SPARTANBURG COUNTY BUILDING CODES DEPARTMENT

Similar documents
PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS

4. Number of drawings required: ( ) Locations of nearest streets

A/E Design Deliverable Checklist

APPLICATION NUMBER:, TAX MAP KEY: STREET ADDRESS:, PRPOJECT: APPLICANT:, PHONE NO: MAILING ADDRESS:, FAX NO:

City of Des Moines. Permit and Development Center 602 Robert D Ray Drive Des Moines, IA Phone: Fax:

A/E Design Deliverable Checklist

Building Codes and Ordinances ARC 227

CODE COMPLIANCE PLAN REVIEW PROCEDURES

BUILDING CODES & DESIGN CRITERIA

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION

PLAN SUBMITTAL REQUIREMENTS - ARCHITECTURAL

COMMERCIAL PLANS SUBMITTAL CHECKLIST For Commercial and Multi-family (3 or more units) Building Permit Applications

GENERAL PLAN REVIEW REQUIREMENTS

2014 Commercial Plan Submittal Checklist

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

The Building Codes A.R.E. Building Design and Construction Exam Prep

RESIDENTIAL BUILDING REQUIREMENTS

1 AND 2 FAMILY DWELLING REQUIREMENTS

FS , 712, 713, 714

PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL

Page 3 of 12. Inspected Describe. Explained. Health & Safety. Maj. Def. Examiner Notes STRUCTURE N/A. Financial Impact. Impact.

EXETER TOWNSHIP HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS

2015 IBC Exit Systems

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

CITY OF LOS ANGELES LARUCP PLUMBING/MECHANICAL PLAN CHECK LIST

2015 IBC Inspection of Fire-Resistance Rated Floors, Ceilings and Roofs

2012 IBC Inspection of Fire-Resistance Rated Floors, Ceilings and Roofs

2012 IBC Exit Systems

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

RESIDENTIAL BUILDING PLAN REQUIREMENTS

AGREEMENT CONCERNING EXISTING AS BUILT CONSTRUCTION

Comparison of the life safety elements of the 1997 UBC and the IBC 2000.

Analysis of Changes for the 5 th Edition (2014) of the Florida Codes

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

DESIGN DEVELOPMENT PHASE

Pikes Peak REGIONAL Building Department

WARWICK TOWNSHIP Dept. of Planning & Zoning

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

HENDRY COUNTY BUILDING, LICENSING & CODE ENFORCEMENT

10/23/2011. Plan Examination. Plan ExaminationPurpose. Catch problems in advance of construction.

E2-09/ (IFC [B] )

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

Inspection Report. 1 of 8

What is a Won-Door FireGuard Door?

Application for Commercial Plan Review and Building Permit. Address:

Applying the Building Code During Design

SIDEWALK & RAILING REPLACEMENT BOARD OF ED BUILDING

Training Certification Categories

Repair or replace section of driveway, approach, or sidewalk that are a trip hazard.

General Residential Code Requirements

Standard Plan Review - Project Submittal Checklist

Building Code 8 th Edition

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

Residential Building Inspections

The following is required for a complete permit submittal for each unit.

A homeowners/applicants guide to understanding and making application for a building permit.


TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

EXIT ACCESS RAMP. An interior ramp that is not a required interior exit ramp.

Phased Construction NO TENANT RELATED WORK IS ALLOWED WITH THIS PERMIT.

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

The following is required for a complete permit submittal for each unit.

