Design and Construction Standards SECTION POTABLE WATER SYSTEMS

Similar documents
C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers.

Essex County College - West Essex Campus Addition And Renovations Dib # / SECTION DOMESTIC WATER PIPING SPECIALTIES

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Submittal for Aquatherm Piping System

SECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section.

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

Daytona Beach Pier Building Renovation Jun 2010

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

City of Winnipeg BASES, HANGERS AND SUPPORTS Section NEWPCC - Pump Well Isolation Page 1 of 6 Tender No June 2003

A. Pipe, pipe fittings, valves, and connections for piping systems. 1. Sanitary sewer. 2. Domestic water. 3. Storm water. 4. Gas.

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION

SECTION HYDRONIC PIPING

SECTION FACILITY WATER DISTRIBUTION

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures.

SECTION HANGERS AND SUPPORTS FOR PLUMBING

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers.

1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings

A. This Section includes sanitary waste and vent piping inside the building and to locations indicated.

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD

SECTION PLUMBING PIPING SYSTEMS. A. Types of plumbing piping systems specified in this section include the following:

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION VALVES, HANGERS, AND SPECIALTIES

SECTION WATER SYSTEMS

SECTION PLUMBING PIPING SYSTEMS

Daytona Beach Pier Building Renovation Jun 2010

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems.

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER

SECTION PLUMBING FIXTURES

A. Pipe Supports: ANSI B 31.1, Power Piping. B. Automatic Sprinkler Pipe Supports: Refer to Section

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION SUPPORTS AND ANCHORS

ADDENDUM. Project: BYU-I Smith Building Chiller Replacement Project No.: Addendum No.: 1

1.04 SUBMITTALS PLUMBING FIXTURES

University of Delaware

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SECTION NATURAL GAS PIPING

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

C. Inspect all waster lines and repair all joints that are leaking. Replace all damaged or broken drain lines.

SECTION FACILITY STORM DRAINAGE

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms.

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

January 2015 Town of Surf City Standard Specifications

BuildingName The Description of the Project P DOCUMENTS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Copyright 2015 AIA MasterSpec Premium 12/15 PRODUCT MASTERSPEC LICENSED BY ARCOM TO MUELLER INDUSTRIES, INC.

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

1. Division 23 Section "Hangers and Supports for HVAC Piping and Equipment" for pipe insulation shields and protection saddles.

SECTION PLUMBING PIPING

SECTION PLUMBING PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

B. Drainage Piping: Building sewer piping outside building that conveys storm drainage from building.

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

4 1 /2 MARK 73-5 AMERICAN FLOW CONTROL. It s What We Know. AMERICAN-DARLING FIRE HYDRANT AMERICAN-DARLING 4 1 /2 MARK 73-5 FIRE HYDRANT

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

SECTION TAPPING SLEEVES AND VALVES

CHAPTER 6 WATER SUPPLY AND DISTRIBUTION

Design & Construction Standards, Revised January

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

A. Types of lightgauge metal framing units include the following: 1. C-shaped structural steel studs Uniform Building Code.

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION 12 - WATER DISTRIBUTION SYSTEM

A.Z.E. SUPPLY COMPANY

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin

SECTION PIPE & PIPE FITTINGS PART 1 GENERAL

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

2012 IPC Sections

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Engineering Specifications

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

ST. JOHNS COUNTY ARCH. PROJ. NO SECTION PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Training Certification Categories

DARTMOUTH COLLEGE DESIGN September 15, 2004 &CONSTRUCTION GUIDELINES

A. This Section includes exterior piping for vertical, direct-buried, ground-loop, heat-pump systems that operate between 23 and 104 deg F.

Anvil CSI 3 Part MasterFormat Specifications:

DIVISION 22 PLUMBING

SECTION SANITARY WASTE INTERCEPTORS

Newport City Council Bettws High School Underfloor Heating Specification CONTRACT 2

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

SECTION FACILITY SANITARY SEWERS

Transcription:

