Public Private Partnership. Workshop On Development of Dry Port through Public Private Partnership

Similar documents
Opportunity for Private Investment Mauritius Island Container Terminal

A BRIEFING NOTE ON THE PORT SECTOR IN BANGLADESH. February 15, 2007

Welcome to the presentation of

Trade Logistics Service Liberalization in Bhutan by Mr. Tandin Tshering

Disentangling transit costs and time in South Asia

Bhutan Status of Cross Border & Transit Transport. 21 st January 2014 Hotel Taj Tashi, Thimphu

INTERMODAL FREIGHT TRANSPORT OPERATION USING TOWED TRAILER BETWEEN KOREA AND CHINA AND RESULTING ECONOMIC EFFECTS

Insights from ESCAP s Trade Process Analysis Database (Version 1.0; )

New Priok Port: A New Paradigm for Indonesia

Auto Industry Opportunities & Challenges. 2 nd SIAM Automotive Logistics Conclave Greater Noida 16 th & 17 th January 2015

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN])

SOUTH CAUCASUS RAILWAY REPORT OF THE DIRECTOR GENERAL OF SOUTH CAUCASUS RAILWAY CJSC VIKTOR REBETS

Intermodal Connectivity through Hub & Spoke

Roles of Dry Ports in Economic Corridors. Transport Division, UNESCAP

Rail and Multi-Modal Operations

Good Afternoon & Namaste!

NAMIBIA: LOGISTICS HUB FOR SOUTHERN AFRICA CAPE TOWN, SOUTH AFRICA 17 NOVEMBER 14 (& BEYOND)

Framework for Measuring Performance of Trade Related Services under Trade Facilitation Process

The Policy-Related Road Transport Research in MOT

About Us. Our Expertise FASTIC GROUP

Insert Cover Image using Slide Master View Do not distort. Container Logistics (CFS & ICD) Market India

Bangladesh Regional Waterway Transport Project. Charles Kunaka Senior Trade Specialist Global Product Specialist - Connectivity

Pakistan International Freight Forwarders Association (PIFFA ) Country report

Impact of the global maritime container transport on rail traffic in Europe Klaus-Jürgen Uhl, Senior Adviser, MC Mobility Consultants

Green Freight in Asia in the Context of the Sustainable Development Goals

UN-ESCAP Meeting on Strengthening Railway Transport Connectivity in south and South- West Asia 15 March, 2017 New Delhi

Trade facilitation as a key to unlocking trade potential along OBOR

Transportation of export import containers through inland waterways; Challenges & Opportunities

Inland Port Cargo Complex

MP3EI s Influence on Jabodetabek Metropolitan Priority Area (MPA)

Maritime Transport Connectivity. WTO, Geneva, February 2017,

Transport Connectivity in South and South-West Asia

Intermodal Connectivity through Hub & Spoke

Alexandria port Eldekhiela port

Presentation on Initiatives to Improve Cargo Handling at the Port of Mombasa. Muhamad A. Jezan Resident Representative

APM Terminals Nigeria

Creating access for regional communities to efficient and effective aviation logistics infrastructure

DEPARTMENT OF LOGISTICS UNIVERSITY OF STELLENBOSCH POSTGRADUATE INFORMATION: TRANSPORT ECONOMICS 2018

Freight Transportation Megatrends

National Experience: Mongolia

CEF Transport Info day 2016 Greece

TRADE FACILITATION & PLANT HEALTH RECENT LESSONS

Trade and Transportation Audit in Sri Lanka

TEXAS FREIGHT MOBILITY PLAN 2017

Paperless trade facilitation for SMEs

Sunrise Project South I-205 Corridor Improvement Project

Suez Canal. The Suez Canal Zone represents a new chapter in the economic development of

Status of Development of Dry Ports in Nepal

Intermodal transport project BIMH: Bucharest Ilfov Multimodal Hub

Status of the Development of Dry Ports in Myanmar

MAP 21 Freight Provisions and Seaports

Farooq Sobhan President Bangladesh Enterprise Institute (BEI)

Study on Private-Initiative Infrastructure Projects. in Developing Countries in FY2008. Study on the Improvement Project of Rail Freight

Embassy of Denmark in Vietnam 2 / 10

No other provider of Land Transport services links so many places in Europe as DB Schenker Logistics.

