Industrial Estate Authority of Thailand (IEAT) Saharatananakorn IE., Ayutthaya. Rojana IZ., Ayutthaya. Hi-Tech IE., Ayutthaya

Similar documents
WAIKOLOA RESERVOIR NO. 1 EARTHQUAKE REPAIR PROJECT Information Sheet

Open Trench Construction Plan Review The open trench construction plan review involves the following general investigative elements:

Section 704. STEEL SHEET PILING AND COFFERDAMS

q Item meets standard Project ID: X Item not acceptable Contractor: N/A Item not applicable Inspector: C Item requires engineer s cert.

Science and Technology Adaptation for Community Water Resource Management Jittiporn Chantarojsiri

Lake Houston Dam Comprehensive Evaluation of an Ambursen Dam

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION

UPPER MISSISSIPPI RIVER COMPREHENSIVE PLAN

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

CROSSTOWN LRT Construction Liaison Committee November 1, 2017

Construction Inspection Checklists

Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

SECTION UNCLASSIFIED EXCAVATION AND GRADING

Alternative No. 1 Total Cost DRAFT

Storm Drain Inlet Protection

5.3 Flood Protection Plan

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

TRENCHING AND EXCAVATION

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Sector: AGRICULTURE Sub-Sector: IRRIGATION Activity: Maintenance and Rehabilitation of Irrigation projects. Qty. in unit

Chapter A-15. CID-MO Structural Analysis

Storm Drain Inlet Protection for Construction Sites (1060)

Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP)

Experiences on embankment fill in land expressway over soft ground

Installation and Maintenance of Erosion Control BMPs

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

Builder s enviro guide

INTERLOCK BETWEEN PARTICLES AT EACH PERFORATION

TEMPORARY SEDIMENT TRAP CODE

Estimate FOR THE SEPTIC TANK

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

SECTION STORM DRAIN

Table of Contents for Guide Specifications

1.364 ADVANCED GEOTECHNICAL ENGINEERING HOMEWORK No. 5

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

Design and construction of an immersed concrete tunnel using an integrated dock facility

SECTION FACILITY SANITARY SEWERS

LANDSCAPE RETAINING WALLS

Geosynthetics Cost/Benefit Analysis for the Development of a Landfill Expansion Module in Monterey, California

PAPERWORK REDUCTION ACT A. GENERAL

Dry Stacking of Cycloned Tailings

Sediment Basin. Fe= (Depends on soil type)

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016

A. BILL OF QUANTITIES FOR SANITARY SEWER

CHOLLA POWER PLANT BOTTOM ASH POND INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN CH_Inflowflood_003_

Lecture 7 BALLAST & SUBGRADE. Dr. Charisma Choudhury. April 2011

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES

C. Foundation stabilization for pipe and utility structures.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

Case study analysis for the successful completion and sustainable construction of infrastructure projects

Topic: Site Formation

New Hope Crushed Stone. Monthly Update Solebury Communications Group October 2017

HOLDER CONSTRUCTION COMPANY Superintendents Weekly Activity Report #92 Douthit Hills Student Community, Clemson University Project Joe Jett

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018

RIGID INCLUSIONS. Rigid Inclusions offer an economical approach for building on sites underlain by soft soil.

SECTION GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS

2.1 Backfill - General

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

Modular Sediment Barriers (Instream)

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

Dewatering & Foundations. Water. Low tech

Mill Pond Dam Modifications Feasibility Study

PART 1 GENERAL REQUIREMENTS

A.2.a Random Riprap... Table

Scott Hockly. Environmental Management of an Inner City Roading Project

POST CLOSURE PLAN. CFR (d) GERS Landfill. Pirkey Plant Hallsville, Texas. October, 2016

Tsunami Countermeasures at Hamaoka Nuclear Power Station

UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ. Original Issue Bamyan MAC Site Services - Phase 1 Bamyan, Bamyan, Afghanistan

SECTION STORM DRAINAGE AND STORMWATER MANAGEMENT

6 Preliminary Assessment of Construction Method and Constructability Issues

CHANGE OF AN OLD NAVY BASE TO A MODERN MARINA IN BOLTENHAGEN (BALTIC SEA)

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR

Planning & Building Department. Requirements for Erosion and Sediment Control

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

Steps And Stairs Installation Steps In Wall - Option 1 Steps In Front of Walls - Option 2 Steps In Wall; 10 (25cm) Tread - Option 3 Step Parallel to

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

Infiltration Stormwater Control Measures. Andrew R. Anderson, M.S., E.I.T. Extension Associate Engineer

