EXHIBIT A SCOPE OF SERVICES DISTRICTWIDE GENERAL PLANNING CONSULTANT SYSTEMS AND POLICY PLANNING SUPPORT. FM No (22)-01

Similar documents
EXHIBIT A. TRANSIT AND MULTIMODAL DEVELOPMENT SUPPORT CONTINUING SERVICES SCOPE OF SERVICES FM No

EXHIBIT A SCOPE OF SERVICES SYSTEMS PLANNING OFFICE STRATEGIC INTERMODAL SYSTEM (SIS) PLANNING CONSULTANT

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID: DISTRICT TWO

Scope of Services Traffic Signal Retiming Contract FM NO Florida Department of Transportation District Four

Exhibit A - Scope of Service Office of Freight, Logistics and Passenger Operations Consultant

Continuing Services Contract for Statistics Traffic Data Collection and Analysis. FM No.:

INDEX EXHIBIT A SCOPE OF SERVICES FINANCIAL PROJECT NUMBER

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

Interchange. Resource Guidebook. March 2007

Traffic Study Guidelines

III. Regional TSM&O Overview from the 2040 Regional Transportation Plan (Jessica Josselyn, Kittelson & Associates, Inc.)

USING TRAVEL TIME RELIABILITY DATA TO DEVELOP CONGESTION MANAGEMENT STRATEGIES IN THE TRANSPORTATION PLANNING PROCESS.

Origin-Destination Trips and Skims Matrices

MONITORING IMPLEMENTATION AND PERFORMANCE

INTRODUCTION... 4 DATA COLLECTION AND ASSESSMENT... 6 I-1. DATA COLLECTION AND ASSESSMENT... 6 I-1.1 CTP Inventory and Assessment... 6 I-1.

Working with Transportation Concurrency Exception Areas

VISUM State-of-the-Art Travel Demand Modeling VISUM

Florida Transportation Systems Management and Operations. Strategic Plan

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1

LOCATION AND DESIGN DIVISION

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

Exhibit A Scope of Services Technology and Data Support Consultant for Emerging Transportation Systems

Work Type Definition

MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES

KAW CONNECTS EXECUTIVE SUMMARY

Intelligent Transportation Systems Master Plan

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE

ATTACHMENT A. Detailed Study Scope. I-66 (Inside) Multi-modal Study Scope

TRAFFIC ANALYSES TO SUPPORT NEPA STUDIES

MAP 21 Freight Provisions and Seaports

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

TRAFFIC STUDY GUIDELINES

HCM 6th Edition Planning and Preliminary Engineering Applications Guide (PPEAG) to the HCM Bringing Back-of-the-Envelope Back.

NATMEC June 30, 2014 Anita Vandervalk, PE, PMP

TCATS October 12-Michigan Works 5:30-7pm. NATS October 19-Niles District Library 6-7:30pm

Volume to Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning. Hiron Fernando, BSCE. A Thesis CIVIL ENGINEERING

Congestion Management Process 2013 Update

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS

EXHIBIT A SCOPE OF SERVICES MAINTENANCE PERSONNEL SUPPORT

Project Evaluation Criteria

Mobility and System Reliability Goal

EXHIBIT A Scope of Services Program Services Scheduling, GIS and Web Support

Geometric Design: Past, Present, and Future

REGIONAL SOLICITATION ROADWAY APPLICATIONS: POTENTIAL CHANGES. TAB September 20, 2017

GUIDING PRINCIPLES MEMORANDUM

2016 Mid-Continent Transportation Research Symposium, October 24-25, Donna Brown-Martin, Director Bureau of Planning and Economic Development

Background Study Goals and Objectives

APPENDIX H: TRAVEL DEMAND MODEL VALIDATION AND ANALYSIS

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

Modeling Applications for Freight Tennessee DOT Freight Planning

Operations in the 21st Century DOT Meeting Customers Needs and Expectations

The Indian Nations Council of Governments (INCOG) 2035 Plan: Roadways Element

Scope of Work. Project Approach and Understanding. Task 1: Study Initiation and Administration

SCOPE OF SERVICES INTERSTATE 195 CORRIDOR PLANNING STUDY FROM INTERSTATE 95/NW 12 TH AVENUE TO ALTON ROAD

Chapter 3 - Goals, Objectives, & Strategies

TRANSPORTATION IMPACT ANALYSIS GUIDELINES

District One Freight Mobility & Trade Study and Implementation Plan Joint Charlotte & Sarasota/Manatee MPO Board Meeting January 25, 2016 Keith

Director of Transportation Planning

Management. VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office

Des Moines Area MPO. MPO Planning Subcommittee Meeting March 3, Des M oines Area M etropolitan Planning Organization

I-710 Project Committee Meeting

CHAPTER 1: INTRODUCTION/ GOALS AND OBJECTIVES

The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES

CITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES

Chapter 10 Goals, Objectives + Policies

HORIZON 2030: Plan Projects November 2005

SECTION III - REGIONAL ARTERIAL SYSTEM. The Regional Arterial System is a subcomponent of a broader regional thoroughfare system.

