ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Similar documents
SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION APRIL 6, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10

AUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PUB 336 (4-17)

Straight Line Diagram. Cameron 12. January 2018

Blueprint for One of the Nation s Largest SCM Maintenance Programs

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Oil and Gas Management

2017 Highway Safety Improvement Program Call

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000

General Permit WMGR116. Beneficial Use of Alternative Fuels for Circulating and Bubbling Fluidized Bed Boilers and Pulverized Coal-fired Boilers

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

For Public Input Period

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

STANDARD CONDITIONS GENERAL PERMIT WMGM042

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SITE ASSESSMENT SAMPLING REQUIREMENTS AT REGULATED STORAGE TANK SYSTEM CLOSURES

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

General Permit WMGR025 Residual and Municipal Waste Composting

Annual CSAH Needs Update for 2017

Biosolids Quality. Enhancement Plan. For more information, visit keyword: Biosolids.

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

Maintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

I-91 Viaduct Public Information Briefing

Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

Chapter 4 Bridge Program Drawings

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

Scenarios. The following slides will present you with several Scenarios & Questions that address pollution prevention and good housekeeping.

JOINT PERMIT APPLICATION INSTRUCTIONS FOR A PENNSYLVANIA WATER OBSTRUCTION AND ENCROACHMENT PERMIT APPLICATION AND A

STATE AID GUIDE FOR: Updated: December 16, 2005

Metals Data. for. Pennsylvania Soils

Re: PW Appendix 3 - Part 8

An Assessment of the Economic Impacts of the Pennsylvania Dairy Industry 1

GENERAL PERMIT WMGR125 BENEFICIAL USE OF DRY FGD WASTE AND COAL ASH

Chapter URBAN & RURAL FREEWAY DESIGN

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

G2-0 LIST OF ACTIVE MTODs

Act 101 Section 902 Grants Round 53 Summary

Curb Ramps [ 4.7.3] [ 4.7.2; 4.8.2; 4.1.6(3)(a)] [ 4.3.7] ADA Accessibility Survey Instructions Curb Ramps Page 1 of 6

G2-0 LIST OF ACTIVE MTODs

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

G2-0 LIST OF ACTIVE MTODs

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

ASSET MANAGEMENT GUIDE

550 Surface Treatments

Ohio Department of Transportation

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

Brad Hall Midstream & Marketing

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

CHAPTER 10: PAVING. Refer to page 548 of the 2016 Spec book or page 573 of the 2018 Spec book for material specifications under G.

Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS

PENNSYLVANIA WEEKLY FALL FOLIAGE REPORT

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

Implementing Asset Management: WSDOT s Experience

Project Initiation Form

February Page 1

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

MINISTRY OF TRANSPORTATION ONTARIO MANAGING OUR ASSETS

BUREAU OF WASTE MANAGEMENT. DIVISION OF MUNICIPAL and RESIDUAL WASTE GENERAL PERMIT WMGI005

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

Procedure No: (SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION PROCEDURE

2001 Insertable Sheet List For Use With The 2001 Imperial Road and Bridge Standards February 2008

3.6 Construction Methods

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

Field Guide on. Safe Maintenance and. Work Zone Operations

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND

Project Type: Drainage and Storm Systems

APPLICANT PROJECT REQUESTED RECOMMENDED COMMENTS

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1,

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

MINNESOTA ARCHITECTURE - HISTORY INVENTORY FORM

SHRP2 SOLUTONS. Innovative Bridge Designs for Rapid Renewal. Peer-to-Peer Exchange Workshop Atlanta, GA November 2015

HALIFAX REGIONAL MUNICIPALITY MUNICIPAL DESIGN GUIDELINES

PARKING LOT AND ROADWAY MAINTENANCE

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

COUNTY OF ALLEGHENY. Pittsburgh, Pennsylvania DEPARTMENT OF PUBLIC WORKS PERMIT MANUAL

CONTRACTOR S PROPOSAL FISCAL YEAR STREET IMPROVEMENT PROJECT AND MAIN STREET BRIDGE REHABILITATION

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Cost Estimating Guideline February, 2017

