QUARTERLY REPORT FOR THE PERIOD ENDING 31 MARCH 2017

Similar documents
Lynas AGM 2016 CEO s Address

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE

Why Rare Earth Prices are Likely to Continue Their Upward Trend

For personal use only

Rare Earths Annual 201 7

The Challenges of Meeting Rare Earths Demand in 2015

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

For personal use only

Outlook for Zirconium and Rare Earth Materials until 2020

For personal use only

For personal use only. Cummins Range Rare Earths Project

OCEANAGOLD PROVIDES AN UPDATE TO HAILE COMMISSIONING AND REVISED COMPANY GUIDANCE

Frontier announces positive Preliminary Economic Assessment for its Zandkopsdrift Rare Earth Project in South Africa

For personal use only

Market Update for Rare Earths USGS Congressional Briefing Series December 13, 2013

STARVED ACID LEACH TECHNOLOGY (SALT) CONCEPTUAL STUDY. InCoR Holdings Plc MINING AND METALLURGY. April 2014 REPORT Rev. 00 > Internal ref.

Risiko-Management im Einkauf der BASF anhand des Beispiels der Seltenen Erden

Fourth Quarter Production Report. for the three months ended 31 December 2017

For personal use only

Tradedoubler. Interim report January-September 2015 Stockholm, 12 November 2015

MINERAL RESOURCES LIMITED

For personal use only

For personal use only

For personal use only

BAIINFO Rare Earth Weekly

RESOURCE GOLD PTY. LTD.

JUNE 2017 QUARTERLY OPERATIONAL UPDATE: RECORD QUARTER AND STRONGEST CUSTOMER GROWTH SINCE IPO

Gum Creek Gold Project Free Milling Scoping Study

THE DUBBO ZIRCONIA PROJECT

SILVERCORP REPORTS SILVER PRODUCTION OF 5.0 MILLION OUNCES, CASH FLOWS FROM OPERATIONS OF $31.9 MILLION, OR $0

For personal use only

AuRico Gold Provides Monthly Update on Young-Davidson Ore Processing Underway

FIRST MAJESTIC SILVER CORP.

ILUKA BRIEFING PAPER MODELLING METHODOLOGY June 2016

Confidence in Carrapateena project grows

Haoma Mining NL A.B.N

Minco Plc Woodstock Manganese Property

Sconi and Flemington: Two near-production cobalt-nickel-scandium deposits. ASX: AUZ October 2017

QUARTERLY REPORT March 2011

TERRAMIN AUSTRALIA LIMITED. Annual General Meeting

Australia s leading explorer in Mexico

Quebrada Blanca Phase 2. April 2012

Peak Resources Ngualla Rare Earth Project

RAW MATERIALS AND IRONMAKING. Raw materials improvement in the steel industry

Arafura Resources Limited

CLERK OF THE CIRCUIT COURT

Resource Efficient Mining Processes of Tomorrow

PILOT SOLAR EVAPORATION PONDS COMMISSIONED AT LAKE WELLS POTASH PROJECT, WA

NERA TELECOMMUNICATIONS LTD

Valence Industries Australia s Only Graphite Producer

1Q SPECIAL EDITION Molibdenos y Metales S.A. February 1st, 2012

For personal use only

The Next Big Thing: Rare Metals. September 20, 2007

MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE

A Tiger in the Congo. Charles Brown, COO, S.E.K SPRL, Katanga Province, D R Congo

For personal use only

Summary of analyst presentation 26 February Summary of analysts presentation by:

Strong open pit drilling results boost plan to grow Paulsens' production to 100,000ozpa

Windimurra Vanadium Plant Project Update. Investor Presentation August 2011

YTL POWER INTERNATIONAL BERHAD (Company No H) (Incorporated in Malaysia)

Q Preliminary Production Results, 2018 Production Guidance and Mineral Reserve and Resource Update

For personal use only

For personal use only

For personal use only. Australia on the 'New Age Metal map: Dubbo Zirconia Project

For personal use only

Third quarter and first nine months 2017 Results Release. October 19 th, 2017

Describe remuneration and reward systems

For personal use only

Nullagine Gold Project Life of Mine Update

Zinc Business. September 19, 2017 Dale Andres, Senior Vice President, Base Metals

Rare Earths: Market Overview, Broader Context, and CMI

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

EXCO S PROJECT PIPELINE

Valence Industries Australia s Only Graphite Producer

On the Acquisition of Shares of Santoku Corporation

For personal use only

Study on Gonka Deposit and Taurus Extension

SENETAS 2017 INTERIM RESULTS. 27 February 2017

Grange Resources Australia s leading magnetite producer

Mazda Motor Corporation FISCAL YEAR MARCH 2018 FULL YEAR FINANCIAL RESULTS (Speech Outline)

Low-cost, rich, DRC copper

PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX. November 2017 AGM Presentation

Atlantic Ltd (ASX: ATI; Atlantic or the Company) is pleased to present its report for the quarter ended 30 June 2011.