Qualitative Hot Spot Analysis for PM2.5 February 4, 2008

Florida Department of Transportation 605 Suwannee Street Tallahassee, FL

Charlotte Region HOV/HOT/Managed Lanes Analysis. Technical Memorandum Task 1.3 EVALUATION CRITERIA

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

Construction Alternative Screening with Regional Travel Demand Model

September Public Meetings. Developing a Blueprint for the Corridor

PINELLAS COUNTY MOBILITY PLAN SUMMARY REPORT

Exit 73 I-29 Interchange Modification Justification Study

TRANSPORTATION IMPACT STUDIES

I-66 Corridor Improvements Outside the Capital Beltway in Northern Virginia, USA

IOWA DEPARTMENT OF TRANSPORTATION. Request for Proposal

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

3. STATION SPACING AND SITING GUIDELINES

Chapter 1: The 2035 Virginia Surface Transportation Plan 1. Challenges & Opportunities 2 VTrans2035: The Precursor 2 The VSTP and VTrans2035 2

Chapter 4: Developing the Recommendations

Future System Planning (ST4)

Project Initiation Form

CRTPA Regional Mobility Plan Attachment 1 Agenda Item 4E Page 1 of 11

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

AIR QUALITY AND CLIMATE CHANGE EVALUATION GUIDANCE

University of Kentucky 1 Southeastern Transportation Center Safety Performance in a Connected Vehicle Environment. FIGURE 1: V2V and V2I Connectivity

Technical Methods Part 2

Tool for Operations Benefit/Cost (TOPS- BC) for Florida DOT Applications

RAIL / FREIGHT CONTINUING SERVICES CONTRACT INCLUDING RAILROAD MAINTENANCE MONITORING AND OPTIONAL SERVICES FINANCIAL PROJECT NUMBER:

RAPID INCIDENT SCENE CLEARANCE (RISC)

New Jersey Pilot Study

NEW ORLEANS REGION TRANSIT COMPREHENSIVE OPERATIONS ANALYSIS SCOPE OF SERVICES. RPC Project LA90X361

FY Unified Planning Work Program. Kalamazoo Area Transportation Study 5220 Lovers Lane, Suite 110 Portage, MI (269)

Since the Vision 2000 effort under taken in 1995, ODOT has operated under a Mission,

1.1 Purpose of the Project

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

Transcription:

EXHIBIT A SCOPE OF SERVICES DISTRICTWIDE GENERAL PLANNING CONSULTANT SYSTEMS AND POLICY PLANNING SUPPORT FM No. 233152-7-12(22)-01 This Exhibit forms an integral part of the Agreement which provides for services by the CONSULTANT in connection with the Districtwide General Planning Consultant (GPC) Contract of Systems and Policy Planning and Support. It should be noted that Systems and Policy Planning encompasses all the transportation modes and the services of this contract will support the multi-modal trend of planning the future transportation. To serve this role, the CONSULTANT shall possess and maintain full multi-modal planning and technical analyses capabilities throughout the entire contract period to efficiently and effectively support the Systems and Policy Planning functions of the new era. I. OBJECTIVE The main objective of this contract is to provide professional multi-modal transportation planning services to supplement the FDOT District 4 Systems and Policy Planning staff, as well as to serve as an extension to the FDOT District 4 Planning and Environmental Management Office. The primary tasks include but are not limited to: Site Impact and Growth Management Reviews Project Traffic/Travel Demand Forecasting Review and Development Interchange Access Document Development and Review Lane Elimination Request Review Feasibility and Special Studies Mobility Performance Measures Demand Forecast Model Applications Multi-Modal Corridor Analysis Multi-Modal Transportation Studies Review and Development Transportation Plan Development Provide On-Site Services and Support Public Involvement Legislative/Regulation/Policy Analysis Secondary tasks, as described later in this Scope of Services, may also be issued. Further, the CONSULTANT may be required to perform other Planning tasks to support Planning and Environmental Management functions. II. SERVICES Page 1

