PROGRAM PREPARATORY TECHNICAL ASSISTANCE. 1. The program preparatory technical assistance (TA) is required to:

Similar documents
PROJECT PREPARATORY TECHNICAL ASSISTANCE

TECHNICAL ASSISTANCE

Georgia: Development of Public Private Partnerships

People s Republic of China: Study of Clean Energy Supply for the Rural Areas in the Greater Beijing Tianjin Hebei Region

TERMS OF REFERNCE FOR CONSULTANTS

Technical Assistance Report

TECHNICAL ASSISTANCE RAJASTHAN RENEWABLE ENERGY CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

SUMMARY OF PROJECT PERFORMANCE

Lao PDR: Southeast Asia Disaster Risk Management Project Procurement Plan (As of November 15, 2017)

The Republic of the Philippines: Preparing the Metro Manila Transport Project, Phase 1

Mainstreaming Environment for Poverty Reduction (RETA6422) Subproject Proposal

Technical Assistance Report. Data for Development. Project Number: Knowledge and Support Technical Assistance (KSTA) August 2017

Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145)

ADB Consulting Services

Template for ToR for Transaction Advisory Services

Report and Recommendation of the President to the Board of Directors. Proposed Grant Nepal: Water Resources Project Preparatory Facility

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931)

KENYA REVENUE AUTHORITY (KRA)

Terms of Reference Governance Committee

Proposed Technical Assistance Papua New Guinea: Demographic and Health Survey in Papua New Guinea

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Telecommunication Expansion Project (II)

Office of Climate Change Guyana September, TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE

VIE: Proposed Ha Noi Metro Rail Extension Project (Line No.3: Ha Noi Railway Station Hoang Mai Section)

Promoting Environmental Flow Management in Asian Rivers: Policy, Cases, and Lessons

Office of Climate Change Guyana September TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE

Technical and Vocational Education & Training (TVET) Reform Project. Phase 1 Workplan (Dec 2007 Dec 2009)

Nepal: Earthquake Emergency Assistance Project

AUDIT UNDP COUNTRY OFFICE INDONESIA. Report No Issue Date: 10 October 2014

Islamic Republic of Afghanistan: Preparing the Kabul Managed Aquifer Recharge Project

Republic of Uzbekistan: Tashkent Province Water Supply Development Project

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles

REQUEST FOR EXPRESSIONS OF INTEREST. (Long Term Individual Consultants, Environmental and Social Safeguards - Energy Sector)

Terms of Reference (TOR) Provision of consultancy services for payroll verification exercise

People s Republic of Bangladesh: Climate Change Capacity Building and Knowledge Management (Financed by the Strategic Climate Fund)

Expression Of Interest Letter Sample Tender

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

NATIONAL PUBLIC PRIVATE PARTNERSHIP POLICY

Completion Report. People s Republic of China: Hebei Zhanghewan Pumped Storage Project. Project Number: Loan Number: 1922 August 2014

Business Practice Manual for The Transmission Planning Process

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

Aid for Trade Initiative for Arab States Terms of reference for Individual Contract Project Management and Oversight Consultant

The World Bank. Key Dates. Project Development Objectives. Component(s) Public Disclosure Copy Overall Ratings

INLAND WATERWAYS AUTHORITY OF INDIA (Ministry of Shipping, Government of India) Head Office : A-13, Sector 1, Noida

The World Bank Ethiopia: Supporting Open Data Initiative (P156400)

Republic of Kazakhstan: Fostering the Development of Renewable Energy

The World Bank Pernambuco Rural Economic Inclusion (P120139)

National Urban Livelihoods Mission. Guidelines for Employment through Skills Training & Placement

Invitation to tender

PPP Decision Making Approaches and Tools

Monitoring & Reporting & Best Practice. Marie Curie Excellence Grants (EXT)

DURATION : 30 working days over the period 20 September November 2016

WAC Programme Key Areas


Terms of Reference - INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

Technical Assistance Consultant s Report

PPP IN INFRASTRUCTURE RESOURCE CENTER

REPORT 2015/082. Lebanon. in the United Nations Interim Force in FINAL OVERALL RATING: PARTIALLY SATISFACTORY

World Bank Group Recruitment Drive (TOR for Future Vacancies)

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)

