Ardley Waste Management Facility. Non Technical Summary

Similar documents
Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:

Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref:

Portbury Dock Renewable Energy Plant. Cumulative Impact Assessment Non-Technical Summary September 2009

Parc Adfer Energy Recovery Facility, Deeside Industrial Park, Flintshire. Volume 3 NON TECHNICAL SUMMARY. August 2014 SLR Ref:

Newhurst Energy Recovery Facility, Shepshed, Leicestershire. Proposed modifications to the approved design. Volume 3 NON TECHNICAL SUMMARY

SUNDERLAND RENEWABLE ENERGY CENTRE

Welcome To Our Exhibition

Arcow Quarry, North Yorkshire

Rural Living Environment

Annex F Scoping Checklist

Sizewell B Dry Fuel Store. Environmental Statement Non-Technical Summary

Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary. Final. WNGLDC Environment Agency Title

Thorn Turn Winter Maintenance and Highways Depot

Chapter 17 Cumulative Impacts

Environmental Statement Non-Technical Summary Rectory Farm, Hounslow

Introduction. The Need for Wind Energy. Consultation. The Applicant

introduction 1 On behalf of db symmetry we are pleased to welcome you to view our emerging plans for a new logistics park at Rugby.

Waste Management of Canada Corporation (WM) is pleased to welcome you to Public Open House #2 for the. Twin Creeks Landfill Environmental Screening

COLCHESTER STANWAY QUARRY

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

Non-Technical Summary

06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards

WEST COAST ENERGY PROPOSAL FOR BRAINT WIND FARM

BUT001: Land to the east of Benington Road, Butterwick Sustainability Objective

LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY

Non-Technical Summary

380, , Our operations Waste management. Key facts 8energy recovery facilities

A proposed new gas-fired power station on the Wilton International site

Project Description Report

Network Rail Romford Rail Operating Centre and Maintenance Delivery Unit Volume I: Environmental Statement Non-Technical Summary

18 Cumulative Impacts and Interaction of Effects

Energy from Waste Electricity Generation Plant - Preliminary Environmental Impact Statement

Pyrolysis is the thermal degradation of residual municipal waste in the absence of air to produce a solid fraction and syngas.

BLACKWOOD WIND FARM WELCOME TO OUR EXHIBITION

SEARs project justification and conclusion

Longbridge Town Centre Planning Application

Port of Hull Local Development Order

Western Rail Link to Heathrow (WRLtH) Environmental Impact Assessment: Preliminary Environmental Information Report Non Technical Summary March 2018

EfW Outputs. Guidance on the management of energy outputs and residues including air pollution control residues and incinerator bottom ash

Western Rail Link To Heathrow

4 PROJECT ALTERNATIVES

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture

HALTON GROUP. Keighley Clean Energy Facility, Airevalley Road, Keighley. Environmental Statement. Non Technical Summary

Babergh & Mid Suffolk Joint Local Plan: Sustainability Appraisal. August 2017

State of the Nation Report

Chapter 6 Objective: Protect and Enhance the Environment

6 Risk assessment methodology

Land Reclamation, Surface Coal Mining and Restoration at the Former Tower Colliery Site ENVIRONMENTAL STATEMENT. Non-Technical Summary

Environmental Impact Assessment Non-Technical Summary. June 2015

9.3.9 Industry uses code

Guardbridge Energy Centre. Environmental Statement Volume 1: Non-Technical Summary (NTS)

npower who we are Tilbury Power Station

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

Lostock Sustainable Energy Plant - Environmental Statement. Non-Technical Summary

Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017

VIRIDOR WASTE MANAGEMENT LIMITED. Glasgow Recycling and Renewable Energy Centre. Non Technical Summary

Section Three, Part 4 Residential Zone HOUSING DEVELOPMENT, CONSOLIDATION, GREENFIELD SITES AND RESIDENTIAL AMENITY

(1) Site Suitability PURPOSE

Viridor (Cardiff Energy Recovery Facility) Substantial Variation

Renewable and Low Carbon Energy Facility. Environmental Statement Non Technical Summary

RURAL LIVING AREAS Rural Living Areas Rural Lifestyle and Rural Residential 8.1 Issues, Objectives and Policies

Appendix B. Commitments made in the Approved Terms of Reference

Where is the Proposal?