The CONSULTANT will be required to provide transportation planning services to assist District 4 Systems and Policy Planning staff in performing all or some of the tasks identified in this Scope of Services. The CONSULTANT shall complete all work performed under this contract in accordance with applicable DEPARTMENT policies, guidelines and procedures. Work is to be performed by the CONSULTANT on as-needed basis throughout the duration of the contract. Authorization to begin the work will be issued by the DEPARTMENT in the form of Task Work Order (TWO). Depending on the Method of Compensation for each TWO, the CONSULTANT may be required to track and to report individual staff working hours and provide a summary report to the DEPARTMENT by the end of each billing cycle. The CONSULTANT's work will be managed by a DEPARTMENT Project Manager and/or Task Manager. The DEPARTMENT Project Manager will discuss the scope and product(s) as well as staff-hours with the CONSULTANT Project Manager prior to issuing a TWO. The DEPARTMENT has the final discretion on the choices of consultant staff for each TWO. The CONSULTANT may assist in preparation of a given TWO. After negotiations, the DEPARTMENT will issue the Letter of Authorization, which will include TWO scope of service, describing expected work tasks, schedules, staffing requirements, deliverables, and the total allowable cost. The following sections describe the tasks for which CONSULTANT services may be required. II.1 Primary Tasks The CONSULTANT may be required to perform the following types of primary work: A. Site Impact and Growth Management Reviews The CONSULTANT may be required to evaluate, review and/or prepare transportation studies or methodologies for Developments of Regional Impact (DRI), Transit Oriented Developments (TOD), development orders, and other development related proposals. The CONSULTANT will use the latest version of FDOT Topic No. 525-030-115-c, "Minimum Responsibilities for District Development of Regional Impact Review" Procedure, Site Impact Handbook, DCA Rule Chapters 9J-2 and 9J-5, Florida Statutes Chapters 380.06 and 163, the appropriate Regional Planning Council or State DRI Guidelines, the latest Growth Management Legislation, and other guidance as specified by the DEPARTMENT in any Task Work Order. The CONSULTANT may also be required to attend methodology meetings, review DRI methodologies and Application for Development Approvals (ADA), review amended Development Orders or Notices of proposed change (NOPC), and review Annual Reports. The CONSULTANT may be required to prepare response letters for the technical reviews. The CONSULTANT may be required to assist the DEPARTMENT in assessing proportionate fair share. To facilitate growth management review efforts, the CONSULTANT may be required to assist the DEPARTMENT in maintaining development documents, a database and correspondence. The CONSULTANT may be required to develop, calibrate and validate, and utilize macroscopic, mesoscopic, or microscopic transportation models using such software tools as Cube Voyager, Cube Avenue, Cube Analyst, Synchro, CORSIM, or other software to analyze and evaluate site impacts. The CONSULTANT may be required to present new tools or site impact analysis results to the public Page 2

and/or other public agencies. Evaluation of the effectiveness or applicability of employing various Transportation Demand Management (TDM) or Transportation Systems Management (TSM) strategies to mitigate site impacts may be required as well. With the continuous evolving of growth management laws, the CONSULTANT must be capable of translating the implication of the new laws to the requirements of impact analysis, and with such insights to formulate the appropriate analysis methodologies. B. Project Traffic/Travel Demand Forecasting Review and Development The CONSULTANT may be required to develop, review and/or analyze travel demand estimates for facility designs. The CONSULTANT must be capable of effectively communicating important details of travel demand forecasts such as methodology, data, tools, and results with various department offices, the public, or other public agencies through presentations, workshops or meetings. Travel demand estimation efforts should be comprehensive and include modal projections as needed. Modal projections may include transit ridership, pedestrian movements, freight flows, truck movements, person throughput and others. The work required for this task may include but is not limited to: Project Traffic Reports for Design, Interchange Proposals, Alternatives Analyses and PD&E Studies - The CONSULTANT may be required to project future AADTs, design hour traffic volumes, and turning movements using travel demand models (FSUTMS), historical traffic growth, land use data and/or other appropriate traffic and transit forecasting methodologies agreed upon by the District 4 Planning and Environmental Management Office. Given that the variables used for projecting future traffic, such as population and employment are subject to change, the project traffic reports may require a sensitivity test section to depict the applicable range of the design that the projection calls for. Further, as Managed Lanes becoming a key mean of funding mechanism for new transportation facilities, the CONSULTANT shall be proficient on the managed lane travel demand forecasts methodologies. The CONSULTANT may be also required to develop or review revenue forecasts for managed lane projects. 18-Kip Reports - The CONSULTANT may be required to project future traffic estimates (including turning movements), develop D and T design factors, collect necessary project specific traffic data, and prepare pavement loading reports (18-Kip ESAL) using the above information. Multimodal Travel Demand Forecasting and Analysis - The CONSULTANT may be required to forecast transit ridership and bicycle and pedestrian volumes. In addition, the CONSULTANT may be required to analyze transit viability and plan for transit, bicycle and pedestrian facilities. The multi-modal demand forecasts may engage in all different types of public transit services and non-motorized modes. Also, their demand forecasts methodologies could range from simple sketch planning forecasts to the more complex level in meeting FTA s latest requirements. The CONSULTANT must be competent on assessing the objective of a study and recommend the most pertinent and efficient analysis methodology. The CONSULTANT must be capable of expertly communicate and present the complex technical formulation of transit analysis methodology and the implications of analysis findings in layman s terms. C. Interchange Access Document Development and Review Page 3

