENT MODEL USING COST-BENEFIT ANALYSIS NOR AZLIZA BINTI AKBAR

SIZING OF ENERGY STORAGE BASED ON LOSS OF LOAD PROBABILITY OF STANDALONE PHOTOVOLTAIC SYSTEMS RAZMAN BIN AYOP UNIVERSITI TEKNOLOGI MALAYSIA

MAINTENANCE MANAGEMENT ASSESSMENT IN A LOCAL MANUFACTURING COMPANY MOHAMMAD ANNUAR BIN MD SALLEH

SCHOOL OF QUANTITATIVE SCIENCES UNIVERSITI UTARA MALAYSIA

I/We declare that had read this work and from my/our opinion this work is adequate from scope and quality aspect for award of Bachelor Degree of

PRODUCTIVITY IMPROVEMENT THROUGH LINE BALANCING TECHNIQUE IN A SMALL MEDIUM ENTERPRISE (SUE) MANUFACTURING PLANT SHAHFIRAN BIN SARIFUDDIN

MONITORING TOOL WEAR PROCESS IN TURNING MACHINE USING ACOUSTIC EMISSION TECHNIQUE

MATHEMATICAL MODELLING FOR DEGRADATION OF WATER POLLUTION BY EFFECTIVE MICROORGANISM (EM) IN RIVER

IMPLEMENTATION OF SINGLE MINUTE EXCHANGE DIE (SMED) TECHNIQUE TO ACCELERATE THE MOLD CHANGING TIME AT SME COMPANY MUHAMAD NASRULDIN BIN HASHIM

EXPLORING THE EFFECT OF PROMOTIONAL MIX ELEMENTS ON BRAND AWARENESS IN AIRLINE INDUSTRY

USER RESISTANCE FACTORS IN POST ERP IMPLEMENTATION SAYEED HAIDER SALIH MAHMOUD

COMPARISON BETWEEN BS 5950: PART 1: 2000 & EUROCODE 3 FOR THE DESIGN OF MULTI-STOREY BRACED STEEL FRAME CHAN CHEE HAN

IMPACT OF WORK LIFE BALANCE ON EMPLOYEES LOYALTY, SATISFACTION, AND PRODUCTIVITY KADARKO ESTHER DIZAHO

DESIGN AND MANUFACTURE THE INNER SHELL OF DIESEL FURNACE MUHAMMAD MUIZZUDDIN BIN YUSOF UNIVERSITI MALAYSIA PAHANG

CHARACTERISATION OF STAINLESS STEEL 316L AND PALM STEARIN BASED BINDER BY USING METAL INJECTION MOLDING (MIM) PROCESS

RELATIONSHIP BETWEEN INTERNATIONAL ROUGHNESS INDEX (IRI) AND PRESENT SERVICEABILITY INDEX (PSI)

Introduction 5 MANUFACTURING PROCESSES (SME 2713 )

IDENTIFICATION OF PUBLIC PLACE ATTRIBUTES USING MEAN-END CHAIN RESEARCH MODEL BENTALHODA FOOLADIVANDA UNIVERSITI TEKNOLOGI MALAYSIA

A CROSS FUNCTIONAL PROJECT MANAGEMENT MODEL FOR SIEMENS MALAYSIA VIJAY ANANDA RAJA A/L MURUGESU

QUANTITY SURVEYOR S LIABILITY DURING PRE TENDER STAGE ASMAH ALIA BT MOHAMAD BOHARI UNIVERSITI TEKNOLOGI MALAYSIA

ANALYSIS OF PREVENTIVE MAINTENANCE FOR PROCESSING PLANT ( GASSIFICATION PROCESS UNIT )

BENCHMARKING OF THE ACTUAL INJECTION OF THE PRODUCT VERSUS PLASTIC SIMULATION SOFTWARE ZUL AMRI BIN A.BAKAR UNIVERSITI MALAYSIA PAHANG

PARASITIC MOMENT EFFECT FOR THE THREE SPANS CONTINUOUS PRESTRESSED CONCRETE BRIDGE SITI SARAH SALIM

ABSTRACT. measurement uncertainty is 0.05 ± mg/l Cr 6+. The hexavalent chromium is determined

