Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Similar documents
SAFE WORK METHOD STATEMENT

The safe management and control of Temporary Works

References. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A

Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Manual

ACT Scaffolding Services LTD METHOD STATEMENT Scaffold erection

DEPAUL UNIVERSITY. Scaffolding Program. Environmental Health & Safety. April 2017

Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Code of Practice

BEST PRACTICE GUIDANCE THE SAFE OFF-LOADING OF REINFORCEMENT FABRIC.

MATERIAL HANDLING, STORAGE, AND DISPOSAL

1. Introduction. 2. Background. 3. Guidelines. CICA-Endorsed ENGINEER S COMPETENCIES

CF50/100 KW TURBINE ACCESS ROAD, CRANE PLATFORM, CONCRETE, AND LIFTING SPECIFICATIONS C&F GREEN ENERGY REVISION PREPARED BY APPROVED BY DATE

This article mainly focuses on the importance of Formwork

Kingframe Steel Framing System ("SFS") Infill & Oversail - CDM Design Risk Assessment

PE45 AMAZON MONKEY BARS OWNER'S MANUAL

Contents. Before you begin. Introduction: Carrying out concreting to simple forms 1. Element 1: Planning and preparing 3

Scaffolding. Safety Guide. STOP! Before you climb

Reliant Holdings Ltd Safety Management System

Construction Regulations 2014 vs Construction Regulations 2003

SCAFFOLDS AND SCAFFOLDING WORK

WHS Management Plans

Control of Equipment on Masts, Towers and Rooftops BOP018.8

BP OIL -- TOLEDO REFINERY

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

CS ENERGY PROCEDURE FOR A JOB SAFETY AND ENVIRONMENTAL ANALYSIS CS-OHS-11

Comparative Study on Post - Tensioned and Reinforced Concrete flat Slab Systems for a Multistory Building

HEALTH AND SAFETY MANUAL

Reinforced Concrete. S.Sreenath 17 May 2016

SPECIFICATIONS FOR ERECTION OF PRECAST PRESTRESSED CONCRETE GIRDERS

Heavy Rib. Page 1 of 6. Expanded Mesh & Metal Products. Key Product Features:

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

SAFE WORK METHOD STATEMENT

EM385 Construction Safety and Health Certification Course Section 14 Material Handling, Storage, and Disposal

HOLLOW CORE FLOORS SPEED AND STRENGTH

RISK ASSESSMENT As exhibitions and events are deemed as hazardous environments, it is a legal requirement that all exhibitors and contractors

Comparative Study of R.C.C and Steel Concrete Composite Structures

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

1. Cast-in-place concrete is specified in Section

Load Handling (Hoisting) Policy

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

Shell Beams. Product brochure

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) CS-OHS-11

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Highways Maintenance (Construction)

CONCRETE FORMWORK CHECKLIST AT SITE

Project Address: Name of Person Completing Form:

Ironworker Safety Director Training Course. Steve Rank Executive Director of Safety and Health

FACILITIES MANAGEMENT CONTRACTOR SAFETY PROGRAM

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

Guideline for the erection of Supaloc Steel Trusses Pre- Delivery preparation by the supplier Installing Supaloc Steel roof trusses...

Date Prepared: Location: Time: Approximate Temperature (degrees F): Weather Conditions: Project Name:

CHAPTER 42 FORMWORK 42 FORMWORK. Definitions. Introduction

Unit 9 Reinstatement of modular surfaces and concrete footways

A. Section Metal Decking. (05300 in MF95) B. Section Cold Formed Metal Framing. (05400 in MF95)

Mandatory Building Inspection Scheme (MBIS) and Mandatory Window Inspection Scheme (MWIS)

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE

GUIDELINES FOR DESIGN, FABRICATION AND INSTALLATION OF TENSION MEMBRANE AND SHADE STRUCTURES

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Structural. Professional Engineers Ontario

Load Handling (Hoisting) Policy

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

THE NEW CRANE STANDARD

PRO Traffic Management

GUIDELINES FOR DESIGN, FABRICATION AND INSTALLATION OF TENSION MEMBRANE AND SHADE STRUCTURES

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated:

