Establishing International Roughness Indices for a dense urban area case study in Washington, DC

Similar documents
Predicting Pavement Condition Index Using International Roughness Index in a Dense Urban Area

Evaluation of Smoothness of Louisiana Pavements Based on International Roughness Index and Ride Number

ASTM Definition of Roughness

TRANSVERSE CRACKING PROGRESSION IN ASPHALT SHOULDERS ADJACENT TO CONCRETE PAVEMENTS

UNDERSTANDING PMIS: RIDE, PATCHING, AND OTHER FACTORS. Darlene C. Goehl, P.E. Dist. Pavement-Materials Engr. TxDOT - BRY

Measures of Pavement Performance Must Consider the Road User

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

SUDAS Revision Submittal Form

Roughness on Virginia s Roads Annual Roughness Report

THINLAY ASPHALT FOR PAVEMENT PRESERVATION

Improved Methods for Superelevation Distribution: I. Single Curve

AMERICA RIDES ON US KEYS TO A SUCCESSFUL ALTERNATE BIDDING PROCESS

USING REMAINING SERVICE LIFE AS THE NATIONAL PERFORMANCE MEASURE OF PAVEMENT ASSETS

Pavement Management Systems

INCLUDE IN ALL PAVING PROJECTS UNLESS OTHERWISE DIRECTED BY TSB

A Study of the Performance of Three Popular Asphalt Pavement Rehabilitation Strategies

HPMS Reassessment: Pavements. Southeastern States Pavement Management and Design Conference New Orleans, LA May 13, 2009

OPTIMIZING RAMP METERING STRATEGIES

MONITORING IMPLEMENTATION AND PERFORMANCE

Conditions of Paved Roads in Carbon County, Wyoming

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

- A TECHNICAL REVIEW

404-LVT (Low Volume Traffic) A new 404 specification for your lightly traveled roads

Performance of Aggregate Base Course Pavements in North Carolina

Life Cycle Cost Analysis: Conventional Versus Asphalt-Rubber Pavements

An Introduction to the. Safety Manual

APPLICATION OF SEASONAL ADJUSTMENT FACTORS TO SUBSEQUENT YEAR DATA. Corresponding Author

Evaluating Design Alternatives using Crash Prediction Methods from the Highway Safety Manual

Upon completion of this module, participants will be able to:

Structural and Functional Evaluation of Flexible Pavement in Indonesia Case Study: Ciasem-Pamanukan Section

Performance Evaluation of Asphalt Pavement Preservation Activities

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Pay Schedule for Ride Quality

RELATIONSHIP BETWEEN TRAFFIC FLOW AND SAFETY OF FREEWAYS IN CHINA: A CASE STUDY OF JINGJINTANG FREEWAY

Modeling the Pavement Serviceability Index for Urban Roads in Noida

OJECTS. Additionally, CRCP provides a long-lasting base for resurfacing overlays.

This study was undertaken to provide the LA DOTD with an implementation package to facilitate adoption of the new AASHTO Guide for Design of Pavement

APPENDIX H: TRAVEL DEMAND MODEL VALIDATION AND ANALYSIS

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

Updating Virginia s Statewide Functional Classification System. Briefing to MPOs, PDCs, and Local Governments

Surface Texture Issues Related to Concrete Pavements

Network-Level Life-Cycle Energy Consumption and Greenhouse Gas from CAPM Treatments

2016 Louisiana Transportation Conference Danny Gierhart, P.E. Regional Engineer Asphalt Institute

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

Introduction to Asphalt Pavement Design and Specifications

SUBDIVISION SECTION STREET DESIGN MANUAL

Measures for Highway Maintenance Quality Assurance

ODOT Asset Management Plan 0

Pavement Management Systems PMS PAVEMENT MANAGEMENT SYSTEMS OVERVIEW. Dr. Nick Vitillo

Georgia DOT Micro-milling and Thin Overlay

Sensitivity Study of Design Input Parameters for Two Flexible Pavement Systems Using the Mechanistic-Empirical Pavement Design Guide

