Affinity Water Limited New Supplies

Similar documents
Charging Arrangements for New Connection Services

Dŵr Cymru Welsh Water s Self-lay Policy for Water Mains and Services July 2015

Application Pack 5. How to apply for a Connection to a Public Sewer/Lateral Drain

WESTERN WATER DESIGN AND CONSTRUCTION GUIDELINES FOR SUBDIVISIONAL WORKS

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY WORK PROCEDURE

New Connections Charging. 1 April 2018 to 31 March 2019

HAUC England Advice Note No. 2014/02. Code of Practice for Inspections: Defects Not Causing Danger Inspections ENGLAND

New connection to a public sewer

You are also similarly responsible for any part crossing any neighbouring land, including any length of private service pipe in the public highway.

TruckSafe Operator Business Rules and Code of Conduct

Yorkshire Water Self Lay Policy. Sept 2015

Response to a Bridge Strike. at a Bridge carrying the Railway. over a Road

Yorkshire Water Self Lay Policy Issue Date: April /16

Standard connections for water, sewerage and electricity supply

Installation of sanitary sewers, storm sewers and water piping requires the issuance of a Building Permit prior to commencement of installation.

Application for adoption of new sewers

Keeping Water Safe in Premises

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 1997 to 2015

Conditions of Award. Royal Society Newton International Fellowships funded under the Newton Fund

Auditing of Swedish Enterprises and Organisations

Measurement Assurance and Certification Scotland

Conditions of Award. Royal Society Funding Schemes

CONTENTS NEW CONNECTIONS CHARGING. Version 2 Updated November NORTHUMBRIAN WATER AND ESSEX & SUFFOLK WATER Page 1

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1.

Developer Services. Building over or near a sewer. DEV 005G Guidance notes and procedure. What is a public sewer?

Developer Constructed Headworks Process. Information Guide. 1. watercorporation.com.

your guide to completing an application for a new or replacement water connection from your property to an existing water main

CAMBRIDGESHIRE COUNTY COUNCIL SAFETY OF SPORTS GROUNDS FUNCTION POLICY DOCUMENT

Level 2 NVQ in Heating and Ventilating Ductwork Installation (6088)

Pipelines Safety Regulations 1996

STATEMENT OF METHODOLOGY AND CHARGES FOR CONNECTION TO SP DISTRIBUTION LTD AND SP MANWEB PLC S ELECTRICITY DISTRIBUTION SYSTEMS

Scottish Water Business Stream Charges. Scheme of Charges:

Application process for Water Supply Licence and/or Sewerage Licence (WSSL): guidance

GLASGOW AIRPORT RAIL LINK BILL NETWORK RAIL OBJECTION. 1. Introduction

Access to ICP emaps Portal Procedure

Building over or close to a public sewer

Statement of Methodology and Charges for Connection to the Electricity Distribution Systems of: The Electricity Network Company Limited.

Qualified Persons in the Pharmaceutical Industry. Code of Practice. March 2008

Ensure your own actions reduce risks to health and safety

Safe System of Work Policy

JOB DESCRIPTION. Surveyor Stockbridge Village. CESP (Community Energy Saving Programme) Delivery Team Villages Housing

your guide to completing an application for a new or replacement water connection from your property to an existing water main

Human Resources. Data Protection Policy IMS HRD 012. Version: 1.00

Policy, Responsibilities & Procedures

COMPANY APPLICATION, SEWAGE INSTALLATIONS FIELD

C D M R e g u l a t i o n s

PUBLIC WIFI FROM EE SOLUTION TERMS

Casework Technical Support (Social Welfare - Project Management)

Polysewer Gravity Sewer System SPECIFICATION

UCLH Asbestos Management Plan. July 2017

Foreword 3. Terminology 5

Guidance on Independent Assessment. Rail Industry Guidance Note. Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY

Electricity Supply Agreement

Transfrontier Shipment of Waste Guidelines For Exporting Waste from, and Importing Waste to, the Republic of Ireland

ASSET CREATION DEVELOPER PROCESS INSTRUCTIONS TO DESIGNERS - MAJOR WORKS

Guidance for reservoir managers on the management of controlled reservoirs Reservoirs (Scotland) Act Backwater reservoir SEPA

Water Services Guidelines

DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services)

