STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

Similar documents
SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION FLEXIBLE PAVING

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

SECTION TRENCHING & BACKFILLING

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

BASE CONSTRUCTION MATERIALS A Aggregate

SECTION BITUMINOUS CONCRETE PAVEMENT

BID # REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method

Student Services & Classroom Addition

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

SECTION A1 EXCAVATION AND BACKFILL GENERAL

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

PERMEABLE INTERLOCKING PAVERS

SECTION CAST-IN-PLACE CONCRETE

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

Fees: An application fee of one hundred dollars ($100) shall be included with the application submission.

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

PERMIT TO EXCAVATE IN HIGHWAY CHESHIRE, CONNECTICUT

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION

SECTION STORM DRAINAGE AND STORMWATER MANAGEMENT

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE

INVITATION TO BID ON TOWN PAVING PROJECTS

A. Submittal Procedures: See Article 13 of the General Conditions.

DuPage County Division of Transportation 421 N. County Farm Road Wheaton, IL / (Fax) 630/

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas.

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING

EXCAVATION PERMIT CHECKLIST

REQUEST FOR PROPOSAL Asphalt & Concrete Repair

STANDARD SPECIFICATIONS SECTION TUNNELING. A. Section includes requirements for constructing tunnels 48-inch and larger diameter.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

CONSTRUCTION SPECIFICATION FOR KEYHOLE EXCAVATION AND PERMANENT REINSTATEMENT OF KEYHOLE CORES TABLE OF CONTENTS

Section 508. CHIP SEALS Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal.

Section 505. CHIP SEALS

A. Testing Laboratory Services: Section B. Excavation, Site Fill and Rough Grading: Section Sub-Base Course Material (If requested).

Manual of Infrastructure Standards

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS.

BID FORM (LUMP SUM CONTRACT)

Construction Specification for Utility Cut and Restoration

KANSAS CITY METROPOLITAN CHAPTER OF THE AMERICAN PUBLIC WORKS ASSOCIATION

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL

Cement Stabilized Aggregate Base

HOT MIX ASPHALT PAVEMENT

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

S-1 (2356) BITUMINOUS SEAL COAT REVISED 9/26/07 SP Mn/DOT 2356 is deleted and replaced by the following:

The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase.

550 Surface Treatments

MIDLAND COUNTY ROAD COMMISSION

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING

SECTION 7 STREET DESIGN

2014 Capital Project Phase 3 Grand Island Central School District Cannon Design Project No SECTION PAVING PART 1 - GENERAL

SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG):

San Antonio Water System Standard Specifications for Construction ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND SECTION 500 CONCRETE CONSTRUCTION 502 MATERIAL SPECIFICATIONS - GENERAL

CRUSHED AGGREGATE BLENDED WITH GRANITECRETE ADMIXTURE SURFACING

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING)

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

Construction Specification for Concrete Unit Pavers

CITY OF FARGO SPECIFICATIONS CONCRETE SIDEWALKS AND DRIVEWAYS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

610 - DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

Select Subgrade Material, Compacted

PARKING LOT AND ROADWAY MAINTENANCE

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

CONSTRUCTION SPECIFICATION FOR UTILITY CUT AND RESTORATION TABLE OF CONTENTS TS REFERENCES... 2 TS DEFINITIONS...

Municipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

Park County Public Works Department 1246 CR 16 P.O. Box 147 Fairplay, Colorado (office), (fax) SCOPE OF WORK

Section 504. MICRO-SURFACING

DIVISION 32 EXTERIOR IMPROVMENTS

Request for Proposal: Due October 11, :00 pm

EXCAVATION / RIGHT OF WAY PERMIT

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

NOTICE TO BIDDERS ADDENDUM NO. 1

CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

Transcription:

STANDARD SPECIFICATIONS SECTION 02950 PAVEMENT REQUIREMENTS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for removing, replacing and providing new paving for roads, driveways, parking areas, curb and gutter, walks, and paved areas within limits indicated, including subgrade and base courses. 1.2 DEFINITIONS A. Paved: Covered with gravel, stone, brick, asphalt, concrete, or other material providing a firm, level, or convenient surface for vehicular or pedestrian traffic. 1.3 JURISDICTIONAL REQUIREMENTS A. Commission utility contracts involve work in roads, parking and paved areas under following jurisdictions: 1. MSHA. 2. Montgomery County Department of Permitting Services. 3. Prince George's County Public Works and Transportation Department. 4. Incorporated municipalities. 5. Other jurisdictions. B. When working in these areas, remove and replace roads, driveways, parking areas, curb and gutter, walks, and other paved areas following specific jurisdiction's requirements. 1.4 PAVEMENT REPLACEMENT A. Service Connection Contracts (AC, LC, and SC). 1. Temporary pavement only. PART 2 PRODUCTS 2.1 MATERIAL A. Commission Furnished Materials. 1. Pavement Repair Identification Markers. B. Concrete. 1. Meet requirements in Section 03300, except where jurisdictional requirements apply. 02950-1 July 2011