Traffic Noise Introduction to Traffic Noise Analysis and Abatement

TABLE OF CONTENTS. Background of Existing Facility 3. Proposed Work 4

IOWA TRANSPORTATION BY THE NUMBERS:

Schedule and Condition Responsive Maintenance Strategies for Optimum Utilization of Maintenance Budget

MAINE TRANSPORTATION BY THE NUMBERS:

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements

PROPOSED NEW PERFORMANCE INDICATOR - VEHICLE OPERATING COST INDEX (VOCi) DUE TO ROAD ROUGHNESS

Optimum Time for Application of Slurry Seal to Asphalt Concrete Pavements

MPC-459 April 1, July 31, 2017

CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS

IGGA Guide Specification: Conventional Diamond Grinding for Pavement Preservation Introduction

STRUCTURAL OVERLAY DESIGN OF FLEXIBLE PAVEMENT BY NON- DESTRUCTIVE TEST METHODS IN LOUISIANA

Rational Approach in Applying Reliability Theory to Pavement Structural Design

The Secrets to HCM Consistency Using Simulation Models

Emergency Incident Management, Benefits and Operational Issues

Using Pavement Management Data to Determine Asphalt Pavement Performance Cycles

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

Mechanistic-Empirical Pavement Design Guide

Technology Transfer Program

SELECTIVE FLEXIBLE PAVEMENT REHABILITATION BASED ON FORENSIC INVESTIGATION AND DEFLECTION ANALYSIS: SEVENTEEN YEARS CASE STUDY IN VIRGINIA

Highway Engineering. 3 _ 2/2 Lecture/Laboratory Hours

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES

ROADSIDE SAFETY BARRIER ELEMENTS Module 3

Development of PCI-based Pavement Performance Model for. Management of Road Infrastructure System. Kan Wu

New Jersey Pilot Study

Rubberized asphalt mixtures: a novel approach to pavement noise reduction

NYSDOT TRANSPORTATION MAINTENANCE DIVISION PAVING PROJECT QUALITY ASSURANCE ASSESSMENT Rating Guidelines (Revision #1)

S-1 (2356) BITUMINOUS SEAL COAT REVISED 9/26/07 SP Mn/DOT 2356 is deleted and replaced by the following:

Scoping & Design Project Level. By Robert J. Blight Principal Engineer Pavement Management & Technology

Implementation of HERS-ST in Iowa and Development/Refinement of a National Training Program

Efforts to Improve Micro Surfacing Performance

REQUEST FOR PROFESSIONAL SERVICES

Douglas Woods Wind Farm

500 Interchange Design

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

Comparing Roundabout Capacity Analysis Methods, or How the Selection of Analysis Method Can Affect the Design

CONTINUOUSLY REINFORCED CONCRETE AND UNPAVED ROADS CONDITION SURVEY FIELD MANUAL PUBLICATION 343 APRIL 2017 PUB 343 (4-17)

LOCATION AND DESIGN DIVISION

Pavement Preservation

Issues in Pavement Smoothness:

1 Introduction. Keywords: asphalt pavement evaluation, visual inspection, pavement condition index (PCI)

Performance Modeling of Rubberized Hot Mix Asphalt- A Literature Review (WO number 1)

SECTION III - REGIONAL ARTERIAL SYSTEM. The Regional Arterial System is a subcomponent of a broader regional thoroughfare system.

CITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES

Concept of Operations

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

USING A SIMULATION ENVIRONMENT FOR DYNAMIC TOLL ANALYSIS

I. Project Overview and Limits. Project Goal

VDOT MECHANSTIC EMPIRICAL PAVEMENT DESIGN (MEPDG) IMPLEMENTATION

Transcription:

The Sustainable City VI 275 Establishing International Roughness Indices for a dense urban area case study in Washington, DC S. A. Arhin 1, E. C. Noel 1 & M. Lakew 2 1 Howard University, USA 2 District Department of Transportation, USA Abstract The Federal Highway Administration (FHWA) requires each state in the United States to report the International Roughness Indices (IRI) of their road network in the annual Highway Performance Monitoring System (HPMS). The reported IRI for road segments are compared to the national standards developed by the FHWA based on national data. Deviations from the national standards are used to identify road segments that need to be included in repair or maintenance programs. The FHWA IRI thresholds for all road classes range between 170 in/mi and 96 in/mi for acceptable pavements, and 95 in/mi or less for good pavements. The use of the IRI for identifying sections of highways for repair and rehabilitation has been under review in several states. There is the concern that the national values of the IRI often do not reflect the ride smoothness perceived by citizens in the specific jurisdictions. This research obtained the ride quality ratings of residents of a dense urban area (Washington, DC) and correlated those with the IRI values for selected road segments. This research presents the IRI thresholds developed for the urban area based on the regression models obtained and the standard IRI thresholds for newly constructed pavement. Keywords: International Roughness Index, deceleration, braking. 1 Introduction Since the development of the International Roughness Index (IRI) in the early 1990s, all states have been required by the Federal Highway Administration (FHWA) to report bi-annually IRI results through their Highway Performance doi:10.2495/sc100241

276 The Sustainable City VI Monitoring System. International Roughness Index is a standardized measure of the response of a standard vehicle to roadway profile and roadway roughness. The index is typically expressed in inches per mile. Higher IRI values generally represent rougher roads, while lower IRI values mean smoother roads. Over the past several years substantial progress has been made in improving ride quality through pavement management programs thereby reducing IRI values. Increasingly, modification of FHWA s IRI standards is being used as a strategy for improving the ability of states to identify road segments for repair or maintenance programs. There is concern that the pure values of the IRI are often in conflict with the ride perceived by the occupants of vehicles. A few states [1 3, 8] states are establishing IRI thresholds based on the ride quality perceptions of motorists. The problem appears to be more acute in urban areas where the dominant features are arterials, collectors and local streets and where the public s tolerance for pavement roughness is relatively higher because of low operating speeds. Currently, the District Department of Transportation (DDOT) uses the IRI standards set by FHWA for HPMS reporting. There was concern among the District s engineers that the IRI data collected in bi-annual surveys may exaggerate the extent of maintenance needed since manhole covers and similar roadway features may skew IRI values. This paper presents the establishment of IRI thresholds that are based on the level of satisfaction of the ride quality experienced by vehicle occupants on the District s roads, automated IRI survey data, and IRI specifications used for deciding payments for newly constructed pavements in the District of Columbia. The developed IRI thresholds have the potential for reducing maintenance cost by reducing the number of road segments that may fail the basic FHWA IRI thresholds. This research is aimed at using citizens perception to establish the IRI thresholds for urban roads (the District of Columbia). In particular, the following objectives formed the basis of this research: developed a relationship between the subjective ride quality rating (PSR) provided by citizen subjects and the objective ride quality data (IRI) for various roadway classifications. developed IRI thresholds based on the relationship established and acceptable IRI standards for newly constructed pavement. 2 Literature review Pavement smoothness or roughness can be expressed as the extent of the nonexistence or existence of surface irregularities that affect the ride quality of road users. Research has shown that smooth roads, on the whole, costs highway agencies less over the life of the pavement resulting in decreased highway user operating costs, delay costs, fuel consumption and maintenance costs. Pavement roughness is measured by various automatic multifunctional measuring instruments or devices and is quantified using the International Roughness Index (IRI), an internationally accepted parameter. IRI was first defined in the late 70s by NCHRP Report 228 [1] and was adopted as a universal scale.