APPENDIX: GLOSSARY OF TERMS

Cambridge Biomedical Campus Energy Innovation Centre

6. Net Effects of the Alternative Methods 6-1

Appendix General Environmental Risk Analysis

Former MOD Site Hempsted Lane, Gloucester

C&B Alberta Solar Development ULC

242 Doncaster Unitary Development Plan

SUBURBAN RESIDENTIAL. QLDC PROPOSED DISTRICT PLAN [PART THREE] DECISIONS VERSION 7 lower density SUBURBAN residential

Royal Edinburgh Hospital Masterplan

14. LANDSCAPE AND VISUAL

13 Socio-economics and Tourism

Berth 9 Quay Extension Environmental Statement Non-Technical Summary

LAND DEVELOPMENT AND PLANNING FORUM 2014 THE 2014 PROVINCIAL POLICY STATEMENT AND ENVIRONMENTAL PROTECTION

WE EEN Wizard of the Environment: the Enterprise Europe Network. Eurosportello del Veneto Via delle Industrie 19/C Venezia

Construction of Waste Transfer Station, ready mix concrete plant and overnight parking of 14 HGVs (resubmission of 14/02589/MIN)

SUTTON ESTATE, CHELSEA ENVIRONMENTAL STATEMENT JULY 2015 Volume I - Non-Technical Summary

The following documentation was tabled:

BSkyB Site Levelling and Remediation Works. Environmental Statement Volume 3. Planning Application June 2013 Non-Technical Summary

Town & Country Planning Act 1990

Biomass technologies

H2. Residential Rural and Coastal Settlement Zone

6.0 CONSTRUCTION PROGRAMME

12 WASTE. Introduction. Review of proposed development

Provincial Policy Statement 2014 Training Aid

Advice to decision maker on coal mining project

Environmental Impact Assessment

Documents submitted in response to Regulation 22 request. Additional documents submitted by Provectus Remediation Ltd

Gold Standard Passport CONTENTS

RMB Chivenor Flood Defence Scheme. Non-Technical Summary FINAL. Version 3.0

High Speed Rail (London- West Midlands)

and the term landfill generically refers to all landfills, including the above types, unless specified otherwise.

Overview. Bhlaraidh and Stronelairg wind farm proposals. SSE Renewables. Site locations. This exhibition

Environmental Information Worksheet

Fact Sheet. Feb 2011

Transcription:

Non Technical Summary

CONTENTS 1.0 Introduction 2.0 Site Description 3.0 The Development 4.0 Alternatives 5.0 Potential Environmental Effects 6.0 Conclusions

1.0 Introduction 1.1 The Applicant 1.2 The Development

Site Location Ardley Waste Management Facility

Viridor Waste Management Ltd is one of the UK s leading recycling, renewable energy and waste management companies. It currently operates over 230 waste management facilities providing a range of services from recycling and composting though to waste treatment and disposal throughout the UK. Viridor employs over 2,600 people, providing a full range of recycling and waste management services to local authorities, the industrial and commercial sectors and local businesses. The company has recently won several industry awards for best practice and partnership working. 1.1 The Applicant Viridor has 50 years experience in its sector. Its future vision is clearly focused on delivering quality waste management solutions that respect local amenities and the environment. It also invests in ongoing technical innovation and continuous improvement. Viridor is owned by the Pennon Group; a major water and waste management PLC based in the south west. 1.2 The Development Viridor Waste Management (Viridor) is applying for planning permission to develop an Energy from Waste facility at Ardley Landfill site. The full description of the application is as follows: The construction and operation of an Energy from Waste (EfW) and combined heat and power facility together with associated office, Visitor Centre and bottom ash recycling facilities, new access road and weighbridge

facilities and the continuation of landfill operations and landfill gas utilisation with consequent amendments to the phasing and final restoration landform of the landfill, surface water attenuation features and improvements to the existing household waste recycling facility. In essence the development is for the construction of a facility that would generate electricity from the treatment by combustion of residual waste. The 300,000 tonnes of waste processed by the EfW facility each year would be made up from residual Municipal Solid Waste (MSW) and Commercial and Industrial Waste (C&I). The approved landfill contours will also be amended to accommodate the EfW facility. The existing landfill has imports of 300,000 tonnes per annum, reducing to 200,000 tonnes per annum when the EfW facility is fully operational. This non technical summary accompanies the Environmental Statement which has been prepared as part of the planning application.