Uranium Operations. Uranium Strategy. Exploration Potential. Uranium Investing in clean electricity

Rare Earth Permanent Magnets: Raw Materials, Magnets and Opportunities. S. R. Trout

For personal use only

For personal use only

Third-quarter sales in 2016 at 714 million euros, steadily increasing since the start of 2016.

IMPACT OF IN-PIT CRUSHING AND CONVEYING ON PIT SHELL OPTIMIZATION. Marc Johnson, Regional Manager - South America

For personal use only

At Home in North America

THE NOLANS RARE EARTHS PROJECT

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT

Indian Copper Industry February 2018

Ste De Maisonneuve Blvd W Montréal, QC H3A 3L4 Tel: Fax:

MMG Kinsevere February 2016

NEWS RELEASE. Equinox Gold Begins Mining at Aurizona and Receives Award for Mining Excellence in Brazil

BIG UNLIMITED FY18 Q1 4C UPDATE OCT 2017

GLOBAL DAIRY UPDATE. Welcome to our November 2014 Global Dairy Update IN THIS EDITION Financial Calendar

SECTION 14.0 CAPITAL COST ESTIMATES

Transcription:

QUARTERLY REPORT FOR THE PERIOD ENDING 31 MARCH 2017 SUMMARY RECORD POSITIVE CASHFLOW: Cash flows from Operating and Investing activities increased to $11.6m. In addition to that amount, a further inflow of A$5.15m was received from the exercise of warrants by certain of the convertible bondholders. RECORD SALES: Invoiced sales increased to A$69.3m, up 6.6% from A$65.0m in the December quarter. RECORD PRODUCTION: NdPr production, at 1,373 tonnes, was above design rate for the quarter, up 3.2% from the previous quarter and an increase of 61.5% on the March 2016 quarter. STRONG MARKET POSITION: Lynas is now the second largest NdPr producer in the world. With no in-house downstream production, Lynas is the largest supplier of NdPr to the free market. IMPROVED MARKET DYNAMICS: Market demand for rare earths improved during the quarter, with the in-china market price for NdPr (VAT excluded) increasing from US$31 to US$34. CEO REVIEW The record results on all key performance measures for this quarter reflect the strong foundations on which Lynas operates. Lynas is now the second largest NdPr producer in the world. With no in-house downstream production, Lynas is the largest supplier of NdPr to the free market. In the March quarter, Lynas achieved NdPr production at 104% of design rate. NdPr production, at 1,373 tonnes of NdPr, was up from the strong result in the December quarter when we produced 1,331 tonnes. Total REO production at 4,332 tonnes was up 10.7% from 3,913 tonnes in the previous quarter. The production increases highlight a continuation of strong operational performance, and we expect to maintain production of NdPr at or slightly above design rates. Invoiced sales for the March quarter were A$69.3m, up from A$65.0m in the December quarter as a result of the increased production and sales of NdPr. Cash receipts reached A$69.2m for the quarter. The in-china market price for NdPr (VAT excluded), improved in the quarter increasing from US$31 at the start of the quarter to US$34 at the end of the quarter. Overall, market prices for Rare Earth products strengthened in the March quarter, supported by continued actions by the China central government to enforce environmental regulations throughout the Rare Earths industry. As we enter the traditionally high demand season for magnets, there are indications this price trend may continue in the June quarter. Page 1 of 7