COMBINED EMPIRICAL MODE DECOMPOSITION AND DYNAMIC REGRESSION MODEL FOR FORECASTING ELECTRICITY LOAD DEMAND NURAMIRAH BINTI AKROM

APPLICATION OF THE TRAVEL COST METHOD TO URBAN FORESTS IN JOHOR BAHRU NURUL SHAHIRAWATI BINTI MOHAMED ROSLI UNIVERSITI TEKNOLOGI MALAYSIA

DEVELOPMENT OF LIFT MACHINE (USING CABLE AND PULLEY) ZAIHIN BIN MOHD ZAHIB

BERASAS KOMPUTER. Oleh Mohamad Rodzizan b. Hj. Ahmad Tajuddin. 0 MOHAMAD RODZIZAN TAJUDDIN, Hak Cipta Terpelihara.

HUMAN VALUES IDENTIFICATION AND ASSESSMENT TOOL DEVELOPMENT FOR TQM CONTEXT MUHAMMAD NOMAN MALIK. A thesis submitted in fulfilment of the

AHMAD KHAIRUL HAFIZI BIN WAHAB

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

OPTIMIZATION OF EXTRACTION AND SPRAY DRYING PROCESSES OF TONGKAT ALI EXTRACTS USING RESPONSE SURFACE METHODOLOGY

THE DESIGN AND CONSTRUCTION OF POST TENSIONED FLAT SLAB NURHIDAYAH BINTI ZAKARIA

SIMULATION PERFORMANCE OF LOW DAMAGE BASE CONNECTION ON ABAQUS MAHDI HATAMI

A STUDY ON CURRENT CARRYING CAPACITY OF DOUBLE LAYER PCB MOHD AMIRUL FARUQI BIN ISMAIL BACHELOR OF ELECTRICAL ENGINEERING (INDUSTRIAL POWER)

A STUDY ON ATTITUDE TOWARDS USAGE OF AUTOMATED PUSHER BOX TECHNOLOGY USE BEHAVIOR IN FELDA RUBBER INDUSTRY

BORANG PENGESAHAN STATUS TESIS

A STUDY OF QUEUING TIME IN WAITING LINE OF SUPERMARKET AT CASHIER COUNTER BY USING SIMULATION

MANAGING GREENNESS IN FIRM MARKETING TO ENHANCE BUSINESS PERFORMANCE CHONG KAH JUAN UNIVERSITI TEKNIKAL MALAYSIA MELAKA

SHEAR STRENGTH PARAMETERS OF IMPROVED ORGANIC SOIL BY CALCIUM BASE STABILIZER NORLIZAWATI HASSAN

REORGANIZING DISPATCHING LAYOUT TO MINIMIZE DISPATCHING TIME AT APPAREL INDUSTRY

UNIVERSITI TEKNIKAL MALAYSIA MELAKA SIMULATION OF AUTOMATION OF PEN CAPPING PROCESS FOR EK300 AT SPARKLE PRESCISION SDN. BHD.

EFFECT OF DRY MACHINING ON TOOL WEAR MADIHAH BINTI ZUBIR

Bachelor of Electrical Engineering (Industrial Power)

IMPROVE MATERIAL HANDLING SYSTEM IN HIROTAKO ACOUSTIC SDN.BHD S LOGISTIC DEPARTMENT AREA LINGENTHIRAN A/L SAMYLINGAM

ESTIMATING THE ENVIRONMENTAL IMPACTS OF CARBON EMISSIONS FROM FUEL CONSUMPTION DURING CONSTRUCTION ACTIVITIES PEZHMAN SHAHID

ENERGY EFFICIENT RESIDENTIAL BUILDINGS ASSESSMENT USING BUILDING INFORMATION MODELING AMIN FAKHKHAR ZADEH

INTEGRATED DUAL NANOPROBE-MICROFLUIDIC SYSTEM FOR SINGLE CELL ELECTRICAL PROPERTY CHARACTERIZATIONS

PEMBANGUNAN SISTEM PEMASARAN MENGGUNAKAN KONSEP ADAPTIVE MARKETING SOFFRI BIN YUSSOF

SPRINGBACK PREDICTION OF MILD STEEL ON V-BENDING MOHD HIZIR ARAFAT BIN TAMBUN. A Report submitted in partial fulfillment of the requirements