2.0 Site Description 2.0 Site Description

2.0 Site Description The application site is located at Ordinance Survey Grid Reference 454 200 225 900, with access being gained from the B430, which leads north to J10 of the M40 and south to the A34 towards Oxford. Drawing No.2/1 Site Location Plan identifies the location of the site in context of the surrounding area. The application site area comprises 95 hectares and includes the entire existing Ardley Waste Management site. The proposed EfW will be located in the south eastern corner of the application site. The existing landfill site will be re-phased to wrap around the EfW site whilst the existing civic amenity site in the north of the site will be slightly extended to incorporate improvements. The existing gas utilisation plant will be retained unchanged. The site is located to the west of the M40. The Banbury to High Wycombe railway line and Gagle Brook form the northern and eastern boundaries of the wider landfill site respectively. The western site boundary is the B430. The nearest settlement is Ardley village, approximately 1 km north of the current site access. The village of Middleton Stoney is located 1.7 km to the south and Bucknell, 1.2 km to the east. The settlement of Upper Heyford is located over 2km to the west, adjacent to the former airfield. The southern boundary of the site is a public bridleway and to the south of the bridleway is arable land with permission for mineral extraction, which is due to commence in 2009. A bridleway also runs along the eastern boundary of the site. The site is not covered by any statutory landscape or ecological designations.

3.0 The Development 3.1 The EfW Facility 3.2 Incinerator Bottom Ash Facility 3.3 Revisions to final landfill and restoration landform 3.4 Improvements to Household Waste Recycling Centre 3.5 Ancillary Proposals 3.6 Hours of Operation 3.7 Employment

3.0 The Development The proposed development comprises a comprehensive scheme to provide an Energy from Waste (EfW) facility capable of dealing with 300,000 tonnes of residual municipal, commercial and industrial waste per annum. For the purposes of description and subsequent environmental assessment the proposed development can be considered under the following four main headings: EfW facility and incinerator bottom ash facility; Revisions to final landfill and restoration landform; Improvements to the Household Waste and Recycling Centre; Ancillary proposals. 3.1 EfW Facility The floor level of the proposed EfW has been located close to the base of the mineral workings in the south eastern corner of the application site at 100m AOD to maximise the benefits of screening provided by the existing mineral void and landfill. The base level of the waste bunker is set at -12.5m below base 87.5m AOD. The overall size of the facility is 229m long, varying from 70m to 38m wide and from 70m to 29m in height to the apex of the main roof and 36m to the apex of the fin and a base platform level set at 100m AOD. The Chimney Stack is 82m above base level at 182m AOD.

The main features of the EfW facility include: A Waste Reception Hall with bunker, shredder and a waste feed system; Boiler hall with grate, combustion chamber and a heat recovery boiler; Turbine hall with steam turbine for generating electricity; Flue gas treatment hall with equipment to clean combustion gases; Facility for discharging and loading Air Pollution Control (APC) residue silos and other ancillary equipment; Twin chimney stack to discharge the treated flue gases into the atmosphere; An air cooled condenser for cooling and recycling steam from the generating process. 3.2 Incinerator Bottom Ash Facility The incinerator bottom ash (IBA) facility will allow for the pre-treatment storage, treatment, long term storage and sealed loading of the anticipated 75,000 tpa of IBA produced by the EfW facility. The recycled IBA will be exported for use as secondary aggregate in the construction industry. Revisions to final landfill 3.3 Revisions to final landfill and restoration landform The existing landfill at Ardley currently accepts in the region of 300,000 tpa of municipal, commercial and industrial waste (50,000 tonnes of municipal and 250,000 tonnes of industrial and commercial). Permitted voidspace at Ardley is estimated at 2.65 million tonnes and with existing levels of infill it is anticipated that the currently approved landform would be completed by 2016.