Lanthanum sales grew in the quarter due to improvements in the quality of production, strong demand in the metal and ferrite markets and demand from end-users looking to source materials outside China. In the quarter, Lynas continued to develop improvements in the manufacturing process for Cerium, to better deliver customizable products to our major customers. Now that Lynas has proven its strong position in the industry and is operating at design rates, we will look to optimise sales outcomes by ensuring we supply to customers that provide strong market returns and engage as strategic partners with our business. In another record quarter, Cash flow from Operating and Investing activities was A$11.6m more than double the result achieved in the December quarter. (As the December quarter report noted, we have adopted the cash flow definitions used in the new format of the Appendix 5B.) Production and administration costs increased in the quarter, due to timing differences related to the annual insurance payment and withholding tax payments relating to performance rights vested in December. As mentioned in the December quarter, our first mining campaign at Mt Weld since 2008 commenced in January 2017. During February and March, Western Australia experienced heavy rainfall and as a result there were short delays to the mining campaign. However, the campaign is still running on schedule and is due to be completed by the middle of the June Quarter. Costs are expected to be within budget (approximately A$3m). The ore mined is of a particularly high grade and we have stockpiled ore at >24% REO, 18% to 24% REO, <18% REO. In the quarter, ending unrestricted cash, at A$24.3m, includes A$5.1m from the exercise of 135.6m warrants by certain of the convertible bondholders at a price of A$0.038, which had minimal downward pressure on the share price. SAFETY AND ENVIRONMENT Lynas has established extensive processes to ensure that production is safe for employees, safe for the environment and community, and secure for its customers. In the March quarter, the Company maintained a very good safety record, with the Company-wide 12-month rolling Lost Time Injury Frequency Rate, as at the end of December 2016, at 2.2 per million hours worked. We have recently rolled out a new safety program at the LAMP known as PASS (the Positive Attitude Safety System). This is a behavioural based safety program for front line employees and contractors with daily discussions and reinforcement on safety. Water recycling remains a core sustainability priority at Mt Weld and is essential to long term operation. The Mt Weld concentration process requires high purity water and both bore and recycle water has to be treated by a reverse osmosis plant prior to use. Recycling of water has been technically challenging. Two Micro-Filtration units are now successfully operating to treat free water from the tailings storage facility Page 2 of 7

prior to reverse osmosis treatment. The installation of a third unit to further increase the amount of water recycled is planned for next quarter. Detailed environmental monitoring since the start of LAMP operations in 2012 has consistently demonstrated that the LAMP is compliant with regulatory requirements, and that the LAMP is safe for employees, safe for the community and safe for the environment. Information concerning our environmental monitoring programs, including monitoring data, is available at www.lynascorp.com. In addition, LAMP emissions data is available on the websites of the Department of Environment (www.doe.gov.my) and the Atomic Energy Licensing Board (http://portal.aelb.gov.my/sites/aelb/en/home). Real time radiation monitoring data is available at https://175.142.36.205/public/map. MARKETING & SALES Q1 FY 17 Q2 FY 17 Q3 FY17 YTD FY17 Sales Volume REO t 3081 tne 3350 tne 3437 tne 9868 tne Sales Revenue A$53.8 m A$65.0 m A$69.3 m A$188.1 m ASP A$17.5/kg A$19.4/kg A$20.1/kg A$19.1/kg Sales Receipts (cash) A$57.4 m A$58.3 m A$69.2 m A$184.9 m Sales volume remained at a high level during the March quarter. In addition, sales revenue was the highest quarterly figure to date, totalling A$69.3 million. Demand from our NdPr customers continued to be strong, while the seasonal decrease in demand for Ce and LaCe products was offset by a substantial increase in sales of La. NdPr China Domestic VAT excluded Q3 FY16 Q4 FY16 Q1 FY17 Q2 FY17 January February March USD/kg 33.8 34.5 32.1 31.0 31.9 33.0 34.2 Base 100 100 102 95 92 94 98 101 The NdPr market price increased steadily in the March quarter, supported by continued action by the China central government to enforce environmental regulations throughout the Rare Earths industry, translating into the forced shutdown of a number of separation units and better control of resources. As we enter the traditionally high demand season for magnets, there are indications of this price trend continuing in the June quarter. In the March quarter, Lynas produced NdPr at 104% of design rates, which is the second consecutive quarter of production above design rates. All NdPr was produced to specification, strengthening Lynas reputation as a reliable supplier of high quality product. Page 3 of 7

Lynas is now the second largest NdPr producer in the world. With no in-house downstream production, Lynas is the largest supplier of NdPr to the free market. Our customers and end-users are increasingly focussed on environmental performance. Lynas ability to offer a reliable, fully traceable and auditable source of supply is translating into Lynas achieving some margins above spot market prices with certain key customers During the March quarter, the price for our heavy Rare Earths mix (SEG) increased steadily, supported by some concerns regarding supply of Terbium and Dysprosium, which are necessary additives for high performance magnets. Market demand for Lanthanum was strong including strong demand for Lanthanum for high performance ferrite magnets, and increased sales for use in NiMH batteries as end-users seek to secure a supply source independent of China for NiMH batteries used in hybrid vehicles. Lynas was able to meet demand in both key segments as a result of the improvements in product quality delivered over recent quarters. While significant progress has been made to date, we continue to work with major customers on further improving and customizing our Cerium products. OPERATIONS FY14 FY15 FY16 Q1 FY17 Q2 FY17 Q3 FY17 YTD FY17 Ready for Sale Production Volume 3965 REOt 8799 REOt 12631 REOt 3665 REOt 3913REOt 4332 REOt 11912 REOt Total Ready for Sale Production Volume NdPr 946 REOt 2258 REOt 3896 REOt 1176 REOt 1331 REOt 1373 REOt 3880 REOt Note: The above table sets out ready for sale tonnes. The improvement in output from the LAMP continued during the March quarter. For the second consecutive quarter, LAMP NdPr production was above design rates. Production of La and Ce products was below design rates, but continued to improve in both quality and quantity. Page 4 of 7

