CHAPTER 200 STORM SEWER CONSTRUCTION STANDARDS

Similar documents
GWINNETT COUNTY STORM SEWER PIPE STANDARDS

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

DUKE UNIVERSITY CONSTRUCTION STANDARDS

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

Summary of the 2011 Changes

CHAPTER 6. Sanitary Sewer

SECTION STORM DRAIN

Appendix J: Storm Conveyance Design Parameters

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

SECTION FACILITY SANITARY SEWERS

Transportation, Engineering and Development Business Group Standard Construction Plan Notes for Development Projects January 2013

SECTION STORM DRAINAGE AND STORMWATER MANAGEMENT

SECTION UTILITY MANHOLES AND STRUCTURES

***************************************************************************************************************

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 811 CONDUIT AND DRAINAGE STRUCTURES

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

CHAPTER 300 SANITARY SEWER CONSTRUCTION STANDARDS

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

New Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1

***************************************************************************************************************

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

10.0 Storm Sewer Systems

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

Construction Inspection Checklists

Construction Specification for Utility Adjustments

Subject: Use of Plastic Pipe for Storm Sewer and Culverts on Trunk Highways

Standard Specifications for Road and Bridge Construction. Adopted January 1, 2012

All Regional Engineers. Omer M. Osman, P.E. Special Provision for LRFD Pipe Culvert Burial Tables. July 25, 2014

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

ITEM 464 REINFORCED CONCRETE PIPE

Concrete Pipe Joints Your Best Choice

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

CONCRETE PIPE JOINTS, YOUR BEST CHOICE

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

SECTION DOWNSTREAM DEFENDER

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

STORM AND SURFACE WATER 4-1 GENERAL...4-1

Storm Drainage Systems

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

D. Removal of existing storm sewerage pipe and drainage structures.

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SECTION TRENCHING & BACKFILLING

Fabrication and Installation Table of Contents

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY PHASE II

DIVISION 4 SANITARY SEWERS AND STORM DRAINS

ONE PIPE LENGTH MAX (REFER TO 1/4"/FT SLOPE (MIN) 5'-0" (MIN) OR 4" LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4"x6" REFER TO TYPICAL EXCAVATION,

SECTION PIPE & PIPE FITTINGS PART 1 GENERAL

TYPE "A" CATCH BASIN

PART 5 WATER SYSTEMS

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

Stormwater Local Design Manual For Houston County, Georgia

Article 20: Erosion Control and Stormwater Management

SEWER SYSTEM DESIGN GUIDELINES

San Antonio Water System Standard Specifications for Construction ITEM NO. 850 SANITARY SEWER STRUCTURES

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

Storm Drainage

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS

4.8. Subsurface Infiltration

SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation)

MODEL Stormwater Local Design Manual. City of Centerville

PERMEABLE INTERLOCKING PAVERS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

CITY OF FARGO SPECIFICATIONS CONCRETE SIDEWALKS AND DRIVEWAYS

Chapter 8 TECHNICAL SPECIFICATIONS FOR CONVEYANCE SYSTEMS

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

CHAPTER 12: DRAINAGE

San Antonio Water System Standard Specifications for Construction ITEM NO. 852 SANITARY SEWER MANHOLES

Hydrodynamic Separation Product Calculator

TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

A. This Section includes subdrainage systems for foundations and underslab areas. A. Product Data: For each type of drainage panel indicated.

BMP 6.4.4: Infiltration Trench

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION

SANITARY GRAVITY SEWER LINES. A. Sanitary sewer lines, manholes, fittings, accessories, and bedding

SANITARY SEWERAGE AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) AMERICAN RAILWAY ENGINEERING ASSOCIATION (AREA)

Special Provision No. 405F03 March 2005

SECTION 7 SEPARATION OF WATER MAINS AND SANITARY SEWERS

STANDARD SPECIFICATION STORMWATER QUALITY MEMBRANE FILTRATION TREATMENT DEVICE

4.8. Subsurface Infiltration

CONCRETE PIPE USE MANUAL

BAYFILTER SPECIFICATIONS

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

Storm. Section. B. General Design and Drawing Standards Design

of GENERAL. A. Description

Transcription:

CHAPTER 200 STORM SEWER CONSTRUCTION STANDARDS Storm Sewer System: 1. Detention/retention of stormwater runoff shall be provided in accordance with the requirements of the DuPage County Countywide Stormwater and Floodplain Ordinance and the Village of Lombard Ordinances and requirements. Side slopes of a detention/retention facility shall be no greater than three feet horizontal to one foot vertical (3:1) or four feet horizontal to one foot vertical (4:1) on a residentially zoned lot. If the minimum slope cannot be achieved, than a structurally engineered retaining wall shall be incorporated into the design of the detention/retention facility. Embankments or excavations adjacent to public right-of-way shall comply with 605 ILCS 5/9-115.1. 2. As a minimum: A. The storm sewer system shall be designed to convey stormwater from a 10- year storm by gravity flow (without any surcharging of the sewer). The Design Engineer shall provide necessary plans and calculations (including hydraulic grade line) to document compliance with this requirement to the satisfaction of the Private Engineering Services Division. B. Where a proposed storm sewer or stormwater drainage system connects to an existing sewer or drainage system, the Design Engineer shall furnish any and all studies and calculations to demonstrate to the satisfaction of the Private Engineering Services Division that the existing system has the capacity to accommodate the additional flows without adversely affecting the existing system or other properties. This requirement may include, but is not limited to, hydraulic and hydrologic studies of the entire tributary watershed, not simply the proposed development. Where a storm sewer system is intended to drain additional areas, the studies and calculations shall include all tributary areas. Future development shall be allowed for in the calculations and a proposed development will not be allowed to use up the remaining capacity of a sewer where other undeveloped tributary areas have no other reasonable stormwater outlet.

SECTION 200.01 LINE AND GRADE A proposed development shall adjust (reduce) the allowable release rate based on the capacity of the receiving sewer available to the development. All storm sewer pipe and structures shall be constructed to the planned line and grade. All storm sewer systems shall be designed and constructed at a minimum cleansing velocity of three (3) feet per second. SECTION 200.02 MATERIALS All materials and methods shall conform to the applicable minimum standards established by the American Society for Testing Materials. All storm sewers shall be constructed of reinforced concrete culvert pipe (RCCP) and meet the requirements of Section 550 of the IDOT "Standard Specifications for Road and Bridge Construction", latest edition. Polyvinyl Chloride (PVC) pipe may be used in landscaped areas or for roof drain connections (from the building to the nearest available downstream storm structure) when located under a privately maintained paved areas, but only when approved in writing by the Private Engineering Services Division. SECTION 200.03 PIPE CULVERTS THROUGH DRIVEWAYS Precoated fully-lined galvanized corrugated steel pipe may be used for residential driveway crossings only when a ditch section is present. Reinforced concrete culvert shall be used for commercial and industrial driveway crossings only when a ditch section is present. Pipe culverts shall meet the requirements of Section 542 of the IDOT Standard Specifications for Road and Bridge Construction, latest edition. SECTION 200.04 TRENCH BACKFILL IN PAVED AREAS All trenches for storm sewers located under or within two feet of proposed or existing paved surfaces, stabilized shoulders, curb, or sidewalks, shall be fully backfilled with select granular material conforming to the requirements of Section 208 of the IDOT Standard Specifications for Road and Bridge Construction, latest edition, except that the gradation of the material shall be CA-7 from the spring line of the pipe to 12 below the bottom of the pavement. From 12 below the bottom of the pavement to the top of the trench it shall be CA-6. No recycled concrete will be allowed. Selected granular backfill shall be placed in uniform layers not exceeding twelve (12) inches (loose measure) and compacted with mechanical equipment to 95% of the standard proctor CHAPTER 200 - PAGE 2. 1

