UPCOMING DESIGN & CONSTRUCTION PROJECTS 2 nd Quarter 2018 (Project & Construction Management)

Similar documents
Electrical Work. NOV Embankments Over Swamps and Compressible Soils

PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant

TEXAS PORTS STRATEGIC MISSION PLAN & PORT CAPITAL PROGRAM. November 16, 2016 November Transportation Commission Workshop November 16, 2016

STATE AID GUIDE FOR: Updated: December 16, 2005

I-91 Viaduct Public Information Briefing

CIRCLE K SUB-CONTRACTOR BID FORM

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Section 4 - Design and Construction Overview

VIRGINIA UTILITY PROTECTION SERVICE, INC. Title: Ticket Entry - Work Type List Working Document

1420 Miner Street Des Plaines, IL P: desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS)

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

AAPA Facilities and Engineering Seminar. Robert Tolsma PE, PPM, D.PE Division Manager Atkins North America San Diego, CA Oct 22, 2015

1. FROM (Bidder): (Name)

I-405 Sepulveda Pass Widening Project. Community Advisory Committee Meeting June 24, 2010

BNSF RAILWAY COMPANY

SOLUTIONS FOR THE BUILT WORLD. Assess & Prioritize. Keys to Asset Management. Carl J. Larosche, PE.

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

Alternative No. 1 Total Cost DRAFT

NCDOT Overview. Nick Tennyson, Chief Deputy Secretary March 4, 2015

Virginia Department of Transportation. Tabulation of Bids. Counties: REPLACE SUPERSTRUCTURE OVER NORFOLK SOUTHERN RR

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

I-91 Viaduct Public Information Briefing

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Table of Contents for Guide Specifications

Project Type: Drainage and Storm Systems

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

Port Authority of Guam

HUDSON TUNNEL PROJECT

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

Project #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50

Aviation Capital Construction Program Update

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

Property Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711

Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation

2.0 PROJECT DESCRIPTION

Jacksonville Port Authority Blount Island Marine Terminal Rail Improvements Jacksonville, Florida

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

SECTION UNCLASSIFIED EXCAVATION AND GRADING

Building/Zoning Permit Fee Structure

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

This guide only applies for sewer assets up to and including 225mm diameter.

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10

Re: PW Appendix 3 - Part 8

QUEEN ALEXANDRA COMMUNITY CENTRE

Panama City Marina City of Panama City, Florida

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

Design-Build Capital Infrastructure Project

Section: TABLE OF CONTENTS Temporary Facilities. 04.A General B Access and Haul Roads

Installation of RMG Cranes at Intermodal Rail Yard ABSTRACT INTRODUCTION

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

COMMUNITY BOARD EIGHT

15.8 Multipurpose Terminal Project Preparing Alternative Terminal Plans

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

Abington Memorial Hospital Abington, PA. Project Description

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

This is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established.

Marbella Isles Homeowners Association, Inc.

Outreach Meeting September 29, 2016

TEMPORARY FACILITIES

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

Seward Chamber of Commerce Update

Chapter 2. Description of Proposed Action(s) and Alternatives

Federal Project No.: NONE

New Reclaim Tunnel at Coal Fired Plant

G2-0 LIST OF ACTIVE MTODs

BUILDING DEPARTMENT GUIDE TO RESIDENTIAL BUILDING PERMITS

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition

Attachment D-1: Civil/Structural Scope of Work

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008

BNSF Memphis Intermodal Facility

Bi-Directional Static Load Testing of Drilled Shafts

CONSTRUCTION AND RENOVATION FUNDED BY THE CFI EXAMPLE OF A DETAILED COST ALLOCATION METHOD

Growth In Container Volumes

2013 R-1 Building Permit Package For Additions, Decks, Fences & Garages

TRB Summer Conference June 15-18, 2008 Baltimore, Maryland DOT Practices for the Identification and Abatement of Asbestos in Bridges - TxDOT