At Mt Weld, the second mining campaign commenced as planned in January 2017. Summer rainfall in Western Australia was the highest on record. There were a number of short delays due to the heavy rainfall in February and March, however the mining campaign is still on schedule to be completed by the middle of the June Quarter and the cost is expected to be within budget (approximately A$3m). This campaign is a depth extension of the initial pit to extract the remaining CZ (Central Zone) ore not mined during the initial mining campaign. No overburden removal is required for this second mining campaign. Ore from this mining campaign is being stockpiled according to ore type and ore grades (>24% REO, 18% to 24% REO, <18% REO) for blending. The next (third) mining campaign will see the pit extended to the north. Planning for the third campaign is underway and removal of overburden is expected to commence late in 2017. The Mt Weld concentrator commenced treating ore from the second mining campaign from 16 March 2017. The site-wide improvement programs at the LAMP continue. Key focus areas include: debottlenecking and incremental increases in production rates; improving product quality; increasing REO recovery; and reducing chemical costs. During the March quarter, Cracking and Leaching (C&L) at the LAMP treated over 2,000t REO in concentrate per month for a total of 6,760t REO. The C&L kilns continue to operate at above design rates. Page 5 of 7

As part of the improvement program, the agitators in the Leach Neutralisation circuit were upgraded to handle the increased throughput and to reduce chemical usage. The improvement programs in Solvent Extraction (SX) include debottlenecking of the SX Upstream Circuits and the removal of impurities by solvent extraction instead of by pre-treatment in Product Finishing. In Product Finishing (PF), the refinement of processes to produce high quality Lanthanum and Cerium products continues. Developments during the quarter focussed on improved control of precipitation and centrifuge washing to remove impurities and improved tunnel furnace operations. CASH OUTFLOWS Cash outflows, as presented in the Appendix 5B, can be summarized as follows: - Development related cash flows which mainly relate to the current mining campaign were significantly lower in the March quarter than forecast due to heavier than expected rains in February and March. The mining activities had to be pushed back by a few weeks and more of the payments will now be made in the June quarter than originally expected. We still expect the total cost of the mining campaign to be approximately A$3 million. - Production related cash flows were higher than forecast but in line with higher production volumes. Production related cash costs will increase to about A$ 42.5m in the June quarter more driven by tax refund timings than underlying production changes. - Staff related cash flows were in line with forecast. In the June quarter, staff related costs will be higher by nearly 10%, due to the custom in Malaysia of dividing annual salaries into 13 monthly payments, with the 12 th and 13 th payments due in June. - Administration related cash flows, excluding staff costs, at A$5.8m remained below forecast in the March quarter. As previously highlighted, the March quarter included the annual insurance payments. Administration related costs will reduce to A$4.7m in the June quarter, which is slightly below the run rate of the 1st and 2nd quarters of this financial year. Page 6 of 7

FINANCE CASH POSITION A summarised cash flow for the quarter ended 31 March 2017 is set out below. CASH FLOW AUD million AUD million OPENING CASH BALANCE 1 JANUARY 2017 38.5 INFLOWS Net cash receipts from the sale of goods 69.2 Proceeds from the issue of share capital 5.2 Net withdrawal from security deposits 1.1 TOTAL INFLOW OF FUNDS IN THE QUARTER 75.5 OUTFLOWS Royalty costs (1.3) Ongoing operational, production and administration costs (56.8) Other capital expenditure (0.6) TOTAL OUTFLOW OF FUNDS IN THE QUARTER (58.7) Net exchange rate adjustment (2.7) CLOSING CASH BALANCE 31 MARCH 2017 52.6 Summary of Cash Balance Cash on Hand and at Call 24.3 Funds for JARE & Mt Kellett payments (Restricted Cash) 28.3 CLOSING CASH BALANCE 31 MARCH 2017 52.6 During the quarter, the Group received A$69.2m in sales compared to A$58.3m in the December 2016 quarter. Total cash at 31 March 2017 of A$52.6m comprised unrestricted cash of A$24.3m and restricted cash of A$28.3m. The restricted cash is held in separate Lynas bank accounts for future principal and interest payments under the JARE loan facility and the Mt Kellett convertible bond facility. FOREX The currency composition of the Group s cash at 31 March 2017 was A$3.3m, US$29.4m and MYR36.6m. The AUD strengthened by 6.2% against the USD and 4.8% against the MYR during the quarter. In this report, references to dollars are references to Australian dollars, unless stated otherwise. Page 7 of 7