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

American Railway Engineering & Maintenance-of-Way Association Letter Ballot

UNIT 9 INSPECTION AND QUALITY CONTROL

BISON PRECAST FLOORING SPECIFICATION

Quality Control And Fabrication Manual Metal Stud Crete Metal Stud Crete Metal Stud Crete

Urzgan Rural Access Program

SECTION CAST-IN-PLACE CONCRETE

Corporate Safety Procedure Grid Mesh, Handrail and Flooring Removal. Table of Contents

Scope of Works Partitioning and Office Improvements of Unit 1 TGE Building, Champagne Estate

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter

Corporate Health and Safety Policy July 2012

Work Health and Safety Management Systems and Auditing Guidelines

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

Guide to safe manual tree felling

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &

Proposed Excess Soil Regulatory Package New Proposed Regulation and Amendments to Existing Regulations

Implementing an Effective Personal Protective Equipment (PPE) Programme

STANDARD PRACTICE INSTRUCTION

2016 Port of San Francisco Building Code

Allround Scaffolding. Layher Allround Bridging System Instructions for Assembly and Use. Modular truss system for wide spans

CONCRETE & MASONRY SAFETY

Scaffolding Procedures

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)

(7 February 2014 to date) OCCUPATIONAL HEALTH AND SAFETY ACT 85 OF 1993

WORK IN THE VICINITY OF POWER POLES AND OVERHEAD LINES

OSHA Rules for Scaffolding

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA)

Apply for Working at Heights Permit

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

INFORMATIONAL PACKAGE ACCESSORY RESIDENTIAL BUILDINGS (INCLUDING DETACHED GARAGES, STORAGE BUILDINGS & WORKSHOPS)

SCAFFOLDING PROCEDURE

Transcription:

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI - CoP 40.0 False Work (Formwork) Version 2.0 February 2012

ACKNOWLEDGEMENTS With gratitude Abu Dhabi EHS Center acknowledges the great support provided by the Executive Council in facilitating the issuance of Abu Dhabi Emirate Environment, Health and Safety Management System (AD EHSMS) and its implementation at Emirate level. The issuance of the system would not have been possible without the supervision, diligent efforts and productive recommendations of the AD EHS Center Board of Directors. These documents (Regulatory Instruments) constitute the efforts of the Abu Dhabi EHS Center and the concerned Sector Regulatory Authorities who worked together to integrate all relevant regulatory requirements under AD EHSMS RF. The input, contribution and constructive views of all sectors is highly appreciated. May these documents prove to be beneficial and helpful in system implementation and in expanding the knowledge in the EHS field. CoP 40.0 False Work (Formwork) Page 2 of 15

Table of Contents 1. Introduction... 6 2. Training and Competency... 6 3. Requirements... 7 3.1 Roles and Responsibilities... 7 3.2 Planning and Assessment... 8 3.3 Erection and Construction... 11 3.4 Special Precautions for Permanent False-work... 13 3.5 Inspection and Maintenance... 13 4. References... 14 CoP 40.0 False Work (Formwork) Page 3 of 15

Preface This Abu Dhabi EHS Regulatory Instrument was developed by the Building and Construction Sector Regulatory Authority as the primary Competent Authority for this topic to set the minimum mandatory requirements. Every effort was made in developing this document so that it does not conflict with existing local or federal laws and regulations. In case of conflict, requirements of the existing local and federal laws and regulations shall prevail, and all concerned are obliged to bring the same to the attention of AD EHS Center for resolution. This AD EHS Regulatory Instrument has been developed, reviewed and approved, following the process as described in AD EHSMS Implementation Guideline: The Integration of EHS Requirements in the Emirate of Abu Dhabi, by the following stakeholders: Abu Dhabi EHS Higher Committee; Abu Dhabi EHS Center; Environment Agency Abu Dhabi; Department of Municipal Affairs; Abu Dhabi City Municipality; Al Ain City Municipality; Western Region Municipality; Department of Transport Abu Dhabi; Abu Dhabi Water and Electricity Authority; Health Authority - Abu Dhabi; Higher Corporation for Specialized Economic Zones (ZonesCorp); Center for Waste Management Abu Dhabi; Abu Dhabi Tourism Authority; Abu Dhabi Food Control Authority; Abu Dhabi Education Council; Regulation and Supervision Bureau; and Other Relevant Federal and Local Competent Authorities. The AD EHSMS consists of the following hierarchy of documents: AD EHSMS RF Elements - Mandatory System Requirements EHS Regulatory Instruments: Standards and Guideline Values - Mandatory EHS threshold and exposure levels Codes of Practice - Mandatory EHS technical requirements subject specific Mechanisms - Mandatory system implementation processes and procedures CoP 40.0 False Work (Formwork) Page 4 of 15