INTERIOR ENVIRONMENT

2010 National Building Code Adoption and Associated Process Changes

E d u c a t i o n a l S e m i n a r s f o r B u i l d i n g & R e s i d e n t i a l C o d e

FIRE AND SMOKE PROTECTION FEATURES

OFFICE OF EDUCATIONAL FACILITIES FLORIDA BUILDING CODE SECTION 423 APPLICATION MATRIX

Q. Do residential and historical buildings that are going to be protected with sprinklers need to conduct an LSE?

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

SANDTOWN CROSSING PROFESSIONAL OFFICE PARK Atlanta, GA

Commercial Permit Applications and Forms City of Alpharetta. Commercial Building Permit Applications and Forms

IWF Safety Guidelines

2003 International Residential Building Code

Commercial Remodel Permit

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

June 7, 2012 PARTIES INTERESTED IN HVAC DUCT ENCLOSURE ASSEMBLIES

RESIDENTIAL BUILDING PERMIT CHECKLIST FOR THE CITY OF SANTA ROSA

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II

BUILDING PERMIT PROCEDURE PLEASE READ CAREFULLY AND FILL OUT COMPLETELY TO ASSURE QUICK AND ACCURATE SERVICE

Each proposed project will be reviewed for compliance with the following codes as applicable.

City of Rohnert Park When Permits are Required

1. Frozen food warehouses used solely for storage of Class I and II commodities where protected by an approved automatic sprinkler system.

STATE UNIVERSITY CONSTRUCTION FUND

CITY OF DANA POINT. COMMUNITY DEVELOPMENT, BUILDING AND SAFETY Golden Lantern, Suite 209 Dana Point, CA

MSC Guidelines for Review of Ventilation System Plans

CITY OF CRANSTON RESIDENTIAL PERMIT PROCEDURE BASEMENT RENOVATION

Module 8: Ontario Building Code Fire and Spatial Separations

RENTAL HOUSING SAFETY PROGRAM INSPECTION CHECKLIST

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

One and Two Family Additions

INTERIOR ENVIRONMENT

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210)

CONTACT LIST DOORS IN THE PATH OF EGRESS TRAVEL SHALL MEET THE REQUIREMENTS OF ICC / ANSI A117.1 : SECTION MANEUVERING CLEARANCES AT DOORS

Transcription:

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT PLAN REVIEW CHECK LIST REQUIREMENTS FOR COMMERCIAL BUILDING PERMITS Plan Review Coordinator Kris Brannon 864-596-3180 366 N. Church St Room 500 Spartanburg, S.C. 29303 Phone: 864-596-2727 Fax: 864-596-2194 Applicable Codes/Regulations Description Edition

International Building Code Current International Building Code Building 2015 International Building Code Mechanical 2015 National Electrical Code 2014 International Building Code Plumbing 2015 International Building Code Gas 2015 International Fire Prevention Code 2015 International Energy 2009 General Requirements Construction Documents See IBC, Section 107 Design Professional See IBC, Section 107.3 &.4 If the design professional is an architect or engineer legally registered under the laws of this state regulating the practice of architecture or engineering, then he/she shall affix his official seal to said drawings, specifications and accompanying data, as required by the State of South Carolina. Application Package Please be advised that engineered roof trusses, energy code compliance forms and manufacturer s data for windows, exterior doors, skylights, and roofing materials are required to be submitted at the time of the application. This applies to all commercial buildings 5000 sqft or more or if they are a place of Assembly, Educational or Hazardous use. Construction Plans/Drawings All drawings must be drawn to scale, showing dimensions with sufficient clarity and detail to indicate the nature and character of the work. (1/4 scale is recommended) Floor plans are acceptable when drawn at 1/8 minimum scale if the information provided is clear. Recommended drawing size is 24 x 36, maximum size 30 x 42 Design criteria shall comply with International Building Code 2015 Requirements for wind loads shall be clearly indicated on plans in compliance with the specific provisions of the code. Architects/ Engineer drawings shall bear a certification of compliance with the State Law of South Carolina. Including a raised seal, date, and signature. Architect/ Engineer Drawings shall bear: seal, logo, names, signatures, dates, licenses, addresses, phone and fax numbers Contractor s Drawings (if applicable) shall bear: Contractor name, signatures, dates, licenses, addresses, phone, and fax numbers. Plans for all buildings shall indicate how the required structural and fire resistance integrity (if applicable) will be maintained. Cover/Index Sheet Architects/ Engineers; names, addresses, phone and fax numbers, licenses number (as applicable). Contractors; names, addresses, phone and fax numbers, licenses number, contactor certification (if applicable). Index to Drawings: Architectural, structural, plumbing, mechanical (HVAC), electrical, etc. Abbreviations, symbols legend and general notes.