As part of the proposed development, the approved landfill contours will be re-modelled to recover voidspace lost to the EfW facility, and to provide additional screening from the north. The revised phasing plan for the landfill identifies that there will be a loss of approximately 600,000 tonnes of void space as result of the EfW facility. Restoration Scheme The main aim of the restoration scheme is to produce final and interim landforms/land uses which maintain and enhance the landscape character and ecological value of the site, while mitigating the proposed EfW development. The purpose of the landscape proposals is to ensure that the EfW is successfully integrated into the surrounding landfill restoration and landscape character of the area, while providing a setting and complimentary design form to the built development. 3.4 Improvements to the Household Waste Recycling Centre The existing HWRC operates a split level site with five skip bays at the lower operational area of the site and nine parking spaces on the upper public area. As a result of the space to be created by re-locating the landfill offices and weighbridge to the proposed new southern access, it is proposed to extend the HWRC to provide a further four skip bays and six additional parking spaces. The extended, more efficient layout of the HWRC will provide a better service to the public and enable higher rates of waste recycling and recovery to be achieved.

3.5 Ancillary Proposals Ancillary Buildings A range of buildings and offices will be required on site to accommodate staff, visitors and host ancillary facilities such as storage, control rooms and workshops. The Visitor Centre will enable community participation and the encouragement of recycling and waste reduction in the county; Weighbridge and Gatehouse A new double weighbridge with gatehouse will be provided at the new entrance to the EfW facility. New offices and weighbridge for the landfill operations would also be provided. New Site access and associated vehicle movements on site A new access road located off of the B430 is proposed to ensure the increase in traffic movements is appropriately facilitated. The access would incorporate a ghost right turn lane and would be used to service the EfW facility and landfill only. The proposed access will be located in the south west corner of the site. The access road would follow the southern boundary of the site all the way down to the south eastern corner where the EfW facility will be located. The proposed access has been designed to comply with guidelines pertaining to visibility at the junction.

The existing site access to the north will be retained to provide access to the HWRC. 3.6 Hours of Operation The proposed EfW facility operation would be a 24 hour operation but waste deliveries would be restricted from 0700 to 2000 hours Monday to Sunday. The hours of operation of the landfill will remain as permitted, as follows: 0700 to 1800 Monday to Friday 0700 to 1300 Saturdays Specific exceptions for receiving waste from the HWRC site The hours of operation of the HWRC will also remain as currently permitted, which are: 0830 to 1730 Monday to Friday 0830 to 1600 Saturdays 1000 to 1600 Sundays 3.7 Employment The proposed EfW facility would create in the region of 40 new full time posts. Employment at the landfill and HWRC would remain as existing (10).

4.0 Need and Alternatives 4.1 Need 4.2 Alternatives

4.1 Need Whilst Oxfordshire County Council (OCC) does not have the benefit of an up to date Waste Local Plan, a substantial amount of data has arisen from the preparation of the South East Plan and the work that ERM has subsequently undertaken for OCC in establishing waste arisings, capacity and future requirements. This work identifies a capacity gap of an estimated 291,000 tpa in Oxfordshire for municipal (MSW) and commercial and industrial (C&I) recovery facilities. The proposed EfW will also provide a source energy generating capacity for which there is an urgent national need. Sites 4.2 Alternatives A review of potential alternative sites was carried out to determine if other sites within Oxfordshire would be more environmentally acceptable. Of the eight sites considered in the evaluation, the three sites which performed best were Sutton Courtenay landfill, Palmer Avenue and Ardley landfill. Of these three, Ardley is considered to be the best performing site having regard to deliverability, site access, highway network and proximity to international nature conservation designations.

Alternative Waste Management Technologies The Environment Agency life cycle assessment software Waste and Resource Assessment Tool for the Environment (WRATE) was utilised to model the environmental impacts of the proposed EfW facility against alternative waste management technologies. The environmental burdens of 5 alternative waste treatment processes have been calculated for the processing of 300,000 tonnes of municipal solid waste. Energy from Waste scored was found to have the lowest environmental burden of the 5 technologies considered. 5.0 Summary of Environmental Effects 5.1 Air Quality 5.2 Landscape

5.3 Traffic and Transport 5.4 Noise 5.5 Geology, Hydrology and Hydrogeology 5.6 Ecology 5.7 Cultural Heritage 5.8 Socio Economic 5.9 Climate Change 5.10 Cumulative Effects 5.1 Air Quality An assessment was undertaken to assess the potential air quality impacts of the EfW facility. The assessment focused on the principal emissions to air, including; Pollutants from Vehicles;