AutoGyro Platinum Extra Guarantee

Questions and answers brief on Welfare of Animals at the Time of Killing Regulations (England) 2015

A positive, collaborative airport-wide approach is essential to minimise pollution. Heathrow Pollution Prevention Code of Practice

Level 6 NVQ Diploma in Construction Site Management (Construction)

Field/Mobile Working Policy

Irish Water Business Customer Codes of Practice

LOCAL COUNTER FRAUD/HUMAN RESOURCES LIAISON POLICY

House Bill 4086 Ordered by the House February 21 Including House Amendments dated February 21

ISO 9001:2015 ISO 14001:2015 OHSAS

INFORMATION BULLETIN No. 155

Railway Interface Planning Scheme Rules (RIPS Rules)

Level 3 NVQ Diploma in Controlling Lifting Operations Supervising Lifts (Construction)

Terms of Reference for Mind Committees

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)

Section 11: Water treatment and related matters

Hazardous. Scheme. the power behind your business

FOOTING DRAIN DISCONNECTION PROGRAM GUIDELINES

Registered as a Scottish Charity - No. SC Job Description. Grade 8, Salary commences 25,339 per annum

LinkMeUp Personal Assistant (PA) Register & Recruitment Support Terms & Conditions

Introduction of service pipe alterations and disconnections by Authorised Utility Infrastructure Providers (UIPs) (UIP/GT Briefing Note 5)

ANNEX 3 DETAILED PRICE SCHEDULE RELATED TO THE BILL OF QUANTITIES 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE...

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter

GROUP SICKNESS & ABSENCE POLICY

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Highways Maintenance (Construction)

PALMERSTON NORTH CITY PALMERSTON NORTH STORMWATER DRAINAGE BYLAW. Administration Manual

Irish Water Capital Investments

Materials and Qualification Procedures for Ships

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)

JACKSON COUNTY WATER AND SEWERAGE AUTHORITY. Cross-Connection Control Program

Improvement District Conversion Guide

Curo Group HEALTH & SAFETY POLICY: CONSTRUCTION SAFETY MANAGEMENT & CDM PROCEDURE

Drainage By-law. WM-4 Consolidated as of April 18, 2011

IGEM/TD/102 Communication 1761 Competence framework

Number 42 of 2001 YOUTH WORK ACT 2001 REVISED. Updated to 4 June 2014

Procedure and Specification for the Construction of Vehicle Access Crossings over Footways and Verges April 2016

STATEMENT OF CHARGES FOR CONNECTION TO NORTHERN IRELAND ELECTRICITY NETWORKS DISTRIBUTION SYSTEM. Effective from 1 st October 2017 Version 1.

YOUR CERTIFICATION PROCESS EXPLAINED

Wholesale charges

ISSUE CERTIFICATE OF PRACTICAL COMPLETION AND INITIATE HANDOVER TO UNIVERSITY

RISK ASSESSMENT AND SAFETY METHOD STATEMENT. for. GROUNDWORK PREPARATION AND LAYING OF YORKSTONE SEGMENTAL CIRCLE (3.6m DIAMETER)

Building Regulations and fire safety: procedural guidance

VIENNA JUNE 2017

Transcription:

1 of 13 Affinity Water Limited New Supplies Policy and Company Specific Requirements for Water Mains and Service Pipes Constructed by Self-Lay Organisations

2 of 13 CONTENTS 1 Introduction 3 1.1 General 3 1.2 Context for Affinity Water Limited Policy for Self-lay 3 1.3 General Principles for Self-Lay 4 2 Contact Details 4 3 Self-Lay Policy 5 3.1 Definitions 5 3.2 Available Information for Self-Lay 6 3.3 Code of Practice 6 3.4 Amendments to the Policy or Company-Specific Requirements 6 3.5 Competence of the SLO and Affinity Water Assessment 6 3.6 Scope of SLO Works Permitted by the Company 7 3.7 Access to Details or Plans of the Affinity Water Network 7 3.8 Initial Enquiries / Request for Network Capacity Check and Point of Entry to Site 7 3.9 Application for Self-Lay 7 3.10 Restriction on Operation and Maintenance of Apparatus on the Live Network 8 3.11 Financing Arrangements for Self-Lay 8 3.12 Self-Lay Agreement 9 3.13 Security 9 3.14 Liability for Latent Defects 10 4 Company-Specific Requirements 10 4.1 General Requirements 10 4.2 Measures to Protect Water Quality 10 4.3 Materials for Construction of Water Mains and Services 11 4.4 Disinfection Requirements 11 4.5 Pressure Testing, Swabbing, Disinfection and Sampling 11 4.6 Connecting to Existing Network 12 4.7 Service Connections 12 4.8 Water Mains 13 Appendix 1: Supplementary Information Available from Affinity Water 13

