No. SEIAA/M.S./905 Dated To M/s Ganesh Brick Kiln Co. # 702, Model Town, Phase-I, Distt. Bathinda.

Similar documents
Sr.No Condition Status A. SPECIFIC CONDITIONS:

Registered. M/s Baba Jiwan Singh Baba Dalip Singh Educational Trust, Goindwal Sahib Road, Tarn Taran.

Ministry of Environment and Forests Telefax : 011: M/s Posco India Private Limited

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

Subject: Environmental and CRZ clearance for expansion of Karaikal Port (Phase-II) at Puducherry by MIs. Karaikal Port Pvt. Ltd. - Reg.

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests

Health and safety norms of CPWD should be followed during construction.

Telefax : 011: Dated 1 st November, 2011

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

THE RAMCO CEMENTS LIMITED

Mangalam Cement Ltd. (Unit-II) Stack No.

Mangalam Cement Ltd.(Unit I)

*** Dated: May 2,2014

.in Dated 9th August, Sharma ;

The mine is opened on The reasons for delay for starting mining operations are:

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

Environmental Clearance Compliance Half Yearly Report

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29)

Environmental Clearance Compliance Half Yearly Report

STANDARD OPERATING PROCEDURE

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU


Compliance Report of EC : Compliance Status

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

Environment Impact Assessment (EIA) Notification 2006

Mangalam Cement Ltd.

NLM, VMC and Area Officers Schemes

Forest (Conservation) Rules, 1981

The Control of National Highways (Land & Traffic) Act, 2002 Setting up of Highway Administration.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report

ELDORADO GOLD CORPORATION BOARD OF DIRECTORS TERMS OF REFERENCE

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA


Monitoring the Implementation of Environmental Safeguards

COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014

(A) Cases recommended by SEAC for Prior Environmental Clearance

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

GUIDELINES RESPONSIBILITY FOR ENTERPRISES MARCH 2010

IAF Mandatory Document. Accreditation Assessment of Conformity Assessment Bodies with Activities in Multiple Countries. Issue 2 IAF MD 12:2016

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs)

Environmental Clearance Compliance Half Yearly Report

Guidelines on Corporate Social Responsibility for Central Public Sector Enterprises issued by Department of Public Enterprises in April, 2010.

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON

HINDUSTAN SHIPYARD LIMITED : : VISAKHAPATNAM (A Government of India Undertaking) *** ADVT NO.HR/ES(O)/0102/02/2016 DATED 24 AUG 2016

TERMS AND CONDITIONS Annexure "B" Major terms and conditions for concurrent audit assignment are stated as under. However, the Bank reserves its

Infrastructure Development and Environment

Hind Energy & Coal Beneficiation (India) Ltd.

Guidelines on Corporate Social Responsibility for Central Public Sector Enterprises.

Hind Energy & Coal Beneficiation (India) Ltd.

ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-II (GRANTED VIDE: J-11015/35/2011-IA II CM), dated ( to )

ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-XIII (GRANTED VIDE LETTER NO.J-11015/10/2010-IA.II(M) DATED

(18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002

IMPLEMENTATION PROTOCOL FOR DETERMINATION AND NOTIFICATION OF CRITICAL WILDLIFE HABITATS IN NATIONAL PARKS AND WILDLIFE SANCTUARIES

0 23/05/16 FOR REFERENCE GPCB SP/BPS NV Rev. Date Description of revision Originator Checked by Approved By DD-MM-YY Owners : HAZIRA LNG & PORT

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board

STATE OF ENVIRONMENT ATLAS OF INDIA-OUTLINE

***** Department of Ecology and Environment Room No.709, 7 th Floor, IV-Gate, M.s. Building; Bangalore , Date: 23 rd September 2013.

Approved on & Revised on

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

Republic of Mauritius. Ministry of Labour, Industrial Relations, Employment and Training. Guidelines

DISTRICT RURAL DEVELOPMENT AGENCY (DRDA)

8.8 WIRELESS COMMUNICATION FACILITIES IN DOUGLAS COUNTY THE COUNTY BOARD OF SUPERVISORS OF THE COUNTY OF DOUGLAS DOES ORDAIN AS FOLLOWS:

From. The Chief Administrator, HUDA, Panchkula.