Waste Incineration Directive (WID) Pollutants from point of source (EfW Stack); Dust and litter emissions during the construction and operational phases, odours and bioaerosols arising from the waste treatment process. The findings of the screening assessment of traffic emissions relating to both the construction and operational traffic have found that impacts on air quality may be classified as negligible. Dust was found to be insignificant providing mitigation measures were put in place prior to construction. The assessments of dust, litter, odour and bioaerosols have been undertaken qualitatively and have found that risk of significant generation of emissions during the operational phase is insignificant. The impact of emissions from the Ardley EfW stack on the environment and sensitive ecosystems is predicted to be insignificant for all receptors when typical emission rates and operating hours are considered. 5.2 Landscape A Landscape and Visual Impact assessment was undertaken to assess the potential landscape and visual impacts of the (EfW) facility on the surrounding landscape. Views of the EfW facility main building, car parking and some ancillary buildings would be restricted by the existing and proposed landfill contours. Additional tree planting on the landfill would reduce long term visibility by screening the building further, and from some view points, only the stack would remain visible.

The proposed development would have an impact on the existing landscape of the area. This effect would increase in the future when the proposed development is considered against the future baseline of the restored landfill site. This effect would be permanent in nature. The nature of the effect of the buildings would be directly linked to the high standard of design and the materials proposed, and how it is perceived by individual viewers within the application site. The effect of the development on the wider landscape would be related to the size of the building within the open countryside. To the southeast this effect would be concentrated, resulting in a localised significant impact. The nature of the visual impact would be related to the perception of the viewer. The high standard of design and materials used for the building aims to make the building a landmark building and aesthetically pleasing. The visual impact of the proposed development varies through time due to the effects of the permitted mineral extraction to the south and the proposed landfill development. Significant effects would occur to viewpoints from the east and south east during the short to medium term, with the permitted mineral development partially screening visual effects to the south. Additional significant effects are likely to occur after restoration of the mineral site. The most effected view is likely to be from the footpath on the eastern edge of Bucknell due to the open view across farmland and low lying nature of the intervening landform. This would be reduced slightly as vegetation matures around the EfW. The proposed development would have a moderate to substantial landscape and visual impact. 5.3 Traffic and Transport

The potential traffic and transport impacts of the proposed development have been assessed and are summarised below: In accordance with national guidelines, the parameters of this assessment have been fully scoped with Oxfordshire County Council, acting as both the Planning and Highway authorities. A new access is proposed from a new priority T Junction off of the B430 to accommodate all movements to the EfW facility and the landfill. The junction has been designed in accordance with all relevant guidelines and has been independently assessed from a safety perspective. The impact of generated traffic on the operation of the highway network has been calculated using computer modelling techniques. As traffic generated by the development will be spread throughout the day, rather than concentrated at peak times, the modelling exercise demonstrated that the proposed development would not have a significant bearing on the capacity of the road network, particularly at peak times. The site is well located in respect of the strategic and high capacity road network and has good access from the main centres of population, from which the waste will be imported. The site is not readily accessible by means other than the car due to a lack of pavements and bus stops on the B430. Overall, it is considered that the development proposals are acceptable in terms of highway safety and capacity. 5.4 Noise

An assessment of noise has been carried out in accordance with EIA good practice guide, the EIA Regulations and British standard guidance. The specific noise issues below have been considered: the existing noise climate at noise-sensitive receptors around the site; the process of site clearance, preparation and construction, and their impact on the surrounding noisesensitive receptors; and the impact of the operational use of the facility The noise assessment found that: the predicted construction noise levels achieve the criterion adopted for the assessment; the operational noise levels from the fixed plant will result in a situation of complaints unlikely at all receptors during the daytime and night-time; the increase in on-site heavy goods vehicle movements will have no impact on the ambient noise levels in the area; No impact is predicted as a result of the cumulative impact of the proposals. 5.5 Geology, Hydrology and Hydrogeology An assessment was undertaken based on a baseline description on the local hydro geological and hydrological regimes. A flood risk assessment and surface water management scheme have also been completed. There are no private water supplies or groundwater abstractions are within 2km of the site boundary. The site lies within Flood Zone 1 (low risk flood), however, as the development area is greater than 1ha, a flood risk