Guidelines: Technical Guidelines - Non-mandatory guidance on how to implement an EHS Regulatory Instrument AD EHSMS Guidance Documents - Non-mandatory guidance and interpretation of an AD EHSMS RF concept and/or principle Further, this document is not intended to conflict with any contractual obligations in effect at the time of its issuance. However, all future contracts shall adhere to applicable requirements stated herein, and existing long term contracts shall be brought into compliance with its requirements as soon as reasonably practicable as stipulated by relevant subject authorities. This document will be reviewed periodically as part of the continual improvement cycle. CoP 40.0 False Work (Formwork) Page 5 of 15

1. Introduction (a) This Code of Practice (CoP) applies to all employers within the Emirate of Abu Dhabi. This CoP is designed to incorporate requirements set by Abu Dhabi EHS Center and Sector Regulatory Authorities in the Emirate of Abu Dhabi. (b) This CoP establishes the requirements and standards so that the risks associated with false-work are assessed, that control measures are implemented in accordance with the hierarchy of controls and ensures measures are taken to prevent injury, illness and disease to persons who might be exposed to risks arising from those activities. (c) This CoP applies to the overall management of false-work and to the obligations and requirements of employers, designers, consultants, contractors and employees. (d) False-work is defined as any temporary structure used to support a permanent structure during its erection and until it becomes self-supporting, it includes the form or mould into which concrete is poured, often referred to as Formwork. (e) This definition also applies not only to in-situ concrete construction, but also precast concrete structures, structural steel, steel erection, and items as brick arches and any construction method where the permanent structure may have a period of instability requiring support during the erection process. (f) This includes false-work which is installed to support structural elements such as insitu slabs and is designed to take the load of the supported structural element and its own weight in addition to other loads arising from wind and normal casting operations. 2. Training and Competency (a) Employers shall ensure that EHS training complies with the requirements of: AD EHSMS RF Element 05 Training and Competency; AD EHS RI Mechanism 7.0 AD EHS Professional Entity Registration; and AD EHS RI Mechanism 8.0 AD EHS Practitioner Registration. (b) In accordance with AD EHSMS RF Element 01 Roles, Responsibilities and Self- Regulation Section 3.2.5 employers shall ensure employees required to implement the requirements of this CoP are trained in false-work erection and understand the risks associated with using the equipment and materials and the control measures are implemented by the employer. (c) Employers shall ensure all employees involved in erecting false-work to provide support to structures under construction are trained to recognise and respond to hazards associated with this type of work. (d) Training shall be tailored to the specific requirements of the jobsite and include any unique issues and requirements. (e) Employers shall ensure an overall training programme is provided for both employees and supervisors which shall include the following with regards to false-work: reasonably foreseeable hazards and risks; CoP 40.0 False Work (Formwork) Page 6 of 15

site rules and prohibited activities; safe methods of working; and personal protective equipment. (f) Employers shall maintain a record of the required training that contains the following information: (v) name and ID number; Emirates ID number; subject(s) of training; date(s) of training; and 3. Requirements person(s) providing the training. 3.1 Roles and Responsibilities 3.1.1 Employers (a) Employers shall undertake their roles and responsibilities in accordance with the general requirements of AD EHSMS RF Element 01 Roles, Responsibilities and Self-Regulation Section 3.2.5. (b) Employers shall undertake their specific roles and responsibilities in accordance with the following: (v) (vi) (vii) all false-work erection is appropriately planned, organized and appropriately supervised; those involved in false-work erection are trained and competent; the place where false-work erection is carried out is safe; false-work equipment and materials are appropriately inspected; inform the Principal Contractor and any other relevant parties of the selected method for false-work erection and the equipment to be used; obtain all necessary work permits and authorizations and provide all necessary notifications concerning the work; nominate a person to implement the control measures and to supervise the work at all times. This person shall be competent in the type of false-work erection needed for the particular project and experienced in the implementation of safe work control measures; and (viii) when it has been confirmed that the permanent structure has attained appropriate strength, issue formal permission to dismantle the false-work. 3.1.2 Principal Contractors (a) In the case of the Building and Construction Sector, Principal Contractors shall undertake their roles and responsibilities in accordance with the general requirements of AD EHS RI CoP 53.0 EHS Management during Construction Work. CoP 40.0 False Work (Formwork) Page 7 of 15