The CONSULTANT will be required to develop and/or review proposals for new or changes to existing interchanges such as Interchange Justification Reports (IJR), Interchange Modification Reports (IMR), or Interchange Operation Analysis Reports (IOAR), following the State and Federal requirements and guidelines. This work may also include development and/or review of alternative design concepts and interchange configurations, such as the Diverging Diamond Interchange or the Single Point Urban Interchange. The CONSULTANT will be required to conduct or review assessments of the operational and safety effects of geometric design and traffic control features for new or existing interchanges. This task may also require the CONSULTANT to perform or review dynamic traffic simulation / micro-simulation, using CORSIM, AVENUE or other similar traffic simulation software(s), for operational analysis, visualization and presentation purposes. The CONSULTANT will be required to develop or review reevaluations of previously approved Interchange Access documents based on changes in the proposed interchange geometry at various stages of the project. Consultant may be required to coordinate Interchange Access Proposals with other agencies, consultants, FHWA and the District Interchange Review Coordination Team. D. Feasibility and Special Studies The CONSULTANT will be required to develop and/or review Feasibility Studies and Special Studies including, but not limited to, Lane Elimination, Freeway Managed Lanes & Ramp Metering Studies, Traffic & Revenue Studies, Interstate Master Plans, Freight Planning/Modeling, Roadway Performance Measures, or Data Mining on Transportation Data. The CONSULTANT will also conduct or review Maintenance of Traffic / Lane Closure Analyses, including evaluation of lane and/or roadway/bridge closures or detours on the highway network. This task may also require the CONSULTANT to perform dynamic traffic or micro-simulation for operational analysis, visualization and presentation purposes. The CONSULTANT may be required to coordinate with local agencies, consultants, FTA, FRA and FHWA. E. Mobility Performance Measure, Quality/Level of Service (LOS) Multi-modal LOS (MMLOS), Transit Capacity and Quality of Service Assessment The CONSULTANT may be required to conduct studies related to Mobility Performance Measures of transporting both people and freight. The CONSULTANT may be required to develop specifications for performance measures. The CONSULTANT may also be required to conduct studies related to quality/los assessment, such as assessing localized saturation flow rates and passenger car equivalents (PCEs) for various classes of vehicles as well as developing Q/LOS assessment criteria and methodologies for site impact or other multi-modal analyses pursuant to Highway Capacity Manual and/or FDOT s Quality/LOS, MMLOS and TCQSM Handbook. The CONSULTANT may be required to develop and utilize macroscopic, mesoscopic, or microscopic transportation models using such software tools as Cube, Cube Avenue, Synchro, VISSIM, CORSIM, or other software tools to analyze and evaluate various transportation facilities Level of Service. F. Demand Forecast Model Applications The CONSULTANT may be required to provide highly technical model application and model output evaluation services for both highway and transit facilities using activity-based demand forecast models and other modeling tools. These services may include, but are not limited to: modeling process development, subarea model calibration and validation for both highway and transit Page 4

