INLAND WATERWAYS AUTHORITY OF INDIA (Ministry of Shipping, Government of India) Head Office : A-13, Sector 1, Noida

Similar documents
Infrastructure Development and Environment

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

HIRING OF PROFESSIONALS FOR THE PROJECT APPRAISAL & MONITORING UNIT UNDER JNNURM

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR

PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD

INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY. Environmental and Social Management System for ADB Line of Credit

INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY. Environmental and Social Management System for ADB Line of Credit

Environmental Governance in Myanmar. U Than Aye Director Environmental Conservation Department

Job Title: Managing Director Department: Job/Salary Scale: Accountable To: Responsible For: Job Purpose: Key Result Areas:

Odisha State AYUSH Society

Summary of Preparatory Study

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

AFRICAN DEVELOPMENT BANK GROUP. African Natural Resource Centre (ANRC) Terms of Reference

THE NATIONAL INSTITUTE OF HEALTH & FAMILY WELFARE VACANCY NOTICE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

TITLE OF CONSULTANT: Individual Consultant (IC) to Develop a Strategic Plan and Implementation Program for Business Botswana

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

ORISSA TOURISM DEVELOPMENT CORPORATION LIMITED

TPS 18 DAILY CURRENT AFFAIRS Date:

Outdoor - facilitator to propose location 41 days

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs)

World Bank Group Recruitment Drive (TOR for Future Vacancies)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name Region Country Sector(s) Theme(s)

VACANCIES NILE BASIN INITIATIVE NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway

STAFF VACANCIES Ref. 1714SNE02

Terms of Reference. Senior Researcher / Study Consultant for the Educational Demand and Needs Assessment Study

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6042. Date ISDS Prepared/Updated: 01/26/2011 I. BASIC INFORMATION. A. Basic Project Data

National Policy on Environmental and Social Sustainability of the Hydropower Sector in Lao PDR

EXPRESSIONS OF INTEREST. AFRICAN DEVELOPMENT BANK GROUP B.P Tunis-Bélvédère, Tunisie. African Natural Resource Centre (ANRC)

LIST OF SUSTAINABILITY POLICY

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

ONLY CANDIDATES RESIDENT AND ENTITLED TO WORK IN EGYPT MAY APPLY FOR THIS POST

Notice Inviting EoIs from Individuals to work as event coordinator cum planner For Celebrations of International Year of Biodiversity, 2010.

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

Executive Summary Sri Lanka Strategic Cities Development Project (SCDP)

Terms of Reference (TOR) Provision of consultancy services for payroll verification exercise

Summary of Environmental and Social Consideration in Development Study (Preparatory Study)

Unique Identification Authority of India (UIDAI) Guidelines for recruitment of Volunteers

EXCITING CAREER OPPORTUNITIES

EXPRESSIONS OF INTEREST. AFRICAN DEVELOPMENT BANK GROUP B.P Tunis-Bélvédère, Tunisie. African Natural Resource Centre (ANRC)

Advt. No. MLA/REC/ /03 CALL FOR PERSONNEL TO WORK AT R&D PROJECT OF MEDIA LAB ASIA ON FIXED TERM CONTRACT BASIS. Media Lab Asia REQUIRES

BIHAR STATE ELECTRONICS DEVELOPMENT CORPORATION LTD. Beltron Bhawan, Shastri Nagar, Patna

CAPRA National Accreditation Standards

Environment Impact Assessment (EIA) Notification 2006

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974. Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION. A. Basic Project Data

Unofficial Translation. The Prime Ministerial Decree on The Organization and Functionalities of the Ministry of Agriculture and Forestry

TERMS OF REFERENCE CNF/2015/GEO-004

Office of Climate Change Guyana September TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE

REQUEST FOR EXPRESSIONS OF INTEREST. (Long Term Individual Consultants, Environmental and Social Safeguards - Energy Sector)

