BID TABULATION ( BIDS OPENED MONDAY, APRIL 24, 1:00 P.M. ) CONSTRUCT PARALLEL TAXIWAY - PHASE 3 HABERSHAM COUNTY AIRPORT, CORNELIA, GEORGIA

Similar documents
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

APPENDIX H. Capital Improvement Program Detail Project Costs NORTH PERRY AIRPORT MASTER PLAN UPDATE APPENDICES

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

Lump Sum L.S. (15") EA

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

Forsyth County Procurement

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

Construction Inspection Checklists

Appendix B Sample Plan Notes

ARTICLE V: STORMWATER MANAGEMENT AND DRAINAGE SYSTEMS

Federal Project No.: NONE

Federal Project No.: STP-513-8(192), STP-5138(191)

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

MONROE STREET CONTRACT NO DATE: 12/21/17

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008

APPENDIX C DURING CONSTRUCTION BMP TABLES

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition

Richland County Department of Public Works Engineering (Land Development) Division

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA

TEMPORARY AIR AND WATER POLLUTION, SOIL EROSION, AND SILTATION CONTROL South Terminal C Phase 1 (WS110) Item P-156

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

Erosion & Sedimentation Control Policy

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

SECTION MEASUREMENT AND PAYMENT

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, :30 PM 600 S. Commerce Ave. Sebring, FL AGENDA

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

PERMEABLE INTERLOCKING PAVERS

SECTION 903 EROSION CONTROL

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

Best Management Practice (BMP) Guidance Manual

Sediment Basin. Fe= (Depends on soil type)

Riverside County Transportation Department Summary of Bids

Virginia Department of Transportation. Tabulation of Bids. Counties: REPLACE SUPERSTRUCTURE OVER NORFOLK SOUTHERN RR

The Good, The Bad, and The Ugly

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Project Type: Drainage and Storm Systems

BID FORM (LUMP SUM CONTRACT)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Proper Construction of detention and sediment basins and their conversions

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

SECTION TRENCHING & BACKFILLING

Stormwater Management Criteria

South Dakota Department of Transportation Average Unit Prices from Low Bids

INSPECTION, MAINTENANCE AND HOUSEKEEPING PLAN

At least 2 feet above the seasonal high water table Overflow path or structure provided

Installation and Maintenance of Erosion Control BMPs

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form.

Maine Turnpike Authority

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

(Instructions and explanations of bid items and sources of unit costs are provided on the back of this page.)

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

q Item meets standard Project ID: X Item not acceptable Contractor: N/A Item not applicable Inspector: C Item requires engineer s cert.

Town of Fortville Utility Street Standards

SOIL EROSION CONTROL PERMIT APPLICATION

LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH

2001 Insertable Sheet List For Use With The 2001 Imperial Road and Bridge Standards February 2008

NOTICE OF ADDENDUM ADDENDUM 2 CONTRACT NO PROJECT NO UNIT WELL 31 WATER TREATMENT PLANT

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING March 13, 2018

FIRM NAME DESIGNER: CHECKER: DATE: FPID #: DESCRIPTION: COUNTY: DRAINAGE DESIGN CHECKLIST. Designers Initials. Checkers Initials.

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

TYPE "A" CATCH BASIN

U.S. ARMY CORPS OF ENGINEERS. Little Rock District

ITEM 506 Temporary Erosion Control

[Rev - 1] 06/

CHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION.

RESIDENT ENGINEER S MANUAL 2014 SPECIFICATIONS ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSTRUCTION DIVISION

3/1/2013. History. History. Writing lesson MECA Conference. MNDOT Specifications

Attachment D-1: Civil/Structural Scope of Work

DALLAS FORT WORTH INTERNATIONAL AIRPORT ADDENDUM NO. 2. Northeast End Around Taxiway Package I East Air Freight Taxiway and Utilities

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

10:00 AM, Wednesday, April 8, 2015

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

ENGINEERING DESIGN & IMPROVEMENT STANDARDS

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]

Stormwater Local Design Manual For Houston County, Georgia

CITY OF FARGO SPECIFICATIONS EROSION AND SEDIMENT CONTROL

Electric Service Standards

SPECIAL SPECIFICATION 3504 Septic Tank System

Standard Erosion Control Plan

Erosion Control for Home Builders

MODEL Stormwater Local Design Manual. City of Centerville

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 9, 2018

Diversion Dikes. Fe=0.95

UTILITY NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: TREE PROTECTION NOTES

