BUILDING AN INDEPENDENT TRANSPORT CHAIN NORILSK NICKEL Alexey Tyukavin
MINING AND METALLURGICAL COMPANY NORILSK NICKEL NORILSK NICKEL is Russia s leading mining company and the world s largest producer of nickel and palladium. It is also a major producer of copper, cobalt, platinum group of metals, gold and silver. The key production units of the Company in Russia are the Polar Division located in Norilsk industrial region and Kola Mining and Metallurgical Company located on Kola peninsula. KOLA MMC Monchegorsk POLAR DIVISION Norilsk
EXISTING CARGO FLOW (BASIS 2008) Direct export from Dudinka - 150K mts Export via Murmansk, Total = 270K mts: - from Dudinka 170K mts - from Kola MMC 100K mts From Dudinka to Murmansk, Total = 365K ms: - Fine stein (matte) 185K mts - Copper and nickel 180K mts From Murmansk to Dudinka, Total =150К mts Murmansk From Arkhangelsk to Dudinka, Total = 190K mts Foreign ports (Rotterdam, Hamburg, etc.) Archangelsk Dudinka From Dudinka to Arkhangelsk Copper to domestic market Moscow 130K mts From Dudinka, Total = 130K mts: - Sulfur - 106K mts - Miscellaneous - 24K mts Norilsk To Dudinka, Total = 1670K mts: - Sand - 1100K mts - Miscellaneous 240K mts - Logs in rafts 300K mts Lesosibirsk Railway routes Sulfur - Sea routes - River routes -Ports belonging to the Company - Independent ports Krasnoyarsk Yenisei River Shipping Co Foreign ports (China)
TOTAL SEA AND RIVER CARGO VOLUMES (BASIS 2008) Sea shipments 1,1 Million mts Moscow Norilsk River shipments 1,8 Million mts Total annual cargo volume 2,9 Million mts
STRUCTURE OF TRANSPORT AND LOGISTICS DIVISON Total number of employees 9 046 Department of transport and logistics Head office in Moscow Polar Transport Branch Port of Dudinka Yenisei River Shipping Company Air Company «Taymyr» Murmansk Transport Branch Port of Lesosibirsk Airport «Alykel» Port of Archangelsk Port of Krasnoyarsk Krasnoyarsk Shipbuilding Yard - Branches of the Company - Daughter companies Total employees 3 244 Total employees 4 311 Total employees 1 449 Marine complex River complex Air complex
FINANCIAL STATUS OF TRANSPORT AND LOGISTIC DIVISION ANNUAL TURNOVER FIXED ASSETS Million USD River Complex USD 55 Million Air Complex USD 79 Million 180 175,0 160 140 130,0 120 100 100,0 80 60 40 20 0 Marine Complex River Complex Air Complex Marine Complex USD 570 Million TOTAL turnover 2008 USD 405 Million TOTAL fixed assets on 01.01.2009 USD 704 Million
YENISEI RIVER SHIPPING COMPANY Total length of all river routes serviced by YRSC - Total annual cargo volume - 9 500 km 3,5 Million tons Oil Products 11% Vankor 16% Local 4% Logs and timber 11% Miscellaneous 13% NorilskGazprom 11% Norilsk Nickel 34% Port of Lesosibirsk Fleet of YRSC Group, Total - 818 Self-propelled fleet - 210 Incl.: Tugs 120, Dry Cargo Ships 402, Tankers 18 Dry Cargo and Oil Barges 435 Auxiliary Ships 126 Floating Cranes - 19 Port of Krasnoyarsk Working substance 460 ships of abt. 520.000 mt deadweight Krasnoyarsk Shipbuilding Yard
PORT OF DUDINKA Cargo volume from outside customers 0,29 Million tons Cargo volume from NN group 2,6 Million tons By Sea By the River 2000 1800 1600 1400 1200 1000 800 600 400 200 0 2007 2008 Total cargo handling volume 2,9 Million tons Port of Dudinka is located about 215 miles away from the place where the Yenisei River flows into the Yenisei Gulf.
