Nursery and Landscape Skill Events

Similar documents
PERMEABLE INTERLOCKING PAVERS

PAVING SLABS ON A CONCRETE BASE

Redi Rock Specification and Installation Manual

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

G R A V I T Y / G E O G R I D

How To Install Your Cambridge Pavingstones System How To Install Your Cambridge Segmental Retaining Wall System

SECTION INTERLOCKING CONCRETE PAVERS

LANDSCAPE RETAINING WALLS

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

SECTION A1 EXCAVATION AND BACKFILL GENERAL

CHAPTER 7: TREE PROTECTION DURING CONSTRUCTION 7.1 TREE PROTECTION AREAS

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems

Pennsylvania Department of Transportation District 8-0 Rest Area Site G Specifications for Landscaping and Lawn Maintenance

NOVEMBER 2016 MAGNUMSTONE. retaining walls installation manual

University of New Mexico Environmental Services Design & Development Standard Requirements

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

BITUMEN-SET PRECAST CONCRETE PAVING SLABS

Guidelines to installing the ACO Sport range of products

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

HOW TO BUILD Garden Walls Frestanding & Landscape Walls

at home installation guide Manufactured by:

Instructions for 12 IGT system

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

Questions & Responses RFP No Design-Build Services, Twin Brooks Golf Course Renovations

How To Build A Dry Stone Wall

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

SECTION FLEXIBLE PAVING

Instructions for 12 and 15 IGT systems (12 pictured)

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000

TREE PROTECTION/PRESERVATION POLICY

SYNTHETIC GRASS INSTALLATION GUIDE SOFT AND HARD SURFACE

Section (02830) MODULAR CONCRETE RETAINING WALL

Training on Roads for Water and Resilience

MACHINE-LAY Installation Manual

Marbella Isles Homeowners Association, Inc.

Products for the residential Market. Where. dreams. & yards meet. anchorwall.com

A. Submittal Procedures: See Article 13 of the General Conditions.

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION

Hotel/Motel. Slip, Trip and Fall Self Inspection Checklist. Completed by: Date: Time:

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

SECTION FOUNTAINS

PART 1 - GENERAL 1.01 General Provisions A. The Conditions of the Contract and all Sections of Division 1 are hereby made a part of this Section.

Construction Specification for Concrete Unit Pavers

The Modern and Cost-Effective Solution for Track & Field Drainage and Player Safety TERMINATOR

AUGUST 2017 HASTINGS. retaining walls installation guide

Steps And Stairs Installation Steps In Wall - Option 1 Steps In Front of Walls - Option 2 Steps In Wall; 10 (25cm) Tread - Option 3 Step Parallel to

SECTION CONCRETE PAVING SLABS SET IN MORTAR

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

B. The purpose of the meeting shall be to establish the conditions of all existing trees upon receipt of the Project site by the Contractor. Failure t

StormTech Construction Guide

Section 2: Underground

Tree Protection Policy

CRESTONE STRAIGHT FIRE PIT SKU:

Construction Procedures

15 lbs (6.8 kg) Approx. Weight. AB Junior. AB Jumbo. 35 lbs (16 kg) Approx. Weight

The Garden Wall Collection

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

Steps And Stairs Installation Option 1 - Steps In Wall Option 2 - Steps With Plant Space Option 3 - Steps In Front of Walls Option 4 - Steps Along

UPPER MILFORD TOWNSHIP DIRECTIONS TO APPLICANTS PUBLIC WORKS MAINTENANCE WORKER. General Description of Duties: Duties and Responsibilities:

Installation Instructions

PRESCOTT FIRE PIT INSTALLATION GUIDE AND OWNER S MANUAL

SECTION UNCLASSIFIED EXCAVATION AND GRADING

ArmorZone TL-2 Barrier

TRUEGRID PRO PLUS Permeable Paver Technical Specifications

HANDHOLES, PULLING VAULTS AND JUNCTION BOXES

UTILITY NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: TREE PROTECTION NOTES

CONDUITS AND FITTINGS

Sawmill Safety & Health. Presented By: John Boysen Safety Consultant OHSA Consultation Program

N Scale Double Track Lift Bridge v1.2

Download the AB Courtyard Estimating App Today!

SEVERITY OF HAZARD? ASSESSED RISK

Section 1 OBC FADS /13 Access to Parking Areas

FFA Forestry CDE Chainsaw Information Study Guide:

4 EXTREME FOUNDATION PANELS

Flood Hazard Assessment Report Falls Gulch, Larimer County, Colorado January 16, 2013

Click on image to enlarge.