SACHSE EROSION CONTROL GUIDELINES

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING December 12, 2017

EDENTON (252) GREENVILLE (252) CASTLE HAYNE (910) WILSON (252) DURHAM (919) FAYETTEVILLE (910)

Stormwater Management and Sediment and Erosion Control Plan Review Checklist for Design Professionals

PUBLIC WORKS DEPARTMENT SERVICE DES TRAVAUX PUBLICS. Engineering Division Division de l ingénierie

ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007

Transcription:

BASE BID 1 01000 MOBILIZATION 1.00 L. SUM $799,945.96 $799,945.96 $1,150,000.00 $1,150,000.00 2 01510 FIELD ENGINEER'S OFFICE 1.00 L. SUM $40,000.00 $40,000.00 $5,000.00 $5,000.00 3 ALL-1 4 ALL-2 5 MISC-1 6 MISC-2 7 MISC-3 ALLOWANCE FOR RELOCATING EXISTING PHONE SERVICE WITH LOCAL PHONE COMPANY ALLOWANCE FOR RELOCATING EXISTING POWER SERVICES WITH LOCAL POWER COMPANY CRUSHED STONE CONSTRUCTION EXITS INCLUDING MATERIALS, INSTALLATION, MAINTENANCE AND REMOVAL, COMPLETE ALL WEATHER CONSTRUCTION ROAD 6 INCH DEPTH INCLUDING MATERIAL AND MAINTENANCE INSTALLED COMPLETE REMOVE AND RELOCATE AWOS, PROVIDE NEW CEILOMETER, POWER AND PHONE SERVICE, INSTALLED COMPLETE 1.00 ALL $6,000.00 $6,000.00 $6,000.00 $6,000.00 1.00 ALL $40,000.00 $40,000.00 $40,000.00 $40,000.00 1.00 EACH $14,000.00 $14,000.00 $10,000.00 $10,000.00 8,200.00 SQ. YD. $11.00 $90,200.00 $10.00 $82,000.00 1.00 EACH $44,000.00 $44,000.00 $18,500.00 $18,500.00 8 S-140A REMOVE EXISTING FENCE 100.00 LIN. FT. $5.00 $500.00 $20.00 $2,000.00 9 S-140B REMOVE ASPHALT PAVEMENT (FULL DEPTH) 2,440.00 SQ. YD. $3.50 $8,540.00 $9.25 $22,570.00 10 S-140C REMOVE EXISTING DRAINAGE STRUCTURE 8.00 EACH $1,000.00 $8,000.00 $325.00 $2,600.00 11 S-140D REMOVE EXISTING PIPE (18-IN TO 24-IN) 303.00 LIN. FT. $18.25 $5,529.75 $27.00 $8,181.00 12 P-151 CLEARING AND GRUBBING 6.00 ACRE $10,000.00 $60,000.00 $1.00 $6.00 13 P-152A EMBANKMENT IN PLACE ON-SITE BORROW 20,200.00 CU. YD. $2.00 $40,400.00 $6.00 $121,200.00 14 P-152B EMBANKMENT IN PLACE OFF-SITE BORROW 520,000.00 CU. YD. $5.25 $2,730,000.00 $4.60 $2,392,000.00 15 D-699A MAINTENANCE OF PERMANENT POND 2.00 EACH $1,000.00 $2,000.00 $3,000.00 $6,000.00 16 D-699B MAINTENANCE OF TEMPORARY SEDIMENT BASIN 2.00 EACH $1,000.00 $2,000.00 $2,500.00 $5,000.00 145528_BID_TAB_042417.xls PAGE 1 OF 6 4/24/2017