Construction Forecast

Request for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2

Asphalt Paving

MassDOT Pavement Preservation Updates

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

NJDOT: Asset Management Strategies and Tools

Compliance and Scoping Scenarios by Sector. Matthew Johnston University of Maryland CBPO And PA Phase III WIP Workgroup Co-Chairs 3/16/2018

Transcription:

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 Updated June 30, 2014 LUZERNE COUNTY SR 309(W02) #102354 PROPOSAL:$25.20 PLANS:$6.24 The description and location of the project is as follows: This project is for the resurfacing of approximately 20.32 miles of existing bituminous roadway on the following STATE ROUTES: S.R. 0029 Segment 0030 Offset 0241 to Segment 0070 Offset 3236 and SR 0309 Segment 0010 Offset 0000 to Segment 0070 Offset 2179, in WYOMING COUNTY, VARIOUS MUNICIPALITIES, S.R. 0309 Segment 0290 Offset 0470 to Segment 0400 Offset 2725 and Segment 0760 Offset 0000 to Segment 0850 Offset 2778 and S.R. 2006 Segment 0010 Offset 0000 to Segment 0060 Offset 3120 in LUZERNE COUNTY in the COMMONWEALTH OF PENNSYLVANIA with Warm Mix design Asphalt Wearing and Scratch Courses, Milling, Base Repair, ADA (Design-Build) Curb Ramps, Inlet Construction, Pipe Replacement, Line Painting and Pavement Markings as indicated on the approved drawings included in the bid package for GROUP 4-14-ST 13 in LUZERNE COUNTY, and GROUP 4-14-ST 17 in WYOMING COUNTY. Anticipated Notice to Proceed 8-18-14, Required Completion 10-12-15. CRAWFORD COUNTY SR 1001(04M) #32161 PROPOSAL:$15.48 PLANS:$1.20 For the construction and rehabilitation of a certain section of STATE HIGHWAY in CRAWFORD COUNTY, CITY OF MEADVILLE, Commonwealth of Pennsylvania, STATE ROUTE 1001 SECTION 04M. This project being situated as follows: From the intersection with Linden St. at Segment 0010 Offset 0000 then north to the intersection with Allegheny St. at Segment 0040 Offset 2353. For the bituminous milling and overlay with Warm Mix Superpave Asphalt Mixture Designs 36' to 45' in width; also for loop sensors, and pavement markings all within a project length of 8,468.00 feet (1.60 miles) as indicated on the approved drawings. Anticipated Notice to Proceed 9-2-14, Required Completion 5-1-15. ERIE COUNTY SR 5(DO1) #97867 PROPOSAL:$18.48 PLANS:$6.00 For the bituminous milling and resurfacing of various state routes throughout ERIE COUNTY, Commonwealth of Pennsylvania, with Warm Mix Asphalt Mixture (WMA) Designs. Also for guiderail, concrete curb ramps, drainage, loop sensors, pedestrial pushbuttons, signs, and pavement markings update as indicated on the approved drawings. Anticipated Notice to Proceed 9-2-14, Required Completion 5-1-16. BLAIR COUNTY SR 0000(CCB) #102671 PROPOSAL:$23.16 PLANS:$6.60 12X18:$8.10 24X36:$117.00 X-SEC:$4.40 12X18:$5.40 24X36:$78.00 The description and location of the project is as follows: This work is for the construction of turning lanes and a portion of the access driveway including traffic signal updates for a new access point and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 9900, SECTION CCB, in BLAIR COUNTY, ALLEGHENY TOWNSHIP. This project is located along Convention Center Boulevard and intersects with Convention Center Drive. DBE 6%, Anticipated Notice to Proceed 9-2-14, Required Completion 4-30-15. BEDFORD COUNTY SR 0000(BHT) #95891 PROPOSAL:$28.80 PLANS:$16.72 12X18:$20.52 24X36:$296.40 X-SEC:$9.24 12X18:$11.34 24X36:$163.80 The description and location of the project is as follows: This project involves construction of a pedestrian trail between the Borough of Bedford and the Bedford Springs Resort and includes two pedestrian structures over Shobers Run in the Borough of Bedford and Bedford Township. The trail stretches from the southern border of the Borough of Bedford approximately 1.15 miles south adjacent to the Bedford Springs Resort. The proposed structures will be a single span prefabricated truss bridges on reinforced concrete abutments. The proposed trail length will be approximately 5,900 and will tie into an existing trail loop in the Borough of Bedford along the northern end and parking area at the Bedford Springs Resort. DBE 7%, Anticipated Notice to Proceed 8-18-14, Required Completion 6-9-15. 1