DESIGN AND FABRICATION OF STARK WHITEBOARD KOK YIN HUI. Report submitted in partial fulfillment of the requirement for the award of

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

MODIFICATION OF MEDIA FORMULATION FOR ENHANCING PRODUCTION OF EXTRACELLULAR POLYSACCHARIDES BY Porphyridium cruentum AMIRA SURIATY BINTI YAAKOP

KEBERKESANAN PENGURUSAN PERUBAHAN DI AGENSI AWAM: PERSEPSI WARGAKERJA TERHADAP KEBERKESANAN PENGURUSAN

AUTOREGRESSIVE DISTRIBUTED LAG MODELLING FOR MALAYSIAN PALM OIL PRICES

A SYSTEM DYNAMIC APPROACH IN HUMAN RESOURCE PLANNING IN OIL AND GAS INDUSTRY DINA DIYANA BINTI RASTAM TAN

AN EFFICIENT MICROCONTROLLER-BASED ELECTRONIC BALLAST FOR HIGH PRESSURE SODIUM LAMPS USED IN STREET LIGHTING MOHD HAMIZAN BIN OMAR

DESIGN AND CONSTRUCT OF TIDAL STREAM POWER GENERATION MODEL MOHD SARIZA BIN ABDUL GANI 4 BEKC


DEVELOPMENT OF IMPACT TEST DEVICE MOHD NAQIUDDIN BIN MOHD SALLEH

UNIVERSITI TEKNIKAL MALAYSIA MELAKA OPTIMIZING OPERATOR CYCLE TIME IN A SEMICONDUCTOR COMPANY

APPLICATION OF INTEGRATED FUZZY-ANALYTICAL HIERARCHY PROCESS FOR DESIGN EVALUATION IN PRODUCT DEVELOPMENT NURUL ARIFAH BINTI CHE ROPA

THE DEVELOPMENT OF LIGHTWEIGHT EXPANDED POLYSTYRENE CONCRETE BLOCKS TEY LEE HUAN

SIMULATION ON EFFECTS OF DIFFERENT TYPES OF CHANNEL/DRAIN ENGINEERING STRUCTURE ON MOS DEVICE PERFORMANCE NORAZLINA BINTI MOHD AMIN

STUDY ON CURRENT PRACTICE OF SOLID WASTE MANAGEMENT SYSTEM IN GAMBANG RESIDENTIAL AREA KUANTAN, PAHANG NOR ZARIEFA BINTI ZAHARI

PARTIAL DISCHARGE CHARACTERISTICS ON EPOXY-BORON NITRIDE NANOCOMPOSITE DUE TO AGEING TIME UNDER HIGH VOLTAGE STRESS NOOR ALIAA BINTI AWANG

DATABASE MANAGEMENT INVENTORY SYSTEM SYAHIDA BT ARIPIN

INSTRUCTION: This section consists of SIX (6) essay questions. Answer FOUR (4) questions only.

BEST ENDEAVOURS FOR GRANTING AN EXTENSION OF TIME IN CONSTRUCTION CONTRACT NUR FARAH FARHANA BINTI RASID UNIVERSITI TEKNOLOGI MALAYSIA

The Factors That Influence Motivation to Transfer, and Its Impact on Employees Work Engagement in Libya

This item is protected by original copyright

UNIVERSITI MALAYSIA PAHANG

STUDY OF MICRO PITS ON BILLET EXPERIMENTAL SURFACE IN EXTRUSION PROCESS MAK KAM WONG

THE BEST PRACTICE OF VENDOR PERFORMANCE EVALUATION FOR THE FISHING REEL MANUFACTURING INDUSTRY CONNIE TING

A STUDY OF CAUSES AND EFFECTS OF PROJECT CHANGE IN CONSTRUCTION INDUSTRY JEE KEE LIH (PB 10030)