Cape town Project (Sport and development)

SECTION POROUS PAVEMENT SYSTEM

2011 INSTALLATION MANUAL

CHAPTER 11 CONDUITS AND FITTINGS

BASE CONSTRUCTION MATERIALS A Aggregate

CONSTRUCTION MANUAL 5-0 x 7-6 UNITS

SECTION UTILITY MANHOLES AND STRUCTURES

How to Build a Dry Stone Wall

SAND INSTALLATION GUIDE

TURF CELL Porous Paving System

Design and Installation Guidelines for Retaining Walls. 1 P age. Geo Products, LLC 8615 Golden Spike Lane Houston, TX Phone:

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3

1. Evolution of Screeds in the USA A. Fixed Screeds with Hydraulic Strike-off, Becoming Obsolete B. Rear Mount Screeds with & without strikeoff C. Fro

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

YOUR SPLASH PAD RESOURCE

PERMEABLE PAVERS PHYSICAL AND GEOMETRICAL CHARACTERISTICS - PAVERS DRIVEWAYS, PERMEABLE DRIVEWAYS & PATIOS CHARACTERISTICS CSA A231.

SEGMENTAL BLOCK RETAINING WALLS. Comply with Division 1 - General Provisions and Covenants, as well as the following:

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

ArmorZone TL-2 Barrier and End Treatment

TREE FELLING TECHNIQUES MANUAL

Transcription:

1 Nursery and Landscape Skill Events SKILL NUMBER SKILL TITLE POINTS 1 Plant Layout 100 2 Basic Program Controller 50 3 Lateral Irrigation Repair 50 4 Line Trimmer 50 5 Chain Saw 50 6 Edger 50 7 Power Blower 50 8 Surveying 100 9 Push Mower 50 10 ZTR Mower 50 11 Intermediate Walk Behind Mower 50 12 Sod Installation 100 13 Tree Planting 100 14 Grading and Draining 100 15 Paver Installation 100 16 Skid Steer Loader Operation 50 17 Pruning 100 18 Fertilizer Application 50 19 Service Receipt 50 20 Wall Installation 100 21 Shrub/Perennial Installation 100

2 SKILLS EVENT 1 Plant Layout Scorecard Deducted Placement of plant material Plant placed within 6 inches +/- of correct placement (5 points each) 20 Facing of plant material Plant faced properly (5 points each) 20 Handling of plant material Plant handled properly (5 points each) 15 Correct view point 5 Explain plant care 5 Safely and properly lifted procedures followed 15 Safety glasses worn 10 Gloves worn 10 TOTAL POINTS 100

3 SKILLS EVENT 2 Basic Program Controller Scorecard Initial programming Set to current day 5 Set to current time 5 Clear other programs of everything previously set up 5 Irrigation programming Station (zone) 1 watering run time: 10 minutes 5 Station (zone) 2 watering run time: 35 minutes 5 Start time: 5:30 a.m. 10 All zones will be watered on designated days 5 Manual operation Able to manually activate station (zone) 2 10 TOTAL POINTS 50

4 SKILLS EVENT 3 Lateral Repair and Head Installation Scorecard Properly repair lateral break Damaged section of pipe removed 5 Removed any burrs or rough edges 5 Cleaned surfaces properly 2 Applied primer and cement 5 Connected fitting to the pipe properly 3 Properly install irrigation head Connected head to pipe according to detail drawing 10 Tightened properly 5 Eye protection used 5 Gloves used while cutting pipe and gluing 5 Cutting implements misused or stored improperly 5 TOTAL POINTS 50

5 SKILLS EVENT 4 Line Trimmer Scorecard Pre-operation check Checked air filter and explained 5 Checked fuel level and filled on hard surface 5 Equipment operation Trimmer on ground when starting 5 Demonstrated how to start engine 5 Demonstrated how to trim around posts without hitting post 10 Ear protection used 7 Eye protection used 8 Discussed avoiding pedestrian traffic 5 TOTAL POINTS 50

6 SKILLS EVENT 5 Chain Saw Scorecard Pre-operation check Check air filter, located 5 Checked chain tension with gloves on 5 Checked bar oil level, and explained its purpose 5 Demonstrated fueling of tank with proper fuel 2 Equipment operation Chain saw was on ground when starting 5 Demonstrated how to start engine, must choke and set chain brake 3 Demonstrated how to cut a log on a saw buck 5 Ear protection used 4 Eye protection used 4 Chaps used 4 Hard hat used 4 Gloves used 4 TOTAL POINTS 50