INDIANA COUNTY SR 0(490) #79437 PROPOSAL:$19.32 LANS:$3.74 12X18:$4.59 24X36:$66.30 X-SEC:$5.50 12X18:$6.75 24X36:$97.50 The description and location of the project is as follows: For the construction of an access road into a proposed economic development site including excavation, drainage, bituminous paving, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 9900, SECTION 490, in Indiana COUNTY Center TOWNSHIP approximately 0.2 miles from the SR 119/SR 2019 intersection off of SR 2019 from Station 10+00.00 to station 22+10.00. DBE 8%, Anticipated Notice to Proceed 9-2-14, Required Completion 4-30-15. WARREN COUNTY SR 27(04M) #102688 PROPOSAL:$17.04 PLANS:$2.04 The description and location of the project is as follows: WARREN COUNTY: For the resurfacing and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 27, SECTION 04M, in Warren COUNTY Southwest and Eldred Townships from approximately the Venango County Line at Segment 0010 Offset 0000 to the intersection with Sanford Rd at Segment 0240 Offset 1227. FOREST COUNTY: For the resurfacing and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 36, SECTION 12M, in Forest COUNTY Harmony and Tionesta Townships from approximately the intersection with SR 0062 at Segment 0160 Offset 0269 to the Venango County Line at Segment 0260 Offset 2734. Anticipated Notice to Proceed 8-18-14, Required Completion 5-1-15. WARREN COUNTY SR 957(03M) #97926 PROPOSAL:$15.36 PLANS:$1.92 For the construction of a certain sections of STATE HIGHWAY in WARREN COUNTY, ; Commonwealth of Pennsylvania; STATE ROUTE 0957, SECTION 03M. This project situated as follows: SR. 0957 - From approximately 100 feet west of the intersection with SR. 1005 at Segment 0390 Offset 0217 then east to approximately 98 feet east of the intersection with SR.1009 at Segment 0480 Offset 1541. For the bituminous milling and overlay with Warm Mix Superpave Asphalt Mixture Designs 26' to 28' in width; also for pavement markings all within a project length of 4.52 miles as indicated on the approved drawings. Anticipated Notice to Proceed 8-18-14, Required Completion 5-1-15. WARREN COUNTY SR 59(11M) #97927 PROPOSAL:$15.12 For the construction of a certain sections of STATE HIGHWAYS in WARREN COUNTY, ; Commonwealth of Pennsylvania; STATE ROUTE 0059, SECTION 11M. This project situated as follows: SR. 0059 - From approximately 55 feet east of the intersection with SR. 0006 at Segment 0010 Offset 0055 then east to the Warren/McKean County Line at Segment 0270 Offset 3466. For the bituminous milling and resurfacing with Warm Mix Asphalt Mixture (WMA) Mix Designs 28'-35' in width. Also for loop sensors, and pavement markings update as indicated on the approved drawings. Anticipated Notice to Proceed 8-18-14, Required Completion 5-1-15. BUCKS COUNTY SR 132(BC2) #102374 PROPOSAL:$24.48 The description and location of the project is as follows: Milling, resurfacing, line striping, the design and construction of ADA curb ramps and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0132, SECTION BC2, in BUCKS COUNTY, WARMINSTER TOWNSHIP from approximately Easton Road (SR 611) at segments 0012 & 0013 offset 0000 to approximately Bustleton Pike (SR 532) at segments 0202 & 0203 offset 0000. Anticipated Notice to Proceed 8-18-14, Required Completion 12-31-14. ELKS COUNTY SR 66(0) #102128 PROPOSAL:$17.76 PLANS:$17.60 12X18:$21.60 24X36:$312.00 The description and location of the project is as follows: For the improvement of certain sections of STATE HIGHWAY in CENTRE, CLEARFIELD, CLINTON, CAMERON, MCKEAN, MIFFLIN, ELK and JUNIATA COUNTIES, VARIOUS MUNICIPALITIES, Commonwealth of Pennsylvania, Group 2-14-RS1. For the installation of milled bituminous rumble strips (at centerline and edgeline), pavement markings, and miscellaneous construction for a total construction length of approximately 2,548,594 feet (482.7 miles) as indicated on the approved drawings included in the bid package. DBE 2%, Anticipated Notice to Proceed 9-2- 14, Required Completion 10-30-15. 2

