ADDENDUM #1. The following sheets have been revised and are being reissued as part of this addendum:

Similar documents
ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form.

BID FORM (LUMP SUM CONTRACT)

Addendum No. 1 Page 1 of 2

Bid Form. Schedule 2 Alternate Bid No. 4: Install gutters and downspouts. (100% Local Funded)

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1

American Society of Military Engineers

The Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged.

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014

APPENDIX H. Capital Improvement Program Detail Project Costs NORTH PERRY AIRPORT MASTER PLAN UPDATE APPENDICES

CITY OF MIAMI Capital Improvements Program BID NO.:

Bid Form. To the Texas Department of Transportation hereinafter called the Agent.

Forsyth County Procurement

Document Bid Form (General Contract) State of Ohio Standard Requirements for Public Facility Construction

BUREAU Joe Iuviene, AIA January 20, 2017

BID TABULATION ( BIDS OPENED MONDAY, APRIL 24, 1:00 P.M. ) CONSTRUCT PARALLEL TAXIWAY - PHASE 3 HABERSHAM COUNTY AIRPORT, CORNELIA, GEORGIA

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

ADDENDUM NO. 1 APRIL 24, 2017

STATE PROJECT NUMBER TZ MnDOT

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

Pavement Update Track: Engineering

REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St.

DOCUMENT ADDENDUM No. 2

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

DALLAS FORT WORTH INTERNATIONAL AIRPORT ADDENDUM NO. 2. Northeast End Around Taxiway Package I East Air Freight Taxiway and Utilities

ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS. All Plan Holders and Prospective Bidders

2014 ARTICLE III IMPROVEMENTS IN THE CITY OF EL CENTRO ADDENDUM NO. 02

PERMIT TO EXCAVATE IN HIGHWAY CHESHIRE, CONNECTICUT

City of Naples Utilities Department Wastewater Collections Division

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016

Addendum Number 1. August 31, Colcock Hall Windows. Owner Project Number: Prepared by:

SPECIFICATIONS AND CONTRACT DOCUMENTS FOR NAPLES MUNICIPAL AIRPORT. FDOT No HANSON No. 15A0108. September 14, 2016 FOR BIDDING

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

Specifications for Electrical Underground Residential Distribution Systems

NO. OF PAGES 6 BIDDERS ARE REQUESTED TO RETAIN THIS SPECIFICATION FOR FUTURE REFERENCE TABLE OF CONTENTS

PROJECT NAME: NAVAJO TRIBAL UTILITY AUTHORITY WASTEWATER TREATMENT PLANT UPGRADES

CONTRACTOR S PROPOSAL FISCAL YEAR STREET IMPROVEMENT PROJECT AND MAIN STREET BRIDGE REHABILITATION

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SECTION TRENCHING & BACKFILLING

City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV (775) (775) FAX

SECTION A1 EXCAVATION AND BACKFILL GENERAL


TEMPORARY AIR AND WATER POLLUTION, SOIL EROSION, AND SILTATION CONTROL South Terminal C Phase 1 (WS110) Item P-156

SECTION STORM DRAIN

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method

C. Foundation stabilization for pipe and utility structures.

Recycling and Reclamation of Airfield Pavements

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING TOOLS AND STRUCTURES

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

FAA s Mixture Specifications

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

BID INSTRUCTIONS. Montour County Courthouse Retaining Wall Repair Project

PAVEMENT CONSTRUCTION QA PROCEDURES RIDEABILITY TESTING CONSTRUCTION PRACTICE

Summary of the 2011 Changes

Invitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $

ST. GABRIEL OF THE SORROWFUL MOTHER CHURCH

Eastern Sewershed Package IV Project Solicitation Number: CO Job No.: ADDENDUM 1 April 20, 2018

REQUEST FOR QUALIFICATIONS UTILITY LAYOUT MAPPING AND PLAN OF RECORD AS BUILT DRAWINGS RFQ Q MR ADDENDUM #2 10:00 AM November 18, 2010

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

Installation of Metering System for Monitoring Based Commissioning Program Under Prop. 39 & CCC/IOU

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

CONSTRUCTION SPECIFICATION FOR KEYHOLE EXCAVATION AND PERMANENT REINSTATEMENT OF KEYHOLE CORES TABLE OF CONTENTS

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003

CHAPTER 6. Sanitary Sewer

Request for Proposal: Due October 11, :00 pm

SECTION UNCLASSIFIED EXCAVATION AND GRADING

ATTACHMENT 8. Technical Specifications

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

January 2008 No. 700

UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

A NEW GYMNASIUM AND RENOVATED FINE ARTS FOR MONTGOMERY CATHOLIC PREPARATORY SCHOOL MONTGOMERY, ALABAMA

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

Implementing An effective Airport Pavement Management System

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

SECTION 501 GRAVITY SEWERS. U. No pipe length used shall be less than 5 feet.

