STANDARD OPERATING PROCEDURES-Water Transfer

Similar documents
ENGINEERED SOLUTIONS SAFETY INSTRUCTIONS FOR STRUCTURAL PLATE PRODUCTS

METHOD STATEMENT FOR PIPE WELDING WORKS

BOOM-SUPPORTED ELEVATING WORK PLATFORM PROGRAM

Safety Policy and Procedure

LEVEL 3 HEALTH & SAFETY IN THE WORKPLACE

KENNECOTT UTAH COPPER

SECTION A1 EXCAVATION AND BACKFILL GENERAL

Loading Arm Installation, Maintenance & Safety Manual

Forklift Operator Training

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

R-5 Chainsaw & Crosscut Working Group/PCT Manager

TASC Training. Developed by Safety Partnership TASC SME Team

Standards of Performance. Mariane Ewbank Chairperson Standards and Customs WG

Safety Information for The University of North Carolina at Chapel Hill

Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining and HDPE

BNSF RAILWAY COMPANY

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ACCIDENTAL SPILL PREVENTION PLAN EH-009-R03

PAGE 1 OF 10 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S370 Mobile Cranes Procedure REV /14/2012

ENGINEERED SOLUTIONS. Safety Instructions for Unloading and Handling Contech Corrugated Metal Pipe

Flygt Advanced Low Pressure Sewer System Package

SAUDI ARAMCO Policy: HSE 008 DRILLING & WORKOVER OPERATIONS Issued: 4/27/2006 HSE PROCEDURE Revised : 4/27/2006

Demolition Safety!!!!

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

all VAC LIFT ALL-VAC-LIFT Phone Redstart Street Fax

Forklift Course Pre-Reading Information. Version 2.0. March 2011

SECTION 1 - INTRODUCTION 2 PURPOSE 2 SCOPE 2 DEFINITIONS 2 LEGISLATIVE CONTEXT 4 RESPONSIBILITIES 4

SAFE-TANK DOUBLE WALL TANKS HIGH DENSITY CROSSLINKED POLYETHYLENE STORAGE TANKS WITH OXIDATION RESISTANT LINING SYSTEM (NSF/ANSI 61)

TOWN OF WAYLAND MASSACHUSETTS CONSERVATION COMMISSION

Michigan Department of Environmental Quality Resource Management Division Office of Oil, Gas, and Minerals

the P.R. Skate, LLC Pallet Rack Moving System Product Manual

Arctic Insulation & Manufacturing The Pre-Insulated Pipe People

NEVER REMOVE THE SAFETY GUARDS

3 TM Scotchkote TM Spray in Place Pipe 269 Coating. Case Study: Syracuse, New York

V.2. REFERENCE: G:\Public\OCCUPATIONAL HEALTH & SAFETY\3. INDUCTION\General Site Induction REVIEW DATE: 5/6/2013

JUST THE FACTS CONCRETE PIPE VS. HDPE

POWERED MOBILE EQUIPMENT PROGRAM

Standards of Practice Powered Industrial Truck/Forklift

Concrete Waste Management

FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY AERIAL WORK PLATFORM POLICY 09/06/17 Last Revision

LAST REVIEWED 05/3/13 CHEVRON

HM-Series. Dock Leveler. Owner s/user s Manual

Lift Planning Workshop

SITE SAFETY RULES - SILVERSTONE CLASSIC 2018

Hydraulic Excavators

Technical Note FlexSteel Pipe Transport, Installation, and Handling

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3

CAL/OSHA ELECTRICAL HIGH VOLTAGE

HIGH DENSITY CROSSLINKED POLYETHYLENE STORAGE TANKS WITH OXIDATION RESISTANT LINING SYSTEM (NSF/ANSI 61)

Section 7 Cutting Fusible PVC Pipe

Cristal Australia Pty Ltd

WHS Management Plans

CS ENERGY PROCEDURE FOR A JOB SAFETY AND ENVIRONMENTAL ANALYSIS CS-OHS-11

Operator s Manual for Morse Heavy-Duty Kontrol-Karrier with 3-Piece Drum Holder

GEOMEMBRANE INSTALLATION GUIDELINES RUFCO 20, 30 & 40 MIL UNREINFORCED DURA SKRIM 30, 36 & 45 MIL REINFORCED

SLIDE RAIL SHORING SYSTEMS

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

SAFETY FACT SHEETS. Working with and around High Risk Plant Safety Non Negotiable. G-HS-ST Working with and around High Risk Plant

Tabulated Data Waler Rails

Policy Number: 013 Authorized By: The Cianbro Companies Alan Burton

Stage 4 Geotechnical Investigations Information Sheet

Fumigation Management Plan Methyl Bromide

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Forklift Operator Safety Program

PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE

Design Considerations. Pursuing Dynamic Compaction. waste considered. Pursuing Dynamic Compaction. Page 1 of6

Powered Industrial Trucks Safety Checklist

SEWER FORCE MAIN HDPE PIPE

SECTION 1: APPLICANT INFORMATION. 1. Have you contacted your local Chapter regarding their established submission process or procedure?