VENANGO COUNTY SR 0000 #102098 PROPOSAL:$14.76 PLANS:$4.20 For the tree removal on various state routes within Crawford, Erie, Mercer, Venango, and Warren Counties, as indicated on the approved drawings. DBE 2%, Anticipated Notice to Proceed 9-2-14, Required Completion 12-5-14. ALLEGHENY COUNTY SR 376(A57) #102685 PROPOSAL:$ 20.64 PLANS:$1.32 12X18:$1.62 24X36:$23.40 The description and location of the project is as follows: for lead abatment in the Fort Pitt Tunnel all within a length of 4,515.30 Linear Feet (0.855 Miles) as indicated on the approved drawings included in the Bid Package for STATE ROUTE 376, SECTION A57, in ALLEGHENY COUNTY, CITY OF PITTSBURGH from approximately the West Portal of the Tunnel at Segment 684/685 Offset 1829/1782 to approximately the East Portal of the Tunnel at Segment 690/691 Offset 3621/3664. Anticipated Notice to Proceed 8-18-14, Required Completion 11-21-14. ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 Updated June 26, 2014 HUNTINGDON COUNTY SR 22(31M) #91660 PROPOSAL:$20.40 PLANS:$17.60 12X18:$21.60 24X36:$312.00 X-SEC:$7.26 12X18:$8.91 24X36:$128.70 The description and location of the project is as follows: This project is for the resurfacing of approximately 5.974 miles of bituminous roadway and includes guide rail & drainage upgrades, diamond grinding, traffic signal upgrades and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 0022, SECTION 13M, in HUNTINGDON COUNTY, MORRIS & PORTER TOWNSHIPS at the approximate locations: SEGMENT 0054, OFFSET 0000 TO SEGTMENT 0160, OFFSET 1323 (EB) SEGMENT 0054, OFFSET 0000 TO SEGTMENT 0161, OFFSET 1332 (WB). DBE 6%, Anticipated Notice to Proceed 9-2-14, Required Completion 8-31- 15. FULTON COUNTY SR 915(002) #97861 PROPOSAL:$16.80 PLANS:$4.40 12X18:$5.40 24X36:$78.00 The description and location of the project is as follows: This project is for the milling & resurfacing of approximately 8.112 miles of bituminous roadway and includes guide rail & drainage upgrades and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 0915, SECTION 002, in FULTON COUNTY, BRUSH CREEK & WELLS TOWNSHIPS at the approximate locations: SR 0915 - Segment 0170, Offset 0000 to Segment 0310, Offset 3611. Anticipated Notice to Proceed 8-18-14, Required Completion 12-1-14. HUNTINGDON COUNTY SR 994(013) #91666 PROPOSAL:$166.8 PLANS:$3.30 12X18:$4.05 24X36:$58.50 The description and location of the project is as follows: This project is for the milling & resurfacing of approximately 6.394 miles of bituminous roadway and includes guide rail & drainage upgrades and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 0994, SECTION 013, in HUNTINGDON COUNTY, TODD & CLAY TOWNSHIPS at the approximate locations: SR 0994 - Segment 0330, Offset 0000 to Segment 0460, Offset 1565./ Anticipated Notice to Proceed 8-18-14, Required Completion 11-12-14. BLAIR COUNTY SR 1013(019) #96405 PROPOSAL:$16.92 PLANS:$3.08 12X18:$3.78 24X36:$54.60 The description and location of the project is as follows: This project is for the milling & resurfacing of approximately 9.054 miles of bituminous roadway and includes guide rail & drainage upgrades, pavement markings and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 1013, SECTION 019, in BLAIR COUNTY, LOGAN & TYRONE TOWNSHIPS, CITY OF ALTOONA at the approximate locations: SR 1013 - Segment 0010, Offset 0000 to Segment 0210, Offset 2400. Anticipated Notice to Proceed 8-18-14, Required Completion 10-27-14. 3