The Sustainable City VI 277 IRI is typically measured by automation using a road profiler, which produces a series of numbers to represent the profile of the road by combining a reference elevation, height relative to the reference, and longitudinal distance. Examples of road profilers include the Profilograph, Dipstick Auto-Read Road, and Inertial Profilers [2]. Response-type road roughness meters or profilers are typically used to collect IRI data and are usually mounted in specialized vehicles with computer technology to monitor pavement roughness. The device records the displacement of the vehicle chassis relative to the rear axle per unit distance traveled, usually in terms of counts per mile or foot [3]. Road smoothness may also be quantified in the form of the Present Serviceability Rating (PSR), which depends on subjective human evaluation of ride quality. The PSR was developed in 1962 by the AASHO Road Test. The rating ranges from zero (impassable) to 5 (perfect). It has been established through studies conducted by FHWA that the smoothness index of highway systems obtained through automation (IRI) can be correlated with the subjective ride experience or evaluation of road users (PSR rating). Pavement surface roughness is a major indicator of drive quality, and can induce stress into the pavement structure that could cause premature pavement fatigue and accelerated pavement deterioration. Pavement roughness indices (together with other pavement measurements) are often indicators of pavement surface deformation. Pavement distress, whether originating from above or below, undermines pavement drainage and thereby compromises highway safety. Pavement distress also results in a deterioration of the pavement roughness index value. This therefore suggests that the extent of pavement distress could be correlated with pavement roughness indices, including the IRI. The FHWA recommended a threshold of 170 in/mi (2.7 m/km) for acceptable ride quality in its 1998 strategic plan for the National Highway System. The lower the IRI number the smoother the ride and vice versa. Table 1 provides the pavement condition criteria for all functional road classifications in the national highway system, together with the estimated PSR rating [4]. Table 1: FHWA pavement condition criteria [4]. Road Quality IRI Threshold PSR Rating Terms (in/mi) Good 95 > 3.5 Acceptable 95 and 170 2.5 and 3.5 Most jurisdictions in the United States rely on pavement indices to determine which road segments on their road network need maintenance or improvement. These indices include the IRI and the Pavement Condition Index. Since 1990, FHWA has required states to report road roughness on the basis of the IRI thresholds (and other pavement indices) in Table 1. This mandatory report has caused most states to take a second look at the national IRI thresholds, which may or may not truly reflect actual pavement roughness or smoothness perceived by motorists in local jurisdictions. The application of the national IRI standards

278 The Sustainable City VI has been challenging to dense urban jurisdictions due to heavy traffic volumes, expected traffic interruptions and considerably lower travel speeds. The Minnesota Department of Transportation (MnDOT) developed a mathematical model for converting the IRI to the PSR for bituminous and concrete pavements [5]. In the process of developing this model in 1997, MnDOT asked 32 citizens to rate the smoothness of more than 120 pre-selected test sections on the state s highway system. The range of the ratings was from zero (very poor) to 5 (very good), with grades in-between for good, fair and poor. Using simple regression analysis, the following regression equations were developed for bituminous and concrete pavements respectively: PSR = 5.697 (2.104. IRI ), and PSR = 6.634 (2.813. IRI) (1) where IRI = International Roughness Index, in m/km. These regression models enabled MnDOT to set its own IRI thresholds for acceptable pavement conditions. The City of New York, along with the New York State Department of Transportation (NYSDOT), began an assessment of the quality of the pavements in various jurisdictions using 151 motorists in different community districts [6]. This study was conducted in 1995 and enlisted the services of an independent research firm which asked members of focus groups to rate a list of pre-selected roadways on a scale from 1 (good) to 4 (terrible) as they were driven through each segment. However, instead of using the traditional IRI values, NYSDOT measured the smoothness of the same segments in terms of City Roughness Index (CRI). The reported indices were obtained using the same procedures for obtaining IRI values, except that the CRI is a number that is dependent on the number of jolts encountered per mile on short distance segments with high speeds of travel. The tests were applied only to city streets. A regression analysis was conducted for the data obtained from the motorists perception and the CRI. The percentages of motorists who rated the smoothness of roadways as good, fair, poor and terrible were also reported for each jurisdiction. The results of the study were used to establish the CRI thresholds for city streets in the State of New York. In 2008, DDOT established standards for IRI for newly constructed pavement to be used in identifying the payment mechanism for pavement contractors [7]. The standards for accepting new pavements are based on IRI surveys of 25 ft segments of roads. The threshold averages for good pavement are equivalent to IRI c, defined as the maximum IRI for full pay. These values are presented for Table 2: DDOT s IRI thresholds for new pavement [11]. New Pavement IRI Limits Freeways ROAD TYPES Arterials/ Collectors Local Roads IRI c (Good) 80 160 180 IRI f (Acceptable) 81-160 161-300 181-350