NUR NAJIHAH BINTI AHMAD ZAMRI

DESIGN AND FABRICATION OF MULTIPURPOSE CONTAINER ANAS MUZAMIL BIN HAMIDDIN

1 nrrnrrni COLUMN REPAIRED BY JACKETING METHOD. MUHAMMAD ZULIIlLMI BIN ALI

(4 the undersigned, certib that)

IBG 311 ENZYME TECHNOLOGY [TEKNOLOGI ENZIM]

DEVELOPMENT OF AUTOMATED STORAGE AND RETRIEVAL SYSTEM (AS/RS) PROTOTYPE ABDUL HALIM BIN HADZIR BACHELOR OF ENGINEERING UNIVERSITI MALAYSIA PAHANG

DEFLECTION MONITORING OF CAST IN-SITU BALANCED CANTILEVER PRESTRESSED CONCRETE BOX GIRDER BRIDGE MOHD KHAIRUL AZMAN BIN HAMBALI

SUCCESSFUL IMPLEMENTATION OF SAP SYSTEM IN PROCUREMENT DEPARTMENT CASE STUDIES IN SCOMI RAIL BERHAD

FACTORS AFFECTING POST GRADUATE STUDENTS' ATTITUDE AND BEHAVIORAL INTENTION TOWARD ONLINE SHOPPING FAEZEH MIRGHASEMI

STUDENT EXPECTATION AND PERCEPTION OF SERVICE QUALITY IN UTM HOSTEL. Supervisor: Assoc. Prof. Dr. Buang bin alias

ORCHID FARMING AS A POTENTIAL BUSINESS VENTURE

DOSIMETRIC PROPERTIES OF Al 2 O 3 :C, Mg EXPOSED TO EXTERNAL COBALT-60 GAMMA IRRADIATION

AVAILABLE TRANSFER CAPABILITY BASED ON RANDOMLY GENERATED PROBABILISTIC DISTRIBUTION FUNCTION OF WIND SPEED USING MONTE CARLO SIMULATION

MECHANICAL PROPERTIES OF DISSIMILAR ALUMINUM-BASED ALLOY JOINTS BY MIG WELDING AHMAD DANIAL BIN ABDULLAH

FEASIBILITY STUDY ON EFFECTIVENESS LARGE SURFACE AREA OF ELECTRODE FOR EARTH BATTERY MUHAMMAD IZZUDDEEN BIN KHAZALI

CHARACTERIZATION OF FIBER OPTIC SENSOR FOR LIQUID REFRACTIVE INDEX MONITORING DIANAY SHAFINA BINTI SHAFEI UNIVERSITI TEKNOLOGI MALAYSIA

COMPARISON STUDY OF CORROSION MEASUREMENT TECHNIQUE FADLI BIN

APPLICATION OF GRAPH-BASED METHOD FOR MANUFACTURING LAYOUT EVALUATION

EFFECT OF CARBON BLACK ON THE PROPERTIES OF GRAPHITE- EPOXY COMPOSITE FOR BIPOLAR PLATE

Transcription:

DESIGN AND FABRICATION OF FLEXIBLE RACK FOR LECTURER USE ABDUL ZARIF BIN ABDUL MALEK A report submitted in partial fulfillment of the requirements for the award of the Diploma of Mechanical Engineering PERPUSTAKAAN UNIVFR,S!Tl MALAVSA PAHANG No. Peroehan No. Par9gHn 037922 \lilf Tarikh Faculty of Mechanical Jngmeering Universid Malaysia Pahang NOVEMBER2007

vi ABSTRACT The study of manufacturing was very important in order to carry out this project to ensure that student understand on what are needs to do. This project is about designing and fabricating the flexible rack for lecturer use to helps lecturer storing documents or paper works in their office more efficiently. This project involves the process of designing the rack by considering the shape and also the ergonomic factor for lecturer to use. After the design has completed, it was transformed to its real product where the design is used for guideline. This project also required analysis to make sure the strength of the product to ensure the safety for the user indeed of publishing. Numerous methods and process involve in this; project for instance shaping using bending machine. This project is mainly about generating a new concept of rack that would make storing documents at limited space become easier and more efficient. After all the process had been done, this rack may help us to understand the fabrication and designing process that involved in this project.