WAYNE COUNTY SR 590(15D) #102391 PROPOSAL:$20.04 PLANS:$3.36 This project is for the resurfacing of approximate total of 21.87 miles of existing bituminous roadway on the following STATE ROUTES: (S.R. 0590 Segment 0050 Offset 0000 to Segment 0330 Offset 2800 (15.40 MI), S.R. 0191 Segment 0400 Offset 0000 to Segment 0520 Offset 1169 ( 6.47 MI) in WAYNE COUNTY in VARIOUS MUNICIPALITIES in the COMMONWEALTH OF PENNSYLVANIA with Warm Mix design Asphalt Wearing and Scratch Courses, Milling, Mechanized Edge Repair, Base Repair, Guiderail Adjustments, ADA Rehabilitation, Line Painting and Pavement Markings. Anticipated Notice to Proceed 8-18-14, Required Completion 5-29-15. ERIE COUNTY SR 90(CMB) #102176 PROPOSAL:$17.76 PLANS:$1.20 The description and location of the project is as follows: Installation of Cable Median Barrier and other miscellaneous construction, within an overall project length of 25.55 miles as indicated on the approved drawings included in the bid package for STATE ROUTE 0090, SECTION CMB, in Erie COUNTY; Greene, Harborcreek, Millcreek, McKean, and Summit Townships; from approximately the interchange with SR 0832 (PA 832) at Segment 0180 Offset 2245 to approximately 1/2 mile east of the interchange with SR 0290 (PA 290) at Segment 0324 Offset 1800. DBE 2%, Anticipated Notice to Proceed 8-18-14, Required Completion 10-14-14. CHESTER COUNTY SR 0000(GRC) #98270 PROPOSAL:$21.84 This project is for the repair and/or replacement of guide rail, median barrier and/or their hardware, and Right-Of-Way fence on various State Routes in Chester County, Pennsylvania. Anticipated Notice to Proceed 9-15-14, Required Completion 9-14-17. BERKS COUNTY SR 0000(ISI) #102150 PROPOSAL:$16.80 PLANS:$2.76 The description and location of the project is as follows: District wide Design Build Project for installation of enhanced signing for Intersection Safety Improvement Plan (ISIP), work will include doubling up signs, adding street name plaques on through approaches, splitter islands on stop approaches, adding or adjusting stop bars, and double arrow signs at stem of T intersections, also included is installation of Wrong Way signage improvements for on/off ramps and divided highways AND installation of safety improvements for Roadway Departure Implementation Plan (RDIP) work will include pavement markings, curve signage, delineation markers, slow curve markings, fix drop offs, and wider edge line and other miscellaneous construction, as indicated in the bid package; on Various STATE ROUTE in Various MUNICIPALITIES in BERKS, CARBON, LEHIGH, MONROE, NORTHAMPTON AND SCHUYLKILL COUNTIES, Commonwealth of Pennsylvania. DBE 6%, Anticipated Notice to Proceed 9-29-14, Required Completion 10-31-16. MCKEAN COUNTY SR 6(531) #97951 PROPOSAL:$22.80 PLANS:$5.72 12X18:$7.02 24X36:$101.40 The description and location of the project is as follows: For the improvement of certain sections of STATE HIGHWAYS in MCKEAN and ELK COUNTIES, VARIOUS TOWNSHIPS and BOROUGHS, Commonwealth of Pennsylvania, STATE ROUTES 0006, 0219, 0255, and 4007, SECTION 531. For the improvement to 4 State Routes having a combined construction length of approximately 71,074 linear feet (13.5 miles); involving various combinations of milling, scratch, binder leveling and resurfacing, using various Superpave Asphalt Mixture Designs for binder and wearing courses, pavement markings and legends, guide rail, tree trimming, bridge deck repairs, and miscellaneous construction as indicated on the approved drawings. Anticipated Notice to Proceed 9-2-14, Required Completion 7-6-15. VENANGO COUNTY SR 1001(T18) #95492 PROPOSAL:$16.68 PLANS:$3.96 12X18:$4.86 24X36:$70.20 The description and location of the project is as follows: For the construction of sidewalks, crosswalks, ADA curb ramps, detectable warning surfaces and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 1001, SECTION T18, in Venango COUNTY, Cornplanter Township from approximately north of Hillcrest Avenue at segment 0050 offset 0421 to approximately Oak Road at segment 0050 offset 2353. DBE 3%, Anticipated Notice to Proceed 9-2- 14, Required Completion 4-15-15. 4