REQUEST FOR QUOTATIONS (RFQ)

Islamic Republic of Afghanistan: Proposed Grant for Additional Financing and Administration of Grants for the Road Asset Management Project

INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY. Environmental and Social Management System for ADB Line of Credit

INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY. Environmental and Social Management System for ADB Line of Credit

7 May 2014 GCF/B.07/ May 2014 Songdo, Republic of Korea Agenda item 6. Meeting of the Board

Approved by the Board on July 27, 2017 Page 1

Performance Requirements

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

INTERNAL AUDIT OF PROCUREMENT AND CONTRACTING

ASSESSMENT OF PUBLIC SECTOR MANAGEMENT

Administration Division Public Works Department Anchorage: Performance. Value. Results.

40691 Andhra Pradesh Community Based Tank Management Project

Quality Impact Assessment Procedure. July 2012

COMPANY PROFILE 2016

Sunrise Project South I-205 Corridor Improvement Project

Bangladesh: Second Small-Scale Water Resources Development Sector Project

Shared Service Centers

5 Star London Hotels - Example Report

Technical Assistance Consultant s Report

05-March Training Seminars & Courses in Qatar 2015

Executive Summary Sri Lanka Strategic Cities Development Project (SCDP)

Siavonga District Council. An Update

FinnOC FINNISH OVERSEAS CONSULTANTS LTD. SUSTAINABLE DEVELOPMENT SOLUTIONS

PROCUREMENT PLAN. Consulting Services

Community-Driven Development in Local Government Capacity Building Projects: Emerging Approaches in Africa

AoC and Organizational Reviews: Supporting ICANN Accountability. ICANN53 24 June 2015

Project Administration Manual

Dominican Republic Mid-Term Report. Pedro García Brito Climate Change Director Focal Point for REDD+

SECTION 14.0 CAPITAL COST ESTIMATES

TITLE OF CONSULTANT: Individual Consultant (IC) to Develop a Strategic Plan and Implementation Program for Business Botswana

Distribution: Restricted EB 99/68/R November 1999 Original: English Agenda Item 9(c) English

Consultant to Support the Education Management and Information System in Cambodia

Technical Assistance Report

Maharashtra Project on Climate Resilient Agriculture

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

LETTER OF APPOINTMENT FOR INDEPENDENT DIRECTOR

Internal Audit Vice Presidency (IADVP) FY12 Third Quarter Activity Report

ADB s Initiatives in Capacity Building for efficient Project Implementation

Environmental and Social Management System Arrangement. Sri Lanka: Small and Medium-Sized Enterprises Line of Credit Project

Transcription:

Appendix 3 11 A. Justification PROGRAM PREPARATORY TECHNICAL ASSISTANCE 1. The program preparatory technical assistance (TA) is required to: (i) Undertake sector preparatory work, define the scope of the ensuing program, and undertake (a) technical and systems assessment, (b) safeguards due diligence, and (c) financial sustainability and economic viability assessment of the ensuing program; (ii) Assist the Madhya Pradesh Urban Development Company (MPUDC) in undertaking advance contracting actions for the proposed program by: (a) appointing the program management consultant (PMC) and design and supervision consultants (DSCs), and (b) preparing and managing the bids to procure performance-based contractors (PBCs) for urban services in the proposed program clusters; and (iii) Assist the MPUDC in establishing results-based indicators (RBI) and service level benchmarks (SLBs) for the urban services. B. Major Outputs and Activities 2. The major activities and outputs are summarized in Table A3.1. Table A3.1: Summary of Major Activities and Outputs Major Activities and Outputs ECD A. Program systems assessment TA consultant mobilization Jan 2015 Undertake technical and systems assessment a Jun 2015 Undertake integrated risk assessment Aug 2015 Output: Draft Program Action Plan and Program Systems Oct 2015 B. Financing for prior results Issue PMC and DSC EOIs Feb 2015 Issue PMC and DSC RFP Mar 2015 Output: Award PMC and DSCs contracts Jun 2015 C. Advance financing actions Develop PBC bidding document Mar 2015 Manage PBC bid process May 2015 Output: First PBC awarded Oct 2015 a Refer Section II of the Concept Paper for details on assessments. DSC = design and supervision consultant, ECD = expected completion date, EOI = expression of interest, PBC = performance-based contracts, PMC = program management consultant, RFP = request for proposal, TA = program preparatory technical assistance C. Cost Estimate and Proposed Financing Arrangement 3. The TA is estimated to cost $1,100,000 equivalent, of which $1,000,000 equivalent will be financed on a grant basis by ADB's Technical Assistance Special Fund (TASF-other sources). The government will provide counterpart support in the form of counterpart staff, office accommodation, office supplies, secretarial assistance, domestic transportation, communication facilities for consultants, and other in-kind contributions. The detailed cost estimate is presented in Table A3.2.