The Sustainable City VI 279 freeways, arterials and collectors, and local roads. Similarly, IRI f is equivalent to the threshold for defect correction on new pavements. From the definitions, IRI c could be classified as good while IRI f could be classified as acceptable. The thresholds are presented in Table 2. 3 Methodology In establishing IRI benchmarks for the District of Columbia (DC), a survey was conducted using DC residents who gave their opinions on the smoothness of selected road segments, based on the Weaver/AASHO Scale. The ratings were obtained while the subjects were driven over selected road segments in the City. Using simple regression analysis methods, the average ratings of the drivers perception of the smoothness for each segment were correlated with the corresponding segments IRI values obtained from recent DDOT pavement smoothness surveys. Based on the resulting regression models and acceptable IRI schedules for newly constructed pavement, benchmark IRI values for each roadway classification were obtained. A 5% level of significance was used for the analyses. The average of the thresholds obtained from the regression models and the established values for IRI c and IRI f (for each road classification) were then calculated and presented as IRI thresholds for the District of Columbia. 3.1 Data collection DDOT provided the IRI data for selected segments that represented the various functional roadway classifications in the District. For each segment, the specific lane, direction of travel, and corresponding IRI observations were obtained. In all, 122 segments were selected and were grouped into the following 3 classes: interstate/freeways (30), arterials (62) and collectors (30). The segments selected had IRI values raging from 97 to 499 in/mi. Sixty-six subjects participated in the survey with ages ranging between 21 and 61. Three groups were formed (22 subjects each) for the survey for each of the three roadway classes. Prior to the commencement of the survey, instructions on how to provide ratings using the AASHO/Weaver form were given to all the subjects. Each group was driven over the selected lane of each segment and each member recorded his/her individual perception of the ride using the survey for provided. The Weaver/AASHO form was used by the subjects for rating the smoothness of the segments. The scale ranges from 0 ( impassable ) to 5 ( perfect ). The scale also has intermediate ratings which are labeled as very good, good, fair, poor and very poor. For each segment driven, the subjects were asked to indicate on the scale the position that corresponded with their best description of their feeling about the segment smoothness. A survey form was provided for each segment and for each subject. The subjects familiarized themselves with the survey form before being driven over the selected segments.

280 The Sustainable City VI 3.2 Statistical analysis For each segment, the average of the subjects rating was computed. The average ratings for the segments were correlated to the IRI values using regression analysis methods. After a series of data transformations, the following generalized regression model was deemed to be adequate: ln (IRI) = α + β (PSR) + ε, (2) where IRI is the dependent variable and PSR is the independent variable. The constants α and β are the coefficients of the regression model with an associated error of ε [ε ~ N(0, σ 2 )]. The statistical significance of the regression coefficients were tested at 5% level of significance. The overall statistical significance of each regression model for each classification of roadway segment was tested using the F-test at 5% level of significance. In addition, the regression model was checked for homoscedasticity (constant variance) using residual plots while checking for normality using the normal probability plots. For each regression model, the coefficient of determination or the R 2 value is also reported. This is the amount of variability in the data explained or accounted for by the regression model. 4 Results 4.1 Descriptive statistics Table 3 presents a summary of descriptive statistics of interest for the various types of roadways. Table 3: Descriptive statistics for IRI values. Classification Mean IRI (in/mi) Mean PSR Rating IRI Standard Deviation(in/mi) PSR Standard Deviation Freeways/Interstates 207.88 3.40 101.24 0.23 Arterials 225.52 3.20 55.32 0.45 Collectors 285.45 2.58 72.43 0.23 A PSR rating between 2 and 3 on the AASHO/Weaver scale was considered as fair while a rating above 3 indicated a good ride quality. Thus, on the average, motorists in DC considered road segments with a high IRI value of about 285 in/mi as fair. Interstate and local freeways had the lowest mean IRI value (207.88 in/mi) with a corresponding high PSR rating (3.40) which represents a good ride quality. Collectors had the highest mean IRI value (approximately 286 in/mi) with a mean PSR rating of 2.58. However, on the Weaver/AASHO scale, a rating of 2.58 corresponds to a fair ride quality.