C. Other Materials. 1. Materials for permanent pavement replacement: Meet latest editions of following jurisdictional requirements: a. State Roads: MSHA Standard Specifications, Standard Details, and Master Permits. b. Montgomery County Roads: Montgomery County Department of Permitting Services, Specifications for Utility Construction Permit. c. Prince George's County Roads: Prince George's County Public Works and Transportation Department Specifications and Standard Details. d. Areas not covered above: Follow Right of Way Construction Permit and Special Conditions. D. Temporary Pavement Replacement: 1. Hot Mix Asphalt Surface-Fine (SF): Follow MSHA Standard Specifications. a. When not available, use Engineer approved high performance cold mix asphalt. 2. High Performance Cold Mix Asphalt: Composed of approved suitable aggregate, plant mixed with approved asphaltic liquid blend following blend manufacturer s specifications. a. Final mix: 1) Stripping resistance of retained coating minimum 75% when testing to ASTM-D-1664, latest revision. 2) Remain flexible and cohesive to minus fifteen degrees F (-26 degrees C). 3) Homogeneous, free of lumps. 4) Retain its adhesive qualities in wet applications. 5) Approved High Performance Cold Mix Products: a) National Paving and Contracting, Perma-Patch b) Seaboard Asphalt Product, Bond-X c) Lafarge North America, QPR b. Acceptable aggregate: Consist of 10% crushed stone or laboratory approved equivalent under ASTM C-136. Recommended Gradation: Sieve Size Percent Passing by Weight 3/8 90-100% #4 20-55% #8 5-30% #16 0-10% #50 0-5% #200 0-2% c. Acceptable Liquid Asphaltic Blends: 1) National Paving and Contracting, Co., Perma-Patch Liquid 2) Sylvax Corp., UPM Liquid Asphalt Blend 3) Lafarge North America, QPR Blend 4) Sylcrete Corp., Sylcrete-EV 5) Co-Products Corp., I.A.R. 02950-2 July 2011

6) Seaboard Asphalt Product, Bond-X PART 3 EXECUTION 3.1 PUBLIC NOTIFICATION A. Deliver written notices to all homes and businesses 48 hours prior to commencement of work being conducted, including a local telephone number for inquiries. B. Provide owner or occupant a summary of work to be completed, and time and duration of paving operations. C. Contact any home or business where ingress and egress will be unavailable to property within time stated in written notice. D. Fax or email copies of all delivered notices to Engineer. 3.2 GENERAL A. Construction requiring removal and replacement of roads, driveways, parking areas, curb and gutter, walks and paved areas, and new paving: Meet latest editions of jurisdictional requirements listed above in PART 2. 3.3 REMOVAL OF EXISTING PAVEMENT A. Cut and remove existing pavement in advance of excavating to neat lines following appropriate jurisdictional standard detail utilizing the Commission standard trench widths. B. Saw cut existing concrete pavement and concrete base course full depth and remove load transfer devices where they exist. C. Provide temporary walkways and curb and gutter at Engineer s direction. 3.4 USE OF STEEL PLATING A. Whenever Steel plating is required or used during construction within paved roadway: 1. Notify Engineer at least 48 hours in advance of placing steel plates in roadway. 2. Follow jurisdictional requirements and as specified herein. 3. Dimensions: At least 1 inch thick and large enough to allow minimum of 1 foot of bearing on 3 sides of excavation. 4. Placement: Pin plates to prevent movement. Recess plates at Engineer s direction. 5. Taper cold mix asphalt on all edges of steel plate from height of steel plate extending minimum of 1 foot to existing road surface. 02950-3 July 2011

