ML-150. w w w. s a q u l i t y m e ta l s. c o m. san antonio branch 210 W. Peden San Antonio TX P. (210) F.

Similar documents
Prior to ordering and installing materials, all dimensions should be verified by field measurements.

StrongSeam SSFF1 Panel

Central Snap. Condition Details C SNAPDETAILS

Western States 7/8 Corrugated

Stile. Spanish Tile Installation Guide

TRIAD CORRUGATED METAL, INC.

INSTALLATION GUIDE.

STILE. Panel Information. Design/Installation Considerations. Flashing Profiles. Detail Conditions. Notes. Accessory Profiles. Testing Information

ALLMET CONTINENTAL INSTALLATION GUIDE

1 1/2" SSR. FABRAL The pursuit of excellence since 1967

Pacific Tile Counter Batten and Batten

Product Guide HELPFUL INFORMATION ON PANELS, TRIMS, GUTTERS AND ACCESSORIES

Residential Pricing Guide

RIB PANEL INSTALLATION

SECTION METAL ROOF PANELS

238T and 138T Panel and Accessories Price List 9/29/2017 (price good for shipments through 11/31/2017) Customer Job Date Sales Rep 238T PANEL ITEM #

KS SERIES - VERTICAL INSTALLATION

UNA-CLAD Metal Roofing Systems Application Guide

SL150 Guide Specification

Light-Metal Roof Edge, Raised

INSTALLATION MANUAL Heritage Series

CS-100 Guide Specifications

DETAIL MANUAL A COMPREHENSIVE GUIDE TO METAL ROOFING GULFLOKTM HIDDEN SCREW METAL ROOF SYSTEM

Maximum thermal performance ISOLEREN INSULATED METAL PANELS INSTALLATION GUIDE

Brava Spanish Tile. Installation Manual. Brava Roof Tile Phone: Fax:

TABLE OF CONTENTS IMAGE II. Detail Conditions. Panel Information. Flashing Profiles

T-Rib Roofing System

Central Seam Plus. Central-Loc

HANDBOOK OF CONSTRUCTION DETAILS

SECTION PRE-ENGINEERED BUILDING INSULATION

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Specifications for FL-100 Soffit Panel

Central Span. Product Guide 16" COVERAGE HELPFUL INFORMATION ON PANELS, TRIMS, GUTTERS AND ACCESSORIES

Guardian-Lok. Standing Seam Roof System THIS MANUAL APPLIES TO GUARDIAN-LOK SYSTEMS. GUARDIAN-LOK REQUIRES PANEL SIDELAPS TO BE MECHANICALLY SEAMED.

Central Texas Metal Roofing Supply Co., Inc NET COVERAGE SHEET WIDTH

Central Texas Metal Roofing Supply Co., Inc 36" NET COVERAGE SHEET WIDTH 38 ¼ 40 ¼ 38 ¼ 40 ¼ 38 ¼ 40 ¼ 40 ¼ 40 ¼

INSTALLATION INSTRUCTIONS for MP-RC1 TWO PIECE CONSTRUCTION TO BE INSTALLED ON COMPLETED ROOF DECK

Jackson Plant: 308 Alabama Blvd. Jackson, GA (800) /Fax: (800)

NUCOR VR 16 II STANDING SEAM ROOF SYSTEM TABLE OF CONTENTS

1 1/2 SSR INSTALLATION GUIDE AGRICULTURAL LIGHT COMMERCIAL RESIDENTIAL

RS32 Multi-Section Skylight System under/over seam clip double diverter

PIPE. Central Texas Largest Distributor. Structural Steel, Pipe and Metal Building Components

200 / 300 SERIES PANELS COLD STORAGE

SECTION METAL ROOFING MASTER SPECIFICATION

PBR & PBU Panels. Technical/Installation Information

PBR & PBU PANELS. Technical/Installation Information

Guardian. Standing Seam Roof System. Manual THIS MANUAL REPLACES ALL PREVIOUS MANUALS EFFECTIVE JANUARY 1, 2006 / JC & JEN

FOR FIELD USE PLEASE DISTRIBUTE TO THE ERECTION CREW

CLIP-LOC. Panel Information. Detail Conditions. Flashing Profiles. Notes. Accessory Profiles. Testing Information. Design/Installation Considerations

Central-Span Installation Guide

SECTION EXTERIOR GRILLS AND SCREENS

S BI COM P ON E NT CA T ALOG

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

Guide Specification SDP 200

SECTION ROOF SPECIALTIES

Agenda. Safety Decking Basics Decking Issues Felt Kick Out Flashing Fascia

SECTION 07530CP EPDM MEMBRANE ROOFING

SECTION MANUFACTURED ROOF AND WALL PANELS SECTION SHEET METAL ROOFING

Central Snap. Product Guide. 16" or 18" COVERAGE 1¾" HELPFUL INFORMATION ON PANELS, TRIMS, GUTTERS AND ACCESSORIES

INSTALLATION MANUAL. METAL INSULATED PANELS -ROXUL -Expanded Polystyrene

Student Services & Classroom Addition

application instructions

General. 2. Design. 3. Anchor Bolts And Foundations. 4. Drawings. 5. Structural Framing. 6. Roof Covering Nucor Classic Roof Panel

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof

Metafor Panel System Installation Guide

RS24-10 Single-Section Skylight System

5V CRIMP. Technical/Installation Information

FACADES - ACM BASE AT OVERHANG (WITH BASE FLASHING) INDEX SHEET

Retro-R DESIGN/INSTALLATION INFORMATION

TECHNICAL INFORMATION

DAN S CUSTOM SHEETMETAL Manufacturer and Distributor

BattenLok HS. Technical/Installation Information

Hip Detail. Construction Details. KS1000 LP/CR Roof. Hip Detail STANDARD ENHANCED ENHANCED STANDARD. Mineral fibre insulation

General. Moisture. Secondary Water-Resistive Barrier. Storage. Gaps & Sealants. Stud Spacing. Flashing, Windows, Doors & Openings

ROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

General Overview SECTION PBR & R PANEL - PREFORMED ROOF AND WALL PANELS

LP SmartSide Perfection Shingle

Industry Standard Terms & Definitions Of The Steel Deck Institute

LINEAR METAL CEILINGS Section

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual

City of Republic Community Development Department. Residential Roofs REVISION DATE: JANUARY 2017

A. Source Limitations: Obtain each type of building insulation through one source.

Siding and Soffit Installation Guidelines

Chapter 7. Roof Framing

SECTION INSULATED METAL WALL PANELS. ATAS International, Inc. General Specification for Commercial/Industrial and Architectural Applications

Kingspan Day-Lite Klick

Prestige Roofing System

SECTION MANUFACTURED ROOF AND PANELS SECTION SHEET METAL ROOFING

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

KBS-100 SNAP-LOCK PANEL & 5V PANEL I N S T A L L A T I O N M A N U A L

Instruction Manual for Installing OutBack Steel-Framed Buildings. Gambrel Buildings

Roof Replacement. Notes: T-1 (Title Sheet) Roof Key Plan Russell House Student Union 1400 Greene Street Columbia, South Carolina 29208

PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

SLATE ROOFING INSTALLATION PROPOSAL [Last updated 10/08/2017]

ENGINEERED SOLUTIONS SAFETY INSTRUCTIONS FOR STRUCTURAL PLATE PRODUCTS

29 Gauge. Technical/Installation Information

KingZip. Insulated Standing Seam Roof System. Insulated Metal Wall Systems Installation Guide

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO

Top Ten List: What Gets Metal Roof Designers in Trouble?

OREGON ROOF CONSULTING - ROOF INSPECTION FORM

Transcription:

ML-150 san antonio branch 210 W. Peden San Antonio TX 78204 P. (210) 227-7276 F. (210) 227-0329 MCALLEN branch 2221 Austin Ave McAllen TX 78501 P. (956) 627-2966 F. (956) 627-0918 w w w. s a q u l i t y m e ta l s. c o m dallas branch 2515 Willowbrook Rd Ste 100 Dallas TX 75229 P. (972) 331-6800 F. (972) 331-6803

important notice This manual contains suggestions and guidelines on how to install the subject Quality Metals time without incurring any obligations. To insure you have the latest information available, please inquire or visit our website. Application and design details are for illustrative purposes only and may not be appropriate for all environmental conditions and/or building designs. Projects should be engineered and installed to conform to applicable building codes, regulations, and accepted industry practices.

Introduction ML-150 is a non-structural panel which is mechanically seamed during installation. The product is an integral interlocking system by design meaning the panels install in one direction from a given starting point. with a wide range of building designs. Two clips are center point allowing for multi-directional expansion. Factory Apply Sealant available. Applications fascia, equipment screens, mansards, and wall panels. This system may also be installed on tapered and curved roof areas. other applications. Design ML-150 Standing Seam requires low maintenance. The panel is secured with concealed clips and the panel side laps are locked together using a rooftop seaming machine. Testing UL 790 Fire Test of Roof Coverings, Class A, B, C UL 2218 For Impact Resistance, Class 4 UL 580 Uplift Resistance. Class 90 Construction No. 554. INSTALLATION Solid Substrate Required Snap Seam No Field Seaming Required Weather Tight Warranty is not Available Underlayment Required Oil Canning reduce the incidence of oil canning in the panels. Installer must have prior experience and knowledge of the tolls listed below and their uses in working with Specifications Color and Finishes 24 and 26 Gauge Galvalume 35 Year Finish Warranty on Kynar 500 Finish Widths Actual Panel Coverage (Width): Max 16 Minimum Slope = ½:12" Lengths ML-150 Panel is available in standard lengths from 4 to 40. Longer lengths require additional handling, packaging, and shipping considerations. An extra handling charge may apply to panels over 40. Continuous Rollformed Lengths: eliminates need for panel lap joints. Caulking Gun Snips Cordless Screw Gun Pop Rivet Tool Tape Measure Hemming Tool Electrical Extension Cord Heavy Gloves Safety Glasses. - 01 -

Packaging Options Standard packing A packaging charge will be added to all orders. Standard packing is crating for all orders. Storage Bare Galvalume and painted panels can be expected to give many years of rust-free service when precautions are taken during storage. If metal is not to be used immediately, store inside in a well ventilated, dry location. Any outdoor storage is at the customer s own risk! At time of delivery, inspect panels for moisture. If moisture has formed, the panels should be uncrated, wiped dry, and allowed to dry completely. Failure to remove the entrapped moisture between the sheets immedi- Extended storage of panels in a bundle is not recommended. Storage on Roof, Crates need to be placed parallel to the framing members and the slope of the roof. LTL packing For LTL, panels are packaged in a completely enclose crate to provide optimum protection. Additional charges will apply for non-standard packing and special requests. Strippable film Removal applied to the topside of the panel to prevent possible damage to the painted surface. If panel has a protective sunlight and high temperatures. remain on the panels after installation. Lead Time Please allow 2-3 days for delivery for material or colors we have in stock. Color we have to paint please allow 10-12 working days. Receiving Materials It is the responsibility of the installer to unload material from the delivery truck. The installer shall be responsible for providing suitable equipment for unloading of material from the delivery truck. After receiving material, check the condition of the material, and review the shipment against the shipping list to ensure all materials are accounted for. If damages or shortages are discovered, it should be noted on the shipping copy at time of delivery. If material is delivered by common carrier, a claim must be made with the carrier as soon as possible. - 02 -