The Sustainable City VI 281 4.2 Regression model for freeways/interstates Data for the 30 freeway segments surveyed were analyzed and the results showed that the regression model is adequate at 5% level of significance. The summary of the regression analysis indices is presented in Table 4. The scatter plot with fit and residual plot for the model are presented in Figures 1 and 2 respectively. Since the p-value for the F-statistic is less that 5%, it indicates that the regression model is adequate based on the data collected. In addition, the t- statistics of the coefficients β 0 and β 1 were found to be statistically significant at 5% level of significance. The resultant regression equation is: ln IRI = 6.672 0.4202 (PSR) (3) Table 4: Summary of regression analysis for freeways/interstates. Test Statistic Value P-Value R 2 Value 0.58 n/a ANOVA: Regression F-Value 34.07 0.00 Significance of Regression β 0 : 6.672 0.00 Coefficients (t- Statistic) β 1 : -0.4202 0.00 6.5 Scatter Plot with Fit Linear fit (6.672-0.4202x) 6 95% CI 95% Prediction interval 5.5 Ln IRI 5 4.5 4 1.5 2 2.5 3 3.5 4 4.5 5 Average Figure 1: Scatter plot with fit for freeway regression model.

282 The Sustainable City VI Residual Plot 2.5 Standardized Residual 1.5 0.5-0.5-1.5-2.5 1.5 2 2.5 3 3.5 4 4.5 5 Average Normal Fit Figure 2: Residual plot for freeway regression model. 4.3 Regression model for arterials Based on the regression analysis conducted on the 62 arterial segments, the results indicate a statistically significant regression model at 5% level of significance. This is indicated by the summary in Table 5. Presented in Figures 3 and 4 are respectively the scatter plot with fit and residual plot for the regression model. The p-values for all the major regression indices were found to be less than 5%, thus indicating an adequate regression model. The model only explains about 48% of the variations in the data (based on the R 2 value). The resulting regression equation was determined to be: ln IRI = 6.191 0.2483 (PSR) (4) Table 5: Summary of regression analysis for arterials. Test Statistic Value P-Value R 2 Value 0.48 n/a ANOVA: Regression F-Value 53.64 0.00 Significance of β 0 : 6.191 0.00 Regression Coefficients (t- Statistic) β 1 : -0.2483 0.00

The Sustainable City VI 283 6.2 6 5.8 Scatter Plot with Fit Linear fit (6.191-0.2483x) 95% CI 95% Prediction interval 5.6 Ln IRI 5.4 5.2 5 4.8 4.6 1.5 2 2.5 3 3.5 4 4.5 Average Rating Figure 3: Scatter plot with fit for arterials regression model. Residual Plot 3 2 Standardized Residual 1 0-1 -2-3 1.5 2 2.5 3 3.5 4 4.5 Average Rating Normal Fit Figure 4: Residual plot for arterial regression model.

