Worldwide Pollution Control Association

Similar documents
Worldwide Pollution Control Association

Worldwide Pollution Control Association. August 3-4, 2010

Zero Liquid Discharge Effluent Guidelines Compliance Strategies for Coal-Fired Power Plants FGD Wastewater

Worldwide Pollution Control Association. August 3-4, 2010

Steam Electric Power Generating Effluent Guidelines Protecting Surface Water from Power Plant Discharges

Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016

FGD Wastewater Treatment Evaluation

Worldwide Pollution Control Association

Selenium Removal from Scrubber Water VSEP RO membrane treatment for water reuse

Selenium Removal. Caroline Dale

Dynamic Waste Water Modeling for Coal Burning Power Plants

Managing the New FGD Wastewater Regulations. Technology Options for Biological Treatment: Maximum Treatment Reliability with Lowest Lifecycle Cost

Corrosion and Odor Control in Wastewater Systems

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

PURPOSE PROCESS PAYOFF

Innovative water technologies for maximum efficiency and profitability

The Growth of Dry Sorbent Injection (DSI) and the impact on Coal Combustion Residue

Removing Heavy Metals from Wastewater

WET FLUE GAS DESULFURIZATION (FGD) SYSTEMS ADVANCED MULTI-POLLUTANT CONTROL TECHNOLOGY

SAGD Water Disposal Options, Associated Impacts, and Strategies to Improve Environmental Footprint. Basil Perdicakis, January 27, 2011

Effluent Guidelines and Water Quality Management - Program 56

Treatment Technologies

URS Corporation (URS) conducted a

CHLOR-ALKALI INDUSTRY

Wastewater Treatment Processes

Aquatech Energy Services

FLUE GAS DESULFURIZATION FOR 2 X 6 MW COAL FIRED POWER PLANT

Mercury and SO3 Mitigation Issues for Scrubber Technology

Proposal by Russia to delete hot sub-spot Hot sub-spot name South-West Wastewater Treatment Plant

POWER PLANT AIR QUALITY CONTROL and FLY ASH QUALITY & AVAILABILITY

Soda Ash ( Sodium carbonate) Manufacture

"Significant Cost Savings Obtained Using Advanced Membrane Systems for Cooling Tower Water Treatment and in ZLD plants

ARSENIC IN DRINKING WATER

m&qmr EPA TECHNOLOGY PREPARED BY RECOVERY OF U S ENVIRONMENTAL SPENT PROTECTION AGENCY - SULFURIC ACID ENVIRONMENTAL FROM OPERATIONS -

IWC ZLD: New Silica Based Inhibitor Chemistry Permits Cost Effective Water Conservation for HVAC and Industrial Cooling Towers

TDS AND SLUDGE GENERATION IMPACTS FROM USE OF CHEMICALS IN WASTEWATER TREATMENT

Unit Treatment Processes in Water and Wastewater Engineering

Advanced Treatment of Flowback Water Using Magnetic Ballast Clarification and Vortex Generating Membrane Systems for Discharge

Preparing for Nutrient Removal at Your Treatment Plant

MAKING THE SWITCH FROM LIME TO MEMBRANE SOFTENING: WHEN IS IT THE RIGHT TIME? Introduction

COPPER PRECIPITATION AND CYANIDE RECOVERY PILOT TESTING FOR THE NEWMONT YANACOCHA PROJECT

Reverse Osmosis. Lecture 17

AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal

Selenium Reduction. Caroline Dale

Economics of Lime and Limestone for Control of Sulfur Dioxide

Evaluation of Alternate Process Chemistries for the Removal of Arsenic and Fluoride from Industrial Wastewater

Module: 9 Lecture: 40

Developing a Wastewater Treatment Training Program for the Mexican Metal Plating Industry Located at the Arizona-Mexico border

Lowering The Total Cost Of Operation

Nadeem Shakir Qatar Petroleum. The 2nd Joint Qatar Japan Environmental Symposium, QP JCCP The 21st Joint GCC Japan Environmental Symposium

REACTION TANKS ADVANCED MEMBRANE FILTRATION

Livestock and poultry producers are seeking. Solid-Liquid Separation. of Animal Manure and Wastewater E

Air Pollution Control For

Wastewater Treatment Processes

The Advantage of Mixed Salt Crystallizers in Zero Liquid Discharge (ZLD) Wastewater Treatment Systems

NPDES COMPLIANCE OF COOLING TOWERS BLOWDOWN AT POWER PLANTS WITH RECLAIMED WATER AS SOURCE WATER

LEVEL AND FLOW INSTRUMENTS FOR FLUE GAS DESULFURIZATION

A STRUVITE CONTROL AND PHOSPHORUS REMOVAL PROCESS FOR CENTRATE: FULL-SCALE TESTING. 850 Pembina Highway Winnipeg, MB

To hold a large reserve of metal ions in the soluble form.