Code Compliance Summary Sheet Indicate design criteria and codes compliance summary: Edition of Building Codes used Indicated building area tabulation: living / non-living, total area under roof Occupancy classification: Single occupancy, mixed occupancy Special occupancy (if applicable) General Building Limitations: Allowable height and building areas. Building Height and area Provide a summary of itemized building areas on a matrix format as follows: Living/non-living areas. Total areas; per unit, per floor, per building Number of stories Sprinkled / Un-sprinkled: On Buildings with sprinkler systems, specify system Construction Types: Building Construction type, protected/ unprotected, fire resistance ratings for structural members and exterior walls. Fire separation distance on exterior walls Fire resistant separations Protection of openings Provide a summary of itemized occupant loads on a matrix format as follows: Occupant load on each room or tenant space and each occupancy classification on buildings with mixed uses. Total occupant load per floor. Capacity of Means of Egress Travel distance, dead-end length, exit and means of egress width. Arrangement and number of exits separation, exits remoteness, minimum number of exits Stairway protection Enclosed stairways Exterior exit way stairs, stairs separation Life Safety Plans Life safety drawings shall be required for all assembly occupancies and any other occupancy with an occupant load exceeding 50 people. Provide life safety drawings per floor indication the following: Exit access corridors between required exits. Fire rated walls along the exit access corridor (if applicable) Fire rated walls required for occupancy separations, tenant separations, exits, exits discharge and horizontal exits, Travel distance along the path of travel from the most remote location to the exit on each floor. Fire rated windows Fire shutters Fire exit/ panic hardware Fire department access panels Stair Floor Plans and Details: Floor Plans, enlarged plans; dimensions, elevations and sections Railings: Guard rails, hand rails; dimensions, elevations, sections, height, posts spacing. Roof Plan: Draft stopping, attic access and ventilation (if applicable) Indicate roof slopes Accessibility by Handicapped Persons: Site requirements Accessible route Vertical accessibility Toilet and bathing facilities Drinking fountains Special occupancy requirements Fair housing requirements

Swimming Pool: (if applicable) Submit a copy of drawings approved by the Department of Health and Environmental Engineering. A separate permit applications is required Shop Drawings Shop drawing for any material, equipment or installations to be incorporated in the building shall be stamped, signed and approved by the architect or engineer of record responsible for the design. A copy of approved shop drawings shall be made available at the job site for inspections. Structural Drawings: Index sheet: Abbreviations, symbols legend, general notes, design criteria Soil Analysis Termite protection Threshold inspection plan (if applicable) Design loads Wind requirements Foundation plans, sections and details Bearing Walls and columns, sections and details. Indicate path of travel with and arrow or shaded area showing the actual distance Occupant load on each room or tenant space and total load at each exit door. Indicate the aggregate of the occupant load along the path of travel Exits: Indicate number of exits, exit width and exit capacity. Location of exit signs Location of emergency lights Diagonal of the building and separation distance between exits or stairs Energy Efficiency Provide code compliance energy forms (energy calculations) for all conditioned areas. Indicate details of insulation on floors, walls, floor/ceiling, ceiling/roof assemblies. Architectural Drawings Provide building elevations and sections Wall elevations, sections, details: Architectural drawings shall provide designations, specifications, sections and details for fire rated assemblies and penetrations through those assemblies (wall, floor/ceiling, ceiling/roof assemblies) Specify appropriate fire resistant materials and construction Indicate details for fire resistance ratings of structural members (if applicable) Indicate location, identification or designation of tenant separation and fire rated walls on floor plans: Indicate tenant separation and fire rated walls (sections, details, finishes at top of wall) Provide specific details where tenant separation walls intersect other walls, floors or roof deck. Fire rated assemblies designation and details: walls floor/ceiling, ceiling/roof assemblies Fire rated penetrations, designation and details: walls, floor/ceiling, ceiling/roof assemblies Fire stopping: Details and code compliance notes Draft stopping: Location on roof plans, details and code compliance notes Fire Dampers: Provide code compliance notes on architectural drawing for required fire dampers Fire dampers shall be provided in ducts penetrating walls or partitions having a fire resistance rating of one hour or more. Fire dampers shall be installed in accordance with manufacturers installations instructions Mechanical drawings shall provide designations, specifications and details for fire dampers Location of fire dampers on designated fire rated wall must be shown on mechanical floor/ceiling plans Doors and Hardware Schedules: Provide door and hardware schedules (as applicable) for opening protective on fire rated walls and emergency exits as follows: Fire rated doors Fire rated windows Floor framing/structural plans and details Stairs structural plans and details Roof framing/structural plans and details