Note: Niagara Region has determined that it is necessary to provide additional information relating to the above referenced Request for Tender.

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe.

PLANS. All plans shall be submitted on 24 x 36 sheets

CW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE

Michigan State University Construction Standards EARTHWORK PAGE SECTION EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

Addendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16

CONDUITS AND FITTINGS

ARCHITECTURE/ ENGINEERING

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description

Transcription:

ADDENDUM #1 AIRFIELD IMPROVEMENTS EXTEND, MARK, AND LIGHT RUNWAY 6-24 AND TAXIWAY ALPHA REHABILITATE RUNWAY 6-24 at the LAKE WALES MUNICIPAL AIRPORT FAA AIP NO: TBD FDOT FM NO: TBD BID NO: 16-412 5/11/16 The attention of all bidders submitting proposals for the above referenced project is called to the following additions, deletions, or clarifications to the contract documents. The items set forth herein, whether of clarification, omission, addition, deletion, or substitution are to be included in and shall form a part of the proposal submitted. BIDDERS SHALL ACKNOWLEDGE RECEIPT OF THE ADDENDUM BY WRITING THE WORDS "ADDENDUM #1" (WITH THE APPROPRIATE DATE OF ISSUANCE) ON THE LINE PROVIDED ON THE BID FORM (PAGE BF-3) OF THE CONTRACT DOCUMENTS. ADDENDUM #1, ITEM #1: CONSTRUCTION PLANS The following sheets have been revised and are being reissued as part of this addendum: Sheet 13 Sheet 40 Sheet 41 Sheet 45 Typical Pavement Sections and Details Lighting and Sign Plan Power Feed for Proposed PAPI PAPI Details ADDENDUM #1, ITEM #2: BID SCHEDULE The following quantity changes are being made to Bid Schedule A: L-108-01 20,410 LF No. 8, 5000 V., L-824 Type 'C' Conductor in Conduit or Duct L-110-01 9,860 LF Trench in Unpaved Area, 24" Deep, for Conduit L-110-02 10,560 LF 2" PVC Sch. 40 Conduit, In Trench The following changes are being made to Bid Schedule B: P-401-8.1b 7,905 TON 3" Bituminous Asphalt Concrete Surface ADDENDUM #1, ITEM #3: MILLING The Milling depth has been changed from ½ inch to 1 inch for Bid Schedule B. ADDENDUM #1, ITEM #4: BITUMINOUS ASPHALT SURFACE COURSE The Bituminous Asphalt Concrete Surface course thickness has been changed from 2 inches to 3 inches for Bid Schedule B. ADDENDUM#1.doc 1

ADDENDUM #1, ITEM #5: ASPHALT PAVEMENT It is required that the final lift of asphalt for Bid Schedule A and Bid Schedule B be placed in one continuous paving operation. ADDENDUM #1, ITEM #6: QUESTIONS AND RESPONSES Question 1: Drawing 7 contains a note that says muck is to be disposed of offsite. Drawing A8 note 2. says it can be used for fill outside the RW and TW safety areas. Which is correct? Response 1: Note on Sheet 15, Drawing A8 is correct. Please disregard the note on Sheet 7. Question 2: Will there be a source of water at the Airport we can use and make some kind of arrangement to pay for Response 2: Yes, there is a water hydrant on Airport Road. The contractor can obtain a hydrant meter from the City. Question 3: Will the test strip for the Runway Extension be the only test strip required or will a test strip be required for Alpha Taxiway and another test strip for Runway Rehabilitation? Response 3: One test strip will be required for Bid Schedule A asphalt pavement, and one test will be required for Bid Schedule B asphalt pavement. Question 4: I want to make sure that the Owner will be responsible for the testing and the Contractor will only be paying for test failures (retesting). Response 4: The Owner will pay for Quality Assurance (QA) testing, as required by the technical specifications. The contractor shall be responsible for paying for the cost of any failing QA tests. Refer to Note 1 on Sheet 4 for more information. Question 5: Will we be required to video the 36 RCP? Response 5: No video is required but the pipe will need to be lamp tested after pipe trench backfill is compacted and brought to grade or pavement subgrade. ADDENDUM #1, ITEM #7: QUESTIONS DEADLINE The deadline for questions has expired. No more questions will be answered regarding this project. ADDENDUM #1, ITEM #8: FINAL BID SCHEDULE An electronic copy of the final Bid Schedule in Microsoft Excel format is included as part of this addendum. Please disregard all other versions of the Bid Schedule and use the one included with this addendum for submitting your bid. Note: Revised contract documents, specifications, and construction plans with all addenda items incorporated shall be issued to the successful bidder prior to contract execution. END OF ADDENDUM #1 ADDENDUM#1.doc 2