PNB Merdeka Ventures Sdn Berhad Green Sukuk Framework

Similar documents
Second Opinion on PNB Merdeka Ventures Sdn. Berhad s Green Sukuk Framework

LEED Application Guide for Multiple Buildings and On Campus Building Projects

Sustainable Design A DIVISION OF SHIVE-HATTERY

LEED LEED. Leadership in Energy and Environmental Design. A voluntary, consensus-based. high-performance, sustainable buildings and neighborhoods

LEED 2009 for New Construction and Major Renovations

Second Opinion on OBOS Forretningsbygg s Green Bond Framework

500 WEST PUTNAM AVENUE GREENWICH, CT

- AIA Honor Award for Interior Architecture - ALA/IIDA Library Interior Design Awards: Best

Synergies & Trade-offs: IP category

Leased Space Environmental and Energy Efficiency Attributes Tenant Instructions

Analysis 1. LEED Analysis of Laboratory Buildings. Penn State School of Forest Resources University Park, PA

LEED -Existing Buildings. Crescent Ridge Corporate Center I

BUILDING FOR OUR FUTURE

LEED for Commercial Interiors

Second Opinion on Quantum Solar Park s Green Bonds Framework

37% 100% 100% PROJECT HIGHLIGHTS LEED Facts. Wiener Auditorium

LEED Application Guide for Multiple Buildings and On-Campus Building Projects

The Fort Collins Discovery Museum LEED stands for Leadership in Energy and Environmental Design.

LEED 2009 for Commercial Interiors. Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP

Devon Tower: From Brown to Gold Larry Nichols May 23, Site Selection

2012 Green Homes Tour

GLADYS VALLEY HALL. Materials & Resources Innovation & Design Process

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc.

LEED Project Delivery Process Manual Appendices

PROPOSED MEDIUM-TERM NOTE FACILITY OF RM430.0 MILLION

88.2% 32% 23% WEITZ LABORATORY GOLD. PROJECT HIGHLIGHTS LEED Facts. of on-site generated construction waste was diverted from landfills.

Green Building Rating System

ADEC S SUSTAINABLE FUTURE SCHOOLS PROGRAM

Notice of Project Change THE HUB ON CAUSEWAY (FORMERLY THE BOSTON GARDEN) OFFICE TOWER

Second Opinion on KommuneKredit s Green Bond Framework

Projected actual points. Responsible for UNC -- Project name. Remarks

Learn more about the many ways The Swift is eco-friendly throughout our building and surrounding area and how you can do your part!

Case Study: Element PROJECT DESCRIPTION

CONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability

LEED version 4 Leadership in Energy and Environmental Design

CALGREEN NON-RESIDENTIAL BUILDING Checklist

Green Star Design & As Built v1.2. Minor wording corrections have been implemented throughout the Submission Guidelines to improve clarity.

Environmental excellence

Construction Specifications Canada Conference May 23, BOMA BESt

The Future of Green Buildings in the Region. Faridah Shafii Institute Sultan Iskandar Universiti Teknologi Malaysia

ULMA S COMPROMISE & CONTRIBUTION TO LEED CERTIFICATION

EDMONTON TOWER. FOR LEASE Avenue NW Edmonton, AB

LEED Basics. Presented by. Jeremy Knoll PGAV Architects

LEED Rated Government Buildings. Government Sector Construction. CPWD Construction Work Load

Finance for Environmental Upgrade Agreements

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

Genentech Building 20 Office LEED-CI Gold XL CONSTRUCTION

MEP Engineer's Letter of Assurance

Sustainability at University of Florida. Bahar Armaghani, LEED AP

SACRAMENTO County New Animal Care Facility LEED Elements

LEED Leadership in Energy and Environmental Design

Achieving Zero Carbon for Buildings in a Densely Populated City and a Subtropical Climate. Guiyi LI Construction Industry Council

Presenters: Dominick Balletta Managing Director Jacob Burns Film Center

Sarawak Energy s New Low Energy HQ And first green building in Sarawak

LEED V4 FACT SHEET FOR STEEL PRODUCTS USED IN CONSTRUCTION APPLICATIONS

University of Illinois Business Instructional Facility LEED Gold Design. University of Illinois. University of Illinois

CDL SETS WORLD RECORD FOR LARGEST VERTICAL GARDEN

The Use of Green Building Materials in Construction and their Impact on Rating Systems

Environmental Stewardship Conference October 05, 2013 Energy Water and Sustainability (EWaS) Program

Raising the Bar for sustainable office design

SUSTAINABLE BUILDINGS. U.S. DIPLOMATIC FACILITIES August 9, 2016

LEED v4 and Beyond: UDI Vancouver Breakfast Jan 18, Next Generation of Green Building in Canada. Thomas Mueller President & CEO