Sea World (SMC Pvt.) Ltd. Company Profile

ONE BELT ONE ROAD To forge closer economic ties, deepen cooperation, and expand development in the Euro-Asia region, we should take an innovative

Presentation on Operationalization of Regional Connectivity between Bangladesh, India, Nepal and Bhutan

Adress:- I.O.C.L Link Road Bharat CFS Zone, Adani Port Road, Mundra- Kutch CIN No. U63011GJ2006PTC Tariff Card

ADDENDUM No. 1B TO TERMS AND TARIFFS OF BMF PORT BURGAS EAD. ACT Burgas Tariff

DCT: Poland's Maritime Window on the World

EURO-ASIAN TRANSPORT LINKS

C o n t a i n e r T e r m i n a l, I n t e r m o d a l L o g i s t i c s

Developing logistic centres in Central Asia

HSR «EURASIA» DEMAND FOR FREIGHT TRANSIT

OVERVIEW. 1.Industry trends. 2.Ports in Transition. 3.The Connected Port

EXIM TARIFF OF ICD-RAIL TERMINAL OF ICD REWARI w.e.f TERMINAL ACCESS CHARGES:

A Supply Chain System: the InterBulk Approach - some practical insights & case studies from InterBulk s Asian customers. Shanghai 21 June 2012

Beyond RFS and MPG: Promoting Cleaner Trucking Services. Warren Lavey February 2014

Build resilient infrastructure, promote inclusive and sustainable industrialization and foster innovation

Item 6: Documentation and Procedures used on Route 3 (3A and 3B)

USD per cubic meter (CBM) USD per consignment, per waybill

CONTAINERISATION. 1 Prof. Ashok Advani - Jaipuria Institute of Management, Noida

North China Europe Express Service

CIO Conference for Strengthening Regional Cooperation to Advance E-Government Development in Asia and the Pacific AIDE-MEMOIRE

BNDES support to Infrastructure

Status of Dry Ports Development in NEPAL

PUBLISHED TARIFF OF M/S KRIBHCO INFRASTRUCTURE LTD. SURAT, HAZIRA

STRENGTHENING YOUR PORT S FINANCIAL STABILITY THROUGH DIVERSIFICATION

Caribbean Port Efficiency: Challenges and Opportunities S. Brian Samuel PPP Coordinator Caribbean Development Bank

ENHANCING EXPORT COMPETITIVENESS THROUGH TRADE FACILITATION: THE EXPERIENCE OF SRI LANKA

Part Five ---- XI. Multimodal Transport and Freight Forwarding 123

Commercial Sea Port of Ust-Luga Russia's strategic choice

Rail freight and development

VOLTRI TERMINAL EUROPA

BERTHING PROBLEM OF SHIPS IN CHITTAGONG PORT AND PROPOSAL FOR ITS SOLUTION

Rail R&D in Europe New opportunities:

CUSTOMS-2-BUSINESS CUSTOMS-2-GOVERNMENT CUSTOMS-2-CUSTOMS

TPM Asia Why Should the Indian Sub-continent be on a Shipper s Radar Screen? Future Trends in Trade, Port Development and Transhipment

STANDARD TARIFF. Bharat CFS Zone-1, Mundra Port & SEZ Ltd. Mundra, Dist: Kutch , Gujarat,

Training Workshop on Corruption Risks and Anti-Corruption Strategies in Climate Financing

84 th International Propeller Club Convention Fundamental Changes to a Traditional Transportation Paradigm. October 7, 2009

LOGISTICS PARKS NETWORK IN INDIA

DISRUPTIVE OPPORTUNITIES

Pre-Shipment Inspection Services

SICAL Logistics Limited. Single Window for Integrated Logistics

Bangladesh-Bhutan-India-Nepal Motor Vehicles Agreement

THE EVOLVING PANAMA CANAL ROUTE FOR CHEMICALS

Rail - What Does the Future Bring?

Norway-South Korea Joint Research Project Dr. Bjørn Gunnarsson, Managing Director

Transcription:

Public Private Partnership Workshop On Development of Dry Port through Public Private Partnership

Background Economic Development Policy 2010 Private Participation in Infrastructure Policy 2010 Graduation from LDC and inclusion in triennial review Building economic resilience Changing development assistance priorities Increase in number of infrastructure projects Disparate initiatives- IT Park, Dry Port, Education City, Agro Park Promoting growth of private sector Moving beyond basic infrastructure requirements- health, education, road tunnels Opportunities created by hydropower development

Background Accelerating Bhutan s Socio-Economic Development- McKinsey: Attracting investments and meeting the job gap by developing priority sectors identified accelerated growthtourism, ICT, construction, cultural industries, agriculture, and cross-cutting factors which enable/inhibit growth Improving the efficiency and effectiveness of public sector services- health care, education, vocational training and government-to-citizen services

PPPs: Theory and Practice Theoretically appealing Practical implementation a challenge Promoting privatisation and providing subsidies to entrepreneurs is not PPP Promoting free market development not equivalent to PPPs- leading to overvaluation/undervaluation of private sector involvement Transformation of traditional roles

Transforming Public and Private Sector PPPs require shift in Public and Private sector roles and attitude Moving away from client-contractor approach Public sector- core functions of supervision & regulation Private sector- greater responsibilities & risks in execution, operation & mobilisation of resources Sustaining the transformation of roles over the long-term

PPP Readiness Development of Dry Port in Bhutan

Brief Background Landlocked country (between China & India) Economic growth Annual average growth of 7.5% for last 35 years. Total Trade growth About 16% for last 15 years Trade Openness Index : 60% (1998) to 80% (2015) Trade liberalization : Bilateral, Regional, and Multilateral Trade routes: Four major trade routes (Phuntsholing, Gelephu, Sandrup Jongkhar, and Samtse). Phuntsholing is the main commercial hub and gateway. In 2015, 74% of Bhutan s Total Trade happened through Phuntsholing.