3 of 13 1 Introduction 1.1 General Affinity Water Limited allows developers to choose whether they wish to install new water infrastructure for their developments by electing a Self-lay Organisation (SLO) to design and install the works, or formally requisition the Water Company to undertake the work. If a developer chooses to adopt a self-lay approach then the developer will enter into a self-lay agreement with Affinity Water under Section 51A of the Water Industry Act 1991 (as amended by the Water Act 2003). If the developer or SLO installs the water infrastructure, provided that the works are constructed in accordance with the terms and conditions of the agreement then Affinity Water shall permit connection of the new infrastructure to their existing water supply network and adopt the new infrastructure (known as vesting). Affinity Water will make an asset payment to the developer for any mains that it adopts. Affinity Water is committed to high standards of construction, health, safety, welfare and environmental protection associated with all its activities. Within our area of supply, the quality of water and the integrity of the water network remains our responsibility. Only competent organisations will be allowed to carry out this work. Those persons/ organisations deemed as competent are defined later in Section 3.5. This document is specific only to Affinity Water and covers: our specific policy for mains and services constructed by SLO s additional company-specific requirements for self-lay This document supersedes any previous self-lay policy implemented by Affinity Water Additional copies of this document and further information on self-lay are available through our website at: www.affinitywater.co.uk 1.2 Context for Affinity Water Limited Policy for Self-lay Affinity Water has structured their policy for self-lay to reflect the principles outlined by the economic regulator for water, Ofwat, in their guidance document Competition in providing new water mains and service pipes: Guidance to companies version 3 issued in April 2009. This is available through the Ofwat website at: http://www.ofwat.gov.uk/consumerissues/selflay/gud_pro_compnewmainpipes.pdf All calculations for asset payment will be undertaken in accordance with the financial guidance issued by Ofwat, Guidance on financial arrangements for self-

4 of 13 lay and requisitioning agreements version 2.0 issued in March 2009. This is also available through the Ofwat website at: http://www.ofwat.gov.uk/consumerissues/selflay/gud_pro_finarrangselflay.pdf Additional guidance relating to self-lay is also available from the Ofwat website. This document is also to be read in conjunction with the Self-laying of Water Mains and Services, a Code of Practice for England and Wales, published by the WRc. Copies of which can be ordered from: http://www.webookshop.com 1.3 General Principles for Self-Lay In addition to the guidance from Ofwat outlined above, Affinity Water approaches self-lay in accordance with the generally adopted Code of Practice for the Self- Laying of Water Mains and Services England and Wales (2nd Edition, published in May 2009 by WRc plc). The code sets out technical guidance for the design and construction of water mains, together with the specification of products aligned with the Civil Engineering Specification for the Water Industry (CESWI) 6th Edition. Further information can be found on the WRc website (http://selflay.wrcplc.co.uk). Technology and standards within the water industry are constantly changing and developing, therefore formal amendments to the text can also be found on the WRc website in the Corrected Specifications section. We strongly recommend that Self-lay Organisations (SLO s) regularly consult this section to ensure their installations are compliant. 2 Contact Details All requests from developers/ self-lay organisations (SLO s) should be made using the formal application form for self-lay and sent to the New Supplies Team at the address shown below: Affinity Water Limited, Developer Services c /o Atkins Anglo St James House 39A Southgate Street Winchester Hants SO23 9EH Tel: 0845 8880081 Website: www.affinitywater.co.uk Office Hours: 09:00 to 17:00hrs.