17 D-699C PUMP PERMANENT POND 36.00 DAY $50.00 $1,800.00 $15.00 $540.00 18 D-699D PUMP TEMPORARY SEDIMENT BASIN 36.00 DAY $50.00 $1,800.00 $45.00 $1,620.00 19 D-700A STONE RETROFITTING (Rt) 2.00 EACH $1,050.00 $2,100.00 $1,575.00 $3,150.00 20 D-700B SKIMMER RETROFITTING (Sk) 13.00 EACH $4,500.00 $58,500.00 $2,200.00 $28,600.00 21 D-701A 15 INCH CPP AND CONNECTORS COMPLETE 900.00 LIN. FT. $38.00 $34,200.00 $39.50 $35,550.00 22 D-701B 18 INCH CLASS III RCP 700.00 LIN. FT. $51.00 $35,700.00 $51.00 $35,700.00 23 D-701C 18 INCH CLASS V RCP 300.00 LIN. FT. $54.50 $16,350.00 $53.00 $15,900.00 24 D-701D 24 INCH CLASS III RCP 538.00 LIN. FT. $74.35 $40,000.30 $67.00 $36,046.00 25 D-701E 24 INCH CLASS V RCP 120.00 LIN. FT. $72.70 $8,724.00 $70.00 $8,400.00 26 D-701F 30 INCH CLASS III RCP 54.00 LIN. FT. $87.75 $4,738.50 $84.25 $4,549.50 27 D-705A 28 D-705B 4 INCH PERFORATED CPP AND CONNECTORS, COMPLETE 6 INCH CORRUGATED POLYETHYLENE RISER PIPE AND CONNECTORS, COMPLETE 1,860.00 LIN. FT. $16.00 $29,760.00 $16.50 $30,690.00 50.00 LIN. FT. $18.50 $925.00 $28.00 $1,400.00 29 D-705C UNDERDRAIN CLEANOUT 14.00 EACH $370.00 $5,180.00 $435.00 $6,090.00 30 D-751A 31 D-751B WATER QUALITY OUTLET CONTROL STRUCTURE ADJUST EXISTING MANHOLE STRUCTURE, FRAME AND GRATE TO PROPOSED ELEVATION. MATERIALS PROVIDED BY OWNER. 13.00 EACH $17,200.00 $223,600.00 $8,360.00 $108,680.00 4.00 EACH $2,500.00 $10,000.00 $515.00 $2,060.00 32 D-753A #57 STONE 410.00 TON $19.00 $7,790.00 $31.00 $12,710.00 33 D-753B RIP RAP CHECK DAM 21.00 EACH $525.00 $11,025.00 $600.00 $12,600.00 34 D-753C RIP RAP TYPE 1 LINED DITCH 600.00 LIN. FT. $17.00 $10,200.00 $29.00 $17,400.00 35 E-891 INLET PROTECTION 13.00 EACH $1,000.00 $13,000.00 $900.00 $11,700.00 36 E-895 TEMPORARY EROSION CONTROL MATTING 10,000.00 SQ. YD. $1.10 $11,000.00 $1.25 $12,500.00 145528_BID_TAB_042417.xls PAGE 2 OF 6 4/24/2017

