Appendix J. Existing Efforts for Identifying Multi-Benefit Projects

Similar documents
Municipal Stormwater Management Planning

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY

General Plan Update Workshop 6 Agriculture, Conservation, & Open Space February 23, 2005

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

DAKOTA COUNTY SOIL AND WATER CONSERVATION DISTRICT COMPREHENSIVE PLAN

FEMA s Mitigation Support for Resiliency: Innovative Drought and Flood Mitigation Projects

STREAM RESTORATION PURPOSE, PRACTICE, AND METHODS. By Marcus Rubenstein, CPESC

West Placer Groundwater Sustainability Agency Community Meeting February 16, 6 to 8 p.m. McBean Pavilion in Lincoln

Stormwater Programs. BIA Meeting June 5, Jason Uhley

Integrated Regional. South Tahoe Public Utility District. Water Management Plan. July 2014 K/J Prepared By Kennedy/Jenks Consultants

Chapter 1. Introduction

Water and Environment. Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan

City of Winter Haven Water Sustainability Program. Mike Britt, P.E., Natural Resources Division

Chapter 9 Wetlands Park Study Team

New Investments in Water Portfolios

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

SECTION 6: MITIGATION STRATEGIES

ATTACHMENT N ASSESSMENT OF PROGRAM EFFECTIVENESS

RIPARIAN CORRIDOR STUDY FINAL CITY CREEK MANAGEMENT PLAN TABLE OF CONTENTS

(1)(A)Inventory of the following existing natural resources on the USFSP Campus or within the context area adjacent to the University.

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT

WATERSHED MANAGEMENT INITIATIVE: GOALS & IMPLEMENTATION OBJECTIVES, JULY 26, 1999

Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future

Water Supply Water Quality Water Reuse and Conservation Watershed Management Interagency Coordination

The newly updated and comprehensive SWMP shall:

Stormwater Control and Treatment

MADERA COUNTY STORM WATER RESOURCE PLAN. TAC Meeting #2. August 30th, 2017

Background / Regulatory Requirements

Paraprofessional Training Session 1

Colorado River Challenges Impacts to Southern Arizona

Questions and Answers about the Water Supply and Water Quality bond act for the November, 2018 ballot. Updated November 17, 2017

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA

9. Evaluation Mechanisms

Solano Multi-Species Habitat Conservation Plan

Chapter 4 Watershed Goals and Objectives

Evaluating Release Rates for Specific Watersheds in Cook County

Managed Groundwater Recharge to Support Sustainable Water Management. A Sacramento Valley Perspective November 8, 2017

What is a stormwater utility fee?

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description

Santa Clara River Watershed Feasibility Study. Information Meeting City of Santa Clarita August 16, 2007

Central Valley Regional Water Quality Control Board. Proposed MS4 General Order and Low Impact Development

Wastewater ENVIRONMENTAL SETTING. Wastewater Collection

Standards for SWMF s. (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities

STORMWATER HARVESTING FOR ALTERNATIVE WATER SUPPLY IN VOLUSIA COUNTY, FLORIDA

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS

GUIDELINES FOR STORMWATER BACTERIA REDUCTIONS THROUGH BMP IMPLEMENTATION NY/NJ HARBOR TMDL DEVELOPMENT

Environmental Information Worksheet

The Water Forum Agreement Ten Years of Implementation 2000 to 2010

Outcomes. Kelly Karll-SEMCOG Margaret Barondess - MDOT

Engineering Department

Sunset Circle Vegetated Swale and Infiltration Basin System Monitoring Report: Rainy Seasons and

Developing Metrics & Indicators for the California Water Plan. CA Sustainability Indictors Symposium February 23, 2011

Marysville Levee Commission

El Dorado Water & Power Authority. El Dorado Water Reliability Project

S.O.P. No. HMD

Integrated Regional Water Management

In support of an alternative water supply

PIMA COUNTY COMPREHENSIVE PLAN CO PIMA COUNTY REGIONAL COMPREHENSIVE PLAN POLICY MAJOR PLAN AMENDMENT

Water and Watersheds. Data Maps Action

BCWMC Capital Improvement Program (approved April 19, 2018; pending minor Plan amendment)

INFRASTRUCTURE ELEMENT

Hydrologic and Ecologic Impacts from the CERP Indian River Lagoon South Project

The Regulatory Framework

Walnut Creek Watershed Management Authority. Project Kick Off March 18, 2015

Environmental Geography

REGIONAL STORMWATER CAPTURE & USE FEASIBILITY STUDY TAC MEETING #1 - JULY 18, 2017

Existing Conditions

10.1 Local Water Planning

Headwater Wetland Restoration Techniques The Wetland Drain Restoration Project

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES

June 22, Francis E. Borcalli, P.E.

