Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

Similar documents
WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

Ironton Russell Bridge Project

Route 7 Widening Project Project No , P101, R201, C501 UPC No January 15, a.m. NOVA District Building

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

Ironton Russell Bridge Project

Ironton Russell Bridge Project

G2-0 LIST OF ACTIVE MTODs

I-405 Sepulveda Pass Widening Project. Community Advisory Committee Meeting June 24, 2010

G2-0 LIST OF ACTIVE MTODs

Whittier Bridge/I-95 Improvement Project. Public Information Meeting

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

G2-0 LIST OF ACTIVE MTODs

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work

Ironton Russell Bridge Project

Exposition Light Rail Transit Project

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

Status Report as of July 31, 2014

Preferred Elevated Tank Site

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

STATE AID GUIDE FOR: Updated: December 16, 2005

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Project Initiation Form

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

3.6 Construction Methods

Pattullo Bridge Replacement Project. Cost Report

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

Rosslyn Circle Improvements, WB Lee Hwy. - US 29. April 6, :30 a.m North Fort Myer Drive, LL-10, Arlington, VA

Categorical Exclusion (CE)

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016

I-91 Viaduct Public Information Briefing

Route 606 Loudoun County Parkway/ Old Ox Road Reconstruction and Widening

FTBA 2018 Construction Conference Major Projects Update

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

Glenmore Causeway Upgrades Project. Calvin T. McClary, P. Eng., Manager, Transportation Engineering, ISL Engineering and Land Services Ltd.

State Project No.: , N501 Contract ID Number: C DB66

Carpinteria Avenue Bridge Replacement Project Description Introduction

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

SCHEDULE THREE TECHNICAL PROPOSAL SUBMISSION REQUIREMENTS

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Ontario Structure Inspection Manual Inspection Form Structure Number: 12

TxDOT Houston District Permit Requirements (Information contained herein is subject to change)

District Department of Transportation ABC in DC (Accelerated Bridge Construction in Washington, DC) Paul Hoffman October 26, 2016

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

I-94/I-69 Interchange Bridge Construction

Select Subgrade Material, Compacted

The State of Ohio Bridges

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

APPENDIX A TIER 1 ANALYSIS

Re: PW Appendix 3 - Part 8

I-91 Viaduct Public Information Briefing

Agenda. PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

For Public Input Period

on the eastbound side of Route 29). identified in the table.

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

To Design and Construct The Project Neon Design-Build Project. Design-Build Contract. Volume II Technical Provisions

I-81 Exit 114 Bridge Replacement Project RFQ Information Meeting

MAINE MEDICAL CENTER

Accelerated Bridge Construction (ABC) National Status

APPENDIX F: CALTRANS COST ESTIMATE TEMPLATE (included in Appendix AA of the CALTRANS Project Development Procedures Manual)

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

ALTERNATIVE PROJECT DELIVERY DIVISION

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

ENGINEERING DESIGN & IMPROVEMENT STANDARDS

Attachment D-1: Civil/Structural Scope of Work

Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( )

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

City of Denton On-system Project Status Report Prepared by ITS

Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan

2001 Insertable Sheet List For Use With The 2001 Imperial Road and Bridge Standards February 2008

Construction Forecast

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

Purple Line Extension Section 1 Construction Community Meeting September 26, 2017

ORANGE VISTA HIGH SCHOOL PHASE I

Reason for Acceptance or Rejection

ENCROACHMENT/EXCAVATION PERMIT APPLICATION

Annual CSAH Needs Update for 2017

2016 TEAM Conference. Waverly Road Progressive Design Build Project Owner: City of Edgerton, KS. March 10, HDR, all rights reserved.