Carpinteria Avenue Bridge Replacement Project Description Introduction

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

REQUEST FOR PROPOSAL ARCHITECTURAL & ENGINEERING SERVICES OTTAWA COUNTY ROAD COMMISSION COOPERSVILLE AREA MAINTENANCE COMPLEX

Consulting Engineers. civil structural geo-environmental traffic flood risk renewable energy rail party wall & cdmc

Jobsite Layout Considerations

Lump Sum L.S. (15") EA

jmt.com INNOVATIVE PROJECT DELIVERY Part of a diversified family of solutions

PRESERVING LOUISIANA S INFRASTRUCTURE: US190 MISSISSIPPI RIVER BRIDGE

PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port Engineer / Vice President

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3

SS David L. Seago, P.E. Assistant Director of Construction Dallas District CST Conference

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS

Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( )

TERMINAL 5 CARGO WHARF REHABILITATION, BERTH DEEPENING, AND IMPROVEMENTS PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT. Chapter 1. Summary 1-1 SUMMARY

Agenda. PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Transcription:

UPCOMING DESIGN & CONSTRUCTION PROJECTS 2 nd Quarter 2018 (Project & Construction Management)

DESIGN PHASE PROJECTS

Manchester - Rehabilitation and Repair of Wharf 2 Structural concrete repair, fender replacement, pile replacement, and geotechnical rehabilitation. Design Time Frame NIGP Codes Small Business Opportunities PHA Contact 2nd Qtr. 2018 2nd Qtr. 2019 Consultants 96258 92533 Contractors 91484 91223 91438 90976 91430 Structural Concrete Repair Fender Replacement Pile Driving Steel Rebar Concrete forming Striping Photography Eddy Kharrazi 713-670-2544 ekharrazi@poha.com

Turning Basin - Design Repairs and Inspection of the Storm Water Sewer System Determine existing conditions of the storm water sewer system. Develop design repair plans and specs for construction bid. Design Time Frame NIGP Codes Small Business Opportunities PHA Contact 2nd Qtr. 2018 4th Qtr. 2018 Consultants 96258 92533 Contractors 90976 91360 Site Preparation Storm Water Systems Jessica Shambra 713-670-2527 jshambra@poha.com

CONSTRUCTION PHASE PROJECTS

Barbours Cut - Expansion of Gate Facilities This design objective is to increase the gate capacity to handle anticipated future growth at this terminal. 2nd Quarter 2019 90976 91438 91316 28500 91430 91461 Site Preparation Demolition Earthwork Alvin Jackson 713-670-2895 ajackson@poha.com

Barbours Cut - Rehabilitation of Wharf 3 The wharf will be upgraded in order to support 100 feet gauge dock cranes and to accommodate larger ships. This project consists of the upgrade of 1000 feet of wharf, a new stevedore support building, structural elements, high mast pole lighting, and electrical infrastructure required to power three new dock cranes. 3rd Qtr. 2018-4th Qtr. 2019 90976 91430 91438 91479 90976 91223 91485 90924 Material Testing Surveying Storm Water Controls Photography Chain Link Fence Security Electrical Signs and Paint Striping Bill Aguirre 713-670-2484 baguirre@poha.com

Barbours Cut - Lash Dock Demolition The project consists of the demolition of the Lash Dock located at the East End of Barbours Cut Terminal. The work includes the removal of all concrete structures such as decks and piles and dredging. 2nd Qtr. 2018-3rd Qtr. 2018 90976 91223 91240 91244 Photography Demolition of Structures Concrete Traffic Barriers Barge Services Bill Aguirre 713-670-2484 baguirre@poha.com

BCT - Rehabilitation of Container Yard C1N and C2N The scope of work includes the construction of approximately 20 acres of concrete pavement for storage of containers as well as traffic lanes to maintain circulation into and around storage areas. 1st Qtr. 2019 2nd Qtr. 2020 91360 91327 90976 Demolition Concrete Grading Excavation Barbara H. Smith 713-670-2483 bhsmith@poha.com