BIG CHICO CREEK WATERSHED ALLIANCE

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN

Winter Haven, FL & the Peace Creek Watershed. Howard T. Odum Center for Wetlands University of Florida

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis

Sacramento Valley Groundwater: An Approach to Better Understand and Manage the Lower Tuscan Groundwater Resources for Northern California

ENVIRONMENTAL RESOURCE PERMIT APPLICATION

RIPARIAN CORRIDOR STUDY FINAL PARLEYS CREEK MANAGEMENT PLAN TABLE OF CONTENTS

Appendix G Preliminary Hydrology Study

Chehalis Basin Strategy Programmatic SEPA Draft EIS

Project Goals and Scoping

Corporate Environmental Water Stewardship Go Green. Todd Reeve October 17, 2017

The total population of the township is 9,942 (2015 Five-Year American Community Survey [ACS]). The median household income is over $109,000.

Farmington Dam Repurpose Project

SECTION 11: REGULATORY FLOODWAYS

SURFACE WATER HYDROLOGY AND HYDRAULICS SECTION

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

Madera Irrigation District Water Supply Enhancement Project

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Local, State and Federal Funding Opportunities

Review of State and Federal Stormwater Regulations November 2007

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

Transcription:

Appendix J Existing Efforts for Identifying Multi-Benefit Projects

Water Purveyor Projects Existing Efforts for Identifying Multi Benefits Projects In-lieu groundwater recharge under RWA planning efforts involves providing surface water during wetter periods to water suppliers that historically have relied on groundwater as a source of supply. When a groundwater-reliant agency receives surface water, groundwater is allowed to recover naturally in a process known as in-lieu recharge. Since the mid-1990s, an average of more than 20,000 acre-feet per year of surface water has been delivered into the area to offset a like amount of groundwater pumping. This has not only eliminated a long-term trend of continuously declining groundwater levels, but it has also achieved an increase in groundwater levels. To date, the source of surface water for in-lieu recharge has been the temporary purchase of surface water rights held by other agencies in the region. In the past, this transfer of water has occurred in the drier summer months when there are virtually no storm events. Under RWA, a planning effort is underway to identify where groundwater demands could be offset in wetter periods during the year to achieve additional in-lieu recharge. One possible source of water during these wetter periods is stormwater taken under a temporary diversion permit issued by the State Water Board. This would effectively capture a volume of water that would otherwise be lost from the region during wet periods and allow it to be stored via in-lieu recharge for use during drier periods. Wastewater Agency Projects Sacramento Regional County Sanitation District s (Regional San s) South Sacramento County Agriculture & Habitat Lands Recycled Water, Groundwater Storage, and Conjunctive Use Program (South County Ag Program) is an exceptional opportunity in southern Sacramento County to proactively restore and manage groundwater, while improving stream flows in the lower Cosumnes river, enhancing groundwaterdependent riparian habitats and wetlands, sustaining prime agricultural lands, and improving regional water supply reliability. The program will enhance water management in the southern Sacramento region by conjunctively managing surface and groundwater resources; using high quality recycled water for in-lieu and wintertime groundwater recharge and using groundwater storage and banking to improve regional water supply reliability. The program will also promote urban and agricultural cooperation, improve agricultural land viability, enhance water quality and ecosystem health within the Delta watershed, and support statewide water systems in proximity to the Delta. The program has the potential to provide up to 50,000 acre-feet per year (AFY) of Title 22 tertiary-treated recycled water produced by Regional San to irrigate up to 16,000 acres of agriculture and habitat lands in Sacramento County near the lower Cosumnes River and Stone Lakes Wildlife Refuge. Because the program would provide recycled water to existing agricultural lands that historically pump groundwater, it would reduce withdrawals of groundwater and allow groundwater levels in the program area to recover. Additionally, the program proposes to implement wintertime irrigation and wildlife friendly recharge basins in the project area where the soils are suitable, to provide further groundwater recharge. Regional San is considering using stormwater as a dilutant for recycled water infiltrated to the groundwater. Flood Control Agency Projects The mission of the Sacramento Area Flood Control Agency (SAFCA) is to reduce flooding in a way that preserves and enhances environmental values and the quality of life in the Sacramento region. SAFCA s innovative projects have acquired floodplain open space in the Dry Creek Parkway and removed obsolete levees, allowing floodwater up onto the floodplain more often, where sediments and pollutants can settle and some of the water can percolate into groundwater. Recent projects have provided more frequent floodplain access in two areas of the lower American River Parkway, and SAFCA has contributed to the removal of concrete lining and enhancement of Cordova Creek. SAFCA routinely incorporates native plantings along waterways and has contributed to research on the effects of levee vegetation. Major levee projects are often associated with habitat improvements. In addition, enhancements to Folsom Dam and its operation will enable retention of more stormwater for water supply. Page 1 of 4