modes, model performance evaluation, demand forecasts for all transportation modes, model output post processing refinements, implementing new model structures/procedures and documentation. In addition, the CONSULTANT may be requested to develop modeling scripts using DEPARTMENT approved software, which will facilitate the conversion of data among various software applications. The tasks may include but not limited to, Python, Java, Fortran, Visual Basic, ArcGIS, CUBE/Voyager, DynasT, R, SQL and other database programming languages. This task may also require the CONSULTANT to provide services of applying modeling results for dynamic traffic simulation using Cube Avenue, matrix estimation using Cube Analyst, Synchro, CORSIM, VISSIM or other similar dynamic assignment and traffic simulation software for analysis and presentation. G. Multi-Modal Corridor Analysis The CONSULTANT may be required to prepare Corridor Analyses in accordance with all applicable FDOT policies and guidelines. The CONSULTANT must be capable of effectively communicating information regarding the analysis, methodology, data, tools, and results with various department offices, the public, or other public agencies through presentations, workshops or meetings. The following delineates the type of corridor work that may be required: The CONSULTANT may be required to collect data, such as traffic volume and speed data, transit service and ridership data, accident data, land use data, access features, highway characteristics, and signalization information. The CONSULTANT may be required to analyze the data and indicate any deficiencies. To do so, the CONSULTANT must be capable of identifying the relationship of causes and consequences of corridor traffic demands and be proficient on interpreting such relationship in common English. The CONSULTANT may be required to identify alternative solutions to existing deficiencies and express each alternative in a form suitable for comparison. The CONSULTANT may be required to provide the following types of corridor travel forecasts including: highway vehicle forecasts, transit ridership forecasts, transit competiveness index assessment, or freight movement forecasts. The CONSULTANT may be required to determine the need for new or upgraded transportation facilities services within a corridor. The CONSULTANT may be required to perform corridor feasibility studies. The CONSULTANT may be required to perform large area traffic flow and transit ridership analyses as needed to evaluate various multi-modal improvement alternatives within a corridor. The CONSULTANT may be required to evaluate the impact of improved public transportation on traffic LOS and "person trips" within specified corridors. The CONSULTANT may be required to identify critical corridors and make recommendations to improve the mobility of corridors, including but not limited to the applicability of transportation demand management strategies. The CONSULTANT may be required to perform benefit-cost analyses for different alternatives. H. Multi-Modal Transportation Studies Review and Development The CONSULTANT may be required to develop and/or review various planning and traffic operational studies such as area-wide or sub-area travel demand analysis, level of service analysis, travel time reliability studies, capacity calculations, development impact and concurrency reports, Trafficways amendments, right-of-way surplus requests, design traffic reports, signal and median opening warrants, lane conversion studies, master plans, or other transportation/traffic studies. The CONSULTANT must be capable of effectively communicating information regarding any Page 5

analysis, methodology, data, tools, and results with various department offices, the public, or other public agencies through presentations, workshops or meetings. The CONSULTANT may be required to develop and/or review a number of multi-modal transportation studies. The studies may encompass any one of the following subject areas: travel demand modeling (multi-modal), transit oriented design, dynamic traffic assignment and simulation, transportation systems management, congestion management, intermodal facilities, park and ride lot planning, multimodal alternatives analysis, transit planning, bicycle and pedestrian planning, and others. Multi-modal studies data collection efforts that may be required include, but shall not be limited to, the following: traffic counts, transit infrastructure inventories, origin/destination studies, freight monitoring, land use data, employment data, literature and/or technology research, mapping, sidewalk/bicycle lane inventories, and rail freight operations data. Multi-modal data analysis efforts may include, but shall not be limited to: long range transportation modeling, traffic engineering analysis, mode split analysis, congestion management studies, intermodal feasibility studies, transportation system management analysis, signal synchronization (systems), preemption/prioritization, reversible lanes, HOV lanes, transportation demand management analysis, transit, carpool, vanpool, crash analyses, sketch planning, and transit routing. I. Transportation Plan Development The CONSULTANT may be required to assist staff in the development of the Florida Transportation Plan (Short and Long-Range Components), including goal and policy development and plan inventory needs assessment. The CONSULTANT may also be required to review and assess demands for all modes of transportation facilities identified in Florida s Transportation Plan (FTP), Regional Long Range Transportation Plans, individual MPO or TPO Long Range Transportation Plans or other types of plans. The CONSULTANT may be required to assist the DEPARTMENT in reviewing and assessing congestion pricing and to evaluate the benefits and risk of Public-Private-Partnership initiatives. The CONSULTANT may be required to assist in performing analyses or to review proposed changes to transportation and growth management policies, standards, and/or other federal or state guidance or regulations. The CONSULTANT may be required to develop multimodal project prioritization evaluation processes to prioritize various needed improvements from the plan. The CONSULTANT may also be required to assist staff with transportation plan development related intergovernmental and inter-agency coordination. J. Technology Feasibility Assessments The CONSULTANT may be required to assist the DEPOARTMENT on assessing and implementing cost saving planning methodologies, such as identify new data sources collected by third parties or new data collection methods useful for transportation planning, and assess their effectiveness and applicability of travel movement tracking technologies for origin-destination studies. K. On-Site Support Upon request, CONSULTANT staff will be required to work at the DEPARTMENT's offices as scheduled by the DEPARTMENT to perform other tasks outlined in this scope. This arrangement allows for direct interactions between consultant and department staff, allows for CONSULTANT to direct access DEPARTMENT s archives to conduct their work in a timely manner and thus to Page 6