Best Practices for Building High-Performance Resource Roads. Road Drainage. Developed by: The Roads and Infrastructure Group

INDUSTRIAL PIPE FITTINGS, LLC

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2)

COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY NEVADA COUNTY CDA GUIDELINES FOR ASH AND BURN DEBRIS CLEAN UP AND REMOVAL AFTER A FIRE

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems

7/17/2017 Page 1 of 5

FORKLIFT TRAINING MANUAL. Safety & Risk Services Unit Human Resources Service Group UPD Building, Third Floor Phone:

CF50/100 KW TURBINE ACCESS ROAD, CRANE PLATFORM, CONCRETE, AND LIFTING SPECIFICATIONS C&F GREEN ENERGY REVISION PREPARED BY APPROVED BY DATE

HM-Series. Dock Leveler. Owner s/user s Manual

Standard Duty Cantilever Rack Installation and Assembly Guide

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

Model TS-100 Tubing Spider Installation, Operation, Service and Parts Book Manual

- 2 - GUIDELINES FOR SAFE UNLOADING OF 20 LINED BOX CONTAINERS CONTENTS

Planning, Ordering, and Installing FRP Trail Bridges In the Forest Service, the recreation program has the

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

PART 22 POWERED MOBILE EQUIPMENT GENERAL. Application 22.1 This Part applies to every workplace where powered mobile equipment is used.

EM385 Construction Safety and Health Certification Course Section 4 Temporary Facilities

PIP PCEPA003 Process Analyzer System Field Installation Guidelines

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK

Port Machinery Container cranes:

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

Field Instruction. All Horizon Power workers who work in and around excavations.

Flood Hazard Assessment Report Falls Gulch, Larimer County, Colorado January 16, 2013

A. This Section includes exterior piping for vertical, direct-buried, ground-loop, heat-pump systems that operate between 23 and 104 deg F.

VALLEY LATERAL PROJECT. RESOURCE REPORT 11 Reliability and Safety. FERC Docket No. CP

CCR COMPLIANCE FUGITIVE DUST CONTROL PLAN. Prepared for: Tucson Electric Power Company Springerville Generating Station Springerville, Arizona

Micro Hydroelectricity Installer Skills Assessment


Electricity at work: Forestry

Universal-Fit LIFT HOOK - Model 1371B

Manual. Standards WOC HSE WOC LP. 1 tel) ( W. McIntosh. WO Executive Vice President Operations DOCUMENT NO: WOC-HSE-ST Section H003 Hot Tapping

Transcription:

SOP WT-16 (MAR 2014) STANDARD OPERATING PROCEDURES-Water Transfer Large Diameter Poly Operations Section 1.0 Introduction and Background Rockwater Energy Solutions, Inc. (and all its affiliated and subsidiary companies, hereinafter collectively referred to as Rockwater ) is committed to providing its employees a safe working environment and avoiding injury to our contractors, customers, and neighbors. As part of our overall commitment to safety, Rockwater seeks to prevent acts or conditions that could result in injury and/or illness to any employee, customer, contractor, neighbor, and/or the environment. In an effort to prevent potentially harmful acts or conditions, Rockwater has developed this Standard Operating Procedure (SOP). This SOP will discuss steps to be taken to promote a safe process, as well as a list of potential hazards that should be identified and remediated prior to beginning this procedure. This SOP will be reviewed and revised on an ongoing basis to keep pace with best oilfield practices. This SOP will be a part of the training provided to all affected employees when they begin their employment with Rockwater and any time the plan is changed. This SOP will also be reviewed with an employee if his/her responsibilities change under the plan. A written copy of this plan will remain in the regional Safety Office, and will be available for employee review. The Vice-President of Health Safety and Environment, or his agents, may be contacted by any employee if he/she needs additional information about this SOP. This SOP has been developed to assist affected employees with the operational steps that may be used to complete the task safely. It must be noted, however, that the experience and background of a trained water transfer employee is essential to the success of any project or task. Nothing contained in this SOP is a substitute for each employee s individual judgment in any given situation. In the event that any employee believes that any task outlined in any SOP cannot be completed safely, then that employee should immediately halt the performance of such task and notify their direct supervisor. In addition to this SOP, the policies and procedures of each operating company will be strictly observed by Rockwater personnel. Section 2.0 Process Steps, Large Diameter Poly Pipeline Operations This SOP will focus on the operational steps required for safely conducting operating involving large diameter poly pipelines. It is expected that this SOP will be applicable for all situations where Rockwater personnel will be operating system. This SOP will focus on three main areas of poly pipeline operations: pipe loading, pipe unloading, and pipeline rig-up. Prior to discussing the operating steps, a brief outline of poly pipe is in order. The poly pipe typically used by Rockwater is made of high-density polyethylene (HDPE) resin. For the purposes of this SOP, all poly pipeline components with a diameter of greater than 8 will be considered large diameter. This pipe typically comes from the manufacturer in 50 long sections and must be fused in the field to fashion a pipeline system. Poly pipe resin formulations are designed in accordance with established protocols, and each designation is assigned a code number. The typical code numbers for pipe used by Rockwater are PE 3408/3608 and PE 4710. The pipe is also rated with a code for dimension ratio, or DR. The DR rating is a function of

the outside diameter of the pipe and the wall thickness of the pipe. In essence, lower DR ratings mean a thicker pipe wall, which typically means a greater working pressure can be handled. Pipe Loading Large diameter poly pipe should be delivered to the jobsite on a trailer of sufficient length and weight rating for the task. This task is typically handled by a third party contractor, but in the event that Rockwater personnel will be performing this task, confirm that the driver has the proper license for the task, based on the length/weight of the load. When loading sections of pipe onto a trailer for delivery to the jobsite, the following operational steps should be taken: Ensure a flat area with sufficient weight capacity is available for loading operations. Use a large capacity powered industrial truck (PIT) with extending boom; tele-handler or equivalent. Only a trained and certified operator should be allowed to use the PIT. Always use a spotter to oversee loading operations; non-essential employees should vacate the work area. Separate forks to maximum width and secure into position Pick up sections of poly pipe with forks in middle of pipe; typically 4 or less sections of pipe per fork load Travel slowly towards the trailer and keep load as close to ground as possible Raise forks over log bunks of trailer and slowly lower forks so that sections of pipe are centered on trailer but not adjacent to trailer head or truck cab; tilt forks slowly so that pipe rolls onto trailer When trailer is half full, stop loading operations and secure pipe with straps. See WT SOP-13, Pipe Loading and Securement for details. When trailer is full, complete the securement process as per SOP Pipe Unloading When unloading sections of pipe off of the trailer at the jobsite, the following operational steps should be taken: Ensure a flat area with sufficient weight capacity is available for unloading operations. Remove all straps from the trailer and pipe Use a large capacity PIT with extending boom; tele-handler or equivalent. Only a trained and certified operator should be allowed to use the PIT. Always use a spotter to oversee loading operations; non-essential employees should vacate the work area. Separate forks to maximum width and secure into position Slowly raise forks and maneuver forks so that they are under the middle of the upper layer of pipe Tilt forks back so that pipe is secure on forks Slowly raise forks over log bunks and back the load away from the trailer Lower the pipes to a safe operating height and transport to staging area; always travel slowly, face the direction of travel, and keep load as close to the ground as possible Repeat until all sections of pipe have been removed from the trailer

Pipeline Rig-Up When setting up poly fusing worksite, ensure that a level area of at least 100 x 100 is available; clean area of debris, rocks, stumps, etc. Unload fusing machine and orient in direction of pipe pull Place roller stand 20-30 in front of leading hydraulic arm, confirm alignment If required for project, set up poly horses on a level plane, 15 apart and in alignment with feeding hydraulic arm Use PIT (or equivalent) and place first section of poly onto fusing machine and secure with clamps Fuse pulling joint to first section of pipe o For more information on poly fusing operations, see WT SOP-18, Poly Fusing Operations When this first fuse has cooled, unclamp pipe and connect pulling straps or cables to the pulling joint and the PIT o Always refer to manufacturer s specifications for cooling time, based on DR, temperature, etc. Use PIT and pull first section of pipe onto roller stands and align for fusing After second section of pipe has been fused, use heavy construction equipment for pipe pulling operations (bulldozer or equivalent) Continue to fuse pipe until desired length has been achieved o Always consult manufacturer s specifications for maximum string length based on pipe diameter Upon completion of pipeline layout and installation of ancillary equipment, perform a dry pigging operation for every 2,500 foot section of the pipeline: dry pigging does not involve water. Upon completion of the dry pig, perform pressure testing as needed; see WT SOP-01, Pressure Testing Operations for details Section 3.0 Potential Hazards Any time that water transfer operations are in progress, the following potential hazards must be considered and mitigated: Latent natural gas Wind direction Ignition sources within 100 feet of the wellhead and/or frac tanks Pressure Line of fire/body placement/grease valve placement Hydrogen Sulfide (H 2 S) Stored energy Overhead work or suspended loads Pinch points