Bayport - Construct Rail Spur (3.1-7509 PTRA Track South Bayport) Construction of approximately 6500 track feet of rail at the Bayport Terminal. This rail will cross State Highway (SH) 146 and connect the existing rail from Strang Rail line to within 900 feet of the Container Freight Station (CFS) Road in the Bayport Intermodal Facility. This project will also include clearing, grubbing, drainage, rail crossings, signalization, and perhaps a sound wall, if required. 3rd Qtr. 2018 3rd Qtr. 2019 91223 90976 96148 Clearing Brush Storm Water Controls Flagman Traffic Controls Surveying Photography Material Testing Rail Roads Alvin Jackson 713-670-2895 ajackson@poha.com

Install Fender System at Wharf Nos. 1 & 2 at CARE Terminal Project will remove the existing fenders and install new fenders at Wharf 1 & 2 at the CARE Terminal. 4th Qtr. 2018-1st Qtr. 2019 91484 91223 91438 Fender Replacement Pile Diving Alvin Jackson 713-670-2895 ajackson@poha.com

JacintoPort Repair of Deck & Back Up Pavement on Wharf Nos. 1, 2 & 3 This project consists of repairing existing holes in the deck at JacintoPort Terminal. 4th Qtr. 2018 1st Qtr. 2019 91484 91223 91438 90976 91430 Structural Concrete Repair Steel Rebar Concrete Forming Striping Jessica Shambra 713-670-2527 jshambra@poha.com

Rehabilitation of Transit Shed Floor at Wharf No. 46 at Turning Basin Terminal Repair of top floor slab of the transit shed. 3rd Qtr. 2018 2nd Qtr. 2019 91360 91430 Concrete and Rebar Excavation Barbara H. Smith 713-670-2483 bhsmith@poha.com

Turning Basin North - Wharf 11, 12 and 13 Damage Repair This project consists of repairing damage to piles, shear walls and structural members of the wharfs. 4th Qtr. 2018 1st Qtr. 2019 91484 91223 91438 90976 91430 Structural Concrete repair Steel Rebar Concrete forming Striping Photography Eddy Kharrazi 713-670-2544 ekharrazi@poha.com

Turning Basin North - Splash Zone Painting 2018 Painting and preservation of splash zone area. 3rd Qtr. 2018 2nd Qtr. 2019 91484 91461 91484 Water blasting Painting Sandblasting Ural Thompson 713-670-2813 uthompson@poha.com

Turning Basin - Transit Sheds 30-31 - Roof Repair Roof removal and replacement for Transit Sheds 30/31 4th Qtr. 2018 1st Qtr. 2019 91473 90976 92678 Roofing Site Clearing Waste and Remediation Ural Thompson 713-670-2813 uthompson@poha.com

Turning Basin North - Ramp Road 7 Speed Gate This project will demolish the entire building structure, slab, pool, pool deck, parking lot to grade on the existing site. 3rd Qtr. 2018-4th Qtr. 2018 91484 91438 28500 99000 Security Systems Electrical Communications Alvin Jackson 713-670-2895 ajackson@poha.com

Turning Basin - Bi-Annual Rail and Switch Replacement - 2019 Repairs or replaces rail and rail switches throughout the Turning Basin Terminal 1st Qtr. 2019-4th Qtr. 2020 90976 92900 91223 92533 Rail and Ballast Concrete and Rebar Rail Switches Drainage Alvin Jackson 713-670-2895 ajackson@poha.com

Turning Basin - Demolition of Seafarers Building This project will demolish the entire building structure, slab, pool, pool deck, parking lot to grade on the existing site. 3rd Quarter 2018 90976 90924 91843 Hauling Photography Demolition Alvin Jackson 713-670-2895 ajackson@poha.com

Turning Basin - Rehabilitation and Repair of Wharf 9 Structural concrete repair, fender replacement, and geotechnical rehabilitation. 1st Qtr. 2019-1st Qtr. 2020 91484 91223 91438 90976 91430 Structural Concrete Repair Fender Replacement Pile Driving Steel Rebar Concrete forming Striping Photography Eddy Kharrazi 713-670-2544 ekharrazi@poha.com