SECTION 15410 POTABLE WATER SYSTEMS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work of this section. B. Division-15 Basic Mechanical Materials and Methods sections apply to work of this section. 1.2 DESCRIPTION OF WORK A. Extent of potable water systems work is indicated on drawings and schedules, and by requirements of this section. B. Refer to other Division-15 sections for insulation required in conjunction with potable water piping; not work of this section. C. Trenching and backfill required in conjunction with exterior water piping is specified in other Division-15 sections, and is included as work of this section. D. Trenching and backfill required in conjunction with potable water piping inside of building foundations is specified in other Division-15 sections, and is included as work of this section. 1.3 QUALITY ASSURANCE A. Manufacturer's Qualifications: Firms regularly engaged in manufacture of potable water systems products, of types, materials, and sizes required, whose products have been in satisfactory use in similar service for not less than five years. B. Codes and Standards: 1. Plumbing Code Compliance: Comply with applicable portions of the Florida Building Code pertaining to selection and installation of plumbing materials and products. 2. Local Jurisdiction: Comply with State of Florida Department of Environmental Protection (DEP) and City of Melbourne requirements. 1.4 SUBMITTALS A. Product Data: Submit manufacturer's technical product data and installation instructions for potable water systems materials and products. B. Show grooved joint couplings and fittings on drawings and product submittals, and specifically identified with the applicable manufacturer's style number. PART 2 PRODUCTS 2.1 MATERIALS AND PRODUCTS A. General: Provide piping materials and factory-fabricated piping products of sizes, types, pressure ratings, temperature ratings, and capacities as indicated. Where not indicated, provide proper selection as determined by Installer to comply with installation requirements. Provide materials and products complying with plumbing code where applicable. Provide sizes and types matching piping and equipment connections; provide fittings of materials that match pipe Potable Water Systems 15410-1 of 5 Facilities Planning & Design

materials used in potable water systems. Where more than one type of materials or products are indicated, selection is Installer's option. 2.2 BASIC IDENTIFICATION A. General: Provide identification complying with Division-15 Basic Mechanical Materials and Methods section "Mechanical Identification". 2.3 BASIC PIPES AND PIPE FITTINGS A. General: Provide piping materials and factory-fabricated piping products of sizes, types, pressure ratings, and capacities as indicated in section 15420. Where not indicated, provide proper selection as determined by Installer to comply with installation requirements. Provide sizes and types matching piping and equipment connections; provide fittings of materials, which match pipe materials used in potable water systems. Where more than one type of materials or products are indicated, selection is Installer's option. 2.4 BASIC PIPING SPECIALTIES A. General: Provide piping specialties complying with Division-15 Basic Mechanical Materials and Methods section "Piping Specialties", in accordance with the following listing: 1. Pipe escutcheons. 2. Low-pressure Y-type pipeline strainers. 3. Dielectric unions. 4. Mechanical sleeve seals. 5. Fire Barrier penetration seals. 6. Water hammer arresters. 7. Pipe sleeves. 8. Sleeve seals. 2.5 BASIC SUPPORTS AND ANCHORS A. General: Provide supports and anchors complying with Division-15 Basic Mechanical Materials and Methods section "Supports and Anchors", in accordance with the following listing: 1. Adjustable steel clevises and adjustable pipe saddle supports for horizontal piping hangers and supports. 2. Two-bolt riser clamps for vertical piping supports. 3. Concrete inserts, C-clamps, and steel brackets for building attachments. 4. Protection shields for insulated piping support in hangers. 2.6 BASIC VALVES A. General: Provide valves complying with Division-15 Basic Mechanical Materials and Methods section "Valves", in accordance with the following listing: 1. Sectional Valves: a. 2" and Smaller: Ball valves. b. 2½ " and Larger: Gate valves. 2. Shutoff Valves: a. 2" and Smaller: Ball valves b. 2½" and Larger: Gate valves. Potable Water Systems 15410-2 of 5 Facilities Planning & Design