density in accordance with the applicable AASHTO or ASTM requirements. For pipe bedding requirements, See Section 200.05 (A). SECTION 200.05 CONSTRUCTION REQUIREMENTS A) PIPE BEDDING Granular pipe bedding material or granular cradle shall be required on all storm sewers. Granular pipe bedding shall be a minimum of six (6) inches thick. The trench shall be backfilled with granular material, CA-7 gradation, to the springline of the pipe. (See Standard Detail STORM 11) B) PIPE COVER All culverts, storm drain, and sewer pipe shall be of proper type and class for the depths intended and shall have a minimum cover of two (2) feet. For additional clarification see IDOT "Standard Specifications for Road and Bridge Construction", latest edition. C) HANDLING OF PIPE Storm sewer pipe shall be handled in a manner that will prevent damage. Damaged or defective material on the job site shall be rejected and replaced to the satisfaction of the Private Engineering Services Division. Methods of construction conducive to the damage of the pipe shall be corrected when called to the attention of the contractor. SECTION 200.06 STORM SEWER STRUCTURES A) STRUCTURES IN NON-PAVED AREAS Only inlet type structures or structures without sumps shall be permitted in nonpaved areas. (See Standard Detail STORM 1 & 2) During construction, silt boxes or filter baskets shall be staked or installed in place at each structure to prevent debris and foreign material from entering the sewer system. They shall be maintained until vegetation has matured enough to prevent erosion. (See Standard detail STORM 14) B) INVERTS OF STRUCTURES CHAPTER 200 - PAGE 2. 2

All structures without sumps shall be provided with a precast or cast-in-place concrete fillet to provide a smooth flow between pipe sections. (See Standard Detail STORM 1 & 2) C) SEALING OF STRUCTURES A continuous layer of non-hardening preformed bituminous mastic material (Rub- R-Nek, EZ Stick, or equal as approved by the Private Engineering Services Division) shall be applied to each structure barrel, cone top section and adjusting ring to provide a watertight seal. No hydraulic cement shall be applied above the cone section or flat top and between frame and structure/rings. D) MANHOLE ASSEMBLIES Manholes are to be constructed with steps and a cone or flat top assembly with an opening offset from center. (See Standard Detail STORM 1 & 13) E) PIPE CONNECTIONS All storm sewer pipe to pipe connections shall be sealed with butyl mastic or preformed flexible, gasket type (ASTM C-443) to ensure water tightness. Lifting holes shall be plugged with a preformed polyethylene plug. The plug shall be manufactured by POPIT Inc., Levittown, Pennsylvania. For more details: POPIT Inc., 922 S. Woodbourne Road, PMB #333, Levittown, PA 19057, Phone: 215.945.5201, Fax: 215.752.8411, http://www.popitplug.com/ Product available through the following area companies: Welch Brothers Inc. Concrete Specialties, Inc. 2323 Graham Street 900 W. 9 th Street Bartlett, IL 60103 Lockport, IL 60441 Phone: (847) 741-6134 Phone: (815) 834-0320 Fax: (847) 741-6195 Fax: (815) 838-92785 For new construction, changes in pipe materials between structures shall not be allowed unless approved in writing by the Private Engineering Services Division. At no time shall connections between the storm sewer systems and sanitary sewer systems be allowed. F) MORTAR COLLARS All pipe section connections to storm structures shall be shaped, both inside and outside the storm structure, with additional mortar to provide a three (3) inch collar around the pipe. (See Standard Detail STORM 1, 2, 3, & 4) G) CONNECTION FOR DRAIN AND/OR FIELD TILE CHAPTER 200 - PAGE 2. 3