Packaging Options Standard packing A packaging charge will be added to all orders. Standard packing is crating for all orders. Storage Bare Galvalume and painted panels can be expected to give many years of rust-free service when precautions are taken during storage. If metal is not to be used immediately, store inside in a well ventilated, dry location. Any outdoor storage is at the customer s own risk! At time of delivery, inspect panels for moisture. If moisture has formed, the panels should be uncrated, wiped dry, and allowed to dry completely. Failure to remove the entrapped moisture between the sheets immedi- Extended storage of panels in a bundle is not recommended. Storage on Roof, Crates need to be placed parallel to the framing members and the slope of the roof. LTL packing For LTL, panels are packaged in a completely enclose crate to provide optimum protection. Additional charges will apply for non-standard packing and special requests. Strippable film Removal applied to the topside of the panel to prevent possible damage to the painted surface. If panel has a protective sunlight and high temperatures. remain on the panels after installation. Lead Time Please allow 2-3 days for delivery for material or colors we have in stock. Color we have to paint please allow 10-12 working days. Receiving Materials It is the responsibility of the installer to unload material from the delivery truck. The installer shall be responsible for providing suitable equipment for unloading of material from the delivery truck. After receiving material, check the condition of the material, and review the shipment against the shipping list to ensure all materials are accounted for. If damages or shortages are discovered, it should be noted on the shipping copy at time of delivery. If material is delivered by common carrier, a claim must be made with the carrier as soon as possible. - 02 -

mechanical handling: Forklift A forklift may be used for panels up to 20 long. Please make sure the forks are at their maximum separation. Do nor transport open crates. When transporting crates across rough terrain, or for a long distance, some means of supporting the panel load must be used. Improper loading and unloading of crates may result in bodily harm and /or material damage. Union Corrugating is not responsible for bodily injuries and/or material damages resulting from impoper loading and unloading. general handling Each crate should be handled carefully to avoid being damaged. Care should be taken to prevent bending of for proper care while unloading and handling crates in order to prevent panel damage: 1. Crates should remain intact during any handling, and until the individual panels in each bundle are ready to be installed. Crates should never be lifted by the banding. 2. Lift each crate as close as possible to its center of gravity. crane A crane should be used when lifting panels with lengths greater than 20. please be sure to utilize a spreader bar to ensure the even distribution of the weight to the pick up points. As a rule, when lifting panels, no more than 1/3 of the length of the panel should be left unsupported. Canvas or nylon slings should be used to pick up the panels. DO NOT use cable or chains because this will damage the panels. 3. If the crates are to be lifted with a crane, use a spreader bar of appropriate length, and nylon band slings. (Do not use wire rope slings as they will damage the panels). 4. Depending on panel length, some crates may be lifted by a forklift. When using a forklift, the forks should be spread apart to their maximum spacing, and the load must be centered on the forks to prevent scratching the next panel. A panel should never be picked up by it s ends. Instead, lift the panel along its longitudinal panels over 10 feet long, two or more people should lift the panel along the same edge. 5. After creates are opened, individual panels must also be handled carefully to prevent panel buckling or damage to the panel coating. When removing a panel from a crate, it should never be allowed to slide over another panel. The individual panels should be rolled out of the crate in order to minimize the chance of panel damage. - 03 -

manual handling: 6. Soft gloves must be worn when handling panels. A panel should never be picked up by its ends. Instead, lift the panel along its longitudinal edge and carry in a All applicable safety regulations, including OSHA regulations, must be complied with during the panel installation process. FOOT TRAFFIC: 6-8 MAX necessary for maintenance over certain areas of the roof, then a permanent walkaway should be installed. field cutting The snips or a nibbler type electric tool are recom- Mechanical Lock panels. If a skill saw is used, the blade will generate silvers of metal chips. Any silvers of metal chips must be immediately removed from the Mechanical Lock panels because product. panels over when cutting. This allows the silvers of metal chips to be brushed from the back side and avoids damaging the paint on the top side of the panels. - tion, provide walking platforms to avoid any panel damage as shown below. Walking on the ribs can cause damage of the panels. Walking Platforms All product surfaces should be free of debris at all times. Installed surfaces should be wiped clean at the end of each work period. Never cut panels over metal surfaces. Metal shavings will rust on the surface thus voiding the warranty. Quality Metals Panels Foot Traffic When cutting metal panels, goggles must be worn for eye protection Quality Metals Panels - 04 -

design considerations & calculations Proper design and installation of vapor barriers and ventilation systems are important to prevent condesation and the resulting problems of moisture damage an Vent Attic Insulation Concensation occurs when moisture-laden air comes in contact with a surface temperature equal to or below the dew point of the air. This phenomenon creates problems that are not unique with metal buildings; these problems are common to all types of construction. In addition to providing resistance to heat transfer, insulation can also protect against condensation forming on cold surfaces, either inside the building or within the wall/roof system cavity. The arrangement of the building s insulation system and vapor retarder is the responsibility of the building designer. These are some basic guidelines to help contro condensation in a metal building: 1. The insulation should have a vapor retarder face on the warm side of the insulation. For most buildings, this means that the vapor retarder is on the side surface. (toward the building s interior) 2. The thickness of the insulation must be designed to maintain the temperature of the vapor retarder above the interior dew point, using the worst-case expected outside temperature. 3. All perimeter conditions, seams, and penetrations of the vapor retarder must be adequately sealed in order to provide a continuous membrane to resist the passage of water vapor. Touch Up Paint: Vent at Eave result in some small scratches or nicks to the paint Touch-up paint is available in matching colors. It is recommended that a small brush be used to apply touch-up paint to those areas that are in need of repair. Touch-up paint does not have the superior chalk and will normally discolor at an accelerated rate. Periodic touch-up may be required to maintain color match. There is no warranty on touch-up paint in regards to color match because the paint processes are Aerosol paint should not be used because of the overspray that may occur. 4. Building ventilation, wheter by gravity ridge vent, power operated fans, or other means, contributes, signifacly to reduce condensation. The movement of air to the outside of the building reduces the interior level of vapor pressure. On buildings that have an attic space or are being retroplaced at both ends of the eave and peak of the roof in order to prevent a buildup of moisture (humidity) in the attic space. Touch-Up Paint Small Brush - 05 -