SPECIFICATIONS SCOPE OF WORK

Quarterly Progress Report

Project Type: Drainage and Storm Systems

2017 Highway Safety Improvement Program Call

CITY UTILITIES DESIGN STANDARDS MANUAL

LOCATION AND DESIGN DIVISION

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

South Dakota Department of Transportation Average Unit Prices from Low Bids

I-10 CONNECT. Public Meeting #1

Bonner Bridge Replacement Update:

Cost Estimating Guideline February, 2017

Transcription:

Rt. 29 Solutions Project Delivery Advisory Panel February 18, 2016

Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2

Agenda item 2: Interaction and Feedback Live Streaming Feb 4, 2016 Jan 21, 2016 Unique Viewers: 21 20 Streams: 38 41 Average Minutes per stream: 23 20 3

Agenda item 2: Interaction and Feedback (continued) For the period Feb 2, 2016 - Feb 16, 2016 Inbox: 4 (email and phone) 2 to be added to weekly traffic alert and newsletter distribution list 1 to be removed from alerts and newsletter list 1 regarding the need to cover sign at Hillsdale and Branchlands Web Provide Input: 1 comment exchange Report regarding condition of right-turn lane at Albemarle Square Project Hotline 844-220-5540: 1 call 1 regarding the need to cover sign at Hillsdale and Branchlands 4

Agenda item 3: Report on Panel Feedback November 2015 v. 2014 accident data Nov 2014: 11 recorded crashes Nov 2015: 2 currently recorded crashes Updates to Nov 2015 will be monitored Dec 2015 v. 2014 will be reported when data available Signal phasing Agenda item 10 Detour map Agenda item 11 5

Agenda item 4: Panel Feedback and Suggestions for Future Agenda Items Open Discussion 6

Agenda item 5: Construction Milestones Status as of Feb 15, 2016 Rio Road GSI Sep 2, 2016 Dec 2, 2016 Rt. 29 Widening Oct 31, 2017 2015 2016 December January February March April May June July August September October November December Utility Relocation (95%) 100% Final Pavement and Markings Drive Abutment Piles - 100% Landscape, Hardscape, Staining Set retaining wall piles and widen roadway - (45%) 50% May 23 start - Rio Restricted Period - Sep 2 intersection open Final Signing Temp. Signals 100% Jack & Bore and Line Large Diameter Culverts Gas line relocation - 0% ROW Acquisition - (80%) 100% Phase 3 Drainage and Paving Waterline Relocation Phase 1 Grading, Drainage and Paving - (35%) 35% Phase 2 Grading, Drainage and Paving Phase 4 Grading, Drainage and Paving Construction Complete ROW Acquisition - (60%) 70% Clearing North of River Roadway Construction North of River Berkmar Oct 31, 2017 S. Abutment Excavation, Pile Driving - (90%) 95% North Abutment Construction Rough Grading South of River - (40%) 50% Utility Relocation - (40%) 40% Pier Construction ROW Acquisition - (40%) 50% Roadway Construction South of River Steel Girder Erection Deck Pans and Rebar Hillsdale Oct 31, 2017 Rt. 29/250 May 21, 2016 Under way Complete 90% Plans - (90%) 100% Final Design 10% Adv for Bids MSE Wall - 100% Pavement Widening - (40%) 60% Final Paving - (0%) 0% Sound Barrier - (20%) 30% Utility Relocation Construction Complete Late ( % ) %complete prior reporting period 7

Agenda item 6: Rt. 29 Solutions Project Updates Rt. 250 / 29 Interchange Work this week Continue subgrade preparation along Route 250 WB Complete storm drain installation in median of Route 250 Continue storm drain installation along Barracks Road exit ramp Continue sound barrier post installation for Sound Wall along Route 250 WB Continue installation of MSE leveling cap and coping 8

Agenda item 6: Rt. 29 Solutions Project Updates (continued) Rt. 250 / 29 Interchange (continued) Significant lane closures this week Inside and outside lanes of Route 250 EB and WB from Hydraulic to Barracks (lane closure dependent upon work activity) Ramp shoulder closures for storm drain installations 9

Agenda item 6: Rt. 29 Solutions Project Updates (continued) Rt. 250 / 29 Interchange (continued) Work next two weeks Continue sound barrier foundation drilling and post installation for Sound Walls Complete storm drain installation along Barracks Road exit ramp Complete subgrade preparation along Route 250 WB 10