7 SKILLS EVENT 6 Edger Scorecard Pre-operation check Checked air filter 5 Checked fuel level and filled on a hard surface 5 Equipment operation Edger was on ground when starting 5 Demonstrated how to start engine 5 Demonstrated how to edge a sidewalk 10 Ear protection used 7 Eye protection used 7 Discussed avoiding pedestrian traffic 6 TOTAL POINTS 50

8 SKILLS EVENT 7 Power Blower Scorecard Pre-operation check Checked air filter 5 Checked fan grill 5 Checked fuel level and fill on a hard surface 5 Equipment operation Cleaned up hazards before blowing area 5 Debris blown away from building 5 Demonstrated proper sweeping pattern with blower 5 Ear protection used 5 Eye protection used 5 Dusk mask used while blowing 5 Discussed avoiding pedestrian traffic 5 TOTAL POINTS 50

9 SKILLS EVENT 8 Surveying Instrument Scorecard Instrument set up and knowledge Instrument set up 10 Knowledge of builder s level, transit, laser 10 Determining the benchmark (Point A) 10 Elevation readings and calculations Point B 5 Point C 5 Point D 5 Calculated the elevations difference between point A and C 7 Calculated the elevations difference between point A and D 7 Cut and fill problems Calculated the percent slope between A and D 15 How much fill or cut would be needed between point A and D to create a percent slope? 10 Explained the marks on a grade stake 5 Explained the difference between an architect s and engineer s story pole 6 Properly tore down and store equipment 5 TOTAL POINTS 100 Note: Communication skills are considered in the above scoring.

10 SKILLS EVENT 9 Push Mower Scorecard Pre-start procedures Oil level checked 5 Air cleaner 5 Mower guard down 5 Adjusting mower height 5 Equipment operation Two times outside area 5 Mow trees on left side of mower 5 Ear protection used 5 Eye protection used 5 Hazards were cleaned up before mowing and observed 5 Discussed avoiding pedestrian traffic 5 TOTAL POINTS 50

11 SKILLS EVENT 10 ZTR Mower Scorecard Pre-start procedures Oil level 5 Hydraulic system oil level check 2 Air cleaner 3 Grease fittings 5 Belts, pulleys, guards 4 Adjusting mower height 5 Equipment operation Two times outside area 3 Mow trees on left side of mower 3 Ear protection used 5 Eye protection used 5 Hazards were cleaned up before mowing 5 Discussed avoiding pedestrian traffic 5 TOTAL POINTS 50

12 SKILLS EVENT 11 Intermediate Walk Behind Mower Scorecard Pre-start procedures Oil level 5 Hydraulic system oil level check 2 Air cleaner 3 Grease fittings 5 Belts, pulleys, guards 4 Adjusting mower height 5 Equipment operation Two times outside area 3 Mow trees on left side of mower 3 Eye protection used 5 Ear protection used 5 Cleaned up hazards before mowing 5 Discussed avoiding pedestrian traffic 5 TOTAL POINTS 50

13 SKILLS EVENT 12 Sod Installation Scorecard Deducted Graded area according to problem description 10 Rolled area (pre sod) according to problem description 5 Calculated and weighed proper amount of fertilizer 6 Applied fertilizer evenly 6 Sodded strips adjacent to edges full width 5 Staggered seams on sod rolls 8 Knitted seams tightly 10 Made cuts accurately 5 Irrigation heads/valve box visible 8 Rolled sod after installation 7 Explained watering of new sod 10 Eye protection used 10 Demonstrated proper lifting techniques 10 Additional safety violations: Deduct 3 points for each observed safety violation such as tools used improperly etc. TOTAL POINTS 100

14 SKILLS EVENT 13 Tree Planting Scorecard Hole dimension according to detail Width 10 Depth 10 Planted according to detail Root pruning 5 Handled correctly 5 Soil berm 5 Tamped properly 5 Mulched properly 5 Explained watering method for new tree 15 Explain stakes and wire installation Stakes at correct depth 5 Stakes straight and plumb 5 Stakes placed per prevailing wind 5 Straps installed at correct height 5 Eye protection used 5 Proper use of glove 5 Proper lifting techniques were used 5 Wore hard hat 5 Additional safety violations: Deduct 3 points for each observed safety violation, such as tools used improperly etc. TOTAL POINTS 100 Deducted