vii ABSTRAK Pembelajaran mengenai proses pembuatan adalah amat penting dalam menjalankan projek mi bagi memastikan pelajar faham apa yang hams dilakukan. Projek mi ialah mengenai merekabentuk dan menghasilkan rak yang feksibel untuk kegunaan pensyarah menyimpan segala dokumen atau kertas keija di dalam pejabat mereka secara teratur. Projek mi melibatkan proses merekabentuk rak dengan mengambil kim rupa bentuk dan juga faktor ergonomi untuk kegunaan pensyarah. Selepas proses merekabentuk disiapkan, ia akan diteijemahkan kepada produk yang sebenar berdasarkan rekabentuk yang telah dibuat. Projek mi juga memerlukan analisis bagi memastikan produk itu kukuh dan selamat kepada pengguna apabila siap kelak. Pelbagai kaedah dan proses terlibat dalam menghasilkan projek mi; sebagai contoh proses membentuk dengan menggunakan mesin membengkok. Keutamaan projek mi ialah menghasilkan konsep rak yang baru iaitu untuk menyimpan dokumen di dalam keadaan ruang yang terhad dengan lebih mudah dan lebih tersusun. Selepas segala proses yang terlibat selesai dilakukan, diharapkan penghasilan produk mi dapat memberi sedikit pemahaman dalam proses merekabentuk dan penghasilan yang terlibat.

viii TABLE OF CONTENTS CHAPTER TITLE PAGE FRONT PAGE SUPERVISOR'S DECLARATION DECLARATION DEDICATION ACKNOWLEDGEMENTS ABSTRACT ABSTRAK TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES II iv v vi vii viii xi xii INTRODUCTION 1 1.1 Project Synopsis 1 1.1.1 General Project Synopsis 1 1.1.2 Specific Project Synopsis 2 1.2 Problem Statement 2 1.3 Project Objectives 2 1.3.1 General Objectives 2 1.3.2 Specific Project Objectives 3 1.4 Project Scopes 3 1.5 Project Schedule 4

LITERATURE REVIEW 6 ix 2.1 Introduction 7 2.2 Product Review 7 2. 1.1 Rack Types and Functions 7 3 PROJECT METHODOLOGY 10 3.1 Project Flow Chart 10 3.2 Design and Sketching 13 3.2.1 Introduction 13 3.2.2 Design 13 3.2.3 Drawing 14 3.2.4 Design Specifications 14 3.2.5 Sketching 14 3.2.6 Sketching Selection 16 3.2.7 Engineering Drawing 17 3.2.8 Overall View of the Design 18 3.3 Material Selection 19 3.4 Manufacturing Method 20 3.4.1 Introduction 20 3.4.2 Cutting Method 20 3.4.3 Shaping Method 21 3.4.4 Drilling Method 23 3.4.5 Joining Method 24 3.5 Fabrication Process 25 3.5.1 Introduction 25 3.5.2 Process Involved 25 3.5.3 Step by Step Process 26

x 4 RESULTS AND DISCUSSION 28 4.1 Introduction 28 4.2 Results 28 4.3 Product Specifications 30 4.4 Project Problems 31 4.4.1 Literature Review Problems 31 4.4.2 Designing and Sketching Problems 32 4.4.3 Material Preparation Problems 32 4.4.4 Fabrication Process Problems 32 4.5 Discussion 32 5 CONCLUSION AND RECOMMENDATION 34 5.1 Introduction 34 5.2 Project Summary 34 5.3 Conclusion 35 5.4 Recommendation and Future Works 35 REFERENCES 36

xi LIST OF TABLES TABLE NO. TITLE PAGE 1.1 Project schedule 2.1 List of material FA 3.1 Product specifications 31

xl' LIST OF FIGURES FIGURE NO. TITLE PAGE 2.1 File rack 7 2.2 Display rack 7 2.3 Paper trays 8 2.4 Bulk storage rack 8 2.5 Newspaper rack 9 2.6 Wall rack 9 3.1 Flowchart 12 3.2 Existing rack 13 3.3 Attachment 1 14 3.4 Attachment 2 15 3.5 Attachment 3 15 3.6 Attachment 4 16 3.7 Attachment 1 16 3.8 Rack (platform) 17 3.9 Attachment (basement rack) 17 3.10 Hinge (for basement rack) 18 3.11 'L' shape aluminium 1.5mm will be attached to hinge 18 3.12 Side rack attachments 18 3.13 Upper rack attachments 18 3.14 Full assemble of rack 18 3.15 Hydraulic shearing machine 21 3.16 Bending machine 22 3.17 Types of bending process 23 3.18 Press drill 24