(b) Principal Contractors shall undertake their specific roles and responsibilities in accordance with the following: 3.1.3 Designers ensure that employers have all available descriptions of the site, including design drawings, site surveys, plans of services and information on the nature and location of hazardous materials, the nature of building materials and the building or structure s relationship to surrounding properties; and all relevant authorities and utility service providers are notified and all necessary approvals are obtained before work commences. (a) Designers shall undertake their roles and responsibilities in accordance with the general requirements of AD EHS RI CoP 20.0 Safety in Design. (b) Designers shall undertake their specific roles and responsibilities in accordance with the following: 3.1.4 Employees consideration of the risks to environment, health and safety during construction, maintenance and subsequent demolition and that the design specifications incorporate particular requirements for false-work erection to be carried out safely; and in the case of false-work used to support in-situ reinforced concrete, specifications are provided as part of the design on the concrete strength to be reached before the false-work can be safely removed. (a) Employees shall undertake their roles and responsibilities in accordance with the general requirements of AD EHSMS RF Element 01 Roles, Responsibilities and Self-Regulation Section 3.2.7. (b) Employees shall undertake their specific roles and responsibilities in accordance with the following: following information provided by the employer regarding false-work erection; observing false-work erection control measures and operating procedures prescribed by the employer, including the observation of warning signs; and use PPE in accordance with the employer s instructions whilst erecting falsework., consistent with AD EHS RI CoP 2.0 Personal Protective Equipment. 3.2 Planning and Assessment 3.2.1 Assessment (a) Employers shall ensure the following: an assessment of the various risks is undertaken and systems of work are established which are safe to all parties involved or affected including the public; that effective control measures are implemented in order to manage false-work activities safely and without risk to health; CoP 40.0 False Work (Formwork) Page 8 of 15

that for the Building and Construction Sector the management of false-work requirements are included in the Pre-Tender Environment, Health and Safety Plan in accordance with AD EHS RI CoP 53.0 EHS Management during Construction Work ; and that associated safe systems of work, and site rules are included in the Environment, Health and Safety Construction Management Plan (EHS-CMP) in the case of the Building and Construction Sector in accordance with AD EHS RI CoP 53.0 EHS Management during Construction Work. (b) Employers shall ensure prior to the construction of any false-work that a risk assessment is undertaken to ensure control measures are identified to prevent or minimise exposure to health and safety risks. Refer to AD EHSMS RF Element 02 Risk Management. (c) Employers shall ensure the risk assessment considers the following hazards associated with erecting false-work which may include: (v) (vi) (vii) persons falling during the erection of false-work; poor erection of false-work; poor quality materials; collapse of false-work during erection or under load; bursting of shuttering when concrete is poured; collapse of structural concrete where false-work is removed; manual handling of concrete shuttering and reinforcement bars; (viii) being struck by a concrete skip suspended by a crane; (ix) (x) (xi) (xii) 3.2.2 Design and Planning silica dust from scrabbling operations; hand abrasions to those tying steel reinforcement bars; manual handling and ergonomic considerations for steel fixers; and cement burns from wet concrete. (a) Employers shall ensure the planning for false-work erection is commenced at the initial design stage with designers taking into account the need for, and the practicality of, safe methods of working during false-work in accordance with the general requirements of AD EHS RI CoP 20.0 Safety In Design. (b) Employers shall consider the following during the design process: stability of the false-work at all stages of erection; the effect of the false-work erection sequence on stability and where this is critical, the sequence shall be stipulated; and provision of safe access to work at height areas and provision of safe working places for those involved in false-work erection. (c) Design specifications shall incorporate particular requirements and essential information for the scheme to be planned and erected safely and include: CoP 40.0 False Work (Formwork) Page 9 of 15