15 SKILLS EVENT 14 Grading and Drainage Scorecard Resemblance to scale drawing of sand mound Top of mound at proper elevation 10 Top of mound at proper location 10 Elevation points (3 different elevation points will be checked by judge Point A 10 Point B 10 Point C 10 Location and elevation of catch basin Location 10 Elevation 10 Will the finished product drain? 15 Eye protection used 10 Proper use of gloves 5 Additional safety violations deduct 3 points for each observed safety violation, such as tools used improperly etc. TOTAL POINTS 100 Deducted

16 SKILLS EVENT 15 Paver Installation Scorecard Procedure Set string line 90 degrees with the base line 10 Install running bond paver pad 15 Install a basket weave pattern pad 15 Explain to the judge the steps involved in laying pavers Using paint or stakes lay out the area to be installed 5 Determine finish grade 5 Excavate a minimum of 6 inches for a solid base 5 Create a 2 percent min slope 2 Add base, compact no more than 4 at a time 3 Base to be 6 beyond finished detentions 5 Install edging 3 Install sand and screed 5 Lay pavers 2 Cut pavers and use of ear protection 5 Sand sweep and compact 5 Eye protection used 5 Gloves used 5 Improper lifting 5 TOTAL POINTS 100

17 SKILL EVENT 16 Skid Steer Loader Scorecard Pre-start procedures Oil level and hydraulic system oil level check 4 Tire pressure 3 Fuel check 4 Air filter check 3 Grease fittings 4 Safe operation of equipment Proper mounting of loader 4 Proper exiting of loader 4 Attaching front implements 4 Safety glasses used 5 Ear protection used 5 Seat belt was used 5 Discussed observing people and hazards 5 Note: Deduct 10 points for any safety violation, Maximum 20 points TOTAL POINTS 50 Deducted

18 SKILL EVENT 17 Pruning Scorecard Tree Structure Identify trunk, leader and lateral branches 15 Pruning tools and methods Properly used hand pruners 10 Properly used loppers 10 Demonstrate the 3-point cut method and rationale 10 Tree pruning Identify 3 appropriate cuts and proper tool to use 15 Shrub pruning Demonstrate how to start and handle gas-powered hedge shears 15 Eye protection used 5 Ear protection used 10 Gloves used 10 Note: Deduct 10 points for any safety violation, maximum 20 points TOTAL POINTS 100 Deducted

19 SKILL EVENT 18 Fertilizer Application Scorecard Checked equipment spinner for proper operation before filling 10 Adjusted spreader setting as instructed 10 Measured the proper amount of fertilizer plus/minus 5 percent 10 Filled spreader off of turf area 10 No fertilizer spillage and spreader is closed prior to filling 10 Opened spreader at appropriate time 10 Spread fertilizer evenly 10 Eye protection used 10 Ear protection used 10 Gloves used 10 TOTAL POINTS 100

20 SKILL EVENT 19 Service Receipt Scorecard Recorded crew time properly 10 Checked off services rendered 5 Recorded actual pre-emergent herbicide calculations 5 Recorded actual mulch calculation 5 Record actual flats installed 5 Record comments about irrigation head 5 Explained annual care 10 Crew leader signed off on service receipt 5 TOTAL POINTS 50

21 SKILLS EVENT 20 Wall Installation Scorecard Procedure Set string line 90 degrees with the base line 10 Install wall proper length 10 Install wall proper height 10 Set cap stone properly 10 Stagger seams on wall 10 Explain to the judge the steps involved in laying pavers Using paint or stakes lay out the area to be installed 5 Excavate a minimum of 6 inches for a solid base 5 Add base, compact no more than 4 at a time 5 Base to be 6 beyond finished wall 5 Cut wall stone and use of ear protection 5 Glue/mortar as needed 5 Safety procedure Eye protection used 5 Gloves used 5 Improper lifting 10 Note: Deduct 10 points for any safety violation, maximum 20 points TOTAL POINTS 100 Deducted

22 TEAM SKILLS CHALLENGE EVENT 21 Shrub/Perennial Installation Scorecard Deducted Placement of plant material Plant placed within 3 inches +/- of correct placement (5 points each) 20 Facing of plant material Plant faced properly to a maximum of 20 points (5 points each) 20 Handling of plant material Plant handled properly to a maximum of 15 points (5 points each) 15 Correct view point 5 Explain proper plant care 10 and proper lifting of plants Safely and properly lifted procedures are followed 10 Safety glasses used 10 Gloves used 10 TOTAL POINTS 100