37 EC-1A 18" SLOPE INTERRUPTION 1,700.00 LIN. FT. $15.75 $26,775.00 $13.70 $23,290.00 38 EC-1B PERMEABLE SOIL FOR DRY ENHANCED SWALES 1,000.00 CU. YD. $56.00 $56,000.00 $66.50 $66,500.00 39 EC-1C CLARIFIER FLOC LOG 2.00 EACH $180.00 $360.00 $420.00 $840.00 40 EC-1D PARTICLE FLOC LOG 2.00 EACH $180.00 $360.00 $420.00 $840.00 41 F-162A 6FT CHAIN-LINK SECURITY FENCE 4,800.00 LIN. FT. $20.50 $98,400.00 $19.50 $93,600.00 42 F-162B 12FT DUAL-SWING GATE 2.00 EACH $1,090.00 $2,180.00 $1,025.00 $2,050.00 43 T-901A TEMPORARY GRASSING 18.00 ACRE $1,000.00 $18,000.00 $750.00 $13,500.00 44 T-901B PERMANENT GRASSING 18.00 ACRE $2,000.00 $36,000.00 $2,400.00 $43,200.00 45 T-904 SODDING 2,000.00 SQ. YD. $10.00 $20,000.00 $9.65 $19,300.00 46 T-905A TOPSOILING (OBTAINED ON SITE OR REMOVED FROM STOCKPILE) 25,000.00 CU. YD. $0.25 $6,250.00 $1.00 $25,000.00 47 T-905B TOPSOILING (OBTAINED OFF SITE OR REMOVED FROM STOCKPILE) 3,000.00 CU. YD. $5.40 $16,200.00 $10.00 $30,000.00 48 L108-5.1 COUNTERPOISE TRENCH IN EARTH 1,000.00 LIN. FT. $1.90 $1,900.00 $1.80 $1,800.00 49 L108-5.2 CABLE TRENCH IN EARTH 965.00 LIN. FT. $1.65 $1,592.25 $1.55 $1,495.75 50 L108-5.3 51 L108-5.4 NO. 8 AWG, 5kV, L-824C CABLE, INSTALLED IN TRENCH, DUCT BANK OR CONDUIT NO. 6 AWG, BARE SOLID COPPER COUNTERPOISE WIRE, INSTALLED IN TRENCH OR WITH DUCT BANK OR CONDUIT, INCLUDING GROUND RODS AND GROUND CONNECTORS 1,050.00 LIN. FT. $1.90 $1,995.00 $1.80 $1,890.00 1,000.00 LIN. FT. $1.55 $1,550.00 $1.45 $1,450.00 52 L125-5.5 53 L125-510 RELOCATED L-861, MEDIUM INTENSITY RUNWAY END LIGHT ON EXISTING LIGHT BASE OR STAKE, NEW ISOLATION TRANSFORMER AND LAMP, IN EARTH SHOULDER, IN PLACE REMOVE STAKE OR BASE MOUNTED MEDIUM INTENSITY RUNWAY OR TAXIWAY EDGE LIGHT IN EARTH SHOULDER, COMPLETE 4.00 EACH $660.00 $2,640.00 $605.00 $2,420.00 1.00 EACH $595.00 $595.00 $545.00 $545.00 145528_BID_TAB_042417.xls PAGE 3 OF 6 4/24/2017

54 MAINTENANCE OF TEMPORARY SILT FENCE GDOT 165-0030 TYPE C 8,000.00 LIN. FT. $0.01 $80.00 $0.02 $160.00 55 MAINTENANCE OF SEDIMENT BARRIER - GDOT 165-0071 MULCH BERM 8,000.00 LIN. FT. $0.01 $80.00 $0.02 $160.00 56 GDOT 167-1000 WATER QUALITY MONITORING AND SAMPLING 6.00 EACH $30.00 $180.00 $30.00 $180.00 57 GDOT 167-1500 WATER QUALITY INSPECTIONS 6.00 MONTH $1,200.00 $7,200.00 $1,750.00 $10,500.00 58 GDOT 171-0030 SILT FENCE, TYPE C 8,000.00 LIN. FT. $6.15 $49,200.00 $5.00 $40,000.00 59 GDOT 550-4215 FLARED END SECTION, 15 INCH 2.00 EACH $825.00 $1,650.00 $550.00 $1,100.00 60 GDOT 643-8200 BARRIER FENCE (ORANGE), 4 FT 4,300.00 LIN. FT. $6.60 $28,380.00 $2.10 $9,030.00 61 GDOT 668 DITCH DROP INLET 2.00 EACH $4,800.00 $9,600.00 $7,800.00 $15,600.00 TOTAL - BASE BID: $4,804,675.76 $4,661,393.25 145528_BID_TAB_042417.xls PAGE 4 OF 6 4/24/2017