(v) (vi) (vii) whether the false-work design is provided as a standard or a bespoke design; in the case of a bespoke design detailed loading calculations shall be prepared for the specific design of the false-work; the estimation of loads to be supported by false-work; the weight of the permanent structure and other factors are to be included in the calculation of loads to be applied to false-work; the loading sequence to prevent the build-up of stresses in individual members of the false-work support structure; elimination of the possibility of moment reversal and uplift on supports, the designer of false-work shall consider the following: 1) sequence of pouring; 2) method of pouring (continuous or in bays placed on different days); 3) type of applied vibration method applied; 4) magnitude of final permanent deflections in relation to progressive construction above the first supported member (in the case of medium and high rise construction); and 5) method and sequence of designed and specified post-tensioning (where applicable). causes of dynamic loads which include: 1) dumping concrete on false-work from skips; 2) shock loads resulting from steel or precast elements; 3) surge loads reaching to false-work from concrete pump pipelines; 4) vibration duration and method; 5) moving loads such as placing plant, dumpers, and erection cranes supported on false-work; and 6) openings in false-work to allow for access and service risers. (viii) any modification of the loading program after designing false-work shall only be carried out after consultation with the false-work designer and it is the responsibility of the site team to notify the designer of any changes. 3.2.3 Documented Safe Systems of Work (a) In accordance with AD EHSMS RF Element 01 Roles, Responsibilities and Self- Regulation Section 3.2.5 employers shall ensure documented safe systems of work are developed and implemented which include: details of the false-work erection methodology in accordance with the design drawings; information on the false-work erection sequence to ensure the structural integrity of the false-work during erection; details of inspections and checks that will be made prior to false-work components being used; CoP 40.0 False Work (Formwork) Page 10 of 15

(v) (vi) (vii) personal protective equipment requirements, considering standards and requirements that apply to construction generally, and to false-work erection specifically in accordance with AD EHS RI CoP 2.0 Personal Protective Equipment; cranes and lifting gear requirements considering the standards and requirements that apply to construction work generally, and to false-work erection specifically in accordance with AD EHS RI CoP 34.0 Safe Use of Lifting Equipment and Lifting Accessories; details of permit to load requirements and engineering checks required for falsework that will provide temporary support for poured concrete; and details of permit to strike requirements once the poured concrete has reached it design strength to allow the false-work to be removed. (b) Documented safe systems of work shall: be distributed to all those concerned with supervision of false-work erection; communicated in a comprehensible way to those involved in the erection of false-work; detail procedures to ensure false-work erection is monitored to check actual work sequences do not deviate from planned work sequences; and be reviewed and updated as necessary so that they remain current. 3.3 Erection and Construction 3.3.1 General Requirements (a) Employers shall ensure the following during the erection and construction of falsework: erection of false-work shall not proceed unless all appropriate materials and equipment are readily available on site that it is reasonable practicable to be expected to be required for use during that working day; to ensure correct false-work erection control measure are followed, all persons in charge of erecting, inspection and checking activities shall receive copies of the following: 1) design drawings and specifications; 2) required standard details; and 3) checklists to ensure that all stages are executed appropriately. all materials and components to be used in the erection of false-work shall be inspected by a competent person prior to use to ensure they are fit for purpose and meet false-work design criteria; any timber to be used shall comply with the following: 1) type, grade, and size shall be in accordance with the design drawings and specifications; 2) no presence of defects, shakes, splits, winds, loose or large knots and crushed or damaged areas are allowed; and 3) no protruding nails or fixings from previous use are allowed. CoP 40.0 False Work (Formwork) Page 11 of 15