Plumbing Drawings Minimum Requirements: Shall comply with International Plumbing code; Section 106.3.1- Plumbing Provide a code compliance note indication compliance with International Building Code 2015 Plumbing Minimum plumbing facilities Fixture requirements Water supply piping Sanitary drainage Water Heaters Vents Roof Drainage Back Flow prevention Irrigation Location of water supply line Grease traps Environmental requirements (if applicable) Plumbing riser Mechanical Drawings Minimum Requirements: Shall comply with International Mechanical code; Section 106.3.1- Mechanical Provide a compliance note indicating compliance with International Building Code 2015 - Mechanical Design criteria shall comply with International Building Code Mechanical, ASHRAW standards and reference standards Provide an index sheet including a code summary, general notes, abbreviations and symbols legend Provide fire dampers in ducts penetrating walls or partitions having a fire resistance rating of one hour or more (if applicable) Fire dampers shall be installed in accordance with manufacturers installation instructions A copy of the manufacturer installation instructions shall be made available at the job site for inspections Location of fire dampers on designated fire rated walls must be shown on mechanical floor plans. Mechanical drawings shall provide designations, Specify UL designations and details for penetrations of ductwork and piping through fire rated assemblies (walls, floor/ceiling assemblies, ceiling/roof assemblies.) HVAC floor/ceiling Plans shall indicate as applicable any ductwork, air devices, diffuser/return grilles, duct sizes, CFM s dampers, fire/smoke dampers, vents, A/C units, fans controls; piping, refrigerant and condensate lines lay out. Show any HVAC equipment (as applicable). Include air handling units, condensing units, split systems, roof top units, ventilation or exhaust fan units, heaters, pumps; locations, schedules, tables and capacities. Show installation methods for equipment, connections, ductwork, piping, etc Indicate methods of securing HVAC equipment to building structure, floors, and roof Indicate equipment shut down devices as per SMC and NFPA Electrical Drawings Minimum requirements: Shall comply with IBC Section 110.1 Electrical Electrical wiring and services Feeders and branch circuits Over current Protection Grounding Wiring methods and materials GFGIs Equipment Special Occupancies Emergency systems Communication systems (if applicable) Low voltage (if applicable) Load calculations Specific requirements: Provide a code compliance note indicating compliance with the National Electrical Code 2014 Provide an electrical site plan showing exterior lighting Electrical power riser diagram: Show location and size of main service, meter, disconnect switch, panels, conduits, conductors and grounding. Indicate locations of service meter, disconnect switches, panels, equipment, receptacles, and outlets. Indicate locations of lights, switches, fans, smoke detectors, exit and emergency lights Panel schedules: Show branch circuits and sizes of conduits, conductors and devices for over current protection Provide load calculations for service and panels.