assessment has been undertaken which together with the proposed surface water management scheme shows there would be no increased or residual flood risk from the proposed development. The potential impacts of the proposed development upon the baseline hydrogeological and hydrological environments have been identified and where appropriate, mitigation measures have been accommodated into the design of the development. Overall it is concluded that with respect to geology, groundwater and surface water, there would be no significant residual impacts of the development with the proposed mitigation measures in place. An ecological impact assessment has been undertaken to assess the potential impact of the proposed development on the ecology of the site and surrounding areas. The following ecological features and species have been assessed; statutory and non-statutory conservation sites; colonising ephemeral, grassland and scrub habitats; ponds; badgers; bats; birds; great crested newt; other amphibians; and 5.6 Ecology

reptiles. In summary, it has been concluded that there would be no impact upon any statutory and/or non-statutory designated species or habitats within the study area. A variety of mitigation measures, including extensive native planting and ponds have been proposed which will help to ensure a biodiversity gain from the proposed development. In respect of the dinosaur footprints that have been found at the site, examples have already been removed from the site for preservation and display at local museums and there is considered to be only a low potential for uncovering additional examples as a result of the proposed development. 5.7 Cultural Heritage An assessment of the potential indirect impact of the proposed development on the settings of heritage assets was undertaken. A study area comprising all land within 2km of the development site was considered appropriate for the collection and assessment of baseline data. Due to the former extraction within the development site, there can be no surviving archaeological remains, ore heritage assets within it, and there could be no possible direct impact from the proposed building and landfill restoration. The heritage assets present within the site study area comprise grouped village buildings including houses and churches, and isolated farm buildings, and industrial and other functional buildings. The villages also contain conservation areas, and there is a registered park and a scheduled castle. The proposed development would create a negligible to moderate indirect visual impact on the settings of the heritage assets.

5.8 Socio Economic The proposed development offers benefits to employment, the economy and tourism. The facility will help Oxfordshire meet its landfill directive targets and therefore avoid costly penalties. The EfW will help supply the national grid with 180,000 MW hours of electricity per year, and offers a potentially low cost form of heat to consumers, which offsets the need for fossil fuels. The overall socio economic impact of the proposed development will be positive; this is attributed to the significance of increased employment, the positive inputs to Cherwell District Core Strategy and improvement to the immediate economy of the area surrounding the site. 5.9 Climate Change The alternative technology review concluded that the EfW facility will result in a negative environmental footprint that is, an overall reduction in environmental impacts such as global CO2 emissions. This can be attributed to the generation of electricity from waste and the subsequent displacement of fossil fuel electricity generation. Whilst the EfW facility will produce carbon emissions but these are less harmful greenhouse gases than methane, which would be produced if the waste was not diverted from landfill. In accordance with the supplement to PPS1, the EfW facility has been designed to minimise energy use and carbon emissions during construction and operation. The site has been designed to attenuate surface water runoff and ensure that the EfW facility would not give rise to additional surface water runoff or down stream flooding.

The EfW facility will also have the potential to provide heat and energy to existing and future development in a 5km area. 5.10 Cumulative Effects Existing activities at the Ardley site include the landfill, household waste recycling centre and mineral extraction all of which are temporary operations. Mineral extraction at the existing Ardley site will shortly be completed but there is consent immediately to the south of the landfill which was implemented in 2009 and will run until 2021. The landfill and HWRC operations are currently permitted until 2027. The main change that would be experienced by the existing and surrounding developments, as a result of the proposed development, would be the permanent addition of an EfW facility and new access at the landfill site. The principal cumulative effect identified is considered to be traffic but the traffic flow increases at the site as a result of the development and proposed and potential future development would not have a significant cumulative impact on the capacity of the surrounding road network. No significant adverse cumulative effects have been identified as a result of the proposed development and positive impacts in relation to employment and climate change have been identified.

6.0 Conclusions 6.0 Conclusions

6.0 Conclusions A need to divert Oxfordshire s waste from landfill has been identified and the Ardley site and Energy from Waste have been identified as the best site and technology to meet this need.

The main environmental impact of the proposed development has been identified as landscape/visual, but given the scale and size of the proposed buildings the design is successful in minimising the extent and degree of adverse landscape and visual impacts. However some significant effects would occur, and the acceptability of these is related directly to the standard of building design. The aim of the building design is to produce a high quality landmark building that is capable of having a positive effect on views and the landscape of the local area.