USE OF CHEMICALS TO CONTROL ODORS AND CORROSION IN WASTEWATER SYSTEMS

Kirill Ukhanov, GE Water & Process Technologies, Russia, describes how advanced membrane technology is helping a Russian refinery to meet stringent

Liquid Filtration for Chlor- Alkali Plants

Chapter 2: Description of Treatment Facilities

The Release of Base Metals During Acidic Leaching of Fly Ash

Page 15 of 490. Appendix A: Definitions, Acronyms, and Abbreviations Used in This Notice. EPA is proposing revisions to the effluent limitations

The Future of Coal Ash

COAL, OIL SHALE, NATURAL BITUMEN, HEAVY OIL AND PEAT Vol. II -Environmental Impacts of Oil Shale and Pollution Control Technologies - J. Q.

EFFECTIVE STRATEGIES FOR RESIDUAL POLYMER AND AQUATIC TOXICITY TESTING FOR DREDGE SLURRY DEWATERING

What is FGD Gypsum? Presented By E. Cheri Miller Gypsum Parameters, LLC Tennessee Valley Authority (Retired)

Advanced Emissions Control Development Project

CeraMem. Ceramic Membrane Technology. Advanced Heavy Metals Removal System WATER TECHNOLOGIES

Full Scale Operation of GE ABMet Biological Technology for the Removal of Selenium from FGD Wastewaters

EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT

4 Angles. Pilot-scale Evaluation of AirPrex for Phosphorus Management. Innovation Program Phosphorus Initiative JTAC 4/22/2017

Sustainable Water Management. for the Power Industry

A Case Study from EP3: Pollution Prevention Assessment from a Cattle Hide Tannery. HBI Pub. 10/31/94

Achieve Zero-liquid Discharge of Industrial Wastewater. (Distill Process Waste for Reuse)

COOLING TOWER WATER TREATMENT

GEA Niro Spray Drying Absorption. The easy way to clean the flue gas from waste incinerators. engineering for a better world. GEA Process Engineering

WATER RECYCLING SOLUTIONS

The Use of Magnesium Hydroxide Slurry as a Safe and Cost Effective Solution for H 2 S Odor, Corrosion, and FOG in Sanitary Sewer Systems

Your Water Treatment Technology Partners for Wash Water & Industrial Water Treatment. Design Supply Integration Installation Maintenance

REMOVAL OF HARDNESS BY PRECIPITATION

Tampa Bay Water (TBW) is a regional

Integrated Treatment Options for Meeting Stringent Selenium Regulatory Limits Using Anaerobic Bioreactors

Proposal by Russia to delete hot spot 18.2

Worldwide Pollution Control Association

Water Solutions for the Mining Industry

ABSTRACT. Electrostatic precipitators (ESPs), which are particulate collectors, are now used as part

Water Quality Permitting Program Monitoring Matrix 1,2,3

Natural Gas Well Development in the Marcellus Shale: The Use of Fresh Water and Beyond

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics

Mercury Control in North America Using Powdered Activated Carbon (PAC)

Primary Clarifier Odor Control Replacing Nitrates with D.O. Kevin Jacobs, P.E. ECO Oxygen Technologies

6 INNOVATIVE PROCESS FOR TREATMENT OF SULFURIC ACID WASTE LIQUIDS WITH RECOVERY OF ANHYDROUS SODIUM SULFATE

Mercury Control in the Boiler

Pretreatment of Industrial Wastewater for ZLD/Resources Recovery

Wet FGD Effluent Characterization in Preparation for WWT Technology Selection

TruePeak TDLS200. NH 3 Slip Measurement. <Document Number> Copyright Yokogawa Electric Corporation <date/time>

Cooling Water Treatment

Transcription:

Worldwide Pollution Control Association WPCA-Southern Company Wastewater Treatment Seminar April 16 & 17, 2013 All presentations posted on this website are copyrighted by the Worldwide Pollution Control Association (WPCA). Any unauthorized downloading, attempts to modify or to incorporate into other presentations, link to other websites, or to obtain copies for any other purposes than the training of attendees to WPCA Conferences is expressly prohibited, unless approved in writing by the WPCA or the original presenter. The WPCA does not assume any liability for the accuracy or contents of any materials contained in this library which were presented and/or created by persons who were not employees of the WPCA. Visit our website at www.wpca.infowpca

