1 FORMER MOD SITE, HEMPSTED LANE, GLOUCESTER NON-TECHNICAL SUMMARY Introduction Bovale Ltd proposes to undertake the redevelopment of the former MOD site, Hempsted Lane, Gloucester. The redevelopment will involve the demolition and removal of all existing structures on the site and the construction of a mix of residential units types and sizes, including houses and apartments. An Environmental Impact Assessment has been undertaken for the proposed redevelopment of the site to identify, assess and mitigate the impacts of construction and operation on the existing environment, and also identify, assess and mitigate for impacts that the existing environment may have on the future residents of the development. The EIA also looks at the need for the project and its design. This document is the Non Technical Summary (NTS) of the Environmental Statement (ES) and provides a brief description of the proposed development and the findings and conclusion of the EIA. Further copies of the NTS are available free of charge on written request from the following address: Simon Blakeley Planning Consultant Harris Lamb Ltd Grosvenor House Francis Road Edgbaston Birmingham B16 8SP Hardcopies and CD-ROM copies of the ES Volumes are available for purchase from the above address, also upon written request. The cost for a hardcopy of the ES is , and for CD-ROM. The Proposed Development The Former MOD site at Hempsted Lane, Gloucester is situated to the Southwest of Gloucester approximately 1km from the City Centre (National Grid Reference SO ). See Figure 1. Bovale Ltd propose to redevelop the site at Hempsted for residential uses with 127 units (109 houses and 18 apartments) and areas of landscaping including an outdoor recreational space (or Local Equipped Area of Play), footpaths/cycleways, habitat area, balancing pond and lake. The units will be accessed from Hempsted Lane, via a T-Junction, access to individual driveways via a series of cul-de-sacs. A gated access to the site, for emergency vehicles only, will be provided from Honeythorn Close. This will be screened from the existing development by a landscape buffer. The site was used for agriculture until it was developed circa 1940 with the construction of a purpose built facility for the bulk storage of petroleum hydrocarbons. The site was operated by Shell Mex on behalf of the Ministry of Defence (MoD) until Since 1970, the site has been operated by Transco Ltd for the MOD until the decommissioning of the site circa No military occupation or use of the site has been identified, except for fuel storage. MWH NTS Page 1 DH06/RT242

2 Figure 1: Site Location Plan Planning Issues The ES has taken into account the relevant policies contained within the Regional Planning Guidance for the South West, Gloucestershire Structure Plan and the Gloucester City Council Local Plan. From the relevant Structure and Local Plans the following items are particularly relevant to this development: 0.9 hectares of the site is allocated for 30 dwellings within the Local Plan; The whole site is subject to a residential allocation of 30 units within the Draft Gloucester Local Development Framework; The site is located in the Landscape Conservation Area ; The site is located adjacent to an area of principal archaeological interest; MWH NTS Page 2 DH06/RT242

3 The site is also partially located within a flood risk area; Adjacent land uses include an operational landfill site and household recycling centre site, to northern site boundary. Physical Environment The site is situated above Made Ground and Alluvial Deposits (Superficial Deposits) overlaying the Lower Lias Clays. Due to the former use of the site as a depot for fuel storage, it is anticipated that some contamination will be locally present within certain parts of the site. These are associated with the bulk storage tanks, the internal fuel distribution pipelines, and the above ground fuel storage tank. However, these potential areas are located within clearly defined parts of the site and any contamination present within the ground surrounding these areas can be expected to be limited. Intrusive site investigations undertaken at the site encountered some evidence of hydrocarbon contamination, although there was no evidence of any widespread leakage from the Tank Farm Area. Environmental risk assessments indicate that there is a low risk of future site users within the residential dwelling being exposed to contamination at the site, however the risk slightly increases with regard to future garden and landscaped areas. The risk of exposure by development/construction workers is also slightly increased, although these risks will be mitigated for by the use of appropriate personal protective equipment (PPE) and good hygiene procedures. An environmental remediation strategy for mitigating the risks posed to human health and controlled waters has been prepared, which outlines the appropriate management options. With the implementation of this remediation strategy, it is considered that any contamination, if present, will be of limited extent and will be of only minor adverse significance locally. The presence of asbestos has also been confirmed on site. All asbestos will be disposed of by a licensed contractor to an appropriate disposal site. Water Resources The River Severn is located at a distance of approximately 800m to the north-west of the site whilst the Gloucester and Sharpness Canal is located approximately 300m to the east of the site. The site sits within the River Severn floodplain. The site lies above superficial deposits, classified as a Minor Aquifer of intermediate vulnerability. The underlying and near surface geology: Lower Lias Clays are classified as a Non Aquifer. These underlying clays afford some protection from any leaching and migration within the superficial deposits, the potential for which is considered to be low. No surface water abstractions or groundwater abstractions are located within 770m of the site. Throughout construction, impacts on surface water and groundwater systems will be controlled and managed, to negligible levels, through the implementation of a Construction Environmental Management Plan, incorporating construction environmental best practice techniques. MWH NTS Page 3 DH06/RT242