xli' 4.1 Basement rack 29 4.2 Side rack 29 4.3 Upper rack 29 4.4 Assemble rack (front view) 29 4.5 Assemble rack (top view) 30 4.6 Assemble rack (side view) 30 4.7 Assemble rack (isometric view) 30

CHAPTER 1 INTRODUCTION 1.1 Project Synopsis 1.1.1 General Project Synopsis The project involves designing and fabricating a flexible rack for lecturer use. This rack would be entirely different from existing rack. As the Diploma final year project allocates the duration of 1 semester, this large man-hour project therefore requires significant efforts of the students to participate. Basically the entire flexible rack could be divided into three stages, which are concept review and development, designing and fabrication. The flexible rack is equipped by using all necessary items and method for instance sheet metal, skills in manufacturing process by performs cutting process, bending process, drilling process and others. The advantages of the flexible rack to be developed can be seen in its flexibility to be moved and can be located at limited space such that, lecturer are offered to make their work easier since the rack will facilitate them to store items such as student's assignment and paper works. The process of development is initiated from designing the shape of the rack by considering the function as well. In order to produce user friendly product that is suitable to the consumer, consideration to the ergonomic factor is taken into account.

2 t involves the measurement process before the materials are cut into pieces before oined together..1.2 Specific Project Synopsis My project title is "Design and Fabrication of Flexible Rack for Lecturer Jse". The project involves small review of the existing flexible rack and fabrication f the rack itself with concerns regarding strength, ergonomic factor, and onvenience. New concept of rack is required to improve its functions. Overall, the project will meet acquire skills of design and fabrication..2 Problem Statement The concept of the flexible rack is to facilitate lecturer for storing their ocument and paper works. This rack will primarily help lecturer especially lecturers f Faculty of Mechanical Engineering to store and arrange their document that's eed rack for convenience. Lecturers are facing problem while the need to store.ocuments in limited space due to unavailability of existence rack. Thus, with the evelopment of this rack, it is hope that it can contribute to give them ideas how to vercome problem in storing documents by choose the better way in facilitate their )utine at Universiti Malaysia Pahang especially for Faculty of Mechanical ngineering staff..3 Project Objectives.3.1 General Objectives Diploma fmal year project objective is to practice the knowledge and skill of ie student that have been gathered before in solving problem using academic

research, to born an engineer that have enough knowledge and skill. This project also important to train and increase the student capability to get know, research, data gathering analysis making and then solve a problem by research or scientific research. 3 The project also will educate the student in communication like in a presentation and educate them to defend their research in the presentation. The project also will generate students that have capability to make a good research report in thesis form or technical writing. This project also can produce and train student to capable of doing work with minimal supervisory and more independent in searching, detailing and expanding the experiences and knowledge. 1.3.2 Specific Project Objectives The specific project objectives are: i. To design flexible rack that is suite to its application especially for storing documents. ii. To fabricate and introduce the new concepts and ideas for future prospect of rack. 1.4 Project Scopes The project scopes are elaborations on achieving the project objectives. Thus, the first scope is to gather literature reviews that are valuable data to consider the variable designs of the flexible rack in terms of its function and method to produce. Secondly, the sketching and designing processes are focus on using sketches and Solid Works software in creating the design of the rack.