1) MERV (Minimum Efficiency Reporting Value) is relevant to which ASHRAE standards in LEED v4? (Choose 2)

Second Opinion on Entra s Green Bond Framework

Green Building Ordinance Overview

Research Analysis: Building Envelope and LEED Credits Introduction

DPR Phoenix Regional Office Net Zero Certification

SUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR

GREEN U.S. EMBASSIES. Low Carbon Cities April 22, 2014

The 2010 California Green Building Code; "CalGreen" effective January 1st, 2011

TORONTO GREEN STANDARD v3

TORONTO GREEN STANDARD v3

TD CANADA TRUSTCREDIT VALLEY TOWN PLAZA

One That is Already Built.

2016 LEED Equivalency Analysis for Stanford Campus

LEED-EB Checklist. Sustainable Sites - 14 points 3/9/ Documentation Required. Not Pursued Key Party. Purchase Record. Targeted.

Estidama Sustainability at Large A Mandate for Success

Asset Enhancement Initiative. 27 May 2010

THERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS

Facade Design for Super High- Rise Building in Subtropic Region in China

- Innovative, multifunctional and lightweight façade skin. - Resource, time and cost efficient refurbishment method. - New social platforms

MEP's Letter of Assurance

LEED And Your Indoor Environment

tall buildings sustainable & practical design approach case study: 20 fenchurch street cibse regional seminar birmingham 8 february 2012

LEED for Existing Buildings:

Institute of Marine & Antarctic Studies

Energy Efficiency Solutions for Multifamily Housing. Clark Energy Group LLC

BANK ONE CORP /OH/ FORM 11-K (Annual Report of Employee Stock Plans) Filed 7/11/1997 For Period Ending 12/31/1996

Green Campus & Sustainability Program

Framework for CICERO s Second Opinions on Green Bond Investments


LEED v4. Materials Deep Dive

GREENSmart Handbook. Achieving Sustainability through Environmental Practices

Zero energy highrise. Dream Comes True? Zero Carbon Building Conference 2015

The Development of ISKANDAR Malaysia with Clean Technologies & Low Carbon Footprint

ASHRAE s s Sustainable Roadmap. .meet the ASHRAE GreenGuide. Research Strategic Plan. Journal Articles

Sustainability in Semiconductor Facilities

75% 40% reduction in water consumption. 43% 68% 90%

NPCA SUSTAINABILITY RESOURCE. Precaster s Guide to. LEED v4. National Precast Concrete Association. 1 PRECASTER S GUIDE TO LEED v4 precast.

SINAR KAMIRI SDN BHD GREEN SRI SUKUK SECOND OPINION REPORT 2 NOVEMBER 2017 PROPOSED SUKUK ISSUANCE OF RM245.0 MILLION

Transcription:

PNB Merdeka Ventures Sdn Berhad Green Sukuk Framework Introduction Permodalan Nasional Berhad ( PNB ) was incorporated on 17 March 1978 and is a wholly-owned subsidiary of Yayasan Pelaburan Bumiputra (Bumiputra Investment Foundation). Yayasan Pelaburan Bumiputra was established in January 1978 to formulate policies and guidelines for Bumiputra equity investment participation and PNB was set up as its subsidiary to implement its policies. PNB is the parent company for Amanah Saham Nasional Berhad which operates a number of unit trust schemes. To date, PNB holds a diversified portfolio of investments in asset management, unit trusts, institutional property trusts and property management. In 2009, PNB announced their proposal to embark on a project to build an integrated development with an Iconic tower in the historic Stadium Merdeka and Stadium Negara enclave. PNB Merdeka Ventures Sdn Berhad ( PNBMV ) was set up as a wholly-owned subsidiary of PNB to undertake this project. The Project named as the Warisan Merdeka development consists of a 118-storey Iconic Tower, retail mall and service apartments. The tower was named Merdeka PNB118 by, comprising office space, a luxury hotel and an observation deck. The Green Sukuk Framework The Green Sukuk Framework was developed by PNBMV in order to ensure transparency, disclosure and integrity for the issuance of a Green Sukuk. This Green Sukuk Framework is built upon guidelines established by The Green Bond Principles: published by the International Capital Market Association and having the key components, as follows: 1. Use of Proceeds 2. Sustainability Features 3. Management of Proceeds 4. Reporting CICERO Center for International Climate Research was retained to review the framework in fulfillment of the Green Bond Principles.