All storm water drains or field tiles encountered during construction shall be connected to the storm drainage system. The location of known field tiles shall be depicted on the final engineering plans. The connection point of all field tiles to the storm drainage system shall be shown on the As-built record drawings for the storm sewer system. H) MANHOLES Manholes shall be located at the junction of two (2) storm sewer pipes or at any change of grade, alignment or size of pipe. The maximum spacing of manholes shall be three hundred (300) feet for storm sewers. I) MANHOLE APPURTENANCES The following items shall apply to all manhole structures: a. Manhole shall be furnished with a self-sealing frame and solid cover (Neenah Foundry R-1772-C, East Jordan Iron Works 1022-3, or equal approved by the Private Engineering Services Division) with the word Storm imprinted on the cover in raised letters. b. Both the manhole frame and cover shall have machined horizontal and vertical bearing surfaces. Inverted manhole frames are not allowed. c. Pick holes shall not create openings through the manhole cover. d. Manholes located in areas subject to inundation shall be furnished with waterproof, bolt-down frames and covers (Neenah Foundry R-1916-C East Jordan Iron Works 1022-3PT or equal approved by the Private Engineering Services Division. e. Manhole frames shall be adjusted to proper grade utilizing rubberized adjusting rings or reinforced, precast concrete rings. Brick, metal shims or concrete blocks shall not be allowed. f. All manhole frames and adjusting rings shall be securely sealed to the cone section or top barrel section of the manhole using resilient, flexible, non-hardening, preformed, Butyl Mastic (Rub R Nek, EZ Stick, or equal as approved by the Private Engineering Services Division). This mastic shall be applied in such a manner that no surface water or ground water inflow can enter the manhole through gaps between the top barrel section or cone section and the first adjusting ring, between adjusting rings, or between the last adjusting ring and the manhole frame. Up to twelve (12) inches of adjusting rings may be installed on a given manhole. Concrete CHAPTER 200 - PAGE 2. 4

SECTION 200.07 ADJUSTMENTS rings must be at least 3 thick. No more than three (3) adjusting rings in total shall be used. g. A continuous layer of non-hardening, preformed bituminous mastic material (Rub R Nek, E Z Stick or equal, as approved by the Private Engineering Services Division) shall be applied to each manhole barrel, cone, and top section to provide a watertight seal. h. A non-shrink hydraulic cement or Portland cement mixture shall be used on all manhole interior joints. No mortar shall be applied above the cone section or flat top. i. Only plastic polymer steps shall be used. j. Manhole steps on a maximum sixteen (16) inch center shall be furnished with each manhole, when required and specifically called out, securely anchored in place, and true to vertical alignment, in accordance with the Lombard Standard Detail STORM 13. k. Hydraulic cement, mortar, and concrete must be of strength and water tightness quality per ASTM Standards. l. All manholes shall be thoroughly cleaned of dirt and debris and all visible leakage eliminated before final inspection and acceptance. In no instance shall a structure be constructed entirely of adjusting rings. When adjustments are necessary, a minimum of two tapered rubberized adjusting rings shall be used for final adjustment. Concrete rings must be at least 3 thick. Recycled rubber rings may be used. Maximum height of adjustment is 12 inches. A maximum of 3 rings (all rubber and /or rubber and concrete mix) rings will be allowed. The rings shall be set in a bed of preformed non-hardening mastic (Rub-R-Nek or approved equal). In landscape areas, concrete adjusting rings shall be mortared inside and outside of the joints. In non-landscaped areas, mortaring on the outside of the concrete adjusting rings shall not be required. In all locations non-preformed mastic (for cones, flat tops, or rings) or manufacturer approved adhesive/sealant (for rubber, high density expanded polystyrene with polyuria coating or expanded polypropylene products) shall be used. Under no circumstances shall frames be set to grade using miscellaneous construction material. (See Standard Storm Detail 7 & 8) SECTION 200.08 CHAPTER 200 - PAGE 2. 5

OPEN CUTTING OF PAVEMENT Open cutting of pavement is not allowed without a permit from the Private Engineering Services Division. SECTION 200.09 CONNECTION TO EXISTING FACILITIES Prior approval from the Private Engineering Services Division shall be received before connections are made to any existing storm sewer. SECTION 200.10 CLEANING Prior to acceptance, the storm sewer system shall be cleaned and operational to the satisfaction of the Private Engineering Services Division. SECTION 200.11 END SECTIONS Storm sewer outlet structures (i.e. end sections, flared end sections, box inlets) with an opening greater than twelve (12) inches in diameter, shall be covered with a grate whose openings are three (3) inch horizontal by eight (8) inch vertical and which is rakeable. (See Standard Detail STORM 12) All flared-end sections shall have additional hydraulic cement to provide a three (3) inch collar around the connection to the pipe. CHAPTER 200 - PAGE 2. 6