The Placer County Flood Control District and Water Conservation District (PCFCD) collaborates with Placer County and its cities to protect lives and property from the effects of flooding. A PCFCD project relevant to the SWRP is the Antelope Creek Flood Control Project. This regional project slightly increases the footprint of the existing FEMA-recognized 100-year floodplain limits; provides substantial mitigation for increases in urban runoff and peak flood flow increases due to new and existing development in the watershed; provides reduction of the 100-year peak flow in downtown Roseville; and includes stream channel and habitat restoration components, removal of non-native plants and re-planting with natives, and improved public access and educational opportunities for the public along the existing multi-use recreational trail. PCFCD also manages the Dry Creek Watershed Flood Control Plan, which provides a detailed hydrological analysis of the Dry Creek watershed, recommendations for feasible regional flood control projects, and the means to mitigate development projects. In addition, PCFCD has recommended an updated facility plan and fee program. The American River Flood Control District (ARFCD) has been providing flood protection to the citizens of the Sacramento community for over 75 years, with the mission of protecting the district s citizens by maintaining the 40 miles of levees along the American River and portions of Steelhead, Arcade, Dry, and Magpie Creeks. While their current projects focus on training for flood response and repairing levees, the district may be open to multi-benefit opportunities. Reclamation District 1000 (https://www.rd1000.org/) also does flood control projects. Municipal NPDES Compliance Programs The City of Sacramento s Combined Sewer System (CSS) NPDES Permit requires the City to implement a Combined Sewer System Improvement Plan (CSSIP), which primarily addresses two NPDES permit requirements: the reduction of CSS discharges and in-system surface flooding and outflows. In 2014, the City s Department of Utilities (DOU) completed the Combined Sewer Improvement Plan Update (CSIPU), which recommended an adaptive management strategy starting with implementation of the top 20% of prioritized projects, pilot testing of the programs, and additional refinement of the hydraulic model. Two of the programs were Green Infrastructure (GI) and rainfall dependent inflow and infiltration (RDII) reduction. The planning-level analysis presented in the CSIPU showed that the cost benefit of GI is competitive with grey water programs to provide flood reduction benefits. Additionally, GI would reduce the volume of treated discharges to the river. The GI program would be applicable in the entire CSS, but would need to be customized for soil properties, surface slope, community interest, and other issues. The CSIPU therefore recommended development of the Combined Sewer Green Infrastructure Pilot Program to 1) evaluate different types of Green Infrastructure technologies and test their performance in different surface and sub-surface conditions, including soil type and slope, general public acceptability, maintenance issues, and other topics; 2) monitor the performance of the different technologies and establish the baseline performance of the different technologies; and 3) update the cost estimates based on the pilot programs. The City is currently conducting this work. The output for this project will be a technical memorandum documenting the process of identifying applicable stormwater needs and project opportunity locations, the feasibility analysis of potential projects, and a final prioritized list of GI pilot projects that have been ranked based on performance and cost benefits. The outcome of this project will serve as a great resource for future SWRP, multiple benefit projects. The City of Sacramento s DOU is also hoping to offer a program to rate payers that provides a reduction in storm drainage fees either through rebates or reduced monthly fees as an incentive to increase the use of green infrastructure on private property. Many other cities have implemented similar incentive programs and can provide valuable input on program administration costs and annual participation estimations. The city is therefore conducting the Green Stormwater Infrastructure (GSI) Incentive project, which includes 1) researching/reviewing existing incentives programs and lessons learned from other cities, 2) quantifying the benefits of green stormwater infrastructure on existing City drainage systems using hydrologic and Page 2 of 4