New York, USA VACANCY ANNOUNCEMENT. Chief Operations Officer UN University Centre for Policy Research (UNU-CPR) (Fixed Term Appointment (FTA) P-3)

Public Disclosure Authorized

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1

PROJECT PREPARATORY TECHNICAL ASSISTANCE

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

Environment and Climate Change Adaptation and Mitigation in Myanmar. SAN WIN Assistant Director Environmental Conservation Department 23 August, 2014

ODISHA FORESTRY SECTOR DEVELOPMENT SOCIETY

BUSINESS RESPONSIBILITY POLICY

PMGSY - RURAL ROADS PROJECT

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON

TERMS OF REFERENCE FOR CONSULTING SERVICES

DATE: 05/03/2018. REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/001 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF

Director of Voter and Civic Education department Commission Secretary General (CEO) National Independent Electoral Commission

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)

Sri Lanka: Dam Safety and Water Resources Planning Project. Environmental Assessment and Management Framework (EAMF)

TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

CIRCULAR CHIEF PERSONNEL OFFICER. Permanent Secretaries and Heads of Department. DATE: February 13, 2017

Supplier Code of Conduct

Bhutan: Rural Renewable Energy Development Project (Part D Biogas Plants)

The Authority wishes to recruit results oriented Kenyans citizen with drive, vision and creativity to fill the following positions:- Designation

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

Waterborne Commerce Statistics Center

REQUIRED DOCUMENT FROM HIRING UNIT

POWER SYSTEM OPERATION CORPORATION LTD. 01/ Consultant/2018

Salary Range: $160,300-$170,400 September 12 to October 31, 2016

EA Frameworks Case Study

Pailin (whole province), Kampong Cham (1 district), Tbong Khmum (1 district), and Svay Rieng (1 district). 3

Number: HMT/MTK/HRM/PA-LPSC/02/2018 February 13, 2018

EMERGENCY MANAGEMENT ACT

Consultancy services

CARIBBEAN COMMUNITY SECRETARIAT DETAILS OF THE POST OF SENIOR PROJECT OFFICER, HUMAN RESOURCE MANAGEMENT

MARITIME INDIA SUMMIT Anchored for Growth

BARMER LIGNITE MINING COMPANY LIMITED. (NIT No BLMCL/MD/JPR/13-14/33 dated 23/09/2013)

AGENDA ITEM NO. F. No. 8-20/2015-FC

Hydropower and Water Resources

ROSTERS OF JUNIOR AND SENIOR EXPERTS Specifications of the Call for expression of interest

EMPANELMENT OF STAFF FOR PROGRAMME MANAGEMENT UNIT(PMU) & MICRO PROJECT AGENCIES(MPAs).

NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY

Village of Lincolnwood

CONSOLIDATION OF EMERGENCY MEASURES ACT S.Nu. 2007,c.10 In force November 8, 2007, except s.5-9 s.5-9 NIF. (Current to: August 24, 2010)

Law on Museums. The Saeima 1 has adopted and the President has proclaimed the following Law:

KENYA TRADE NETWORK AGENCY VACANCY ANNOUNCEMENT

(JCTSL) / 1. INTRODUCTION

Environmental Scientist Series Specification (Established July 22, 1981)

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

REQUIRED DOCUMENT FROM HIRING UNIT

LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY

Transcription:

Project Management Unit (World Bank Assisted Development Project for NW-1) INLAND WATERWAYS AUTHORITY OF INDIA (Ministry of Shipping, Government of India) Head Office : A-13, Sector 1, Noida - 201301 Phone : 0120-2544004, Fax : 0120-2543976 website: www.iwai.nic.in Inland Waterways Authority of India (IWAI) is a statutory body under Ministry of Shipping, Government of India. IWAI was set up in 1986 for development, maintenance and regulation of inland waterways for the purposes of shipping and navigation, specifically National Waterways (NW). World Bank has been requested to provide Technical Assistance and Investment Support for a Project for capacity augmentation of Haldia - Allahabad stretch of National Waterway-1 for navigation with least available depth (LAD) of 2.5 to 3.0 meters. The Project will involve construction of permanent river training works, barrages, navigational locks, terminals for cargo handling, channel marking, night navigation facilities, channel marking, dredging etc. IWAI is the Implementing Agency (IA). A Project Management Unit (PMU) has been set-up to initiate institutional arrangements for preparation and pre-appraisal activities pertaining to the project. The PMU is desirous of engaging the following domain Consultants on short term basis (initially for 1 year) for institutional strengthening and capacity development of PMU. S. Name of the Position No. 1. Consultant for Environmental Studies, including Environmental Impact Assessment (EIA) and Environment Management Plan (EMP). 2. Consultant for Social Development, including Social Impact Assessment (SIA) and Resettlement Action Plan (RAP). No. of Positions 1 1 This is not an employment but a consultancy only for a particular project and period. Persons would be engaged purely on short-term basis for the delivery of services. Engaged Consultants will be paid a consolidated remuneration. Selection will be on academic qualifications, merit and experience in the related field and working knowledge, preferably on World Bank projects. Interested individuals may obtain further information and TOR from the website: www.iwai.nic.in. The curriculum vitae with credentials in relation to the prescribed qualifications should be addressed to the Project Director, PMU and must reach in a sealed envelope at the above mentioned address by post or by hand on or before 08.12.2014. The Project Director, PMU reserves the right to accept or reject any or all applications and to cancel application under process at his discretion and his decision shall be final and binding. Project Director

CONSULTANT FOR ENVIRONMENTAL STUDIES, INCLUDING EIA AND EMP ON PROJECT CAPACITY AUGMENTATION OF NAVIGATIONAL FACILITIES ON NATIONAL WATERWAY -1 (JAL MARG VIKAS). Qualifications 1. Master s Degree in Environment Planning/Engineering/Sciences. 2. Experience (5 years or more) in Environmental Impact Assessment of Infrastructure Projects (preferably waterway, highway, barrage or at least similar linear projects). 3. Knowledge/understanding of typical environmental impacts; associated mitigation measures and community consultation. 4. Experience of working as social/resettlement expert for major civil engineering projects is preferred. 5. Familiarity with the working of State Govt., Central Govt. and the World Bank. 6. Ability to understanding of technical drawings and sketches. 7. Proficiency in use of Computers. 8. Good Communication Skills (in English and local language). Role of Consultant This assignment will involve frequent travel to project corridors, affected villages, block and district headquarters. The Consultant would be responsible for, but not limited to, the following activities and would report to the Project Director and Project Manager on daily basis. 1. Preparation of ToR, bidding documents for hiring of Consultant for EIA, EMP and SIA study. 2. Assist in co-ordination during site assessment etc. 3. Provide oversight and co-ordination during preparation of Environmental Screening, EIA, EMP and SIA Reports including various Reporting Formats, Checklists and Guidelines 4. Ensure integration of EIA/EMP/SIA findings in engineering design and bidding documents 5. Assist in assessment of fauna including fish and benthic diversity and flora and impact of movement on fisheries, aquatic life and river ecology through the consultant 6. Assist in ensuring social responsibilities of the project, such as compliance with the labour laws, prohibition of child labour, HIV/AIDS and gender issues. 7. Compilation of Pollution Monitoring Data, report preparation and coordination with monitoring agencies, 8. Prepare plan for trust building exercise between the Community and IWAI 9. Prepare guidelines for community consultations; reports on consultations; plans for further action and guide during implementation of Resettlement Action Plan (RAP) 10. Assist and guide IWAI for information dissemination and proper disclosure of document Capacity Building Activities