5 of 13 3 Self-Lay Policy 3.1 Definitions For the purposes of this policy document and company-specific requirements the following terms/ abbreviations have the following meaning: CDM Construction (Design and Management) Regulations 2007 DWI Drinking Water Inspectorate, responsible for assessing and enforcing the quality of drinking water in England and Wales. Reference should be made to their regulations at: www.dwi.gov.uk/regs/regulations.shtm Ofwat Financial Guidance Guidance and principles outlined in Ofwat document Guidance on financial arrangements for self-lay and requisitioning agreements version 2.0 Ofwat Self-Lay Guidance Guidance and principles outlined in Ofwat document Competition in providing new water mains and service pipes: Guidance to companies version 3 SLO Competent Self-Lay Organisation or developer wishing to design and/or construct new mains and/or service pipes for a new development Affinity Water WRc Code of Practice Affinity Water Limited The generally adopted WRc Code of Practice for the Self-Laying of Water Mains and Services England and Wales (2nd Edition, published in May 2009 by WRc plc) WIA91 The Water Industry Act 1991 (and as amended by the Water Act 2003)

6 of 13 3.2 Available Information for Self-Lay Affinity Water are committed to providing clear guidance and information for competent developers / SLO s wishing to undertake the construction of water mains and service pipes. Written guidance and advice is available for download from our company website at: www.affinitywater.co.uk 3.3 Code of Practice Unless explicitly covered in the company-specific requirements or operational standards and processes, Affinity Water will adopt standards and requirements identical to those covered in the WRc Code of Practice for self-lay. 3.4 Amendments to the Policy or Company-Specific Requirements The company policy and company-specific requirements for self-lay described in this document are subject to change. Affinity Water reserves the right to publish amendments to this document at any time and without prior notice to the SLO. It is the responsibility of the SLO to ensure they are in possession of and working in accordance with the latest version of this document by checking our website at: www.affinitywater.co.uk 3.5 Competence of the SLO and Affinity Water Assessment It is reasonable for Affinity Water to expect SLO s to be competent in the basic elements of design, selection and procurement of materials, construction, commissioning and the principles of water supply hygiene. Lloyds Register operates the Water Industry Registration Scheme (WIRS), and performs technical assessment of the service providers who elect to be assessed for contestable works associated with the installation of water infrastructure. Affinity Water does not operate its own system of accreditation for SLO s, but fully supports the Water Industry Registration Scheme. All SLO s must be registered with WIRS before carrying out any work in the AFFINITY WATER area of supply. For a list of accredited SLO s and/or to apply for accreditation please refer to the Lloyds Register website www.lr.org/wirs. Affinity Water reserve the right to conduct reasonable additional checks for SLO competence before entering into a Self-Lay Agreement with a SLO.

7 of 13 3.6 Scope of SLO Works Permitted by the Company Affinity Water will only permit the SLO to undertake constable works as defined in the Ofwat Self-Lay Guidance. All non-contestable works will be undertaken by Affinity Water, unless expressly defined within the Self-Lay Agreement before the works commence. 3.7 Access to Details or Plans of the Affinity Water Network Plans are available upon request; please contact: Keith Hexter, Affinity Water, The Cherry Garden, Cherry Garden Lane, Folkestone, Kent,CT19 4QB. A charge may be applied for this service. If you require plans of wastewater apparatus in the Affinity Water region, it will fall within the remit of the following providers depending on the location of you proposed development site: Southern Water Telephone 01962 858688 These providers may charge a fee for this service over which Affinity Water has no control. 3.8 Initial Enquiries / Request for Network Capacity Check and Point of Entry to Site The SLO should consult with Affinity Water at the earliest opportunity possible by making an initial enquiry, which can include a network capacity check and point of entry to site, if the SLO requires. Affinity Water will charge a fee for undertaking the network capacity check as detailed in the non-contestable works scale of charges, available on request or from the company website. Affinity Water will not process any requests for network capacity until all the necessary information has been received. 3.9 Application for Self-Lay Affinity Water will only accept formal applications which are made by completing the company s self-lay application form (available on request or from the company website). Affinity Water will not proceed with vetting of SLO design, or commence design of any mains or services until all the information has been received from the SLO. Affinity Water will charge a fee for vetting of design or the mains design as defined in the non-contestable works scale of charges, available on request or from the company website.