Challenges Underdeveloped trade infrastructure facilities, such as dry port, cold storage, etc. Logistic Performance Index (LPI) 128/155 in 2010 and 143/160 in 2014. High transaction costs ( Muliple CFA, Kolkota port, etc.) Transportation cost (LL, Narrow road, rugged terrain) Highly dependent on single export sector (hydro) Small domestic market (Export is key)

Challenges cont Phuntsholing : Traffic congestion due to increasing volume of both cargo and passenger traffic hinders competitiveness, safety and convenience of cross border movement There is increasing containerized traffic requiring demand for container handling requirements. Customs inspection is conducted at multiple locations - mainly at four different locations - due to lack of parking space and cargo handling area.

Dry Ports Projects in Bhutan Mini Dry Port (MDP) in Phuntsholing with financial support of the ADB under the South Asia Sub-regional Economic Cooperation (SASEC). Dry Port at Pasakha with financial support of the World Bank under the Regional Connectivity Project.

Mini Dry Port Area is 5.4 acres 3-Zones: 1. Generalized cargo area (south). 2. Administrative area (center) 3. Container area (north) Cost estimate: USD 2.5m ($1.65 for construction) Short to medium. Feasibility Study Conducted in 2013 and found feasible 10,385 TEU p.a (5000 TEU initial demand and 20% growth p.a.).

Functions of MDP Customs clearance for import and export traffic Provide storage/warehousing facilities Loading/unloading facilities for containerised import/export Container stuffing/de-stuffing Conduct other exports/imports inspections (SPS)

Benefits from MDP One-stop point for all customs clearance and related services Aappropriate transhipment and parking areas for the cargo trucks Truck and cargo idle time savings resulting from reduced dwell time Reduction of losses of perishable goods resulting from the construction of a covered area. De-congest Phuntsholing city and bring in efficiency in the cross-border movement of goods

Traffic forecast for cargo trucks (2013-2036) Scenarios Period Low Medium High 2013-2020 1.65% 3.32% 4.99% 2021-2030 1.00% 1.68% 2.70% 2030-2036 1.00% 1.68% 2.70% Traffic is expected to grow at much higher rate with the Motor Vehicle Agreement among four countries Bangladesh, Bhutan, India and Nepal ( BBIN) is expected to increase the traffic flow.

Economic and Financial Benefits Scenarios EIRR With bypass road Low growth 18.4% 14.6% Threshold Med growth =12% 21.5% 17.6% High growth 24.7% 17.6% Without bypass road

Financial benefits In terms of operational costs, the Project will breakeven within the first five-year period at applying existing tariff structures. Profits in subsequent years is expected to rise significantly. The mini dry port project shows financial sustainability for operation and maintenance and thus potential for O&M contract under PPP. However, it would not generate sufficient excess cashflow for funding of initial investment under a PPP/concession scheme.

Proposed contact type and packaging Design and Build Contract under conventional procurement method for detail designing and construction of the MDP. National Competitive Bidding process has been recommended. O & M under PPP framework. Management contract for O&M on the basis of fixed fee and performance-related bonuses. This would benefit from private sector expertise in building facilities management and transport logistics.

Pasakha Dry Port Area: 15.6 Acres 3-Zones: 1. Export Zone 2. Administrative area 3. Import Zone Cost estimate : USD 16m Project life cycle : 20 Yrs (2+18) Full fledged dry port For med to long run TEU 0.064m (2016) 0.327m (2035)

Layout concept Cold Storage Import Container freight Station Import Processing zone Container freight Station Export Empty container yard Staff Residential Zone Container yard Reefer Container yard Canteen & clinic Dry bulk & dusty Cargo vehicle parking

Benefits Exporter/Im porter Freight forwarder Shipping Agent Port Authority Society Transporter Increased Trade Flow Faster customs clearance Reduced no. of C&F agents Improved Communication Reduced road congestion Creation of jobs Quicker turnaround time Reduced road accident Increase national security

Financial Viability and Sensitivity analysis Scenarios/Metrics Project Equity Minimu Average IRR IRR m DSCR DSCR Base Case 12.25% 13.90% 1.13 1.34 10% 12.78% 14.81% 1.24 1.40 Traffic 20% 13.19% 15.55% 1.31 1.44-10% 11.47% 12.61% 1.00 1.25-20% 10.40% 10.94% 1.00 1.14 Capex 5% 11.55% 12.80% 1.07 1.28 10% 10.89% 11.75% 1.01 1.22 O&M 10% 11.54% 12.78% 1.06 1.28 20% 10.78% 11.58% 1.00 1.21 Debt IFA - 2%,2% 12.15% 18.32% 1.62 1.85 (unhedged)

Procurement contract Design & Construction O & M

Thank You