ADDITIVE BID 1 01000 MOBILIZATION 1 L. SUM $100,135.53 $100,135.53 $42,500.00 $42,500.00 2 P-152C SUBGRADE PREPARATION -12 INCH DEPTH 10,000 SQ. YD. $2.10 $21,000.00 $2.85 $28,500.00 3 P-209 CRUSHED AGGREGATE BASE COURSE 2,750 CU. YD. $53.00 $145,750.00 $65.00 $178,750.00 4 P-602 BITUMINOUS PRIME COAT 4,700 GAL $4.85 $22,795.00 $7.50 $35,250.00 5 P-603 BITUMINOUS TACK COAT 1,400 GAL $1.80 $2,520.00 $7.50 $10,500.00 6 P-620 PAVEMENT MARKING, YELLOW, REFLECTIVE 3,800 SQ. FT $1.95 $7,410.00 $2.85 $10,830.00 7 L108-5.1 COUNTERPOISE TRENCH IN EARTH 4,590 LIN. FT. $1.90 $8,721.00 $1.10 $5,049.00 8 L108-5.2 CABLE TRENCH IN EARTH 4,990 LIN. FT. $1.65 $8,233.50 $1.20 $5,988.00 9 L108-5.3 10 L108-5.4 11 L109-5.1 12 L110-5.1 13 L125-5.1 14 L125-5.2 15 L125-5.3 NO. 8 AWG, 5kV, L-824C CABLE, INSTALLED IN TRENCH, DUCT BANK OR CONDUIT NO. 6 AWG, BARE SOLID COPPER COUNTERPOISE WIRE, INSTALLED IN TRENCH OR WITH DUCT BANK OR CONDUIT, INCLUDING GROUND RODS AND GROUND CONNECTORS INSTALLATION OF AIRFIELD TRANSFORMER VAULT EQUIPMENT IN PLACE, COMPLETE CONCRETE ENCASED, ELECTRICAL DUCT BANK, 2-WAY, 4" NEW L-861T, MEDIUM INTENSITY TAXIWAY EDGE LIGHT ON L-867B BASE IN EARTH SHOULDER, IN PLACE NEW L-861T, MEDIUM INTENSITY TAXIWAY EDGE LIGHT ON MOUNTING STAKE IN EARTH SHOULDER, IN PLACE RELOCATED L-861T, MEDIUM INTENSITY TAXIWAY EDGE LIGHT ON EXISTING L-867B BASE, NEW ISOLATION TRANSFORMER AND LAMP, IN EARTH SHOULDER, IN PLACE 7,050 LIN. FT. $1.90 $13,395.00 $1.20 $8,460.00 5,230 LIN. FT. $1.55 $8,106.50 $1.15 $6,014.50 1 L. SUM $14,600.00 $14,600.00 $13,500.00 $13,500.00 90 LIN. FT. $63.75 $5,737.50 $58.00 $5,220.00 7 EACH $800.00 $5,600.00 $730.00 $5,110.00 32 EACH $560.00 $17,920.00 $510.00 $16,320.00 3 EACH $600.00 $1,800.00 $545.00 $1,635.00 145528_BID_TAB_042417.xls PAGE 5 OF 6 4/24/2017

16 L125-5.4 RELOCATED L-861T, MEDIUM INTENSITY TAXIWAY EDGE LIGHT ON NEW MOUNTING STAKE, NEW ISOLATION TRANSFORMER AND LAMP, IN EARTH SHOULDER, IN PLACE 17 EACH $520.00 $8,840.00 $475.00 $8,075.00 17 L125-5.6 18 L125-5.7 19 L125-5.8 20 L125-5.9 21 GDOT 402-3113 22 GDOT 402-3190 NEW L-858 SIGN, SIZE 2, STYLE 2, 1-2 CHARACTERS, CONCRETE PAD, L-867B BASE, IN PLACE NEW L-858 SIGN, SIZE 2, STYLE 2, 5-6 CHARACTERS, CONCRETE PAD, L-867B BASE, IN PLACE RELOCATE EXISTING L-858, SIZE 2, 1 MODULE, GUIDANCE SIGN, IN PLACE REPLACE SIGN MESSAGE PANEL FOR EXISTING L-858, SIZE 2, 1 MODULE, GUIDANCE SIGN, IN PLACE RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 1 OR 2, INCL BITUM MATL & HYDRATED LIME RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM MATL & HYDRATED LIME 3 EACH $3,030.00 $9,090.00 $3,025.00 $9,075.00 1 EACH $3,650.00 $3,650.00 $4,475.00 $4,475.00 2 EACH $2,190.00 $4,380.00 $2,175.00 $4,350.00 2 EACH $730.00 $1,460.00 $730.00 $1,460.00 1,100 TON $115.00 $126,500.00 $106.00 $116,600.00 1,100 TON $108.00 $118,800.00 $100.00 $110,000.00 TOTAL - ADDITIVE BID 1: $656,444.03 $627,661.50 GRAND TOTAL: $5,461,119.79 $5,289,054.75 145528_BID_TAB_042417.xls PAGE 6 OF 6 4/24/2017