12 Appendix 3 a Table A3.2: Cost Estimates and Financing Plan ($'000) Total Cost Item Asian Development Bank a 1. Consultants a. Remuneration and per diem i. International consultants (21 person-months) 533.4 ii. National consultants (23 person-months) 223.0 b. International and local travel 174.1 c. Reports and communications 7.5 2. Workshops, training, seminars, and conferences b a. Workshops at ULBs conference halls 6.0 3. Surveys 26.0 4. Contingencies 30.0 Total 1,000.0 Financed by the Asian Development Bank's Technical Assistance Special Fund -other sources. ULB = urban local bodies b Workshops, training, seminars, and conferences Purpose Venue Training ULB office or hotel D. Consulting Services 4. Eleven individuals comprising 4 international consultants and 7 national consultants (providing 44 person-months of input) will be engaged to undertake the TA. Lump-sum payment or output-based contracts will be considered for consulting services. Table A3.3 summarizes the consulting services requirement for the individuals. Table A3.3: Summary of Consulting Services Requirement Positions Person-Months Required International Civil Engineering Specialist and Team Leader 12 Environmental Specialist 3 Procurement Specialist 4 Financial Specialist 2 National Civil Engineering Specialist 4 Sanitation Specialist 3 Financial Specialist 4 Economist 3 Environmental Specialist 3 Resettlement Specialist 3 Social Development and Gender Specialist 3 Source: Asian Development Bank. 5. The outline terms of reference for the program preparatory TA consultants are described in paragraphs 6 to 16.

Appendix 3 13 1. Outline terms of reference for international consultants 6. Civil Engineering Specialist and Team Leader. The Team Leader will be an Engineer with minimum 15 years of experience in the infrastructure industry with a focus on urban services. The Specialist would have extensive working knowledge in India in the water supply and sewerage/sanitation sectors with a strong understanding of local contracting market and business acumen of potential contractors. She/he will assist on advance contracting actions to appoint the PMC and DSCs, coordinate technical feasibility assessment, safeguards assessment, and economic and financial viability assessment, and assist on bidding document preparation and bid process management for the first performance-based contract (PBC). She/he will be involved in program appraisal and structuring the program. All team members will report to the Team Leader. 7. Environmental Specialist. The Environmental Specialist will have a masteral degree required in environmental science or related field and minimum 15 years experience with a minimum 5 years of international experience with demonstrated performance in preparation and delivery of high quality environmental impact assessments. She/he would lead preparation of the program safeguards system assessment (PSSA) and related environmental safeguards work including oversight of environmental assessment documents (EIA, IEEs) for solid waste, wastewater, and water supply projects constituting the first PBC. The specialist would apply high standard of quality and international best practices to all deliverables and develop the environmental and social management system for the program. The specialist would also supervise the national environmental specialist on the team. 8. Procurement Specialist. The Procurement Specialist will be an Engineer with knowledge of ADB Consulting and Procurement Guidelines with a minimum 15 years experience on recruitment of consultants and procurement of civil works and goods on ADB financed projects. She/he will assist on advance contracting actions to appoint the PMC and DSCs, and assist on bidding document preparation and bid process management for the first PBC. 9. Financial Specialist. The Financial Specialist will have a background in accounting and/or financial management and/or Masters in Business Administration, preferably a qualified professional accountant, with extensive knowledge of working with service utilities power, telecom or water for a minimum 10 years. She/he will undertake a fiduciary expenditure framework assessments of proposed results-based lending program agencies, assess municipal finance performance of benefitting ULBs, prepare a financial model to simulate cash flows under the PBC and identify evaluation criteria for the procurement, suggest a tariff structure based on the modeling, undertake a financial viability assessment of the proposed program, develop results-indicators for disbursements, develop payment guarantee mechanisms for PBCs, and suggest a mechanism for MPUDC to monitor ULBs ability to maintain governance reforms. The Specialist will also evaluate the need for advance financing and financing of prior results, determine and agree arrangements for program financial reporting, auditing and public disclosure. 2. Outline terms of reference for national consultants 10. Civil Engineering Specialist. The Civil Engineering Specialist will have minimum 20 years of experience in the water supply, sewerage/sanitation and storm water drainage sectors. She/he will draft the terms of reference for the PMC and DSC, undertake technical assessment and define the scope of the program, undertake quality check of the available engineering