3. Drain Valves: a. 2" and Smaller: Gate valves or ball valves. b. 2½" and Larger: Gate valves. 4. Check Valves: a. All Sizes: Swing check valves. 2.7 BALANCE COCKS A. Threaded Ends 2" and Smaller: Class 125, bronze body, bronze plug, screw driver operated, straight or angle pattern. B. Soldered Ends 2" and Smaller: Class 125, bronze body, bronze plug, screw driver operated, straight or angle pattern. C. Manufacturer: Subject to compliance with requirements, provide balance cocks of one of the following: 1. Bell & Gossett ITT; Fluid Handling Div. 2. Hammond Valve Corp. 3. Milwaukee Valve Co., Inc. 4. Spirax Sarco. 5. Taco, Inc. 2.8 RELIEF VALVES A. General: Provide relief valves as indicated, of size and capacity as selected by Installer for proper relieving capacity, in accordance with ASME Boiler and Pressure Vessel Code. B. Combined Pressure-Temperature Relief Valves: Bronze body, test lever, thermostat, complying with ANSI Z21.22 listing requirements for temperature discharge capacity. Provide temperature relief at 210 F (99 C), and pressure relief at 150 psi. C. Manufacturer: Subject to compliance with requirements, provide relief valves of one of the following: 1. Cash (A.W.) Valve Mfg. Corp. 2. Conbraco Industries, Inc. 3. Watts Regulator Co. 4. Zurn Industries, Inc.; Wilkins-Regulator Div. PART 3 EXECUTION 3.1 INSPECTION A. General: Examine areas and conditions under which potable water systems are to be installed. Do not proceed with work until unsatisfactory conditions have been corrected in manner acceptable to Installer. 3.2 INSTALLATION OF BASIC IDENTIFICATION A. General: Install mechanical identification in accordance with Division-15 Basic Mechanical Materials and Methods section "Mechanical Identification". 3.3 INSTALLATION OF POTABLE WATER DISTRIBUTION PIPING: Potable Water Systems 15410-3 of 5 Facilities Planning & Design

A. General: Install water distribution piping in accordance with Division-15 Basic Mechanical Materials and Methods section "Pipes and Pipe Fittings". 1. Unless designed or specified otherwise, install piping level and plumb. B. Locate groups of pipes parallel to each other, spaced to permit applying full insulation and servicing of valves. C. Electrical Equipment Rooms: Do not run piping thru electrical equipment rooms or above electric panels. 3.4 INSTALLATION OF PIPING SPECIALTIES A. Install piping specialties in accordance with Division-15 Basic Mechanical Materials and Methods section "Piping Specialties". 3.5 INSTALLATION OF SUPPORTS AND ANCHORS A. Install supports, anchors, and seals in accordance with Division-15 Basic Mechanical Materials and Methods section "Supports, Anchors, and Seals". 3.6 INSTALLATION OF VALVES A. Install valves in accordance with Division-15 Basic Mechanical Materials and Methods section "Valves". B. Sectional Valves: Install on each branch and riser, close to main, where branch or riser serves 2 or more plumbing fixtures or equipment connections, and elsewhere as indicated. C. Shutoff Valves: Install on inlet of each plumbing equipment item, and on inlet of each plumbing fixture, and elsewhere as indicated. D. Drain Valves: Install on each plumbing equipment item located to completely drain equipment for service or repair. Install at base of each riser, at base of each rise or drop in piping system, and elsewhere where indicated or required to completely drain potable water system. E. Check Valves: Install on discharge side of each pump, and elsewhere as indicated. F. Balance Cocks: Install in each hot water recirculating loop, and elsewhere as indicated. 3.7 EQUIPMENT CONNECTIONS A. Piping Run outs to Fixtures: Provide hot and cold water piping run outs to fixtures of sizes and indicated, but in no case smaller than required by the plumbing code. B. Mechanical Equipment Connections: Connect hot and cold water piping system to mechanical equipment as indicated, and comply with equipment manufacturer's installation instructions. Provide shutoff valve and union for each connection, provide drain valve on drain connection. 1. Where grooved joint piping systems are utilized, unions are not required, grooved joint couplings shall serve as unions. 3.8 FIELD QUALITY CONTROL A. TESTING: 1. Flush Out piping systems with clean water before proceeding with required tests. Inspect each run of each system for completion of joints, supports and accessory items. 2. Hydraulically pressure test each section or segment of the system prior to backfilling, encasing, enclosing or otherwise preventing visual observation of the section or segment being tested. Potable Water Systems 15410-4 of 5 Facilities Planning & Design

Backfill underground systems. Exposing joints only, is permitted on all systems and required on systems having a pressure test exceeding 30 psig. 3. Water test potable water system at 150% of design pressure, (100 psig minimum) for a period of 4 hours using a gage with a 0 psi to 200 psi and a minimum of 4 2 " dial. 4. Disinfect potable water system: See Plumbing Piping for disinfection specification. 3.9 SPARE PARTS A. Furnish to Owner, with receipt, one valve key for each key operated hydrant, bibb, or faucet installed. END OF SECTION Potable Water Systems 15410-5 of 5 Facilities Planning & Design