1. General training of IWAI officials and contractors class-room and on-site (including preparation of training material) 2. Intensive training to selected/designated field officials of the State Govt. and environmental officers of the contractors 3. Preparation of checklists/guidelines for sustainability of practices/long term usage by IWAI Supervision and Monitoring for compliance 1. Environmental inspections and preparation of Environmental Inspection Reports 2. Monitoring and Documentation of EMP, SIA Compliance Reporting and Documentation 1. Preparation of status/monthly/quarterly reports for the IWAI and World Bank on Environmental Aspects (such as Regulatory Clearances, Tree Cutting, EMP implementation, Afforestation Programme etc.) 2. Preparation of Compliance Reports for Department of Environment and Forests, State Govt./MoEF, GoI (as required) 3. Preparation of Compliance Completion Reports of each phase 4. Review of Reports submitted by the Contractors and/or Supervision Consultants Co-ordination with Other Departments and Agencies Preparation (as needed with regard to project scope) of applications and follow-up on Environmental Clearances; SPCB NOC; Forestry Clearances; Tree Cutting Permissions; NOC for construction activities on river, near ASI monuments etc. ***

SPECIALIST FOR SOCIAL DEVELOPMENT, INLUDING SOCIAL IMPACT ASSESSMENT (SIA) AND RESETTLEMENT ACTION PLAN (RAP) STUDY, ON TH PROJECT CAPACITY AUGMENTATION OF NAVIGATION FACILITIES ON NATIONAL WATERWAY -1 (JAL MARG VIKAS). Qualifications 1. Master s Degree in Social Work/Sociology/ Anthropology/Urban and Regional Planning. 2. Experience: Not less than 10 years in the areas of land acquisition process, involuntary resettlement, consultation and participation, socio-economic surveys, monitoring and evolution, etc. 3. Knowledge/understanding of typical sociological impacts of large infrastructure projects; associated mitigation measures; and community consultation. 4. Experience of working as social/resettlement expert for major civil engineering projects. 5. Familiarity with the working of State Govt., Central Govt. and the World Bank. 6. Proficiency in use of Computers to manage data base and generation of reports. 7. Good Communication Skills (in English and local language). Role of Consultant This assignment will involve frequent travel to project corridors, affected villages, block and district headquarters. The Consultant would be responsible for, but not limited to, the following activities and would report to the Project Director and Project Manager on daily basis. 1. Overall responsible for overseeing the preparation, implementation and monitoring of Social Impact Assessment and Resettlement Action Plans (RAPs) and Communication Strategy and implementation of communication action plan. 2. Support Project Director to respond to queries from stakeholders 3. Organize and facilitate consultations and workshops with stakeholders. 4. Prepare minutes and proceedings of consultations. 5. Maintain and upgrade the computerized data base related to the delivery of Resettlement Entitlements and generation of periodical progress reports; 6. Manage Consultants responsible for the preparation of RAP; 7. Review the output of consultants; 8. Co-ordinate with state revenue department to implement land acquisition. 9. Undertake field visit and organize focus group discussions with settlements around fixed terminals and others that may be affected by project and ancillary activities. 10. Co-ordinate the meetings of various committees established for the implementation Resettlement activities;

11. Undertake field visits as appropriate to review the progress at ground level; 12. Manage the resettlement impact assessment studies and other studies related to Resettlement. 13. Set up system for grievance management. 14. Track and document grievance management. Capacity Building Activities 1. General training of IWAI officials and contractors class-room and on-site (including preparation of training material) 2. Intensive training to selected/designated field officials of the State Govt. and sociologists of the contractors. 3. Preparation of checklists/guidelines for sustainability of practices/long term usage by IWAI Supervision and Monitoring for compliance 1. Sociological Inspections and preparation of Inspection Reports. 2. Monitoring and Documentation of RAP Compliance. Reporting and Documentation 1. Preparation of status/monthly/quarterly reports for the IWAI and World Bank on Sociological Aspects (such as Regulatory Clearances,) 2. Preparation of Compliance Reports for various stakeholder Ministries and Department of Government of India and the State Govts.(as required). 3. Preparation of Compliance Completion Reports of each phase. 4. Review of Reports submitted by the Contractors and/or Supervision Consultants ***