Agenda item 6: Rt. 29 Solutions Project Updates (continued) Rt. 250 / 29 Interchange (continued) Anticipated significant upcoming lane closures Inside and outside lanes of Route 250 EB and WB from Hydraulic to Barracks (lane closure dependent upon work activity) Ramp shoulder closures for storm drain installations 11

Agenda item 6: Rt. 29 Solutions Project Updates (continued) Rio Grade-Separated Intersection Work this week Prep Albemarle Square island for demolition Sidewalk demolition in NE quadrant Underdrain, grading, curbing for widening Island demolition (29SB to Rio WB) Pile installation for retaining walls and concreting Storm drain installation in all quadrants (Work this week continued next slide) 12

Agenda item 6: Rt. 29 Solutions Project Updates (continued) Rio Grade-Separated Intersection (continued) Work this week (continued) Continue Fashion square retaining wall Install tie-back anchors Abutment A formwork Backfill Fashion Square retaining wall Refresh pavement markings in intersection Remove existing signal poles 13

Gas line burn off at Rio GSI 14

Rio retaining wall auguring 15

Rio storm drain installation 16

Agenda item 6: Rt. 29 Solutions Project Updates (continued) Rio Grade-Separated Intersection (continued) Significant lane closures this week Feb 17 - Mar 9: Rt. 29 SB right turn lane closed during daytime from south of Myers Drive to Rio Road. Business entrances and Rio right turn will remain open. Rio crossover closed at nighttime restricting thru movements and left turn movements. Right turns will be open. Rt. 29 triple lane closures northbound and southbound 17

Agenda item 6: Rt. 29 Solutions Project Updates (continued) Rio Grade-Separated Intersection (continued) Work next two weeks Albemarle Square island demolition Sidewalk and retaining wall demolition in NE quadrant Begin BMP 4, SW quadrant Underdrain, grading, curbing for widening Pile installation for retaining walls and concreting Storm drain installation in all quadrants Install tie-back anchors Abutment B formwork 18

Agenda item 6: Rt. 29 Solutions Project Updates (continued) Rio Grade-Separated Intersection (continued) Anticipated significant upcoming lane closures Feb 17 - Mar 9: Route 29 SB right turn lane closed during daytime from south of Myers Drive to Rio Road. Business entrances and Rio right turn will remain open. Rio crossover closed at nighttime restricting thru movements and left turn movements. Right turns will be open. Rt. 29 triple lane closures northbound and southbound 19

Agenda item 6: Rt. 29 Solutions Project Updates (continued) Rt. 29 Widening Work this week Install temporary drainage structures Continue median grading Utility relocations (CenturyLink, Dominion, Fiberlight, Lumos) Grading for pond 3 location Pond 2 construction entrance and clearing 20

Agenda item 6: Rt. 29 Solutions Project Updates (continued) Rt. 29 Widening Significant lane closures this week (nighttime) Route 29 left lane closure NB and SB 21

Agenda item 6: Rt. 29 Solutions Project Updates (continued) Rt. 29 Widening (continued) Work next two weeks Install temporary drainage structures Continue median grading Utility relocations (Dominion, Lumos, Charlottesville Gas) Grading for pond 3 location Culvert jack and bore installations Pond 2 construction entrance and clearing 22

Agenda item 6: Rt. 29 Solutions Project Updates (continued) Rt. 29 Widening (continued) Anticipated significant upcoming lane closures (nighttime) Route 29 left lane closure NB and SB 23

Agenda item 6: Rt. 29 Solutions Project Updates (continued) Berkmar Extended Work this week Abutment A pile driving and concrete placement MSE formwork Clear abutment B Grading at abutment B Significant lane closures this week None 24

Berkmar pile driving 25 25

Berkmar pile driving 26

Agenda item 6: Rt. 29 Solutions Project Updates (continued) Berkmar Extended (continued) Work next two weeks Abutment A pile driving and concrete placement Construct leveling pad for MSE wall at abutment A MSE formwork Clear abutment B Grading at abutment B Mobilize crane and drive piles at abutment B Significant upcoming lane closures None 27