6. During months when snowfall may be expected, mark steel plates with 2 inch square stake painted International Orange and extending at least 4 feet above ground, placed adjacent to edge of roadway. 7. If jurisdictional or Commission forces must correct emergency condition due to excavation and plate placement, Contractor will be charged for cost of corrective measures required. 8. Unless otherwise approved by Engineer, remove steel plates in not more than 7 days. 3.5 PREPARATION FOR PAVEMENT REPLACEMENT A. Compact Trench Backfill following Section 02315. B. Provide temporary or permanent pavement immediately upon completion of backfill. 3.6 TEMPORARY PAVEMENT A. Place temporary pavement as specified herein except where otherwise required by jurisdictional requirements. 1. Place and compact hot mix asphalt bituminous concrete mix minimum thickness of 3 inches and at same grade as surrounding surface on Trench Backfills required in Section 02315 for Type I areas under existing paving. 2. When approved by Engineer for use, place and compact high performance cold mix asphalt minimum thickness of 3 inches and at same grade as surrounding surface on Trench Backfills required in Section 02315 for Type I areas under existing paving. a. Stockpiling of high performance cold mix asphalt will be permitted provided it is stored in manner to prevent infiltration of deleterious material and not longer than 1 month from date of mixing. b. Compact high performance cold mix asphalt using uniform tamping equipment. 3. Provide hot mix asphalt for temporary curb and gutter, walks, and driveways. 4. Mark temporary pavement repairs in all roads with blue paint for water or water and sewer, and green paint for sewer in 4 inch high letters to read WSSC-S for Systems Construction or WSSC-F for Facilities Construction. 5. Temporary pavement: Remain in place maximum of 60 days, unless jurisdictional requirements are more stringent. a. If approved suppliers of permanent paving are unavailable due to wintertime shutdown, allotted time period will be extended to include shutdown period. 6. Maintain temporary pavement in condition acceptable to Engineer until permanent pavement is placed. 7. If temporary pavement becomes defective and creates an emergency, commence repair to rectify situation within 1 hour after notification by Engineer or Engineer may arrange to have Work performed by others and deduct costs thereof from monies owed Contractor. 3.7 PERMANENT PAVEMENT 02950-4 July 2011

A. Dimensions: Follow jurisdictional requirements. 1. If pavement has been undermined, damaged, or disturbed by Contractor's operations, increase extent of repaving so that new pavement and base extends at least 18 inches over undisturbed soil. 2. Install pavement repair identification markers in each repair and every 50 feet in longitudinal repairs. B. Bituminous Concrete Overlay: 1. Place bituminous concrete overlay to limits and depth specified in Drawings, trench details and Right of Way Construction Permit. 2. Pavement replacement for trenches to be overlaid: Follow standard jurisdictional requirements or as specified below. C. Milling and Bituminous Concrete Overlay: 1. Mill and place bituminous concrete overlay to limits and depth specified following jurisdictional requirements. 2. Pavement replacement for trenches to be overlaid: Follow standard jurisdictional requirements or as specified below. D. Bituminous Concrete Pavement Replacement: 1. Prime coat cut surfaces to receive asphalt patch and between each new layer of asphalt. a. Clean surface of loose and foreign materials. b. Apply under pressure: Uniformly, at rate of 0.01 to 0.05 gallons per square yard of area. 2. Bituminous Concrete: Follow jurisdictional requirements. E. Concrete Pavement Replacement: 1. Replace load transfer devices where removed. 2. Place concrete pavement following jurisdictional requirements. 3. Place expansion joints at 40 feet on center, maximum, or space to match existing joints, whichever is less. F. Shoulder Replacement: 1. Replace disturbed shoulder areas with type of material existing before disturbance, following appropriate jurisdictional requirements. 2. Reuse of gravel or aggregate material may be permitted with Engineer s approval, provided gravel or aggregate is removed and stockpiled separately, and is not infiltrated with foreign material. G. Curb and Gutter Replacement: 1. Do not tunnel concrete and asphalt curbs without Engineer s approval. 2. Replace curb and gutter following jurisdictional requirements. 02950-5 July 2011

3. When curb replacement is required within 4 feet of construction joint, extend replacement to joint. H. Walk Replacement: 1. Remove and replace entire walk square affected. 2. Space joints to match existing surrounding walk. I. Driveway and Other Replacement: 1. Driveways in State or County Rights-of-way: Replace following applicable jurisdictional requirements. 2. Unless otherwise shown on Drawings, replace driveways at other locations and other paved areas in kind. PART 4 MEASUREMENT AND PAYMENT 4.1 ROADWAY PAVEMENT REPLACEMENT A. Measurement: By square yard following Commission standard trench widths measured horizontally along trench centerline. B. Payment: At unit price listed in Bid Schedule. 1. Payment includes excavation and disposal of existing and temporary pavement. 4.2 BITUMINOUS CONCRETE OVERLAY A. Measurement: By square yard. B. Payment: At unit price for each square yard listed in Bid Schedule. 1. Payment includes labor, material, and equipment to provide bituminous concrete overlay specified herein. 4.3 MILLING AND BITUMINOUS CONCRETE OVERLAY A. Measurement: By square yard. B. Payment: At unit price for each square yard listed in Bid Schedule. 1. Payment includes labor, material, and equipment to provide milling and bituminous concrete overlay specified herein. 4.4 TEMPORARY HOT BITUMINOUS CONCRETE TO REPLACE COLD PATCH IN MARYLAND STATE HIGHWAY ADMINISTRATION ROADWAYS A. Measurement: By square yard following Commission standard trench widths measured horizontally along trench centerline. 02950-6 July 2011

B. Payment: At fixed contingent unit price for each square yard listed in Bid Schedule. 1. Payment includes removal of temporary cold mix, labor, material and equipment to provide hot bituminous concrete patch as specified herein. **WSSC** 02950-7 July 2011