(v) (vi) (vii) where proprietary false-work systems are used, the manufacturer s instructions shall be available on site and followed during the erection sequence; the bases of all upright supports used in false-work shall be positioned on a firm level surface (never directly onto sand or soil); during the erection of false-work appropriately boarded working platforms shall be provided to ensure work can be carried out safely, employees are not permitted to climb and work directly from false-work components; (viii) when primary and secondary bearing timbers are being placed, work shall be carried out from below the working level using an appropriately boarded working platform; (ix) (x) take steps to prevent employees having contact of concrete; and control measures in accordance with AD EHS RI CoP 23.0 Working at Heights shall be implemented when false-work decking is constructed. 3.3.2 Steel Fixing Work (a) Employers shall ensure the following during the undertaking of steel fixing work: 3.3.3 Loading False-Work wherever reasonably practicable mechanical means will be used to move steel reinforcement around the site; where manual handling of steel reinforcement is necessary employers shall ensure the requirements of AD EHS RI CoP 14.0 Manual Handling and Ergonomics are complied with; the false-work deck is not to be overloaded with steel reinforcement; and bundles of steel reinforcement shall be placed in designated storage areas on the false-work deck in accordance with the engineers load calculations. (a) Employers shall ensure the following prior to loading false-work with concrete: (v) no concrete placing work shall take place until a competent engineer has inspected the false-work and signed the false-work off in accordance with the design drawing or specification; a Permit to Load shall be issued by the employer clearly stating that the falsework is completed to a satisfactory level and meets the design requirements; immediately prior to the placement of concrete the employer shall carry out a final inspection of the false-work ensuring all components are secure and screwjacks (where used) are tightly in place; concrete shall be placed progressively never allowing a large accumulation in one area where overloading could occur; and all employees shall be made aware of the permit to load requirements and instructed not to place concrete until instructed by supervision. CoP 40.0 False Work (Formwork) Page 12 of 15

3.3.4 Striking False-Work (a) Employers shall ensure the following prior to striking false-work: (v) (vi) (vii) prior to striking any false-work employers shall ensure that the concrete has reached its required design strength; concrete strength is checked in accordance with engineering requirements (normally concrete cube tests carried out by a testing laboratory); once the employer is satisfied that the concrete has attained the required strength a permit will be issued to strike the false-work; all employees shall be made aware of the permit to strike requirements and instructed not to strike false-work until instructed by supervision; during the striking of false-work an exclusion zone shall be established to prevent unauthorized access to the striking area; striking work shall be carried out in a controlled and progressive manner; timbers shall be de-nailed as work progresses; and (viii) timber sheets used to form concrete shall not be left in place once the false-work has been struck and shall be removed progressively with the false-work. 3.4 Special Precautions for Permanent False-work (a) Where false-work is employed to permanently support structural elements such as pre-cast slabs, employers shall ensure: it is designed to take the load of the supported structural element and its own weight in addition to other loads arising from wind and normal casting operations; and with pre cast elements: 1) the top and bottom surfaces shall be marked appropriately for identification; 2) the lifting system shall be arranged in a way to avoid collision and consequential breaking of pre-cast elements; and 3) lateral supports shall be provided before releasing pre cast elements from the sling, especially in the case of beams with a width to depth ratio exceeding 1:3. 3.5 Inspection and Maintenance 3.5.1 General Requirements (a) Employers shall ensure the following: all false-work plant and equipment shall be inspected prior to each use by a competent person; damaged or incomplete plant and equipment shall be removed from service for repair or disposal; where a working platform is constructed on false-work it shall be treated as a place of work and be subject to a daily visual inspection by a competent person; and CoP 40.0 False Work (Formwork) Page 13 of 15

false-work decks used by carpenters and steel fixers shall be subject to daily visual inspections and weekly formal documented inspection. 3.5.2 Maintenance of False-Work (a) Employers shall ensure the following: 4. References maintenance of false-work and associated component shall only be carried out in accordance with the manufacturers recommendations; repairs and modifications are to be in accordance with the manufacturers guidelines; no unauthorized repairs are to be made on false-work components; and structural repairs requiring welding or riveting are to be checked and approved by a competent engineer. AD EHSMS RF Element 01 Roles, Responsibilities and Self-Regulation AD EHSMS RF Element 02 Risk Management AD EHSMS RF Element 09 Compliance and Management Review AD EHS RI CoP 2.0 Personal Protective Equipment AD EHS RI CoP 14.0 Manual Handling and Ergonomics AD EHS RI CoP 20.0 Safety in Design AD EHS RI CoP 21.0 Permit to Work Systems AD EHS RI CoP 23.0 Working at Heights AD EHS RI CoP 34.0 Safe Use of Lifting Equipment and Lifting Accessories AD EHS RI CoP 53.0 EHS Management During Construction Work CoP 40.0 False Work (Formwork) Page 14 of 15

Abu Dhabi EHS Center 2012 This document is and shall remain the property of the AD EHS Center. The document may only be used for the purposes for which it was intended. Unauthorised use or reproduction of this document is prohibited. CoP 40.0 False Work (Formwork) Page 15 of 15