Agenda item 6: Rt. 29 Solutions Project Updates (continued) Signal Updates Work this week Design of signal improvements and contract (task order) development Schedule April 1 through May 1, 2016 Significant lane closures this week None Work next two weeks Design of signal improvements and contract (task order) development Significant upcoming lane closures None 28

Agenda item 6: Rt. 29 Solutions Project Updates (continued) Hillsdale Extended Work this week Complete appraisal work Request DBE goal determination Continue making offers to property owners Finalize MOU with County for Stormwater Management Basin Finalize settlement and closing documents for USPS property Continue Final Road & Bridge Plans Continue preparation of special provisions Continue final plat preparation 29

Agenda item 6: Rt. 29 Solutions Project Updates (continued) Hillsdale Extended (continued) Work next two weeks Continue preparation of Final Road & Bridge Plans Obtain approval for sole source and proprietary items Final plat submittal to VDOT for review Continue preparation of special provisions Complete ROW offers 30

Agenda item 7: Budget Review and Update Route 29 Solutions Budget Update as of Feb 15, 2016 Construction Contracts Original Contract Value Expended (invoiced) as of February 15, 2016 Approved Change Orders Exposure (Anticipated COs) Remaining CV Total Anticipated Expenditures at Completion Rte. 29 Solutions Design-Build $116,746,000 $41,039,761 $130,883 $2,468,266 $75,837,122 $119,345,149 Rte. 29/250 Interchange Change $0 $31,734 ($31,734) ($31,734) $0 $11,121,078 $6,892,647 $109,216 $567,872 $4,337,646 $11,798,166 Change $663,603 $16,400 ($40,689) ($647,204) ($24,288) Adaptive Signals (Budget) $3,720,000 $2,226,433 $125,000 $50,000 $1,618,567 $3,895,000 Hillsdale Extended (Budget, Construction) Change $0 $0 $0 $0 $0 $11,198,000 Change $0 $0 $0 $0 $0 31 31

Agenda item 8: Partial Daytime Closure Rt. 29 SB right-turn lane; south of Myers Drive to Rio Road Occurring Feb 17 through Mar 9 due to expected nighttime temperatures 15 work shifts accelerated by performing work in daytime temperatures At VDOT s reasonable discretion and approval, Lane-Corman may submit a request for additional lane closures (Section 2.10.3.1) Requests limited to specific work tasks for specific durations Lane-Corman must demonstrate both a clear need and a public benefit VDOT and Lane-Corman jointly monitor traffic VDOT may withdraw approval Future requests, if any allowed, must be submitted at least 2 weeks before first day of requested additional closure 32

Agenda item 9: Woodburn Road Joint Construction Office Residents concerned about presence of trucks, speeding, stockpiled material, nighttime noise and condition of road Relocation of access road prohibited by steep grade (slide 34) One valid speeding matter addressed directly with driver of vehicle Certain equipment - but not all equipment - retrofitted with low noise emitting backup alarms Stockpiled aggregate moved away from Woodburn to eliminate aggregate hauling operations on Woodburn Road Street sweeper leased for daily cleaning, will be stored at Woodburn site Condition of road will be assessed post-construction and appropriate rehabilitation included in District workplan 33

34 34

Agenda item 10: Rio WB to Hillsdale Left Turn Signal Phasing during Nighttime Lane Closures VDOT observed Rio WB - Hillsdale movement Feb 16 pm, Feb 17 am, Feb 17midday During observations, Rio WB - Hillsdale movements functioned normally Rt. 29 signals being placed in flash mode nightly 30-60 minutes after lane closures established; Rt. 29 in yellow, Rio in red VDOT will discuss May 23 - Sep 2 signal phasing with Lane-Corman for review at Mar 3 PDAP meeting 35

Agenda item 11: Detour Routes: May 23 - Sep 2, 2016 Detour routes, slide 37 Get-Around map developed by Business Assistance Subcommittee, slide 38 36

Detour routes, May 23 - Sep 2, 2016 37

Get-around map developed by Business Assistance Subcommittee 38

Agenda item 12: New Business and Wrap Up 39

Agenda item 13: Adjourn 40

Rt. 29 Solutions Project Delivery Advisory Panel February 18, 2016