accesories ¼ 14 x 7/8 Hex Head Lap Tek Screw metal to metal #10 x 1-½ Hex Head Woodmate Screw Metal-to-Wood #10 x 1 Pancake Head Woodscrew 2 Pancake Head Woodgrip 1-½" 1-½" 36" 1-3/4" 1 Pancake Head Tek Screw 2-½ Pancake Head Tek Screw Neoprene Universal Closure Vented Ridge Closure Closure Tube Sealant Hand Crimper Double Bead Butyl Tape (7/8 x 3/16 x 40 ) Pipe Boot (Various sized, heat treated Clips Roll Valley 20 x 50 Hemming Tool Bearing Plate - 06 -

fastener installation recomended toll type Use depth locating nose or adjustable clutch on screw gun to prevent over-drilling and strip out. Do not use impact tools or runners. washer. DO NOT OVERDRIVE THE FASTENER. self driller correct too loose too tight Sealing material slightly visible at edge of metal washer. Sealing material is not visible; not enough compression to seal. woodscrew Metal washer deformed; sealing matereial pressed beyond washer edge. condition of substructure: Whether over solid substrate or open structural framing, panel distortion may occur if not applied over properly aligned and uniform substructure. The installer should check the roof deck for squareness before installing Mechanical Lock ML-100 panels. Several methods can be used to verify squareness for proper installation of the panels. Method 1 Measure diagonally across one slope of the roof from similar points at the ridge and eave and obtain the same dimension. Method 2 Measure a point from the corner along the edge of the roof at a module of three (3). Measure a point from the same corner along another edge at a module of four (4). Then by measuring diagonally between the two points stablished, the dimension corner. Multiple uses of this system may be required to determine building squareness. If the endwall cannot be made square, the roof system cannot be installed as shown in these instructions. To prevent wobbling make sure fastener head is completely engaged in the socket. If the head does not go all the way in the socket tap the magnet deeper into the socket to allow full head engagement. Metal chips will build up from drilling and should be removed from time to time. Protect drill point. Push only hard enough on the screw gun to engage clutch. This prevents excess friction and burn out of the drill point. Correct pressure will allow screw to drill and tap without binding. Drilling through sheet and insulation ease up on pressure when drilling through insulation to avoid striking the purlin or girt with the pont apply more pressure after drill point contacts purlin or girt. Drilling through purlin overlaps. Drilling through lapped purlins requires extra care. Excessive voids between purlins sometimes damages drill ponts and two self drillers might be necessary to complete the operation. - 07 -

ML SERIES installation The three drawings below ilustrate the seaming process. Starting with Step 1, clips are installed over the male leg and fastened to the substrate. Step 2. involves the female leg of the adjoining panel to then be set on the male leg/clip assembly. Step 3 involves the panels to be seamed, with either a mechanical or hand seamer. The seam shown is a 90 degree seam or a 180 degree or double seam is optional. This type of seam is typically required where high wind loads are needed. Data from extensive wind step 1 Hand tool positioned over seam step 1 step 2 step 3 HAND CRIMPER step 2 Hand tool locked onto seam step 3 Hand tool crimps seam - 08 -

2 ML SERIES installation MECHANICAL LOCK SERIES PANEL OR CURVED PANEL CONTINUOUS FACTORY APPLY VINYL WEATHER SEAL CONTINUOUS CLIP FASTENERS; 2 AT EVERY PURLIN FOR OPEN FRAMING CONDITIONS 2 FASTENERS 36 O.C. MAX. FOR SOLID SHEATING 1 3/8 11/16 1 3/16 16 2 1/16 2 1/4 PANEL SECTION CONTINUOUS CLIP WITH FACTORY APPLIED VINYL WEATHER SEAL MECHANICAL LOCK SERIES PANEL OR CURVED PANEL 1 3/8 PANEL SUPPORT CONTINUOUS CLIP FACTORY APPLIED EXTRUDED VINYL WEATHERSEAL PANEL SUPPORT OPTIONAL SEAM SECTION 1/8 2-09 -

ML SERIES installation electric seamer: The electric seamer will run in one direction only. To determine the direction of the seamer, stand at the eave and look upslope. If the roof is being installed left to right, the seamer will run upslope. If the roof is being installed right, the seamer will run upslope, an orientation plate is on the seamer to assist you in placing the seamer onto the seam properly. Shen the roof has endlaps, the panels will always be installed right to left. When the roof slope is 6 on 12 or greater, panels must run right lo left. To begin seaming, set seamer on seam with the locking bar up and to the open side of the seam. The rear wheels should be even with the edge of the roof panel. Push the locking bar down to engage the rolls and turn the seamer on. Stop seamer about one foot from end panels. Disengage locking bar and remove the electric seamer. Finish seam with hand tool. caution Seamer operation should be closely supervised at all times. A safety line should be attached to the seamer. Do not entangle the electrical cords in the seamer tooling while it is in operation. This could couse serious injury or death to the operator and severely damage the seamer. Electrical cords should be 10-gouge to provide power to the semaer and never be over 200 feet from the electrical source - 09 -

trim diagram 2 5 RAKE / EAVE 1 end wall ridge cap 5 2 2 7 7 3 4 1 6 1 3 4 6 7 gutter valley PITCH CHANGE downspot - 11 -

RC24-SO16 A=7 B=1 RCS24-SO16 A= 4½ B=1 C=2 D=½ 13.87 PC24-SO16 A= 7 B=1 C=5 D=6 E=1 20 15.83 Z24-SO334 A=1 B= 1¾ C=1 3.75 2.85 VENTED ZEE AVAILABLE, PLEASE INQUIRE - 12 -

GUS24-SO235 A=4 B=6 C=7 D=5 E=1 24 GU24-SO2114 A= 6 B= 5 C= 6 D= 4 E= 1 F=1 24 20.37 DS24-SO1618 A= 4 B= 3 14 VC24-SO24 A=4 B=1 C=5 D=1 E=1-13 -

CS24-SO418 A=2 B=5/8 C=1½ D=3/16 DRIP EDGE (DL) DL24-SO08 A=4 ½ B=1 C=1½ D=1½ 8 7.30 EAVE (OFFSET CLEAT) A EC24-SO08 A=4 B=3 C=½ 8 6.93 B C SIDEWALL SW24-SO09 A=3 B=5 C=1 9 7.40 A C B - 14 -