284 The Sustainable City VI 4.4 Regression model for collectors Similarly, a statistically significant regression model was developed for the correlation between the IRI and the PSR rating for the arterial roads surveyed. The analysis was conducted at 5% level of significance. The primary regression indicators, as in the previous cases, showed a statistically significant correlation between the independent variable and the dependent variable. The summary of the results are presented in Table 6 with scatter plot with fit and residual plot for the regression model presented in Figures 5 and 6 respectively. The analysis resulted in the following regression equation: ln IRI = 6.599 0.3772 (PSR) (5) Table 6: Summary of regression analysis for collectors. Test Statistic Value P-Value R 2 Value 0.51 n/a ANOVA: Regression F-Value 29.63 0.00 Significance of β 0 : 6.599 0.00 Regression Coefficients (t- Statistic) β 1 : -0.3772 0.00 6.4 6.2 6 5.8 Scatter Plot with Fit Linear fit (6.599-0.3772x) 95% CI 95% Prediction interval Ln IRI 5.6 5.4 5.2 5 4.8 4.6 1.5 2 2.5 3 3.5 4 Average Figure 5: Scatter plot with fit for collector regression model.

The Sustainable City VI 285 Residual Plot 3 Standardized Residual 2 1 0-1 -2-3 1.5 2 2.5 3 3.5 4 Average Normal Fit Figure 6: Residual plot for collector regression model. The plots also validate the underlying regression assumptions presented earlier. 5 Developing IRI thresholds for DC Based on the regression analyses conducted at 5% level of significance, the threshold IRI values (based on motorists perception of ride quality) can be inferred. The thresholds derived from the analyses are presented in two-fold: based on FHWA pavement condition scale as presented in Table 1 and on the Weaver/AASHO scale range. The regression equations were used in arriving at these thresholds for each type of roadway. The minimum PSR ratings of 3.5 and 2.5 were used to characterize good and acceptable IRI thresholds, respectively. These limits were substituted into the regression equations to produce the corresponding IRI limits presented in Table 7. Using the limits in Table 3 and Table 7, the following threshold values were obtained by computing the average of the limits for each roadway classification. The results, representing the IRI thresholds for the DC, are presented in Table 9. Table 7: IRI limits based on regression models. IRI Threshold (in/mi) by Roadway Classification Ride Quality Freeways Arterials Collectors Good < 167 < 204 < 196 Acceptable 167-276 204-262 196-286

286 The Sustainable City VI Table 8: IRI thresholds for DC. IRI Threshold (in/mi) by Roadway Classification Ride Quality Freeways Arterials Collectors Good <124 <182 <188 Acceptable 124-218 182-281 188-318 6 Conclusion The IRI thresholds recommended by FHWA are 95 and 170 for good and acceptable conditions respectively. These values, however, do not generally reflect the perception of dense urban environments. In addition, since roadway geometrics and pavement durability vary considerably from state to state, as expected, many states have embarked upon a similar research to establish their own smoothness tolerance levels which the driving public is willing to accept, based on prevailing driving conditions. Within the margin of error, the thresholds derived can be adequately generalized for the three roadway classes in the District of Columbia. The IRI thresholds derived in this study could be used to select road segments for pavement maintenance and rehabilitation programs. Acknowledgement Appreciation is extended to the District Department of Transportation for supporting this study. References [1] Sayers, M.W., et al., The International Road Roughness Experiment, World Bank Technical Paper Number 45, pp 453-454, 1986. [2] Sayers, M.W., et al, Guidelines for Conducting and Calibrating Road Roughness Measurements, World Bank Technical Paper Number 46, World Bank, 1996. [3] Gillespie, T.D., et al, Calibration of Response Type Road Roughness Measuring Systems, NCHRP Report 228. [4] Highway Performance Monitoring System, Field Manual, Appendix J. U.S. Department of Transportation, Washington, D.C. FHWA Publication 5600.1A, 1990. [5] Minnesota Department of Transportation. An Overview of Mn/DOT s Pavement Condition Rating Procedures and Indices, Technical Report, 2003. [6] New York City Department of Transportation. How Smooth Are New York City s Streets? Technical Report, 1998. [7] District of Columbia Department of Transportation, Special Provision for Pavement Ride Quality, 2008.