Capstone Turbine E-Finity Distributed Generation The Power to be Independent Authorized Capstone Distributor
Capstone Turbine Corporation Who is Capstone? Develops Manufactures Sells & Services MicroTurbine Technology
The MicroTurbine Leader Founded 1988 1st company to introduce a MicroTurbine 100% MicroTurbine focused 7000+ units sold and shipped Million s of documented run hours 50,000,000
Made in America Made in America 75+% US Steel USA owned and operated >100 Patents Worldwide ISO 9001:2000 UL-2200 & 1741 certified
(1) Fuel (4) Benefits Out 1. Reliable Hot Water 2. Reliability Chilled Water 3. Reliable Electricity 4. Reliable Back-Up Power Clean & Green Local Power Generation Power When You Need It Where You Need It
E-Finity
E-Finity Distributed Generation The Power to be Independent Mid-Atlantic & Southeastern Regions Authorized Capstone Distributor
E-Finity Actively Supports EPA
Active DOE Clean Energy Member
Trade Associations 9
Factory Certified and Supported E-Finity Provides Authorized Capstone: Conceptual Design Approval (CA) Service s Factory Trained Installer Services (FTI) Authorized Service Provider (ASP) Long Term Maintenance (FPP)
Capstone Technology
Single Stage Jet Engine 1750 F Combustion Recuperated 3 Air Bearings Electronic Gearbox Stand-Alone Capability
Single Stage Jet Engine 1750 F Combustion Recuperated 3 Air Bearings
Patented Air Bearing Turbine 1 moving part: Turbo Generator Shaft Air bearings No oil or grease Air cooled No anti-freeze or liquids Spring Foil Shaft Variable speed 45,000 to 96,000 RPM
Worry Free Operation Lowest Maintenance Available Air-Cooled One Moving Part Air Cooled Electronics No Lubricants or Antifreeze No Spark Plugs / Lifters, etc Complete Remote Monitoring & Trouble Shooting No post-combustion devices or chemicals
Lowest Carbon Footprint Low emission design Super-low NO X - Less than 9ppm -.14 to.16 g/hb-br Endorsed by the SCAQMD No additional Catalysis requirement
Remote System Diagnostics Data Logging & Storage monitors and records key system data 24x7 Real-Time Notification alert and local CST Technician notification Balance of Plant Interactivity monitoring of compressors, water flow and temperatures, etc.
Capstone Products
Capstone Turbine C30, C65, C200, C600, C800, C1000 Natural Gas Propane Digester, Landfill and Goal Bed Methane
Simple Modular Solutions Product Offerings 30 65 kw net output Grid Connect Stand Alone Dual Mode CHP App s HP Natural Gas Landfill/Digester Gas Sour Gas Liquid Fuel & Propane
Simple Modular Solutions Product Offerings 65 kw Heat Recovery Grid Connect Stand Alone Dual Mode CHP App s 200 1000 kw net output HP Natural Gas Landfill/Digester Gas Sour Gas Liquid Fuel & Propane
C600 expandable to C800& C1000
Capstone Solutions
Reliable Onsite Electric Peak Shaving Load Following Clean Reliable Back-up Power - Straight Line 60Hz @ 480 Volts
Integrated CHP Module Heat Recovery Module Model C65 MicroTurbine
Integrate with Absorption Chillers Every C65 MicroTurbine produces 20 Tons Chilled Water Can be Exhaust Fired or Hot Water Fired
C200 with External HRM
Capstone C1000 Hot Water = 500 gpm Chilled Water = 300 Tons Steam = 3500 Mlbs/hr 1000 kw Clean Power
C1000 Series with Heat Recovery
Dual Mode System Controller Islanding from Utility MT Monitors Utility Voltage Identifies Abnormality Opens Motorized Breaker Isolates BLDG from Utility DMSC verifies Island MT Sets back to Load State Less than 5 Seconds
Dual Mode System Controller Return to Utility Upon Utility Return the DMSC Sends Signal to MT to Start System Timer for Reconnection (Customer Specified, Generally 5 Minutes) MT Disconnects & DMSC Closes Breaker System Resumes Normal Operation MT Begins Recharge Mode MT Never Shuts Down
Factory Support Services
Capstone FPP Benefits 24 Hour Technical Support Response time within 24 hours 24 Hour remote monitor and alarming to Capstone and Customer PROPRIETARY AND CONFIDENTIAL Capstone Turbine Corporation 33
Capstone Remote Monitoring Web access to sites Data Logging Alarming Remote trouble shooting Less windshield time 34
Capstone Preventative Maintenance 8,000 Hours 20,000 Hours 40,000 Hours Air Filters Fuel Filter Igniter Injectors Battery Pack Thermocouple Engine Clean/Replace Replace Replace Replace Replace Replace Exchange Typical Maintenance cost of $1.00 MTRH Average of 6 Hours of Planned mtn/yr Capstone will guarantee cost of planned and unplanned maintenance Servicing injectors at 20,000 hrs on a BP platform Capstone MicroTurbine
Simple Overhaul in Minutes Four Bolts Disconnections Generally (2) 2 hours Back on Line!
CHP Plus & Minus
Reasons to Encourage CHP Lower carbon footprint (EPA) Power independence (DOE) Help meet Renewable Energy Portfolio Standard (States) Funds infrastructure upgrades & improvements Encourages the use of energy efficiency technologies Lowers energy costs Helps keep the door open Create new Green Job
Barriers inhibiting CHP Utility standby charges or ratchet penalties Electric utility discouragement (Cogen Killers) Incentives with Open & Close window programs Onerous submission process 3rd party implementers add layers and costs Lack of value for net metering (export to grid) Looses to Low Hanging Fruit Lack of awareness (changing)
Additional Barriers?? Interconnection Permitting Financing The biggest one Lack of Parody for ITC s Solar / Wind = 30% CHP = 10% 70-90% efficient yet the lowest ITC????
E-Finity Applications
Viking Yacht (NJ Manufacturer) NJ Incentive New Equipment 100% Heating & AC 40% Self Electric Generation Slashed Carbon Foot Print Barrier > Incentive Challenges
York Sewer Authority (PA WWTF) PA DEP Incentive New Equipment Renewal Energy Project $300,000 Savings / Yr Significant Carbon Savings 100% US Made Products Plus > Incentive Challenges
Gas Storage Site Stand-A-Lone Site 100% Site 3 Phase Power 100% Building Heat & Fuel Gas Heating (4) C65 ICHP & (5) C65 1 st Commissioned 2006
Industrial Gas Plant
Electric & Hot Water
Combined Heat & Power Fours Seasons Philadelphia
Combined Heat & Power Fours Seasons Philadelphia 100% Hot Water 25% Building Electric 15% Building Heat Emphasis was on: Controlling Energy Costs Reduce Greenhouse-Gas Emissions
Tri-Generation Philadelphia Gas Works Capstone C200 Turbine Hot Water Heat Exchanger 40 Ton Hot Water Absorber Capstone Logic Controller
Electric Load Following UGI Headquarters PPL Utility Meter set at 0kW Capstone Makes 100% of Building Electric
Combined Heat & Power Bristol Bridge 100% Building Electricity 100% Building Hydronic Heat Future 90Tons Absorption Chilling Islanding Capable Dedicated Back Up Power for Exhaust Hood Containing Dangers Fumes
Heating / Cooling/ Islanding CHP Salem College, New Jersey Red Cross Disaster Relief Facility 195kW Electric Load Following 100% Hot Water 100% Chilled Water Island / Stand Alone Site
Questions & Answers