1. Use of Proceeds PNB Merdeka Ventures Sdn Berhad ( PNBMV ), will issue a Green Sukuk of MYR 2 billion. The proceeds of the Notes issued will be utilized for the Merdeka PNB118 Tower. The Tower is part of the Warisan Merdeka development comprising the 118 storey Tower, a Retail Mall and 3 blocks of Serviced Apartments within the vicinity of Stadium Merdeka in Kuala Lumpur, Malaysia. Eligible Project The Merdeka PNB118 Tower is a 118 storey tower consisting of 83 floors of Grade A office space, 16 floors of luxury hotel, 3 floors of observation deck (including restaurant) and 16 floors of sky lobbies and amenities. The Merdeka PNB118 Tower will be the tallest building in South East Asia at approximately 630 metres. Merdeka PNB118 Tower aspires to be a model for workplace safety and sustainability. It aims to secure multiple green building certifications through the Leadership in Energy and Environmental Design (LEED) 2009 Core and Shell, Green Building Index (GBI) and GreenRe. The mix of the three (3) certification systems benchmarks the project with a more comprehensive cross section of green features than if using only one certification system. 2. Sustainability Features Sustainable features for the Merdeka PNB118 Tower covers the following areas: Features Sustainable Site Planning and Management Examples - Multiple public transit connections including a direct in-building connection to Mass RapidTransit (MRT) station and existing connection to the monorail and nearby connections to the Light RapidTransit (LRT) line - Accommodations for bike commuting including storage and showers - Prioritized accommodations for fuel efficient vehicle parking - New public green open space mostly in the form of a new linear park - Material and tree selections on site to minimize the site s heat island effect Water Efficiency - Grey water and condensate water collection and treatment - Water efficient fixtures certified under WELS - 100% rain water harvesting and use - mainly for irrigation - Metering and leak detection systems.

Energy and Atmosphere - Optimized energy performance with district cooling with onsite chilled water energy storage, zoned daylight sensors, tenant submetering and high performance lighting Material Conservation Resource - On site renewable energy offset with solar hot water panels for supplying the hotel - Building integrated solar photovoltaic (PV) at the south canopies - Returned energy regeneration from the lifts - Lifts with fully regenerative AC drives, sleep mode for lighting and ventilation in lift cabs - Construction waste management programme diverting a minimum of 75% of construction waste from landfills - Prescribed recycled content of installed materials (30%), regional materials (20%), and sustainable certified wood products (50%). Indoor Quality Environmental - Smoke free environment and outdoor air delivery monitoring - Prescribed low emitting materials (low VOC, no formaldehyde, etc.) and prescribed indoor pollutant control - User controllable thermal comfort including low velocity displacement underfloor cooling - Floor layouts that promote daylight and views - CO2 monitoring and control - Construction IAQ plan, construction mold prevention, daylight glare control and acoustic optimization Sustainable Construction - Construction activity pollution control including run-off - QLASSIC quality assessment - Construction waste management - Prescribed reuse of concrete formwork The Project would also have social benefits such as creation of additional employment opportunities, positive multiplier effect to the whole country and it would also support the growth of local suppliers and service providers. Additionally, the market value of the real properties in the surrounding area would also increase because of the Project. It would also stimulate the growth of tourism sector with its Iconic tower complete with Skydeck which will be a new tourist attraction for Kuala Lumpur.

3. Management of Proceeds The issuer shall open and maintain a Shariah-compliant bank account designated as the Proceeds Account 1 where the Proceeds Account 1 shall capture monies from: 1. Proceeds from Green Sukuk 2. Equity contribution from PNB 3. Any amount or payment paid by PNB derived from the call of completion guarantee 4. Facilitation fund proceeds (if the funds received during construction period). Funds in the Proceeds Account 1 shall then be transferred to: 1. Project Account 1 to meet the construction cost; 2. Profit & Expense Account 1 to meet the recurring fees, profit payment obligations and Completion Guarantee fee; 3. Finance Service Reserve Account 1 to meet the Minimum Required Balance. Below is a diagram for the flow of the funds during construction and operation.

4. Reporting To enable investors to follow the development, PNBMV will provide an annual letter to investor including; 1. The total amount of disbursed funds and use of the funds 2. Environmental impact reporting on energy and CO2, water and waste. For example, Building Management System ( BMS ) which would provide actual energy and water use data including from the solar and water treatment subsystems. Meanwhile for CO2 impact, this will be reported based on BMS raw data. External Audit The Green Sukuk programme reinforces our commitment to the environment. Our rigorous periodic monitoring ensure that the project is financially, environmentally and socially responsible. The internal tracking method, the allocation of funds from the Green Sukuk proceeds and the investor letter will be verified by PNBMV External Auditor annually. The opinion of the External Auditor and the investor letter will be made available on PNBMV s web page www.pnbmerdekaventures.com.my.