RIGHT TO INFORMATION ACT, MATERIAL PURSUANT TO SECTION 4(1)(b) OF THE RIGHT TO INFORMATION ACT, 2005

Medley Pharmaceuticals Limited

THE PLASTICS MANUFACTURE, SALE AND USAGE RULES, 1999

MALAYSIAN CODE ON CORPORATE GOVERNANCE. (Revised 2007)

King III Chapter 2 Board Charter. September 2009

IN THE SUPREME COURT OF INDIA. IA No in IA No. 22 in Writ Petition (C) No of Decided On:

Forest (Conservation) Act, 1980 with Amendments Made in 1988

PATEL INTEGRATED LOGISTICS LIMITED

F. No.12-40/2013-HSMD Government of India Ministry of Environment & Forest & climate Change

CMPDI. 4.6 Mine Closure Plan

PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD

Management Board Terms of Reference

LANCO INFRATECH LIMITED

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

7.2 PUBLIC CONSULTATION

Builder Agreement. Access to build in Mountainside Village constitutes agreement to abide by the following:

INDIAN INSTITUTE OF TECHNOLOGY INDORE

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai.

Jhabua Power Ltd. NOTICE INVITING BIDS

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager

HERO MOTORS LIMITED CORPORATE SOCIAL RESPONSIBILITY POLICY

Code of Ethics Strata Community Australia (Qld)

Page# The Top soil generation is very less and it is being simultaneously utilized.

Supervisory Board Rules Philips Lighting N.V.

DEPARTMENT OF FIRE & EMERGENCY SERVICES DAMAN

Transcription:

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:- 0175-2215636 No. SEIAA/M.S./905 Dated 6.2.2014 To M/s Ganesh Brick Kiln Co. # 702, Model Town, Phase-I, Distt. Bathinda. Subject:- Environmental clearance for mining of minor minerals (brick clay) in the revenue estate of Vill. Kotshamir, Tehsil & Distt. Bathinda by M/s Ganesh Brick Kiln Co. This has reference to your application for obtaining environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Kotshamir, Tehsil & Distt. Bathinda and subsequent presentation given before the SEAC for seeking prior environmental clearance as required under the EIA notification, 2006. The proposal has been apprised as per procedure prescribed under the provisions of EIA notification dated 14.9.2006 on the basis of the mandatory documents enclosed with the application Viz, form-1, Prefeasibility report, lease deed and the additional clarification furnished in response to the observations of the SEAC. It is inter-alia noted that the proposal involves mining of minor minerals (brick clay) in the revenue estate of Vill. Kotshamir, Tehsil & Distt. Bathinda. The mining of minor minerals (brick clay) will be carried out in a total area of of 0.8092 hectare. The mining of brick clay will be carried out at one site, the details of which is as under:- Village Name Site No. Hadbast No. Khasra No. Kotshamir 1 57 16/108 th share of 302//16/2 (4-9), 25 (7-11), 303//19/2 (6-9), 20/2 (6-9), 21(7-11), 346//1(8-0),2(8-0),9/1(4-0),10(8-0), 11(8-0), 347//4(8-0),5(8-0),6(8-0),7(8-0) Lease Period 30/04/2014

The case considerd by the SEAC in its 90th meeting held on 21.01.2014, wherein, the project proponent prestended the salint features of the project proposal. After detailed deliberations, the Committee observed that the project proponent has provided adequate and satisfactory clarifications of the observations raised by it. Therefore, the Committee decided to forward the case to the SEIAA with the recommendation to grant Environmental Clearance to the project proponent for mining of minor minerals (brick clay) for the above site having total area of of 0.8092 hectare located in the revenue estate of Vill. Kotshamir, Tehsil & Distt. Bathinda subject to the certain conditions in addition to the proposed measures. The case was considered by the SEIAA in its 61 st meeting on 01/02/2014 and observed that the case stands recommended by SEAC. The SEIAA, after detailed deliberations, decided to grant environmental clearance for mining of minor minerals (brick clay) for the site located in the revenue estate of Vill. Kot Shamir, Tehsil & Distt. Bathinda and having total area of 0.8092 hectares only for a period up to 30.04.2014 or for completion of excavation of brick earth up to a depth of 0.9 m (3 feet) only, whichever is reached earlier, subject to following conditions:- Specific conditions: i) The environmental clearance will be valid for a period for which lease period is valid i.e. up to 30.04.2014 or for completion of excavation of brick earth up to a depth of 0.9 m (3 feet) only, whichever is reached earlier, for mining of minor minerals in the aforesaid location and khasra numbers. ii) iii) iv) The project proponent shall ensure that the mining shall be carried out as per the EMP prepared and as per the Mines & Mineral (Development & Regulation) Act, 1957 / other Acts/rules related with mining of minor minerals. It shall be ensured that no mining shall be carried out during the monsoon season. Effective safeguard measures shall be taken by project proponent to ensure that the ambient air quality levels at various locations are within permissible limit as prescribed by MoEF/PPCB. The project proponent shall ensure that wherever deployment of labour attracts the Mines Act, the provision thereof shall be strictly followed. v) The project proponent shall undertake plantation/afforestation work by planting the native species in the nearby area adjacent to mine lease. vi) The project proponent shall ensure that effective safeguard measures, such as regular water sprinkling shall be carried out in critical areas prone to air