J-TRIM A JC24-SO06 A=3 3/8 B=1 1/8 C=1 D=½ 6 5.20 D B C FW24-SO1078 A=6 B=5 5/8 C=1 ¼ D=½ EW24-SO09 A=3 B=5 C=1 HIGH SIDE FASCIA FH24-SO13 A=3 B=5 C=½ - 15 -

vented z VZ24-SO414 A=1 B= 1 C=1 D= 1¾ E=1 5.75 3.90 B C D E endwall-q EWQ24-SO06 A=1 B= 3 C=1 D=1/2 6 4.25 counter flashing COF24-SO45 A=¾ B=¾ C=1¼ D=1¼ E=1 5 3.95 e BOX RAKE BOR24-SO45 A=3 B= 2 ½ C=1 ½ D=5/8 8.25 5.36-16 -

valley VA24-SO24 A=11 B= 1 24 19.3 A valley single VAS24-SO25 A=11 B= 1 24 19.3 b A rake B C RA24-SO1078 A=3 B=2 ½ C=5/8 D=1 E=5/8 7 ¾ 6.12 D e continuous cleat CC24 A=2 ½ B= ½ 3 2.6 A 135 b - 17 -

eave detail 10-12X1 WOOD SCREWS -12 O.C. ML PANEL SERIES DRIP EDGE WOOD DECK 10-12X1 WOOD SCREWS -12 O.C. CLEAT FASCIA BOARD ML PANEL SERIES 10-12X1 WOOD SCREWS -12 O.C. 3 10-12X1 WOOD SCREWS -12 O.C. 1 SOLID DECK DRIP EDGE 2 CLEAT 1. Install cleat onto fascia with #10-12x1 wood screw 12 O.C. 2. install drip edge by sliding open hem onto cleat & fastening with #10-12x1 wood screw, 12 O.C. on to substrate. 3. Engage drip edge into open hem of panel to begin panel installation. - 18 -

gutter detail ML SERIES PANEL GUTTER STRAP POP RIVET SOLID DECK WOODGRIP 10 X 1 GUTTER FASCIA BOARD ML SERIES PANEL CLIP 1. Install all gutter flashings before panel installation. 2. Fasten back of gutter top of fascia w/ #10-12 x 1 Pancake head screws @ 24 O.C. 3. Install drip edge over back of gutter & fasten # 10-12x1 Pancake head wood screws @ 12 O.C. on top of substrate. 4. Engage field hemmed end of panel top hem of drip edge. DRIP EDGE 3 PANCAKE HEAD 10 x 1 SOLID DECK FASCIA BOARD 4 PANCAKE HEAD 10 x 1 WOODGRIP 10 X 1 POP RIVET GUTTER 1 2 GUTTER STRAP - 19 -

hip/ridge detail RIDGE/HIP CAP FLASHING Z CLOSURE DOUBLE BEADED TYPE 1. Box ends of panels. 2. Field cut Z closures to fit between panel ribs. 3. Set Z closure in tape sealant or 2 cont. beans of sealant and attach to panel. with (3) #10-12 x1 wood screws. 4. Apply sealant on side legs of Z closure, filling any gaps around panel ribs. 5. Attach ridge/hip flashing to Z closures with a pop rivet on one side at 24 O.C. 6. If additional flashing lengths are required, apply sealant and lap the flashing over the installed flashing by a minimum of 3 securing the connection with pop rivets. ML SERIES ROOF PANEL POP RIVET ONE SIDE ONLY 5 #10-12 X 1 SCREWS 1 BOX END PANEL Z CLOSURE CUT TO FIT 2 3 4 BETWEEN PANEL. SET IN 2 CONT. BEADS OF AND CAULKED VERTICALLY AT SEAMS. RIDGE/HIP CAP FLASHING Z CLOSURE - 20 -

metal VENTED RIDGE DETAIL RIDGE/HIP CAP FLASHING VENTED Z PANEL DOUBLE BADED TYPE 1. Box ends of panels. 2. Set Z closure in tape sealant or 2 cont. beads of sealant and attach to panel with (3) #10-12 x 1 wood screws. 3. Attach bottom of vented Z closure to top of Z closure with stitch screws @ 24 O.C. 4. Hook other hem side of ridge cap onto the long end of the other vented Z closure and pop rivet both sides @ 24 O.C. 5. Insert long end of vented Z closure into an open hem side of ridge cap. RIDGE CAP FLASHING 3 VENTED Z PANEL POP RIVET @ 24 O.C. 4 5 BOX END OF PANEL 1 #10-12 X 1 SCREW (3) PER PANEL Z CLOSURE CUT TO FIT BETWEEN PANEL, SET IN 2 CONT. BEADS OF AND CAULKED VERTICALLY AT SEAMS ML SERIES ROOF PANEL Z CLOSURE 2 SOLID DECK - 21 -

VENTED RIDGE DETAIL RIDGE CAP VENTING MATERIAL Z CLOSURE ML SERIES ROOF PANEL DOUBLE BADED TYPE 1. Box ends of panels. 2. Field cut Z closures to fit between panel ribs. Set Z closure in tape sealant or 2 cont. beads of sealant and attach to panel with (3) 10-12 x 1 wood screws. 3. Apply sealant on side legs of Z closure, filling any gaps around panel ribs. 4. Attach ridge flashing to Z closures through venting material with a stich screw at 24 O.C. 5. If additional flashing over the installed flashing by a minimum of 3 securing the connection with pop rivets. 1 BOX END OF PANEL 4 RIDGE CAP VENTING MATERIAL STITCH SCREW #10-12 X 1 SCREWS PER PANEL Z CLOSURE CUT TO FIT 2 3 BETWEEN PANEL, SET IN 2 CONT. BEADS OF AND CAULKED VERTICALLY AT SEAMS ML-SERIES ROOF PANEL - 22 -