PORT OF ARCHANGELSK The Ekonomiya Port-area is located in 18,5 nautical miles from the Pilot Buoy and 25 km from the center of Archangelsk Cargo volume from NN group 0,36 Million tons Total cargo handling volume in 2008 1,76 Million tons Cargo volume from outside customers 1,40 Million tons
MURMANSK TRANSPORT BRANCH «Norilsk Nickel» (April 2006) «Monchegorsk» (August 2008) «Zapolyarnyy (November 2008) «Talnakh» (December 2008) «Nadezhda» (February 2009) 2006 i/b «Dudinka» 2008 2009 (October 2006) Main data of container/cargo ship "Norilsk Nickel": Ice Class LU 7 Length (LOA),м 169.0 Breadth, м 23.1 Depth Moulded, м 14.2 Draft Winter,м 9.0 Draft Summer, м 10.0 Deadweight Winter, tn 14 928 Summer, tn 18 486 No. of holds / TWD 4 / 3 Container capacity, TEU 654 Type of main engine Diesel - Electrical Type of propulsion system - Azipod Max. rating, KW 13 000 Service speed (open water, rating 10 200 kw), knots 16.5 Murmansk Archangelsk Dudinka
FLEET OPERATIONS RESULTS FOR 2006-2009 Average Speed and Consumption Cargo Volumes and Voyage Durations 55,00 50,00 45,00 40,00 35,00 30,00 25,00 20,00 15,00 10,00 5,00 0,00 Murmansk July- Aug 2006 Sept- Oct 2006 Nov- Dec 2006 Jan- May 2007 July- Aug 2007 Sept- Oct 2007 Nov- Dec 2007 Jan- May 2008 Archangelsk July- Aug 2008 Average sailing distance (hundreds nautical miles) Average transit time (days) Average speed (knots) Average consumption (tons per day) Sept- Oct 2008 Nov- Dec 2008 Jan- Mar 2009 2006 (9 months) 2007 2008 2009 (1st Quarter) Number of the vessels 1 1 4 5 Total volume of cargoes carried 178,0 261,6 432,0 255,7 including: Murmansk-Dudinka-Murmansk, Total 178,0 261,6 393,7 167,2 Murmansk Dudinka 51,5 80,2 100,9 48,3 Dudinka Murmansk 126,5 181,4 292,8 118,9 Archangelsk-Dudinka-Archangelsk, Total 0,0 0,0 38,2 88,5 Archangelsk Dudinka 14,2 60,0 Dudinka Dudinka Archangelsk 24,0 28,5 Number of round trip voyages, Total 10,5 15 19,5 11,0 including: Murmansk-Dudinka-Murmansk 10,5 15 19,5 6,0 Archangelsk-Dudinka-Archangelsk 5,0 Round trip voyage durations: Murmansk-Dudinka-Murmansk summer navigation 19-20 18-19 18 winter navigation 20-21 20-21 21-22 22-23 Archangelsk-Dudinka-Archangelsk winter navigation 32-33
GAS CONDENSATE TRANSPORTATION FROM PYLYATKA GASFIELD Archangelsk To Foreign Ports Murmansk Dudinka Existing annual volume about 90,000 tons Forecast up to 200,000 tons Main Dimensions: Length overall 169.00 m Breadth, moulded 23.10 м Depth 14.20 m Design draft 9.00 m Scantling draft 10.00 m Deadweight, design 14,800 t Deadweight max, scantling 18,400 t Cargo capacity: Cargo tanks 100% 19,300 m3 Slop tanks 100% 660 m3 Speed (Т=9м, 9000kW) 15.5 knots Icebreaking capability 1.5 m Vessel s Class: RMRS КМ*, ARC 7, 1, АUT2, tanker (oil) ice class ARC 7 (9.00 m) Equipment for Cargo: Cargo pumps 3 х 550 m3/h Slop pumps 2 х 100 m3/h Hose handling crane (outreach 17m) SWL 10 t Machinery: 3 diesel generators total output 3 х 8,314 kva Propulsion system Azipod 13,000 kw Accommodation: Crew incl. pilot 19 pers.
MURMANSK TRANSPORT BRANCH Design of Cargo Terminal in Murmansk Murmansk Sea Commercial Port Berth No.15 Total projected annual cargo handling volume 1.5 Million tons Total annual cargo handling volume of the port - 14,4 Million tons Total investments required - USD 130 Million Total annual cargo handling volume of the berth No 15-0,630 Million tons Cargo volume from outside customers 0,100 Million tons Cargo volume from NN group 0,530 Million tons
NORILSK NICKEL THANK YOU FOR YOUR ATTENTION