Bioreactor Landfill Design

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

Filter Tube Barriers (Instream)

SECTION TRENCHING & BACKFILLING

INSPECTION, MAINTENANCE AND HOUSEKEEPING PLAN

***************************************************************************************************************

Last Updated March 15, 2016

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

Lower Columbia River Pile Dike Assessment

COMBINED CONCRETE SIDEWALK AND RETAINING WALL. Comply with Division 1 - General Provisions and Covenants, as well as the following:

Temporary Shoring. Specifications, Applications, & Best Practices. Stephen M. (Matt) Revell, P.E. Assistant Geotechnical Engineer

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14

Sampling of Aggregates

SAND POINT CITY DOCK REPLACEMENT ALTERNATIVES ANALYSIS REPORT

RUWAIS HOUSING COMPLEX PHASE IV CIVIL & ELECTROMECHANICAL WORKS

Transcription:

Saharatananakorn IE., Ayutthaya Rojana IZ., Ayutthaya Hi-Tech IE., Ayutthaya Factory Land IZ., Ayutthaya Bang Pa-In IE., Ayutthaya Navanakorn IZ., Pathum Thani Bangkadi IP., Pathum Thani

No. 3 4 5 6 7 Site Total Area (Rais) Total Factories Investment Cost (MB.) Manpower Saharatananakorn,440 46 0,34 4,696 Hi-Tech,446 43 57,034 56,096 Bang Pa-In,96 90 67,0 56,887 Rojana 9,00 3 94,504 55,957 Factory Land 70 84,360 3,65 Navanakorn 6,500 7 80,000 8,3 Bangkadi, 36 66,000 30,000,078 839 577,44 445, 3

6

7 8

9

) High Water Level & Overflow ) High Water Pressure & Land Slide Last Design Criteria. Provide Retention Pond and Dewatering Station for Drainage with Spare Pumps and Serviced Road (Compacted Clay 0.0 m. thickness /.50 m. width min.) for Maintenance. Flood Protection Dike Must Higher than 0 Years Period Max. Flood Level (+ 0.50 m. free board) Width of Road not less than.50 m. Compacted Clay 0.0 m. thickness Not Disturb Water Way Revised Design Criteria. Provide Retention Pond and Dewatering Station for Drainage with Spare Pumps Within hrs. Drainage Capacity Capacity and Efficiency of Spare Pumps not less than Working Pumps Provide Serviced Road surround Retention Pond. Flood Protection Dike Must Higher than 70 Years Period Max. Flood Level (+ 0.50 m. free board) Strong Structure and Resist Hydro- Pressure Width of Road not less than.50 m. Not Disturb Water Way included Quantity and Direction

Last Design Criteria 3. In case of Fill Earth Cover the Entire Area, Allow 0.50 m. Higher than Max. Flood Level Revised Design Criteria 3. In case of Fill Earth Cover the Entire Area, Allow 0.50 m. Higher than 70 Years Period Max. Flood Level 4. Designing of Dewatering System must be considered and concerned with the capacity and direction of outer water way 5. Provide periodic maintenance 6. Provide Water monitoring system, Early Warning System and Emergency Response Plan for Flood Protection 7. Annually Inspection and Report 3 TYPE I : EARTH DIKE WITH.50 m. ACCESS ROAD 3.5m.5 m Road +5.4mMSL Highest FloodLevel =+4.9 mmsl Approx. +.4mMSL NewFill.5 Old Fill Geocell (withstones) 4

TYPE II : EARTH DIKE WITH RC FLOOD WALL +6.00m MSL Design Flood El.: +5.00m MSL 0 Flood El.: +4.8m MSL Concrete Slab Dike RC Floodwall Dike Crest: +4.40m MSL Precast Concrete Panel Service Road Concrete Cut-off Trench Foundation Soil (Clay) Toe Drain 5 TYPE III : EARTH DIKE WITH CONCRETE RETAINING WALL 3.9m Approx. +.4 mmsl NewFill.5m Road Old Fill +5.4 mmsl Precast Concrete Wall Flat Concrete Sheet Pile Highest Flood Level = +4.9 mmsl Geocell (withstones) 6

TYPE IV : FLOOD WALL 7 No. Site Total Factories Operated Fully Partly Total % 3 4 5 6 7 Saharatananakorn Hi-Tech Bang Pa-In Rojana Factory Land Navanakorn Bangkadi 46 4 3 7 58.70 43 0 3 79.0 90 5 8 79 87.78 3 00 66 66 77.93 84 84 0 84 00 7 90 96 86 8.94 36 7 9 80.56 Total 839 454 30 684 8.53 8