GABLE DETAIL ML SERIES ROOF PANEL GABLE FLASHING SOLID DECK CLEAT #10-12 X 1 WOOD SCREWS @ 12 O.C. STITCH SCREW AT 12 O.C. 5 ML SERIES ROOF PANEL 2 CONT. BUTYL TAPE 3 SOLID DECK GABLE FLASHING 4 CLEAT 1 1. Install cleat on to fascia with #10-12x1 pancake wood screws at 12 O.C. 2. Field bend panel at 90 degrees 1-1/2 minimum. 3. Adhere a continuous length of butyl tape onto the top inside of the panel leg. 4. Slide gable flashing onto cleat and align with panel. 5. Connect gable flashing with a stitch screw at 12 O.C. #10-12 X 1 WOOD SCREWS @ 12 O.C. - 23 -

valley DETAIL ML SERIES ROOF PANEL OFFSET CLEAT VALLEY FLASHING #10-12 x 1 PANCAKE SCREWS AT 24 O.C. CONT. 3/8 x 1 BUTYL TAPE 1. Install all valley flashings before panel installation. 2. Fasten valley flashing to substrate with #10-12 x 1 pancake head wood screws 24 O.C. 3. Align and install offset cleat with tape sealant on both sides of valley flashing. 4. Fasten offset cleat through valley flashing and tape sealant to substrate with #10-12x1 pancake head wood screws 24 O.C. 5. Field hem panel. 6. Engage field hemmed end of panel to offset cleat and attach panel as usual. ROOF PANEL FIELD CUT & PANEL ML SERIES ROOF PANEL #10-12 x 1 PANCAKE SCREWS AT 24 O.C. 4 1 2 VALLEY FLASHING 5 6 OFFSET CLEAT 3 SOLID DECK CONT. 3/8 x 1 BUTYL TAPE - 24 -

endwall DETAIL WALL SYSTEM ENDWALL FLASHING Z CLOSURE POP RIVET AT 24 O.C. #10-12 X 1 SCREWS WALL SYSTEM ENDWALL FLASHING ML SERIES PANEL ROOF #10-12 x 1 SCREWS (3) PER PANEL 1 1. Box panel ends. 2. Field cut Z closures to fit between panel ribs. 3. Set Z closure in tape sealant of cont. beads or sealant and attach to panel with (3) #10-12x-1 wood screws. 4. Caulk Z closure vertically at panel seam. 5. Attach high side transitions flashing to Z closure with pop rivets. Z CLOSURE POP RIVET AT 24 O.C. 5 Z CLOSURE CUT TO FIT BETWEEN PANEL, SET IN 2 CONT. BEADS OF AND CAULKED VERTICALLY AT SEAMS 2 3 4 SOLID DECK - 25 -

endwall DETAIL WOODGRIP 10 x 1 CAULKING BUTYL TAPE COUNTER FLASHING POP RIVET AT 24 O.C. ENDWALLFLASHING Z CLOSURE #10-12 X1 SCREW (3) PER PANEL SOLID DECK CAULKING WOODGRIP 10 x 1 BUTYL TAPE COUNTER FLASHING ENDWALL FLASHING 5 FIELD BOX END OF PANEL 1 6 ML SERIES ROOF PANEL #10-12 X1 SCREW (3) PER PANEL Z CLOSURE 2 3 4 POP RIVET AT 24 O.C. 1. Box panel ends. 2. Field cut Z closures to fit between panel ribs. 3. Set Z closure in tape sealant or cont. beads of sealant and attach to panel with (3) #10-12x-1 wood screws. 4. Caulk Z closure vertically at panel seam. 5. Attach endwall flashing to Z closure with pop rivets 24 O.C. 6. Install counter flashing and caulk top with sealant. Z CLOSURE CUT TO FIT BETWEEN PANEL, SET IN 2 CONT. BEADS OF AND CAULKED VERTICALLY AT SEAMS SOLID DECK - 26 -

endwall DETAIL ENDWALL C FLASHING POP RIVET AT 24 O.C. Z CLOSURE BUTYL TAPE CAULKING 6 ENDWALL WITH REGLET FLASHING 5 FIELD BOX END PANEL 1 ML SERIES ROOF PANEL #10-12 x 1 SCREW PANEL 1. Box panel ends. 2. Field cut Z closures to fit between panel ribs. 3. Set Z closure in tape sealant or cont. beads of sealant and attach to panel with (3) #10-12x-1 wood screws. 4. Caulk Z closure vertically at panel seam. 5. Attach endwall flashing to Z closure with pop rivets 24 O.C. and set top of flashing in wall. 6. Caulk with sealant.- Z CLOSURE POP RIVET AT 24 O.C. Z CLOSURE CUT TO FIT BETWEEN PANEL, SET IN 2 CONT. BEADS OF AND CAULKED VERTICALLY AT SEAMS SOLID DECK - 27 -

side wall DETAIL FINISHED WALL COUNTER FLASHING FASTENER AT 24 OC BUTYL TAPE FINISHED WALL 1. Apply sealant tape to inside of panel leg. 2. Attach sidewall flashing by installing fastener at 24 O.C. through sealant tape into panel 3. Install counter flashing. 3 FASTENER COUNTER FLASHING 2 SIDEWALL FLASHING BUTYL TAPE FASTENER AT 24 O.C. 1 ML SERIES ROOF PANEL SOLID DECK - 28 -

side wall DETAIL FASTENER AT 24 O.C. CONT. BUTYL TAPE STITCH SCREW COUNTER FLASHING SIDEWALL FLASHING CONT. BUTYL TAPE ML SERIES ROOF PANEL 1. Apply sealant tape to inside of panel leg. 2. Attach sidewall flashing by installing fastener at 24 O.C. through sealant tape into panel 3. Install counter flashing and caulk with sealant. FASTENER AT 24 O.C. CONT. BUTYL TAPE 3 COUNTER FLASHING 2 SIDEWALL FLASHING BUTYL TAPE STITCH SCREW 1 ML SERIES ROOF PANEL SOLID DECK - 29 -

