Arun LNG Receiving Terminal & Arun- Belawan Gas Pipeline : Project Update Hendra Jaya President Director PT Pertamina Gas Bali, May 20, 2014 CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement
Disclaimer The presentation is made solely for the purpose of this event and is not intended to be and should not be used by any other person or entity. The contents may contain copyright and/or legally privileged information and the reader must therefore not use, copy, disclose or take any action based on this presentation material or any information herein. PT Pertamina Gas (or by any of their respective officers, employees or agents) will not in any manner whatsoever be deemed or construed to implicitly or explicitly represent or warrant the accuracy or completeness of the information or the contents of this presentation material. All consequences and/or liabilities (including without limitation, those arising from negligence) to other parties for the utilization of the documents are specifically disclaimed. CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement
Background The Potential of Arun LNG Plant Assets Utilization Government Program Existing Arun LNG Contract will be expired in October 2014 There is no prospective gas reserve to substitute National energy fulfillment from non oil based fuels sector Government s duty to revitalize Arun LNG plant assets utilization that integrated with Arun Belawan pipeline (based on SK Menteri BUMN no.s-141/mbu/2012) Lack of Gas Supply for Strategic Industries Operation in Aceh & North Sumatera PT PIM only operate 1 out of 2 units of their plant PT AAF stop operating since 2003 PT KKA is not actively operated. PG PDPA could not be operated since August 2009 PLN North Sumatera lack of gas supply Arun LNG Plant Operational Continuity PT Arun NGL operational stop end of Arun LNG contract Arun LNG plant assets utilization will support economy and industry in Aceh CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement 2
Pipeline Arun - Belawan (24 x 350 Km) Business Scheme Tangguh LNG Plant /Other Plant LNG SPA Regas Agreement (PLN & PAG) REGAS PLANT (Design. 400 Mmscfd) REGAS PLANT >>>Invested & Operated by : PT. Perta Arun Gas LNG Carrier Gas delivery to PLN POWER PLANT PLN Arun Aceh Utara 40 mmscfd GAS PIPELINE >>>Invested & Operated by : PT. Pertamina Gas Other Customers POWER PLANT PLN Belawan -Design Cap : 250 mmscfd -Commited Vol (contract w/ PLN) : 95 mmscfd CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement 3
Arun LNG Facilities Location in Blang Lancang, Lhokseumawe 6 Trains LNG Plant with Total Capacity 12.5 MTPA LPG Plant with Capacity 1.4 MTPA Condensate Treating with Maximum Capacity 120,000 barrel/day 11 Power Plant with Capacity 220 MW 5 LNG Storage Tanks with Total Capacity 636,000 m3 4 LPG Storage Tanks with Total Capacity 302,000 m3 4 Condensate Tanks with Total Capacity 2.12 Million barrel 2 LNG Jetty @80,000 DWT 1 LPG Jetty 65,000 DWT SBM and MBM for Condensate Loading Office and House Area CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement 4
Milestone Arun Regas & Arun-Belawan Gas Pipeline Perta Arun Gas Establishment PT. Pertamina Gas : 70% PDPA : Max 30% 18.03..2013 2011 2012 JAN FEB MAR 2013 APR MAY JUN JUL AUG SEPT OCT NOV DEC 2014 Juli.2012: Conceptual Study, FEED,Pre Env study FID 23 Februari 2013 21.01.2013 HoA Regas (Pertamina & PLN) 06.03.2013 : EPC Contract Arun Regas (REKiND) 17.07..2013 : EPC Contract Arun Belawan pipeline Comm & Start up : Aug 21 20.09.2014 On Stream : Oct 2014 Stages of Initiation & Pre Project (Pertamina) EPC Phase (PNA & PAG) CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement 5
Progress as of May 2014 for Arun Regas Project Overall Percentage Cable Unloading -2.377% Motor Support Installation Cable Pulling CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement 6
Progress as of May 2014 for Arun Belawan Gas Pipeline Project Overall Percentage Welding Trenching 3.859% Holiday Test Lowering Back Fill CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement 7
Thank You CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement
Closing Remark 1. Arun Regas and Arun Belawan Gas Pipeline Projects are kye role to maximizing GoI asset to fullfill gas demand in Aceh and North Sumatera. 2. The projects are expected start operation in October 2014 although Arun Regasification may on stream in early 2015 due to shut down of LNG plant in October 2014. 3. Potential gas field monetization surrounded facilities will be beneficial for gas producer and end user 4. Establishment of project will drive economic activities in Aceh and North Sumatera region CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement 9