Treatment and Discharge of FGD Liquid Wastes Gordon Maller URS Process Technology Office, Austin, TX

Topics To Be Covered Overview of regulations Properties of FGD purge water (wastewater) FGD design and operation Design considerations for WWT processes Discussion of WWT technology Physical-chemical treatment Biological treatment Constructed wet lands Discussion of ZLD technology Summary and lessons learned

Overview of Regulations Current Regulations for plant liquid discharges to surface waters: Rules first issued in 1974 Clean Water Act Revised in 1977 and 1982 No changes in last 30 years Implemented through National Pollutant Discharge Elimination System (NPDES) program EPA currently revising Effluent Limitation Guidelines (ELG) for power plants: New regulations expected to be implemented between 2014 and 2019 through 5-year NPDES permit cycle Based on BACT Some state limits as low as: 1.3 to 12 ppt Hg; 10 to 100 ppb - Se

Scope of New ELG Regulations FGD wastewater Fly ash transport water Bottom ash transport water Collected leachate and runoff from dry landfills containing CCR Flue gas Hg control wastes (e.g., ACI)

FGD Wastewater Wastewater a result of need to purge chlorides from scrubber Corrosion of alloy materials Ability of scrubber to obtain acceptable limestone utilization Ways that Chlorides are purged from scrubber Free moisture in FGD byproducts Low solids purge stream Characteristics of wastewater: Suspended solids Major species: Ca, Mg, Na, SO3, SO4 and Cl Trace species: As, B, Br, F, I, Hg, Se, Mn Heavy metals Nitrogen (nitrates and nitrites) ORP: Can affect oxidation state of Se and Hg

FGD Wastewater (continued) Composition depends on: Properties of fuel, reagent and makeup water FGD process design and operation Wastewater from FGD can be saturated with gypsum. Can lead to scaling in WWT filtration and evaporation equipment

FGD Design and Operation Can Affect Wastewater Properties Forced oxidation versus natural or inhibited oxidation ORP Amount of free moisture in byproducts High versus low chloride Can affect sulfate levels and degree of gypsum supersaturation Operation Filtercake wash? Filtercake free moisture

What is ORP Measure of redox potential of slurry. Indication if environment is oxidizing or reducing. Also indication of how strongly oxidized or reduced ORP determined by: Process: forced oxidized versus natural or inhibited oxidation The presence and quantity of a number of reduced sulfur species, nitrogen species, and sulfur nitrogen species Trace transition metals ORP can: Determine form of selenium (selenite versus selenate) Determine oxidation state of mercury Can affect solubility of Mn which is thought to be a cause of under deposit corrosion of duplex SS and higher grade alloys

Design Considerations for WWT Treatment Concentration limits for pollutants in effluent Design chloride level for FGD Function of inlet flue gas conditions, makeup water properties and corrosion resistance of building materials Determines the volume of purge water required Economic trade-offs between cost of materials and volume of purge need to be evaluated during design phase Purge stream should be as low in suspended solids as possible and should not be diluted Properties of wastewater need to be considered in design of WWT system: ph, temperature, ORP, composition, degree of supersaturation

Theoretical Scrubber Cl - Blowdown Rate Assumptions: 600 MW; Fuel HHV 12,000 Btu / lb; Heat Rate 10,500

Discussion of WWT Technology

WWT Treatment Options Physical-chemical treatment Biological treatment Constructed wet lands

Overview of Physical-Chemical Treatment Source of flow diagram CH2MHill

Discussion of Treatment Steps 1. Desaturation a. Raise ph to about 8.5 9.0 with lime to precipitate metal hydroxides and gypsum b. Do not want to allow ph get too high and precipitate all of the Ca and Mg c. Retention time about 30 minutes d. Sludge from first clarifier recycled to provide seed solids (nucleation sites) 2. 1 st Clarifier a. Remove fine gypsum and other suspended solids b. Design similar to FGD sludge thickener c. Common to add flocculent to improve settling of solids d. Targeting 10 to 20 wt.% in underflow e. Typical overflow rate 0.5 gpm/sft

Discussion of Treatment Steps (continued) 3. Equalization Tank a. Used to provide consistent flow and composition for chemical treatment b. May be located upstream of desaturation tank or close to scrubber depending on number and location of influent streams 4. Chemical Treatment Tanks a. Metals removed by precipitation as metal-hydroxide or metal-sulfide (example: mercury-sulfide [cinnabar]) b. Metal-sulfides precipitate rapidly and are very fine and difficult to settle. To overcome this, sulfide is bonded with large organic molecule, organosulfide. This increase size of precipitate and makes it easier to settle c. Ferric chloride is dosed at high concentration and precipitates d. Metals co-precipitate with the iron and are removed (example selenite) e. Retention times in chemical treatment tanks typically 10 15 minutes