side wall DETAIL FASTENER COUNTER FLASHING SIDEWALL FLASHING FASTENER ML SERIES ROOF PANEL 1. Apply sealant tape to inside of panel leg. 2. Attach sidewall flashing by installing fastener at 24 O.C. through sealant tape into panel 3. Install counter flashing and caulk with sealant. 3 COUNTER FLASHING 2 SIDEWALL FLASHING BUTYL TAPE 1 FASTENER ML SERIES ROOF PANEL SOLID DECK - 30 -

ridge/hip cap RIDGE / HIP CAP POP RIVET FASTENERS, (5) PER PANEL Z CLOSURE BUTYL TAPE ML SERIES PANEL 18 GA. STEEL BACK UP PLATE OR WOOD BLOCKING METAL DECK 5 RIDGE / HIP CAP FASTENERS, (5) PER PANEL BOX PANEL END 3 4 1 POP RIVET 2 FASTENERS, (5) PER PANEL BUTYL TAPE BUTYL TAPE 1. Box ends of panels. 2. Field cut Z closures to fit between panel ribs. 3. Set Z closure in tape sealant or 2 cont. beans of sealant and attach to panel. with (3) #10 x 1 screws 4. Apply sealant on side legs of Z closure, filling any gaps around panel ribs. 5. Attach ridge/hip flashing to Z closures with a pop rivet on one side at 24 O.C. 6. If additional flashing lengths are required, apply sealant and lap the flashing over the installed flashing by a minimum of 3 securing the connection with pop rivets. METAL DECK - 31 -

VALLEY WITH INTEGRAL CLEAT VALLEY WITH INTEGRAL CLEAT ML SERIES PANEL FILL PANEL HEM WITH BUYTL PANCAKE FASTENER, 12.C. RIGID INSULATION PLATE OR WOOD BLOCKING CAULK BETWEEN WEBS FILL PANEL HEM W/ BUTYL ML SERIES PANEL FASTENER 12 0.C. 2 1-1/2 INSULATION METAL DECK 1 VALLEY 12 OVERLAP - 32 -

GUTTER ML SERIES ROOF PANEL EAVE FLASHING WOOD BLOCKING PANCAKE FASTENERS, 12 O.C. METAL DECK BUTYL TAPE FASTENER 12 O.C. CLEAT STRAP GUTTER ML SERIES ROOF PANEL 4 PANCAKE FASTENERS, 12 O.C. BUTYL TAPE CAULK BETWEEN WEBS FASTENER, 12 O.C. 1-1/2 INSULATION METAL DECK CLEAT 2 EAVE FLASHING 3 WOOD BLOCKING STRAP GUTTER 1 2. Install cleat on to wood blocking with #10 x 1 pancake wood screws 12 O.C. - 33 -

EAVE APPROVED ML SERIES ROOF PANEL BUTYL TAPE WOOD BLOCKING PANCAKE FASTENERS, 12 EAVE FLASHING FASTENER 12 O.C. CLEAT METAL DECK ML SERIES ROOF PANEL PANCAKE FASTENERS 12 O.C. CAULK BETWEEN WEBS BUTYL TAPE INSULATION METAL DECK FASTENER 12 O.C. EAVE FLASHING 2 WOOD BLOCKING CLEAT 1 1. Install cleat on to wood blocking with #10 x 1 screws 12 O.C. 3. Engage drip edge into open hem of panel to begin panel installation. - 34 -

eave 90 INSULATION PANCAKE FASTENERS, 12 O.C. ML SERIES ROOF PANEL RAKE FLASHING FASTENER 12 O.C. CLEAT METAL DECK WOOD BLOCKING ML SERIES ROOF PANEL PANCAKE FASTENERS, 12 O.C. METAL DECK INSULATION WOOD BLOCKING FASTENER 12 O.C. CLEAT 1 RAKE FLASHING 2 1. Install cleat on to wood blocking with 10 x 1 screw 12 O.C. 2. Install Rake Flashing by siding open hem on to cleat and fastening with #10-1 screws 12 O.C. 3. Engage Drip Edge into open hem of panel. - 35 -

sidewall FASTENER, 12 O.C. SIDEWALL FLASHING Z CLOSURE ML SERIES ROOF PANEL BUTYL TAPE BUTYL TAPE BASE DRIP 2 Z CLOSURE SET IN BUTYL TAPE ATTACHED W/ (5) FASTENERS PER PANEL FASTENER, 12 O.C. BUTYL TAPE ML SERIES ROOF PANEL BOX PANEL END 1 SIDEWALL FLASHING PANEL, BOX, PANEL END 1 SD FASTENERS (3) PER PANEL 4 Z CLOSURE POP RIVET 6 3 FASTENER, 12 O.C. BASE DRIP 1. Box panel end. 3. Set Z closures in the tape sealant of cont beds of sealant and attach to panel with #10-1 screws. 4. Caulk Z closure vertically at panel seam. - 36 -

RAKE RAKE FLASHING Z CLOSURE ML SERIES ROOF PANEL FASTENERS, 12 O.C. BOX END OF PANEL BUTYL TAPE WOOD BLOCKING RAKE FLASHING ML SERIES ROOF PANEL BOX END OF PANEL 1 FASTENERS, 12 O.C. Z CLOSURE 2 3 4 WOOD BLOCKING 1. Box panel end. 1-1/2 INSULATION 3. Set Z closures in the tape sealant of cont. beds of sealant and attach to panel with (3) #10-1 screws. 4. Caulk Z closure vertically at panel seam. - 37 -

ENDWALL FASTENER, 12 O.C. COUNTER FLASHING ENDWALL FLASHING FASTENER 12 O.C. Z CLOSURE ATTACHED W/ (5) FASTENERS PER PANEL BUTYL TAPE ML SERIES PANEL 5 COUNTER FLASHING FASTENERS, 12 O.C. ENDWALL FLASHING POP RIVET 5 BUTYL TAPE ML SERIES PANEL 1 Z CLOSURE 2 4 BUTYL TAPE 3 FASTENER (5) PER PANEL WOOD BLOCKING 1. Box panel end. 1-1/2 INSULATION METAL DECK 3. Set Z closures in the tape sealant of cont. of bead of sealant and attach to panel with #10 x 1 screws. 4. Caulk Z closure vertically at panel seam. - 38 -