Next, to fabricate the designed model, the material has to have optimum specifications and will be fabricated using all the appropriate manufacturing process which are cutting, bending, drilling and others. Finally, testing and evaluation process for the fabricated model which is simulation of the model has to be in line with the expected function. 1.5 Project Schedule According to the table 1 below, this project is begun with using literature review via internet, books, supervisor, and others relevant academic material that related to my title, this literature review takes about 3 weeks. The reviews not stop there. It continues along the way of this project because knowledge is so many to learn. On the week 3, design and sketching will be starting. In this task, several designs of flexible rack will be sketch. This task takes time about 2 weeks. From the four design of flexible rack, new design will be made to improve the current design. Then, the new design is draw by using SolidWorks software. This task finishes on week 6. The progress is continues with material preparation. In this task suitable and strength material will be chosen. This progress also involves measured structure and cutting process. This task takes time about 2 weeks. The fabrication process is schedule to takes on the next week but because of fabrication process is have a lot of part to fabricate and cutting. The process is scheduled to take about four weeks. Next, this schedule comes with assembly, painting and finishing. Next task is the thesis writing. This task will start on week 9 until week 14 to accomplish. The report is guided by ump Thesis Writing Guide and also the

5 guidance of my supervisor. Due to all problems we had when doing the project the management has agreed to extend the time to submit the report. All the task is scheduled to take about fourteen weeks overall. Project Activities ereview g and design L Design using Solid Works Table 1.1: Project schedule Week(s) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 xxx x x x x x Material Preparation x x Fabrication - x x x - Evaluation & improvement x x Thesis writing x x x x x x x

CHAPTER 2 LITERATURE REVIEW 2.1 Introduction Rack basically used as place to store items. It will facilitate to store items in proper way and more efficient. Racks come in a wide variety of shapes, height, and materials, depending on their origin, style, and intended use. All racks are composed of a flat horizontal surface and a base with one or more supports, or legs. Rack can be freestanding or designed for placement against a wall. The basic material used at the early of rack fabrication overall source using from wooden. The wooden is still used as the important source for nowadays rack fabrication but it was known as Plywood which have more toughness and strength compared with usual wood. The other material used in rack fabrication such as aluminium, iron, solid rubber and Others. Most of rack is put on the table. Therefore, the design and size are really important and must be consider as the factors to create it. Too much space will limit the usage of a table. Rack also used as something that could be made as decoration on the table.

7 Product Review.1 Rack Types and Functions i. File rack Figure 2.1: File rack File rack is a rack that typically used to store file. This rack is limited only to e file folder. This rack can be arranged to sit on desk or office table. ii. Display rack iri q Figure 2.2: Display rack Display rack is a rack that used to display items (e.g. magazine). Magazine S are the perfect solution for keeping brochures, pamphlets and other printed rial organized and well presented.

8 iii. Paper trays ET Figure 2.3: Paper trays A paper tray is a tray used to store papers or documents. These paper trays are perfect for desktop file organization and personal efficiency. iv. Bulk storage rack Figure 2.4: Bulk storage rack Bulk storage rack is a rack that can carry major loads items and are available in variety of sizes and shelving options. Designed for hand loading of heavy-weight bulky items, these racks can handle a variety of sizes, shapes and lengths with both front and rear accessibility.

v. Newspaper rack Figure 2.5: Newspaper rack Newspaper rack is a rack for keeping newspaper easily. Newspaper storage racks are just another accessory that can be added to the library shelving. Place the daily newspaper on the hanging rack with the back issues from the month on the shelves below. vi. Wall rack Figure 2.6: Wall rack Wall rack is a storage system to keeps documents in limited space and easy to share documents with co-workers. A wall organizer expands work area and keeps important documents protected, yet easy available.

CHAPTER 3 METHODOLOGY 3.1 Project Flow Chart For the diagram as shown as below, the project starts with literature review and research about the title. This consist a review of the concept of rack, rack system, rack features and type of rack used in various fields such as office, garage and others. These tasks have been done through research on the internet, books and others sources. After gathering all the relevant information, the project undergoes design process. In this step, from the knowledge gather from the review is use to make a sketch design that suitable for the project. After several design sketched, design consideration have been made and one design have been chosen. The selected design sketched is then transfer to solid modeling and engineering drawing using SolidWorks program. The materials and the measurement needed for the rack listed down and calculated to give an ergonomic shape of the rack. Next, after the needed material is listed, acquisition step take places. There are only a few materials that need to bought such as screws, hinges and others finishing product. Some of the needed material is well-prepared by the university. After all the parts needed had been gathered, the project proceeds to next step that is fabrication process. The finished drawing and sketching is used as a reference by following the measurement and the type of materials needed. The fabrication