8 of 13 Where the application is made on behalf of a developer by a SLO, the developer must provide written confirmation to Affinity Water that the SLO is acting for them and authorise the release of sensitive information including asset values. 3.10 Restriction on Operation and Maintenance of Apparatus on the Live Network Operation of any apparatus on the live network is strictly prohibited. When a main laid by the SLO has been made live (i.e. connected to the live network), only the water company may operate and maintain this main. 3.11 Financing Arrangements for Self-Lay The SLO will be given an estimate of the Asset Payment that will be made at the time of Vesting, and charges that will be made by Affinity Water. The Asset Payment will be calculated in accordance with Section 51C of WIA91, and in the same way that the cost of work would have been calculated if the water mains had been requisitioned, please refer to the Affinity Water worked example of this calculation on our web site. The estimated cost of work to be carried out will take account of ground conditions, public highway conditions, and environmental considerations. The SLO will be presented with a breakdown of the estimated cost of works which has been used to calculate the asset payment. In addition to the Asset Payment, Affinity Water reserves the right to make charges for all reasonable costs which it will incur as a result of the works being self-laid. Affinity Water will provide an indication of charges they intend to apply as part of their cost advice to the SLO at the beginning. These charges may cover (but are not limited to) the following activities: On-Site Works Approval of SLO design Connection of diverted mains Easements Inspection and supervision of works Connection to Affinity Water existing network Water sampling and analysis Off-Site Works Design of off-site works Off-site diversions Easements Inspection and supervisions of work Connection to Affinity Water existing network Water sampling and analysis

9 of 13 Affinity Water reserve the right to amend these charges during the course of constructing the works if the scope of works is changed significantly by SLO from those initially specified. The SLO will also be required to pay charges associated with reinforcement of the existing network and where service connections are made the SLO will be required to pay the Infrastructure Charge and associated administration and inspection charges. Service connections do not qualify for an asset value payment. 3.12 Self-Lay Agreement A written legal agreement (Self-Lay Agreement) must be entered into between the SLO and Affinity Water before any self-lay works commence by the SLO. This will formalise the relationship between Affinity Water and the SLO. Affinity Water reserve the right to not accept any works constructed by the SLO prior to a Self-Lay Agreement being in place. Where the development is staged or has multiple phases of a development Affinity Water will require a separate Self-Lay Agreement for each phase. A copy of the model self-lay agreement is available for reference on our web site. 3.13 Security The company will require security in accordance with Principle 12 of the Ofwat Financial Guidance for self-lay, prior to the Self-Lay Agreement being entered into. This will be used to cover the reasonable costs of remedying minor defects in the SLO s works and the cost of the non-contestable works, if these have not already been recovered. Security lodged with Affinity Water for the purposes described above can be in the form of an advanced monetary deposit with the company, or in the form a performance bond. An example of a typical performance bond is available from the company website at: www.affinitywater.co.uk In accordance with Principle 12a of the Ofwat Financial Guidance for self-lay, Affinity Water will retain any security until the SLO has paid charges for works carried out and the defects liability period is over

10 of 13 3.14 Liability for Latent Defects The SLO will be responsible for any defective works for a period of not less than 24 months from the date shown on the Certificate of Vesting this is referred to as the Defects Liability Period. The company will retain any agreed security as necessary to cover the repair of any defective works within the 24 month Defects Liability Period. Following cessation of the Defects Liability Period any residual security will be released to the SLO. 4 Company-Specific Requirements 4.1 General Requirements The following section covers the company-specific requirements with which SLO s will be expected to comply if they are to construct mains infrastructure for adoption by Affinity Water. In addition, the SLO will be required to comply with provisions set out in the Affinity Water document Operational Standards and Preferences, which must be read in conjunction with this addendum. The company has comprehensive procedures to protect the quality of the water and the integrity of the network. Where we have made reference to a specific procedure for water quality, these will be provided to the SLO before works commence on site. Affinity Water standard detail drawings are available on request. All service connections are to be made under pressure and ducted across roads. 4.2 Measures to Protect Water Quality Affinity Water insists on the following requirements in addition to those set out in the COP:- Appropriate sanitary facilities must be available to maintain a high standard of personal hygiene on site. There must be a demonstrable insistence on their use. Discharges should also be disposed of appropriately to prevent any risk of contamination. All clothes, tools, equipment, stores, vehicles, etc., used in connection with installation of pipework should be maintained in a clean condition and kept separated from those employed in other operations notably drainage and sewerage works.