LANCASTER COUNTY SR 4033(001) #74955 PROPOSAL: $ 50.76 PLANS:$28.60 12X18:$35.10 24X36:$507.00 X-SEC:$4.84 12X18:$5.94 24X36:$85.80 EXSTRUCT:$0.22 12X18:$0.27 24X36:$3.90 The project involves the replacement or rehabilitation on three separate bridge structures along SR 4033 (Meadow View Road) over Little Chiques Creek and Brubaker Run. The existing structure at Little Chiques Creek will be replaced with a single span composite spread box beam bridge. The remaining two structures (spanning Brubaker Run) will have their superstructures replaced. Approach work and other miscellaneous construction, are all as indicated on the approved drawings for STATE ROUTE 4033, SECTION 001, in LANCASTER COUNTY, MOUNT JOY AND RAPHO TOWNSHIPS, from Segment 0070 Offset 2002 to Segment 0080 Offset 0373 with an over length of 590.00 linear feet (0.112 mile); STATE ROUTE 4033, SECTION 002, in LANCASTER COUNTY, RAPHO TOWNSHIP, from Segment 0080 Offset 0714 to Segment 0080 Offset 1289 with an over length of 398.00 linear feet (0.075 mile); and STATE ROUTE 4033, SECTION 003, in LANCASTER COUNTY, RAPHO TOWNSHIP, from Segment 0090 Offset 1861 to Segment 0090 Offset 2361 with an over length of 383.00 linear feet (0.073 mile). DBE 6%, Anticipated Notice to Proceed 9-2-14, Required Completion 10-21-15. MONTOUR COUNTY SR 254(28M) #88940 PROPOSAL:$20.40 PLANS:$4.84 12X18:$5.94 24X36:$85.80 The description and location of the project are as follows: For resurfacing including: Superpave Asphalt Mixture scratch and wearing courses, base repairs, drainage, paved shoulders, paved drives & side road overlay, pavement markings, weigh-in-motion continuous automatic vehicle counter, rumble strips, and other miscellaneous construction within an overall length of 16,634 linear feet (3.15 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 254, SECTION 28M from approximately 0.74 miles east of the intersection with SR 1023 at Segment 0160 Offset 1218 in TURBOT TOWNSHIP, NORTHUMBERLAND COUNTY and approximately 1.34 miles west of the intersection with State Route 3012 at Segment 0070 Offset 0500, in LIMESTONE TOWNSHIP, MONTOUR COUNTY. Anticipated Notice to Proceed 9-2- 14, Required Completion 11-17-14. ASSOCIATED PENNSYLVANIA CONSTRUCTORS ADVANCED INFORMATION LETTING JULY 17, 2014 Updated June 16, 2014 ALLEGHENY COUNTY SR 885(A38) #84018 PROPOSAL:$135.36 PLANS:$51.26 12X18:$62.91 24X36:$908.70 X-SEC:$8.14 12X18:$9.99 24X36:$144.30 The description and location of the project is as follows: This is a partial Design Build roadway project. Design activities are limited to: Wingwall, traffic control plan, and utility coordination. For the new wall, new culvert and five culvert replacements, milling and bituminous pavement, drainage, guide rail, sidewalk, signals, pavement marking, sewer relocation, and other miscellaneous construction, all with in a length of 2632.54 linear feet (0.498 miles), as indicated on the approved drawings included in the bid package for STATE ROUTE 0885, SECTION A38 (Mifflin Road/Lebanon Road) and STATE ROUTE 3098, SECTION A03 (Glass Run Road), in ALLEGHENY COUNTY, CITY OF PITTSBURGH, WEST MIFFLIN and BALDWIN BOROUGHS, Commonwealth of Pennsylvania. This project being situated as follows: SR 0885, Section A38 - From a point approximately 2605 feet north of Miller Road in the City of Pittsburgh at Segment 0180 Offset 1407 (Station 545+27) to a point approximately 2499 feet south of Glass Run Road in the City of Pittsburgh at Segment 0200 Offset 0230 (Station 569+53). SR 3098, Section A03 - From a point approximately 1927 feet east of John Road in Baldwind Borough at Segment 0040 Offset 1237 (Station 46+20) to a point approximately 6710 feet west of Baldwin Street in the City of Pittsburgh at Segment 0050 Offset 0538 (Station 51+75). DBE 8%, Anticipated Notice to Proceed 8-18-14, Required Completion 12-4-15. 5