pollution and having high levels of particulate matter such as loading and unloading point and all transfer points. Extensive water sprinkling shall be carried out on the approach roads. It should be ensured that the Ambient Air Quality parameters conform to the norms prescribed by the Central Pollution Control Board/MoEF in this regard. vii) The project proponent shall obtain necessary prior permission of the competent authorities for withdrawal of requisite quantity of water (surface water and groundwater), if any, required for the project. viii) Vehicular emissions shall be kept under control and regularly monitored. The mineral transportation shall be carried out through covered trucks/trollies only and the vehicles carrying the mineral shall not be overloaded. ix) No drilling and blasting operation shall be carried out. x) Periodical medical examination of the workers engaged in the project shall be carried out and records maintained. For the purpose, schedule of health examination of the workers should be drawn and followed accordingly. xi) Provision shall be made for the housing of construction labour within the site with all necessary infrastructure and facilities such as fuel for cooking, mobile toilets, mobile STP, safe drinking water, medical health care, crèche etc. The housing may be in the form of temporary structures to be removed after the completion of the project. xii) The critical parameters such as RSPM (Particulate matter with size less than 10micron i.e., PM10) and NOX in the ambient air within the impact zone shall be monitored periodically. Further, quality of discharged water shall also be monitored [(TDS, DO, PH, Faecal Coliform and Total Suspended Solids (TSS)]. The monitored data shall be uploaded on the website of the company as well as displayed on a display board at the project site at a suitable location near the main gate of the Company and website of mining department i.e. www. pbindustries.gov.in in public domain. The Circular No. J-20012/1/2006-IA.II(M) dated 27.05.2009 issued by Ministry of Environment and Forests, which is available on the website of the Ministry www.envfor.nic.in shall also be referred in this regard for its compliance. xiii) The project proponent shall submit within 3 months their policy towards Corporate Environment Responsibility which should inter-alia address (i) Standard operating process/ procedure to bring into focus any infringement/deviation/violation of environmental or forest norms/ conditions, (ii) Hierarchical system or Administrative order of the company to deal with environmental issues and ensuring compliance of EC conditions and (iii) System of reporting of non compliance/violation of environmental norms to the Board of Directors of the company and/or stakeholders or shareholders. xiv) Vehicles hired to be used for transportation of mined material should be in good condition and should conform to applicable air and noise emission standards.

xv) Ambient noise levels should conform to prescribed standards both during day and night. Incremental pollution loads on the ambient air and noise quality should be closely monitored. xvi) The Risk assessment and disaster management plan should be prepared. xvii) The project proponent shall ensure that the compensation to the private land owner (s) for the mined area shall be made as per the prevalent policy of the State Govt. xviii) The project proponent shall obtain permission from the National Board of Wild Life, if required as per guidelines laid down in Office Memoranum No. 6-10/2011/WL dated 19.12.2012 of Govt. of India and in case the said memorandum is applicable in the case, the promoter company shall not carry out any mining activity at site till the said permission is obtained and the copy of the same be submitted to the SEIAA, Punjab. The grant of environmental clearance does not necessarily imply that wildlife clearance shall be granted to the project and the proposal for grant of wildlife clearance will be considered by the respective authorities on merits. xix) The project proponent will comply with all the conditions situplated by the Department of drainage vide letter no. 7697/118-E dated 23.10.2013. General conditions: i) No change in mining technology and scope of work should be made without prior approval of the Ministry of Environment & Forests. ii) iii) iv) Data on ambient air quality RSPM (Particulate matter with size less than 10micron i.e., PM10) & NOx should be regularly submitted to the Ministry of Environment and Forests including its Regional office located at Chandigarh and the Punjab Pollution Control Board / Central Pollution Control Board once in six months. Personnel working in dusty areas should wear protective respiratory devices and they should also be provided with adequate training and information on safety and health aspects. Occupational health surveillance program of the workers should be undertaken periodically to observe any contractions due to exposure to dust and take corrective measures, if needed. The funds earmarked for environmental protection measures should be kept in separate account and should not be diverted for any other purpose. Year wise expenditure should be reported to the Ministry of Environment and Forests and its Regional Office located at Chandigarh. v) The Regional Office of this Ministry located at Chandigarh shall monitor compliance of the stipulated conditions. The project authorities should extend full cooperation to the officer (s) of the Regional Office by furnishing the requisite data / information / monitoring reports. vi) The project proponent shall submit six monthly reports on the status of compliance of the stipulated environmental clearance conditions including results of monitored data (both in hard copies as well as by e-mail) to the Ministry of Environment and Forests, its Regional Office Chandigarh, the