11 of 13 Affinity Water may at any time request that the Contractor removes any person employed by him or sub-contractors from the work area, if there is reason to believe that a person presents a contamination risk to the quality of the water supply. Any person removed will not be allowed to work on any part of the Contract area, until Affinity Water provides authority in writing to the SLO Contractor that the person is permitted to do so. 4.3 Materials for Construction of Water Mains and Services Specific Affinity Water requirements are set out in the Affinity Water document Operating Standards and Preferences which must be read in conjunction with this addendum. 4.4 Disinfection Requirements Guidance on Affinity Water disinfection procedures are contained in document WI- NET-514 available on request. Pre-disinfection: Following a satisfactory pressure test the main should be swabbed and flushed (3 times the volume of the main) using potable water. Disinfection: Disinfect with free chlorine levels of greater than 50mg/l with a contact time of greater than 30 minutes. The chlorine used must comply with DWI Regulation 31. Post-disinfection: The chlorinated water in the main should be discharged (dechlorinated) and the main flushed with potable water until chlorine residual at the inlet and outlet are the same. The water in the main should then be allowed to stand for a minimum of a further 24 hours before water samples are taken from it. 4.5 Pressure Testing, Swabbing, Disinfection and Sampling Before any new pipework with a nominal diameter of 50mm or above is brought into service, it must be pressure tested, swabbed, flushed, disinfected and water quality samples (taken by Affinity Water) must achieve satisfactory passes following bacteriological testing. Affinity Water will carry out water quality sampling, arrange for the appropriate tests and confirm that the pressure and disinfection records are satisfactory. If the records or results do not meet the required standards, the SLO will be required to meet any additional costs for the extra work undertaken.

12 of 13 4.6 Connecting to Existing Network Final connection to the network must not be made until a satisfactory pressure test and water sample results are confirmed by Affinity Water. Non contestable connections to the network will normally be carried out by Affinity Water within 14 days from sample date and contestable connections (ie routine inline connections) undertaken by the SLO must be completed within 14 days from the sample date. Further testing may be required if the 14 day deadline is exceeded. The SLO must not operate any Affinity Water control valves. 4.7 Service Connections In advance of connection, the SLO must provide: Payment for building water costs in advance All relevant payments for charges associated with the properties being connected A WIAPS certificate to confirm that the installed pipework and fittings comply with the water regulations. This certificate will be signed by a plumber with WIAPS accreditation who has inspected the customer side pipework The SLO is required to provide the full postal address of the property and meter details within five working days following connection of the property to the main. A form will be provided for this purpose at the time that Affinity Water provide the meter; this form is also available for download from our company website at: www.affinitywater.co.uk Whilst Affinity Water gives SLO s the flexibility to programme the timing of service connections to suit the Developer s construction programme, Affinity Water retains the right to control the timing of service pipe connections to new live mains. The SLO should submit the connections programme at least 5 working days in advance of the work being carried out for our consent, in order that Affinity Water can ensure that the new main is potable and inspect the work at the time the connections are made. Meters will be provided by Affinity Water stores upon request; all other materials must be provided by the SLO.

13 of 13 4.8 Water Mains The SLO must implement an appropriate procedure to enable witnessing and certification of all hydraulic tests by Affinity Water. When working in the highway the SLO is required to apply for any street works licences under their own name and to take full responsibility for liaison with the relevant Highway Authorities and other Utilities as regards the execution of the works, in compliance with all relevant legislation. Appendix 1: Supplementary Information Available from Affinity Water The following documents are available from the developer services section of Affinity Water s website: www.affinitywater.co.uk It is the responsibility of the SLO to ensure that they are in possession of the latest revisions of all these documents, prior to the Self-Lay Agreement being in place. Use of superseded or unapproved versions of these documents may lead to a delay in the scheme progressing. 1. Affinity Water Operational Standards and Preferences 2. National Model Self-lay Agreement 3. Affinity Water Model Performance Bond 4. Affinity Water Statutory Calculation Worked Example 5. Affinity Water - App01SL SLO Application Form for Self-Lay 6. Affinity Water - Req01SL SLO Notification of Mains Laying Commencement 7. Affinity Water - Req02SL SLO Notification of Service Connections 8. Affinity Water - Req02SL SLO Request for Water Sampling for Bacteriological Testing 9. Affinity Water - Req03SL SLO Request for Meter Supply or Fitting 10. Affinity Water - Notf01SL Completed Meter Installation Form A link is also provided on the website to the Company s Scheme of Charges.