expedite the completion of work assignments. The details of consultant staff work schedule will be defined in Task Work Orders. L. Public Involvement The CONSULTANT may be required to perform public involvement duties as needed to support other tasks specified in this scope of services. For example, the CONSULTANT would be required to develop and conduct public involvement program for a travel survey. The CONSULTANT may also be required to conduct public workshop and to present the work products of other tasks. The CONSULTANT would be responsible for advertising public involvement events and documenting public inputs. II.2 Secondary Tasks The CONSULTANT may be required to perform the following types of secondary work: M. Data Collection and Analysis Support The CONSULTANT shall utilize the state-of-the-art and cost effective data collection methods for carrying out these data collection tasks. The CONSULTANT may be required to conduct traffic counts at any location throughout the District. The CONSULTANT may be required to collect any of the following standard types of traffic counts including, but not limited to: vehicle classification, speed studies, bi-directional 24-hour, 48- hour, 72-hour arterial and expressway counts, and turning movement counts. The CONSULTANT is expected to document the field conditions at the time of the counts. Field documentation also includes counter location and geometric measurements such as number of lanes, length of storage and taper for turn/merge lanes, type of traffic control, and the location and/or presence of signal boxes and loop detectors. The CONSULTANT will be required to assure the quality of the data by performing regular quality checks of the data. The CONSULTANT will be required to fully document the data collection effort and provide this documentation and collected data in SPF format. The CONSULTANT may be required to perform other planning related data collection and analysis which may include, but is not limited to: Origin-destination survey License plate survey Travel time and delay survey Spot speed survey Draw bridge closing/boat volume survey Trip generation rate survey Saturation flow rate survey Parking demand survey Traffic conflict survey Traveler intercept survey Park-and-ride lot usage Pedestrian/bicycle survey Transit ridership survey Page 7

The CONSULTANT may be required to assist in designing and managing the collection of transit ridership data to analyze the transit rider profiles, and their travel patterns and transit usage, to support the development and calibration of FSUTMS transit modeling. For some data collection efforts such as origin-destination surveys, the CONSULTANT may be required to develop and execute a public involvement plan. The CONSULTANT may also be required to develop a survey plan and survey instruments, as well to ensure that the type and amount of data collected are statistically valid. For these surveys, the CONSULTANT may be required to perform data cleaning work for the collected data, and to summarize survey findings. N. Geographic Information System (GIS) Analysis The CONSULTANT may be requested to perform Geographical Information System (GIS) analysis to support Department Planning and Environment Management functions. This work may include but is not limited to: Compilation of GIS data Data cleaning and data update Data layer conflation Data transfer between different GIS data formats Develop scripts to perform data integration, data manipulation, data analysis, data display, and mapping, in ArcGIS environment O. Congestion Management Planning The CONSULTANT may be required to perform a variety of functions associated with development of metropolitan areas and statewide congestion management plans and systems, and feasibility studies for various Intelligent Transportation Systems (ITS) strategies, as well as travel demand management and localized (e.g., intersection) capacity improvements. The CONSULTANT may be required to assist with Transportation System Management and Operation (TSM&O) program data collection, analysis and/or alternative modeling or testing. The CONSULTANT may be required to utilize sketch planning tools to analyze the potential costs and benefits of implementing various congestion management strategies. The CONSULTANT may be required to use tools such as STEAM, IDAS, FITSE, etc. P. Access Management Classification The CONSULTANT may be required to participate in the classification or re-classification of the State Highway System in accordance with the guidelines and regulations set forth in Rule Chapter 14-97 F.A.C. and any other supporting documentation. Q. Project Management Support The CONSULTANT may be required to provide Project Management support to DEPARTMENT Project Managers. Tasks may include assisting in tracking data compilation efforts, reviewing work products, coordinating meetings (public or internal) related to DEPARTMENT projects or contracted projects, attending meetings or assisting DEPARTMENT project managers in related ways. Page 8