11 process that involved is cutting, bending, drilling and others. After every process was fi nished, the parts are checked to make sure that the output of the process obeys the product requirement. If all the parts had been processed, the parts are joined together to produce full-scaled rack. Here come the testing and evaluation process. The rack will be test to see if it fulfills the requirement such as ergonomic aspect, safety, strength and maneuverability. During the testing, if problem occur such as malfunction or unstable platform, the rack will step back to the previous process, where the error is fixed. The rack is expected to have an error that may cause the part to be re-designed and re-fabricate again. The rack may be finished by doing some finishing process such as spraying and others. After all the parts had been joined together, here comes the last phase of process that is data discussion. In data discussion, the draft report and all the related articles are gathered and hand over to the supervisor for error checking. The finish product will be compared with the report to make sure that there is no mistake on both project and report. After the product and the report had been approved by the supervisor, the report is rearrange and print out to submit at the supervisor, the project coordinator and faculty of Mechanical Engineering. In this stage, the final presentation was also being prepared and waited to be present.

12 LITERATURE REVIEW DESIGN AND MEASUREMENT ACQUISITION AND MATERIAL PREPARATION FABRICATION I I MODIFICATION IMPROVEMENT DATA DISCUSSION REPORT PREPARATION PRESENTATION AND REPORT SUBMISSION Figure 3.1: Flow chart

13 3.2 Design and Sketching 3.2.1 Introduction The Design of the flexible rack must be compliance to several aspects. The design consideration must be done carefully so the design can be fabricated and the system functioning. The aspect that must be considered in designing the flexible rack is this rack must have an attachment to make it very flexible. From aspect material, that flexible rack must be lighter than existing rack and have more strength. The toughness of flexible rack will be the most important criteria in designing the flexible rack. Ergonomic factors also need to be considered which means the rack must be user friendly as easy and convenience. The rack also must be suit to environment so that the rack must be suitable to be use in limited space. The cost of the whole system must not exceeded budget given and must be reasonable. The design cost must also efficient and reduce waste and losses. 3.2.2 Design Actually for this project, the attachment must be design for the existing rack which is found at UMP Mechanical Lab itself. The idea is to join the attachment to the existing rack to make it to be flexible rack. So here only design for the attachments is need to be considered. Here is the design of the existing rack: Figure 3.2: Existing rack

14 3.2.3 Drawing The drawings are divided into two categories, which are sketching and 3D drawing. Firstly, all the ideas for the rack fabrication are sketched on the paper first to ensure that idea selection can be made after this. Then, the final idea is drawn into the 3D drawing format with details features by using Solid Works software. 3.2.4 Design Specifications The design of the flexible rack must be considered that it can endure several specifications which have three platform racks. It will have the basement, upper rack and side rack. The basement is the important platform, because it has to support the upper rack and also will be attached with lot of attachments. Then, for the upper platform, it can fold in and out when needed. It also will be attached with some attachment to make sure it can fold in and out easily. Side's platform also can fold in and out when needed. Lastly, this rack must capable to store a lot of documents and paper works, so the size must be really sure. 3.2.5 Sketching From the existing ideas, only four sketching that had been chosen to be considered as the final ideas, which are: 1. Design 1 v-.eyi-1 1 yod Figure 3.3: Attachment 1

15 This is t he first design for the attachment. It works by using 'L' shape steel rod. The rod can be slide from down to above. The advantages of this design are, it so practical and easy to use and also easy to fabricate. But, still the mechanism of this design is not very proper. It is because, when the steel rod is slide up, it can not stay to support the upper rack. Material that used on this design is steel rod and zinc 2.0mm. ii. Design 2 C-CkM_2 S AC ( Figure 3.4: Attachment 2 This design is look simpler. It will be attach to the side rack. It is easy to use, just fold the second rack which is side rack to the basement rack. Advantage of this design is, easy to fabricate. Also, no need much time to fabricate. Material that used on this design is aluminium 1.0mm. iii. Design 3 EJI 3 Figure 3.5: Attachment 3