14 Appendix 3 designs (undertaken by the government) prior to undertaking identified advance procurement actions, and scope out the specifications, functional guarantees, and performance parameters of the PBC. 11. Sanitation Specialist. The Sanitation Specialist will have a minimum 10 years experience in the sanitation sector with demonstrated experience in low cost and decentralized sanitation options. Along with the Team Leader and national Civil Engineering Specialist, she/he will identify subproject options for benefitting urban local bodies (ULBs) at the town/city level and at poor settlements. She/he will develop output based aids to supplement payment guarantees for PBCs. 12. Financial Specialist. The Financial Specialist will have a background in accounting and/or financial management and/or Masters in Business Administration, preferably a qualified professional accountant, with extensive knowledge of working with service utilities power, telecom or water for a minimum 5 years. She/he will support the international Financial Specialist. 13. Economist. The Economist will have a background of having undertaken economic analysis for infrastructure projects comprising roads, urban transport, power, telecom and water for a minimum 10 years. She/he will undertake economic viability analysis of the proposed program drawing from existing data and willingness to pay studies, and along with the Financial Specialist suggest a tariff structure and results-indicators. 14. Environmental Specialist. The Environmental Specialist will have a background of having undertaken environmental assessment for infrastructure projects comprising roads, urban transport, power, telecom and water for a minimum 5 years. She/he will undertake a PSSA and develop the environmental and social management system, and undertake safeguards assessment through initial environmental examinations for the first PBC. 15. Resettlement Specialist. The Resettlement Specialist will have a background of having undertaken resettlement planning for infrastructure projects comprising roads, urban transport, power, telecom and water for a minimum 5 years. She/he will undertake a PSSA and develop an ESMS, undertake involuntary resettlement assessment and prepare a resettlement plan for the first PBC, if required. 16. Social Development and Gender Specialist. The Social Development and Gender Specialist will have a background of having undertaken poverty reduction and social impacts assessment, and gender assessment and action planning for a minimum 5 years. The Specialist will undertake socioeconomic and willingness to pay surveys and analysis, and work closely with the social development team in the PMC (appointed through advance actions) to undertake the gender assessment and identify gender actions for the Program Action Plan. 1 The Specialist will assess hygiene and sanitation practices in poor settlements and develop a behavioral and change management program. She/he will also identify the extent to which government programs are effectively utilized and their impact in terms of poverty alleviation to design benefits under the proposed program in harmony with government targets. 1 The Social Development and Gender Specialist will have a subcontract to appoint a survey firm through a Single- Source Selection (SSS) method to undertake required surveys for the TA and program appraisal.

Appendix 3 15 E. Implementation Arrangements 17. The MPUDC will be the TA s executing agency. It will provide in-kind contributions in the form of counterpart staff, office accommodation, office supplies, and communication facilities for consultants. The proposed TA processing and implementation schedule is listed in Table A3.4. Disbursements under the TA will be done in accordance with the Technical Assistance Disbursement Handbook (May 2010, as amended). Consultants will be mobilized in a staggered manner with a focus on prioritizing the advance actions on: (i) recruiting the PMC and DSC, and (ii) undertaking advance actions for awarding PBCs. Table A3.4: Technical Assistance Processing and Implementation Schedule Major Milestones Expected Completion Date Concept paper clearance Dec 2014 TA Consultant mobilization Jan 2015 First PBC awarded Oct 2015 PMC and DSC mobilization Nov 2015 TA completion date Dec 2016 DSC = design and supervision consultant, PBC = performance based contract, PMC = program management consultant, TA = technical assistance