ENDWALL FASTENER, 12 O.C. COUNTER FLASHING ENDWALL FLASHING FASTENER 12 O.C. Z CLOSURE ATTACHED W/ (5) FASTENERS PER PANEL BUTYL TAPE ML SERIES PANEL 5 COUNTER FLASHING FASTENERS, 12 O.C. ENDWALL FLASHING POP RIVET 5 BUTYL TAPE ML SERIES PANEL 1 Z CLOSURE 2 4 BUTYL TAPE 3 FASTENER (5) PER PANEL WOOD BLOCKING 1. Box panel end. 1-1/2 INSULATION METAL DECK 3. Set Z closures in the tape sealant of cont. of bead of sealant and attach to panel with #10 x 1 screws. 4. Caulk Z closure vertically at panel seam. - 39 -

ENDWALL SIDING FASTENER, 12 O.C. ENDWALL FLASHING FASTENER 12 O.C. WOOD BLOCKING FASTENER Z CLOSURE SIDING FASTENERS, 12 O.C. ENDWALL FLASHING POP RIVET 5 BUTYL TAPE ML SERIES PANEL 1 Z- CLOSURE 2 4 BUTYL TAPE 3 FASTENERS, (5) PER PANEL WOOD BLOCKING 1-1/2 INSULATION 1. Box panel end. METAL DECK 3. Set Z closures in the tape sealant of cont. beads of sealant and attach to panel with (3) #10-1 screws. 4. Caulk Z closure vertically at panel seam. - 40 -

ENDWALL FASTENERS 12 O.C. COUNTER FLASHING Z CLOSURE FASTENERS, (5) PER PANEL ML SERIES ROOF PANEL APPROVED FASTENERS COUNTER FLASHING FASTENERS, 12 O.C. ENDWALL FLASHING POP RIVET 5 ML SERIES PANEL 1 6 Z CLOSURE 2 4 BUTYL TAPE 3 FASTENERS, (5) PER PANEL WOOD BLOCKING 1. Box panel end. 1-1/2 INSULATION METAL DECK 3. Set Z closures in the tape sealant of cont. beads of sealant and attach to panel with (3) #10-1 screws. 4. Caulk Z closure vertically at panel seam. - 41 -

vent pipe flashing detail 1. Cut pipe boot at appropiate pipe diameter. 2. Slide the pipe boot down over the pipe using water to lubricate it of necessary. 4. Seal between base and roof with tube sealant. 5. Fasten the pipe boot with 1-1/2 woodscrew at 1-1/2 centers to complete the seal. 1-½" Woodscrew @ 1-½" Centers Pipe Boot - 42 -

step 1 Install lower panels around curb. curb detail (chimneys & skylights) Field form legs against curb sides min. 1 high 12" min. Remove half of female leg 6 Panel Installation Direction Field trimmed female leg: Remove lower hook to allow overlapping panel condition. step 2 Install Z-Closure w/ screws at 4 o.c. double bead mastic Install butyl tape each side for seal between Z-Closure and panel. Panel Installation Direction - 43 -

Fold curb detail (chimneys & skylights) step 3 Install sidewall and high wall Field form tabs to return around high end of curb Field form tabs to return around sides of curb Highwall flashing: hook hem onto Z-Closure Side wall flashing: hook hem onto Z-Closure Panel Installation Direction step 4 Install (2) layers of mastic tape sealant under perimeter of low wall flashing Remove material each side after field tracing profile Set flashing & field trace against curb to determine trim profile prior to cutting 12 min. Remove Excess Fold Apply sealant at trim laps typically Fastener as required by condition Panel Installation Direction - 44 -

step 5 Install cleat and prepare for upper panel installation curb detail (chimneys & skylights) Pancake head fastener at overlap location Continuous cleat set in sealant: fasten at 4 o.c. Hex head w/ washer at exposed face Install field hemmed upper panels over low wall flashing onto cleat 6 min. lap Panel Installation Direction Sealant at Z & low wall intersection at both sides of curb step 6 6 Install final upper panel over low wall flashing onto cleat Field trim male leg: remove as shown to allow flush fit against adjacent continuous panel - 45 -

CURB DETAIL STEP 1 POLYSTICK MTS POLYGLASS NAILER BASE ISO BOARD ML SERIES ROOF PANELS - 46 -

CURB DETAIL STEP 2 FASTENERS INSTALL CURB OVER HIDDEN FASTENERS AREA DIRECT TO METAL DECK POLYSTICK MTS-POLYGLASS APPLY 3 LINES OF FLAT SHEET GAUGE 24 FLASHING BASE 12 MIN REMOVE HALF OF FEMALE LEG 6 6 ML SERIES ROOF PANEL PANEL INSTALLATION DIRECTION TERMINATION BENDING LAP ON HIGH RIB, CUT ON SITE step 1 step 2 step 3 step 4-47 -

CURB DETAIL STEP 3 MECHANICAL LOCK PANEL HIDDEN FASTENERS DIRECT TO METAL DECK PANEL RIB COVER (OPTIONAL) APPLY 3 LINES OF MECHANICAL LOCK PANEL 3/16 X 7/8 DOUBLE BEAD TAPE 3/32 X 1 ROLL TAPE MTS POLYGLASS - 48 -

CURB DETAIL STEP 4 ML SERIES ROOF PANEL FASTENERS 1/4-14 x 1/4 LONG LIFE SELF TAPPING SCREWS PANEL RIB COVER (OPTIONAL) 3/16 X 7/8 DOUBLE BEAD TAPE 3/32 X 1 ROLL TAPE MTS POLYGLASS NOTE: THIS DETAIL APPLIES FOR RIGID INSULATION SYSTEM - 49 -