vii) viii) ix) respective Zonal Office of Central Pollution Control Board and the State Pollution Control Board. The proponent shall upload the status of compliance of the environmental clearance conditions, including results of monitored data on the websites referred in para A (xii) and shall update the same periodically. It shall simultaneously be sent to the Regional Office of the Ministry of Environment and Forests, Chandigarh, the respective Zonal Office of Central Pollution Control Board and the State Pollution Control Board. A copy of the clearance letter shall be sent by the proponent to concerned Panchayat, Zila Parisad/ Municipal Corporation, Urban Local Body and the Local NGO, if any, from whom suggestions/ representations, if any, were received while processing the proposal. The clearance letter shall also be put on the website of the Company by the proponent. The State Pollution Control Board should display a copy of the clearance letter at the Regional office, District Industries Centre and the Collector s office/ Tehsildar s. The environmental statement for each financial year ending 31st March in Form-V as is mandated to be submitted by the project proponent to the concerned State Pollution Control Board as prescribed under the Environment (Protection) Rules, 1986, as amended subsequently, shall also be put on the website of the company along with the status of compliance of environmental clearance conditions and shall also be sent to the Regional Office of the Ministry of Environment and Forests, Chandigarh by e-mail. x) The project proponent shall adhere to the commitments made in the Environment Management Plan. xi) xii) xiii) xiv) The project proponent should advertise at least in two local newspapers widely circulated, one of which shall be in the vernacular language of the locality concerned, within 7 days of the issue of the clearance letter informing that the project has been accorded environmental clearance and a copy of the clearance letter is available with the State Pollution Control Board and also at web site of the Ministry of Environment and Forests at http://envfor.nic.in and a copy of the same should be forwarded to the Regional Office of this Ministry located at Chandigarh. The MoEF/SEIAA or any other competent authority may alter/modify the above conditions or stipulate any further condition in the interest of environment protection. The Ministry may cancel the environmental clearance granted to this project under the provisions of EIA Notification, 2006, if, at any stage of the validity of this environmental clearance, it is found/ come to the knowledge of this Ministry that the project proponent has deliberately concealed and/or submitted false or misleading information or inadequate data for obtaining the environmental clearance. The depth of the mining shall not exceed 0.9 m (3 feet) below ground level and shall terminate at least 2 m above the groundwater table at site, whichever situation is reached first.

xv) xvi) xvii) The project proponent shall ensure that the excavation of brick earth does not alter the natural drainage pattern of the area and a distance of atleast 100m shall be maintained from any nearest choe and a distance of atleast 30 m shall be maintained from any nearest water body. The project proponent shall ensure that excavated pit is restored for useful purposes. The project proponent shall make appropriate fencing all around the excavated pit to prevent any mishap. xviii) The project proponent shall ensure that a berm is left from the boundary of adjoining field having a width equal to atleast half the depth of proposed excavation. xix) xx) xxi) xxii) The project proponent shall ensure that no civil structure is allowed to come up/exists within a distance of 15 m from the periphery of excavation area. The project proponent shall properly demarcate the mining lease area. Any appeal against this environmental clearance shall lie with the National Green Tribunal, if preferred, within a period of 30 days as prescribed under Section 16 of the National Green Tribunal Act, 2010. The project proponent will ensure that mining activity will be started only after obtaining environmental clearance & meeting other statutory condition/requirement. In case, it comes into the notice of MOEF/ SEIAA that mining has been carried out prior to obtaining environmental clearance, environmental clearance granted to the project proponent is liable to be revoked and legal proceedings would be initiated against the project proponent under the provisions of Environment (Protection) Act, 1986. REGISTERED Member Secretary (SEIAA) Endst. No.906-14 Dated 6.2.2014 A copy of the above is forwarded to the following for information & further necessary action please. 1. The Secretary to Govt. of India, Ministry of Environment and Forest, Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi. 2. The Chairman, Central Pollution Control Board, Parivesh Bhavan, CBD-cumoffice Complex, East Arjun Nagar, New Delhi. 3. The Deputy Commissioner, Bathinda. 4. The Member Secretary, Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala.

5. The Director (Environment), Ministry of Environment and Forest, Northern Regional Office, Bays No.24-25, Sector 31-A, Chandigarh. The detail of the authorized Officer of the project proponent is as under: a) Name of the applicant Sh. Vikramjit Singh Sandhu b) Mobile/Phone No. 9501462123 6. The Monitoring Cell, Ministry of Environment and Forest, Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi. 7. The General Manager-cum-Mining Officer, District Industries Center, Bathinda. 8. The Superintending Engineer, PWD, Irrigation Department, Drainage Circle, Bathinda. 9. The Environmental Engineer (Computers), Punjab Pollution Control Board, Head Office, Patiala for displaying the environmental clearance on the web site of the State Level Environment Impact Assessment Authority. Member Secretary (SEIAA)