3 7 43 90 84 36 9 Not Operated 684 Operated 0

+6.00m MSL Design Flood El.: +5.00m MSL 0 Flood El.: +4.8m MSL Concrete Slab Concrete Cut-off Trench RC Floodwall Dike Crest: +4.40m MSL Precast Concrete Panel Dike Foundation Soil (Clay) Toe Drain Service Road No. 3 Site Saharatananakorn Hi-Tech Bang Pa-In Cost (M ) Started Planned Finish 535.3 Temporary Dike Construction 558.06 Feb. 0 3 Aug. 0 704.374 Feb. 0 3 Aug. 0 4 Rojana,030.000 0 Feb. 0 3 Aug. 0 5 6 Navanakorn Bangkadi,0.00 5 Feb. 0 3 Aug. 0 583.80 Mar. 0 3 Aug. 0 Total 5,5.9

8 30 3 5 7 9 3 5 7 9 3 5 7 9 3 5 7 9 3 5 7 9 3 5 00% WORK PROGRESS REPORT Temporary Dike Construction Project Saha Rattana Nakorn Client : Industrial Estste Authority of Thailand(IEAT) and Saha Rattana Nakorn Co.,LTD Contractor : st Development Division, st Thai Army Area, Royal Thai Army Update to : 9 Sep Contract Start : 7 Aug 0 Finish : 5 October 0 ; 60 Days Report By : IEAT Item Description Quantity Duration 0 Working % Aug Sep Oct Schedule Actual Weight Days Start Finish Start Finished 0 0 30 40 50 60 % Progession Mobilization & Preparation L.S. 5 3% 7 Aug 3 Aug 7 Aug 3 Aug 00% Surveying & Clearing 48,000 sq.m. 5 0% Sep 5 Sep 7 Aug Excavation Removed and 3 30,375 cu.m. 5 0% 4 Sep 8 Sep 7 Aug Compaction Existing Dike Fill and Compaction Dike 4 33,030 cu.m. 40 6% 6 Sep 5 Oct 9 Sep Embankment 5 Big Bag Installtion on Dike,6 Pcs 45 9% 9 Sep 3 Oct 4 Sep 97.9% 78.54 7.8 7.89% 75% 50% 6 Frontage Road Improvement 4,774 cu.m. 0 3% Oct 0 Oct Planned 4% 7 Finishing & Modification 5,00 cu.m. 0 6% Oct 0 Oct Actual 9.33% 5% 8 Demobilization & Recovery L.S. 5 3% Oct 5 Oct 9 55 00% 7 Aug 5 Oct Planned Progression Actual Progression 0% Current % 8% 6% 7% 6% 3% 0% Accumulate % 8% 34% 5% 67% 90% 00% Current % 3.50%.37% 3.46% Accumulate % 3.50% 5.87% 9.33% Plan 4.00% Actual 9.33% Delayed.67% 3 5m 4m Local Road +5.4 mmsl Highest Flood Level = +4.9 mmsl Approx. +.4 mmsl New Fill.5 Old Fill Geocell (with Stones) 4

3.9m Approx. +.4mMSL NewFill.5m Road OldFill +5.4mMSL Highest FloodLevel =+4.9mMSL Precast ConcreteWall Geocell (withstones) Flat Concrete SheetPile 5 +6.00m MSL Design Flood El.: +5.00m MSL 0 Flood El.: +4.8m MSL Concrete Slab Concrete Cut-off Trench RC Floodwall Dike Crest: +4.40m MSL Precast Concrete Panel Dike Foundation Soil (Clay) Toe Drain Service Road 6

3.9 m Approx. +.4 m MSL New Fill.5 m Road Old Fill +5.4 m MSL Highest Flood Level = +4.9 m MSL Precast Concrete Wall Geocell (with Stones) Flat Concrete Sheet Pile 7 8

No. Site Cumulative Planed Progress (%) Cum. Existing Progress (%) at 7 Sep 0 Compare to Plan Cum. Existing Progress (%) at 30 Aug 0 Compare to Last Update Saharatananakorn 4.00% 9.33% -.67% 3.00% +6.33% Hi-Tech 94.50% 90.9% - 4.86% 85.0% +5.7% 3 Bang Pa-In 4 Rojana 66.96% 75.00% +7.39% 7.00% +3.00% 00.00% 98.00% -3.00% 94.00% +4.00% 5 Navanakorn 00.00% 97.83% -3.00% 95.00% +.83% 6 Bangkadi 93.97% 84.08% -3.99% 77.9% +6.6% 9 30