hydraulic models, 3) developing examples and estimating installation costs, 4) reviewing the existing fees, summarizing potential funding, and developing estimated participation rates, and 5) recommending a drainage rate reduction and/or rebate program to encourage the implementation of green infrastructure. The output for this project will be a matrix listing all prospective GSI incentives compliant with funding, policy, law, and program goals that could be considered by DOU. Attributes will include expected participants, gallons of stormwater reduced, costs per gallon reduced, benefits per gallon reduced, compliance with performance goals, and funding sources. The final incentive program adopted by the City will also serve as a potential resource for future SWRP projects. Other NPDES permits applicable to the region call for permittees to regulate development through required implementation of various low impact development measures for projects of a certain size. The permittees may coordinate with developers to incorporate such projects into this SWRP as appropriate. Finally, NPDES permittees are each working to comply with regional and state TDML and 303(d) requirements. Such efforts include planning for implementation of the statewide trash policy, participation in statewide true source control programs, and incorporation of Integrated Pest Management programs. SSQP, as required by their permit, is prioritizing pollutants of concern, developing plans to address the prioritized pollutant, and conducting an RAA of the proposed activities. Projects and programs established for TMDL and 303(d) compliance are, therefore, great candidates for SWRP projects. Municipal Capital Improvement Projects Most municipalities in the ARB region have capital improvement projects, programs, or plans (CIPs) for the construction or repair of municipal buildings and facilities such as streets, roads, storm drains, traffic signals, parks, community centers, airports, libraries, waste management and recycling, water drainage, water resources, and water supply. During development of this SWRP, several stakeholders coordinated with the relevant departments planning these CIP to identify opportunities to capture and use stormwater. CIPs will continue to serve as ideal capture and use opportunities as this SWRP is implemented in the future. Groundwater Sustainable Agency Plans There are multiple Groundwater Sustainability Agencies within the ARB region that are developing groundwater management plans under the Sustainable Groundwater Management Act. Most GSA plans are under development, and these will serve as key opportunities for groundwater recharge projects in the future. In 2017, Placer County issued a report that evaluated potential groundwater recharge areas in West Placer County (Placer County 2017). The assessment identified potential direct and indirect groundwater recharge methods and their feasibility, as well as potential recharge projects. The projects were developed at the conceptual level and did not include any field investigations or design drawings, but tasks needed to further evaluate their feasibility were cited. This is document will be a key resource for SWRP projects in the Placer County area. Watershed Stewardship Efforts As presented in Table 4-1, there are many stewardship organizations that manage or support the ARB watersheds and their effects on the Delta. For example, VFWC is a regional partnership that shares expertise from nonprofit, government, and private organizations to help implement priority projects for watershed health throughout many of the ARB region s sub-watersheds. VFWC s website serves as a repository for historic and current watershed studies that identify areas impacted by urban development and propose projects to address hydromodification. These studies and projects, along with those developed by other regional stewardship groups, serve as great resources for potential SWRP projects. There are also many Cosumnes River corridor recharge projects underway, including the Nature Conservancy's Oneto Denier Floodplain Restoration Project and the Omochumne Hartnell Water District's Page 3 of 4

Off Season Irrigation Project. Other recharge project partners include UC Water; UC Davis; Cosumnes Coalition; CSU, Sacramento; The Nature Conservancy; and Sacramento County Water Agency. Municipal General Plans and Conservation Plans The land use, open space, conservation, and agricultural elements of the regional municipality s General Plans identify strategies and measures that can address impacts from urban runoff and provide multiple benefit opportunities. Examples of such measures include 1) limiting development in floodplains and some streams to maintain their wildlife habitat, recreational, hydrologic, and flood attenuation values; 2) development of habitat mitigation plans (HMPs) for state and federally listed endangered and threatened plant and animal species; and 3) issuing ordinances to protect and expand open space. These elements of the municipal general plans therefore serve as additional opportunities for SWRP projects. In Placer County, there is a Placer County Conservation Plan (PCCP), which coordinates and streamlines issuance of state and federal permits. The PCCP serves as a Habitat Conservation Plan (HCP) under the Federal Endangered Species Act and a Natural Community Conservation Plan (NCCP) under the California Natural Community Conservation Planning Act. In addition to wetland and resource management projects throughout the county, the PCCP includes a 47,300-acre Reserve System that has restoration and enhancement requirements to mitigate areas affected by hydromodification effects, as well as additional commitments for supporting the vitality of vernal pool, seasonal wetlands, riverine/riparian zones, and stream systems. Page 4 of 4