R. Strategic Intermodal System (SIS) Support The CONSULTANT will be required to support and provide technical analysis, data collection and analysis, and miscellaneous support for the highway component of the SIS, as well as the multimodal component of the SIS. Activities are associated with supporting technical work in progress, and may include the review of data collection efforts, review of data analyses, analysis of existing data, and level of service analysis. Additional tasks may include conceptual engineering, travel forecasting, freeway and arterial capacity/level of service analysis, revenue analysis, interagency coordination, various corridor and connector needs assessments, and participation in public meetings and presentations. S. Regional Freight Assessment The CONSULTANT may be required to review and assess demands for regional freight needs. The CONSULTANT may also be required to assist with data collection efforts, including analyzing TranSearch and other commodity flow data and future year projections, truck movement tracking, railroad crossing delays, classification counts. The CONSULTANT may also be required to assist in the development of a regional freight strategy, based on the review of other regional plans and corridor studies, the Florida Statewide Plan, and other literature, and applying national best practices. T. Other Secondary Tasks The CONSULTANT may be required to perform the following types of work: Assist staff in various congressional transportation authorization (MAP-21) implementation activities, including: 1. Development and implementation of the management systems; 2. Data collection and analyses for factors that must be considered during the state planning process; 3. Development and analyses of innovative approaches to enhance the mobility of people and goods, and recommendations of specific pilot projects; and 4. Development of the transportation portion of the Florida Transportation Plan. The CONSULTANT may be required to develop scope of services, level of effort estimates, and contract provisions for future district planning studies, including estimated staffing requirements and estimated costs for the study. Performing various mapping and graphics tasks for presentation or report purposes using CADD and other graphics software and techniques. Organizing and conducting workshops and presentations to DEPARTMENT staff and other audience for technical subjects specified in this Scope of Services. Page 9

Developing technical memoranda, reports, newsletters and web pages, in compliance with the DEPARTMENT s rules, for distributing technical information related to the functions of Office of Planning and Environmental Management. Performing other tasks, such as planning work tasks, related to the implementation and maintenance of the Office of Planning and Environmental Management Efficient Transportation Decision Making (ETDM) System, to facilitate the Office in meeting its mission and performing its functions and assignments. Evaluation and analysis of legislation, regulations, rules, procedures, and policies involving growth management, transportation regionalism, climate change, and other areas of interest and its effects on DEPARTMENT processes, tools, and products. Development and or review of project grant applications Development and review of air quality conformity determinations and State Implementation Plan (SIP) emission reduction strategies Development of performance measures Developing concurrency alternatives Transit Ridership and transfer demand estimation Park and ride lot demand estimation Congestion pricing and managed lanes travel demand estimation III. SCHEDULE The CONSULTANT agrees to begin work after issuance of a notice to proceed by the DEPARTMENT and upon receipt of Work Orders. IV. METHOD OF COMPENSATION Payments for each Task Work Order will be specified on the Letter of Authorization of each work order. V. KEY PERSONNEL The CONSULTANT's work shall be performed and directed by key personnel identified in the proposal presentations by the CONSULTANT. Any changes to these personnel shall be reviewed and approved by the DEPARTMENT. These key personnel, including CONSULTANT Project Manager, shall possess superior verbal and writing communication skills, capable of translating complex technical analysis findings to common language and capable of presenting results in concise manner that can be intuitively understood by elected officials and general public. Page 10