SCHUYLKILL COUNTY SR 443(06M) #101613 PROPOSAL:$15.72 PLANS:$3.24 This project is for the improvement of SR 443 located in Schuylkill County, East Brunswick Township, West Brunswick Township, and Orwigsburg Borough from Segment 460/1184 to Segment 580/0 as follows: The project involves resurfacing of approximately 28,817 Linear Feet (5.46 Miles) of the existing road using a bituminous overlay, shoulder upgrade, bituminous and concrete patching, guide rail updates, pavement markings upgrade, and other miscellaneous construction items. All work is within the existing Right-of-Way and is 100% state funded. Anticipated Notice to Proceed 8-11-14, Required Completion 12-8-14. ASSOCIATED PENNSYLVANIA CONSTRUCTORS ADVANCED INFORMATION LETTING JULY 17, 2014 Updated June 11, 2014 ALLEGHENY COUNTY SR 885(A38) #84018 PROPOSAL:$135.36 PLANS:$51.26 12X18:$62.91 24X36:$908.70 X-SEC:$8.14 12X18:$9.99 24X36:$144.30 The description and location of the project is as follows: This is a partial Design Build roadway project. Design activities are limited to: Wingwall, traffic control plan, and utility coordination. For the new wall, new culvert and five culvert replacements, milling and bituminous pavement, drainage, guide rail, sidewalk, signals, pavement marking, sewer relocation, and other miscellaneous construction, all with in a length of 2632.54 linear feet (0.498 miles), as indicated on the approved drawings included in the bid package for STATE ROUTE 0885, SECTION A38 (Mifflin Road/Lebanon Road) and STATE ROUTE 3098, SECTION A03 (Glass Run Road), in ALLEGHENY COUNTY, CITY OF PITTSBURGH, WEST MIFFLIN and BALDWIN BOROUGHS, Commonwealth of Pennsylvania. This project being situated as follows: SR 0885, Section A38 - From a point approximately 2605 feet north of Miller Road in the City of Pittsburgh at Segment 0180 Offset 1407 (Station 545+27) to a point approximately 2499 feet south of Glass Run Road in the City of Pittsburgh at Segment 0200 Offset 0230 (Station 569+53). SR 3098, Section A03 - From a point approximately 1927 feet east of John Road in Baldwind Borough at Segment 0040 Offset 1237 (Station 46+20) to a point approximately 6710 feet west of Baldwin Street in the City of Pittsburgh at Segment 0050 Offset 0538 (Station 51+75). DBE 8%, Anticipated Notice to Proceed 8-18-14, Required Completion 12-4-15. SCHUYLKILL COUNTY SR 443(06M) #101613 PROPOSAL:$15.72 PLANS:$3.24 This project is for the improvement of SR 443 located in Schuylkill County, East Brunswick Township, West Brunswick Township, and Orwigsburg Borough from Segment 460/1184 to Segment 580/0 as follows: The project involves resurfacing of approximately 28,817 Linear Feet (5.46 Miles) of the existing road using a bituminous overlay, shoulder upgrade, bituminous and concrete patching, guide rail updates, pavement markings upgrade, and other miscellaneous construction items. All work is within the existing Right-of-Way and is 100% state funded. Anticipated Notice to Proceed 8-11-14, Required Completion 12-8-14. 6