Solubility of Metal Hydroxides

Discussion of Treatment Steps (continued) 5. 2 nd Clarifier a. Used to settle precipitated metals to a solids concentration of 10 to 20 wt.% b. Typical overflow rate 0.33 gpm/sft c. Lamella clarifiers are an option if space is limited d. Polymers (coagulant and flocculent) often added to facilitate settling 6. Effluent media filtration a. Used to remove un-settled suspended solids and metal precipitates b. Filters will need to be back-flushed c. Control of gypsum RS is important because filters are prone to scaling 7. Ion-exchange technology a. Sometimes used for challenging treatment applications (example B removal) b. Very prone to scaling. Should not be regenerated with H2SO4

Discussion of Treatment Steps (continued) 8. Sludge dewatering a. Filter presses most common b. Work best at feed solids concentration of 10 to 20 wt.% c. Typical dewatered solids concentration 60 to 70 wt.% d. Sludge transported and disposed of in dry landfill

Overview of Biological Treatment Biological treatment (SBR) are located downstream of phys-chem treatment Needed to remove BOD/COD, NO3, NO2, ionic Hg Activated sludge process need to maintain population of anaerobic bacteria to treat waste water Anaerobic bacteria reduce ionic Hg to elemental form which is no longer soluble Process typically more challenging for O&M Problems with high or low temperature Problems with high salinity Works best with consistent influent flow and influent properties, does not work well as a batch operation

Constructed Wetlands Wastewater flows through microbial and bacteria rich material such as compost Requires a large area for treatment Novel vertical flow design is being evaluated as means to reduce size At some point the bacteria rich material needs to be removed and disposed

Discussion of ZLD Technology

ZLD Treatment Options Deep well injection Evaporative thermal process In duct evaporative process Wastewater spray dryer Non-thermal process

Deep Well Injection Deep well injection: Waste must be treated before injection Lower capital and O&M costs Higher environmental risk Not an option in some regions

Evaporative Thermal ZLD Evaporative thermal process: Brine concentrator for initial concentration of wastewater Reverse osmosis treatment Thermal evaporative (e.g., Vertical tube falling film) Crystallizer Removal of suspended solids and Ca ++ required prior to treatment High capital and energy requirements Dissolved salts present in FGD wastewater, like CaCl2, hydrolyze at high temperature and become acidic and corrosive Fairly complex operating and maintenance requirements

Block Diagram for Evaporative Thermal ZLD

Wastewater Evaporation System Direct injection of wastewater into ductwork Salts collected with fly ash in particulate control device

Wastewater Spray Dryer Addition of wastewater to small spray dryer installed in flue gas slipstream bypassing air heater Salts collected with fly ash in particulate control device

Overview of Non-Thermal ZLD Process Fixation and Blending for Disposal in Landfill: Mixture of scrubber solids (e.g., gypsum), fly ash, lime (if required) and waste water to produce a cement-like product suitable for disposal in landfill Non-thermal technology No pretreatment of wastewater Has potential to eliminate all discharges from plant (operate as ZLD plant) Low capital and operating costs Reduce quantity of ash available for resale May be preferred option due to low cost and simple O&M

Block Diagram for Non-Thermal ZLD Process Typical Composition of Stabilized Byproduct 30-35% gypsum 30-35% fly ash 30-35% purge water 2-4% lime

Project Approach for Plant ZLD Operation Project Approach Non-thermal ZLD Mix FGD wastewater with scrubber solids (gypsum or sulfite), fly ash, and lime (if necessary) to produce a stable and fixated waste material. Place fixated waste material in dry landfill Return leachate and contact water to FGD

Summary and Lessons Learned 1. Have good understanding of FGD process chemistry to improve ability to predict properties of purge water and capability of FGD system to process miscellaneous plant wastewater 2. Have a reasonable and accurate design basis for fuel, inlet flue gas properties, reagent and water 3. Operate and optimize FGD system to reduce and minimize quantity of wastewater and to produce a consistent purge stream in terms of volume and properties 4. Optimize plant water management to reduce volume of process streams 5. Consider full range of load conditions and fuel properties in design 6. Operate landfill to minimize volume of leachate and contact water

Gordon Maller URS Process Technology Office, Austin, TX gordon.maller@urs.com