Schedule of Values The Schedule of Values outlined below is intended to reflect the standard format that would be used in a Contractors Application for Payment. Values reflect materials and labor. General Conditions Site Work Masonry Structural Steel Carpentry Thermal and Moisture Protection Doors and Windows Finishes Specialties Elevator/Escalator Mechanical Electrical Value 1
General Conditions Site Work Masonry Project Management General Superintendent Superintendents Safety Engineer Scheduling Field Engineering Bonds Trailer Mobile / Demobile Fencing Temp Elec Service Trailer Temp Water Toilets Field Office Expenses Building Permit Clean Up Final Cleaning As Built Drawings Mobilization Erosion and Sedimentation Demolition Clearing and Grubbing Topsoil, Strip, Stock, Respread Earthwork Fill Sanitary Placement/Relocation Storm Placement/Relocation Water Lines Building Excavation and Backfill Sidewalks and Curbs Asphalt Placement Landscaping Demobilization Footings and Foundations Vapor Barrier Floors Steps Rebar Face Brick Ground Face Block Block, Grout and Beams Flashing 1
Structural Steel Carpentry Thermal and Moisture Protection Doors and Windows Finishes Specialties Insulation Precast Masonry Accessories Structural Steel Material Steel Joist and Metal Deck Structural Detailing Structural Erection Steel Stairs and Railings Steel Ladders Misc. Trim and Supports Bollards, Inlets, etc. Rough Carpentry Finish Carpentry Foundation Waterproofing Metal Wall Panels Roof Insulation EPDM Roofing Sheet Metal Flashing and Trim Manf. Roof Spec Roof Expansion Assemblies Roof Hatches Membrane Air and Water Barrier Caulking Doors and Hardware Aluminum Framing and Glazing Interior Glass Skylights Metal Stud Framing Wallboard Insulation Ceramic Tile Acoustical Ceilings Resilient Flooring Painting Expansion Joint Visual Display Surface Toilet Compartments Signs Fire Extinguishers and Cabinets 2
Elevator/Escalator Mechanical Toilet Accessories Projection Screens Floor Mats Project Management Mobilization Group 1 Hydraulics Fixtures Cab Entrances Wiring Installation Labor Demobilization/Clean Up Permits/Inspections Condensing Unit Reloc Condensing Unit Re Reloc Duct Drawings RTU Mat, Lab Split Systems Mat, Lab Air Curtain Mat, Lab VAV Boxes Mat, Lab Fin Rad Mat, Lab Heaters Mat, Lab HW Pumps Mat, Lab Galv Duct Mat and Fab Galv Duct Install Air Out/Inlets Mat, Lab Exhaust Fans Mat, Lab HVAC Piping Mat, Lab HVAC Insulation HVAC Start Up HVAC Certified Balancing Sanitary Underground Storm Underground Sanitary Aboveground Storm Aboveground Domestic Water Gas Piping Pipe Insulation Plumbing Fixtures Drains/Carriers/Cleanouts Water Heater/Exp Tank Backflow Preventer/Press Fire Protection Rough In 3
Electrical Fire Protection Finish Fire Protection Testing ATC Mobilization ATC Engineering ATC Material ATC Installation ATC Commissioning Mobilization/De Mobilization Temporary Electric Temporary Communications Fire Alarm Equipment Fire Alarm Install Generator Transformer Cable Tray Light Fixtures Light Fixtures Install Conduit MC Cable LV Control and Comm. Cable Wire #14 #10 Wire #8 #1 Wire #1/0 #4/0 Wire #250mcm #500mcm Telephone Cable and Fiber Rough In Outlets Devices Trenching and Backfill Wireless Clock System Voice and Data System Public Address System Systems Install Coordination Study Gear MDP Gear Panelboards Gear Misc. Disconnects, Contacts Floor Boxes Generator Pad PTF Vault Site Lighting Supervision 4