Section 4.0 Other Safety Items In addition to the above potential hazards, the following items should be discussed and implemented during the pre-project tailgate safety meeting and JSA process, prior to commencement of onsite activities: All possible flammable gas or liquid sources are to be identified and controlled or remediated. All possible ignition sources are to be identified and controlled or remediated. Environmental controls; o Erosion and Sedimentation (E&S) controls in place? o E&S controls appropriately located? o E&S controls adequate for situation? Ensure that safety equipment and personal protective equipment (PPE) is onsite and available and properly utilized when necessary or otherwise required pursuant to this SOP or the operating company s policies and procedures. Ensure that air monitoring equipment is calibrated and fully charged. Access signs or tape (as required) are available. Non-sparking tools for potential leaks are available. Potential communication issues should be identified and resolved; o Among Rockwater employees. o Between Rockwater and other contractors onsite. Strategies for limiting site access should be discusses and implemented, if possible. Rally points for and routes for emergency evacuations should be identified. o Identify a secondary rally point, along with a secondary evacuation route. Grounding and bonding of tanks and equipment must be completed. Appropriate actions on/around tanks must be discussed. Spill/leak cleanup procedures must be reviewed. Containment requirements must be reviewed. Reporting requirements and procedures must be reviewed. Discuss that the integrity of lines is not guaranteed, and can be negatively impacted by o Pressure; o Vibration; o Torque; or o Binds. Record-keeping and project log requirements should be reviewed. Water for pressure testing, purging requirements and processes must be identified. A minimum of three workers must be present onsite for all poly rig-up and fusing operations. Two workers may be sufficient for poly pipe loading and unloading operations.

SOP In-Field Checklist, Large Diameter Poly Pipe Operations Pipe Loading Use a flat area with sufficient weight capacity. Use large capacity PIT with extending boom, operated by trained/certified personnel Use spotter to oversee loading operations; other employees should vacate work area. Separate forks to maximum width and secure into position Pick up sections of poly pipe with forks in middle of pipe; 4 or less sections of pipe per fork load Travel slowly towards the trailer and keep load as close to ground as possible Raise forks over log bunks and slowly lower so that pipe is centered on trailer; tilt forks slowly so that pipe rolls onto trailer When trailer is half full, stop loading operations and secure pipe with straps Pipe Unloading Use a flat area with sufficient weight capacity Remove all straps from the trailer and pipe Use large capacity PIT with trained/certified operator Use spotter to oversee loading operations; other employees should vacate the work area. Separate forks to maximum width and secure into position Slowly raise forks and maneuver forks so that they are under the middle of the upper layer of pipe Tilt forks back so that pipe is secure on forks Slowly raise forks over log bunks and back the load away from the trailer Lower forks to safe operating height and transport to staging area Repeat until all sections of pipe have been removed from the trailer Pipeline Rig-Up Use a level area of at least 100 x 100 ; clean area of debris Unload fusing machine and orient in direction of pipe pull Place roller stand 20-30 in front of leading hydraulic arm, confirm alignment If required, set up poly horses on level plane, 15 apart and in alignment with feeding hydraulic arm Use PIT and place first section of poly onto fusing machine and secure with clamps Fuse pulling joint to first section of pipe When first fuse has cooled, unclamp pipe and connect pulling straps to the pulling joint and the PIT Use PIT and pull first section of pipe onto roller stands and align for fusing After second section of pipe has been fused, use heavy construction equipment for pipe pulling operations (bulldozer or equivalent) Continue to fuse pipe until desired length has been achieved Upon completion of pipeline layout and installation of ancillary equipment, perform a dry pigging operation for every 2,500 foot section of the pipeline Upon completion of the dry pig, perform pressure testing as needed