VI. SUBCONTRACTING SERVICES The sub-consultants must be qualified by the DEPARTMENT to perform all work assigned to them. Additional sub-consultants with specialized areas of expertise may be required by the DEPARTMENT or requested by the CONSULTANT to complete specific Task Work Order assignments. The need for additional sub-consultants to perform required work should be mutually agreed by the DEPARTMENT and the CONSULTANT prior to adding them to this contract. Sub-consultants not on this contract shall not perform any work of this contract nor be paid by this contract. VII. MEETINGS The CONSULTANT must be available for unscheduled meetings. The CONSULTANT shall be available with no more than a one (1) weekday notice to attend meetings at the request of the DEPARTMENT. Such meetings and presentations may be held at any hour between 8:00 a.m. and 9:00 p.m. on any weekday. VIII. RESPONSIBILITIES OF THE DEPARTMENT The DEPARTMENT will provide a Project Manager who shall be responsible for: A. Day-to-day management of this contract B. Coordination with the CONSULTANT pertaining to the development and execution of all Task Work Orders of this contract C. Defining the specific tasks to be performed and schedule for completion of such work D. Agreeing on the CONSULTANT staffing and availability (including substitutions from the available staffing list provided) E. Processing of CONSULTANT invoices for payment The DEPARTMENT will also provide assistant Project Managers/Work Order Task Managers, when required, to provide support to the Project Manager for various Tasks. The DEPARTMENT shall provide, prior to the initiation of any work on any of the tasks defined in this exhibit, a specific Task Work Order for the task defining the work to be accomplished and the total reimbursement due the CONSULTANT. The DEPARTMENT shall furnish, without charge, the following services and data to the CONSULTANT for the performance of the requested services: A. All criteria and full information as to the DEPARTMENT's requirements for the CONSULTANT's services including objectives, constraints, budgetary limitations, and time restraints. B. All DEPARTMENT Policies, Procedures, Standards, and other information applicable to the services. C. All specifications, schedules, reports, and other information prepared by or for the DEPARTMENT by others which are available to the DEPARTMENT and which the DEPARTMENT considers pertinent to the CONSULTANT's responsibilities described herein. Page 11

D. Available traffic and planning data necessary for the CONSULTANT to perform each Task. E. Limited training of the CONSULTANT, if required, on applicable software and DEPARTMENT standards and procedures. IX. RESPONSIBILITIES OF THE CONSULTANT A. The CONSULTANT shall designate a Project Manager, who serves as the principal person of contact for the entire contract. The CONSULTANT Project Manager will coordinate with the DEPARTMENT Project Manager in developing TWO scope of work and staffing efforts, as well as to assemble consultant staff to complete the work in good quality and by specified completion dates. The CONSULTANT Project Manager shall communicate with the DEPARTMENT Project Manager on a regular basis and shall provide monthly progress reports by Task Work Order. These progress reports will serve as the basis for appraising work progresses and for invoice approvals. B. The CONSULTANT shall provide and maintain a list of staff of the following categories for this contract: Project Manager Senior Specialist/Senior Modeler Senior Planner Specialist/Modeler Planner Senior Transportation Engineer Transportation Engineer Project Engineer Engineer Intern GIS Specialist Technician Secretary/Clerical For all categories, salary rates will be negotiated prior to beginning the contract. Any category not listed above but later determined to be required must be amended to the Contract prior to the issuance of the Task Work Orders that apply the new category. C. The CONSULTANT shall perform all analyses, develop recommendations, and document all by specific time as defined in each of the Task Work Orders. All the documents created for this project shall be ready for internet posting. D. The CONSULTANT will perform all tasks in accordance with all FDOT Guidelines and Standards, specified DCA Rules, applicable Florida Statutes and other Federal and State laws and policies. X. COMPUTING REQUIREMENTS The CONSULTANT may be required to use the following software: Page 12

A. Latest version available of the Highway Capacity Software B. VISSIM, CORSIM, ARTPLAN, FREEPLAN, HIGHPLAN, BLOS, PLOS, TLOS, and all other FDOT Level of Service programs C. FSUTMS Family Products (e.g. CUBE/Voyager, Cube Analyst, and Cube Avenue), SQL Server, and statistical analysis software capable of analyzing high volume of data that cannot be practically analyzed by using spreadsheet. D. ESRI s ArcView, and/or ArcINFO Geographic Information Systems E. Any other traffic operations or planning software as indicated in the individual Task Work Orders The DEPARTMENT will not be responsible for providing proprietary software packages to the CONSULTANT. Should the CONSULTANT desire to use any other DEPARTMENT programs, permission must be granted in accordance with this agreement. Computations or graphics based on computer programs other than the DEPARTMENT's must conform to the formats approved by the DEPARTMENT. XI. SPECIFICATIONS FOR WORK PRODUCTS The CONSULTANT shall ensure that all products of Task Work Orders be prepared using DEPARTMENT approved software, and be transferred to the DEPARTMENT at the completion of each Task Work Order. All documentations shall be in Microsoft Word and Adobe Portable Document Format (PDF). Any programming source codes, form designs, raw source database (in dbf format with field coding definition sheet) and other ancillary files shall be transferred to the DEPARTMENT in addition to the executable applications at the closure of each work order or any moment specified by the DEPARTMENT project manager. Page 13