4 Surface water run-off at the site is towards the north and west, where the run-off will be collected within the surface water ditch located along the low point of the site. The ditch itself drains towards the southwest and eventually into the River Severn. Severn Trent Water Ltd have confirmed that both existing foul and storm water drains are present in Hempsted Lane, and that the existing infrastructure will be sufficient to cope with the demands of the proposed development. Although characteristics of the site make it difficult, the concept of Sustainable Drainage Systems (SUDS) will be incorporated into the development, and discussions and negotiations are continuing with the Environment Agency and Gloucester City Council to ensure that they are appropriate to the site. The incorporation of these features is anticipated to result in impacts of minor positive significance in terms of drainage and ecology. Flood Risk The lower elevations of the proposed development site at Hempsted Lane, along the northern and north eastern boundaries, are within the 1:100 year fluvial event and 1:200 year tidal event floodplains, as indicated by the Environment Agency Flood Maps and confirmed by modelling and historic flood events. As such, a number of units within the proposed development are at risk of flooding. However, mitigation measures are proposed that will ensure that no persons or properties are at risk of flooding and that the functioning of the flood plain and flood flows are not effected. Proposals include: The raising of ground levels and finished floor levels to at least 600mm above the worst historic flood level of 11.18m AOD. This will mean that no units lie within a flood risk area; The provision of a emergency access which is located above the level of the floodplain to provide safe access and egress during flood conditions, as the main proposed vehicular access to the development will be located within the floodplain; The provision of flood plain compensation on a level-for-level, volume-for-volume basis, mimicking the existing flooding mechanism. This will mean that there will be no loss of flood storage and the functioning of the flood plain and flood flows will not effected; The incorporation of the SUDS concept into the proposed development to control storm water run-off to pre-development rates. With the implementation of the above measures, the proposed development is considered to be safe for the lifetime of the development, in accordance with the requirements of PPS25. Ecology No statutory designated sites were identified in close proximity to the application site. However, several non-statutory designated sites were identified near to the site. The fringe of Hempsted Village is designated as a Site of Nature Conservation Interest and is situated immediately adjacent to the application site. Church Farm Hams, situated approximately 1 km south-west of the application site, is currently being managed as a wetland habitat for seasonal migratory birds. MWH NTS Page 4 DH06/RT242

5 Habitats at the site include species-rich grassland, trees and scrub both within the site and around its boundaries, tall-herb vegetation around structures and boundary fences, and wetland and waterside vegetation is located within the north of the site. A number of protected animal species were recorded within or immediately adjacent to the site including Great Crested Newts, Badgers, Water Voles and Bats. Potential impacts at the site resulting from the proposed development include the temporary and permanent loss of habitat due to the construction of the development, the temporary loss of grassland and permanent loss of trees due to construction of a Flood Compensation Area, the temporary and permanent displacement of species, the fragmentation of habitats or severance of ecological corridors during construction; and the temporary and permanent impacts, as a consequence of works, on adjacent habitats and the species that use them. Figure 2: First Aid and Decontamination Unit used by Bats In order to mitigate for these potential impacts, a series of measures have been built into the design and will be put in place on completion. In addition to generic measures to address design and construction impacts, measures include: The re-seeding of grassland areas with mixes of similar composition and local provenance, together with suitable management (mowing) regimes; The protection of valuable trees during construction to ensure their retention within the site, plus the supplementary planting of additional native trees and shrubs to reinforce the existing habitat, wildlife corridors and flight-lines; The creation of at least one hibernaculum for Great Crested Newts, using material salvage from the trees felled, in addition to works undertaken under licence from Natural England; and The creation of replacement bat roosts, such as a bat bungalow, and the erection of bat boxes within the site, at locations to be determined following further survey, in addition to works undertaken under licence from Natural England; MWH NTS Page 5 DH06/RT242

6 In general, it is considered that, with the implementation of the proposed mitigation measures and the creation of habitat features such as the lake, balancing pond and habitat area, residual impacts will generally range from insignificant to significantly positive in terms of the habitats and the species they support. Figure 3: Oak Tree with Tree Preservation Order Archaeology An archaeological desk-based assessment was undertaken, covering the development site and a 500m radius around it. Information was obtained from a number of sources including Gloucestershire Sites and Monuments Record, Gloucester Museum, English Heritage National Monuments Records and the Gloucester Record Office. The remains of medieval ridge-and-furrow land management, the site of a former lodge house and drive, a pit or pond and twentieth century structural remains were identified within the area of the proposed development, in addition to the derelict buildings and installations of the wartime fuel depot. The surrounding area includes the remains of Llanthony Priory: an important medieval monastic site; Newark: a house originally belonging to the priory; and Newark Camp: a Roman and medieval earthwork site. As a result of the assessment, the potential for discovery of previously unknown Roman and medieval remains within the area of the proposed development is judged to be moderately high. Within the development area itself, all the identified remains are of relatively minor significance, and the impacts of the proposed development will be managed by an appropriate programme of mitigation. An archaeological survey of the site will be undertaken prior to construction, with the programme of works discussed and agreed with the City Council s Archaeologist prior to its commencement. Landscape and Visual Impact The landscape and visual assessment identified features of local landscape value as well as features within the development site. This information was also used to establish the baseline landscape character of the area, against which changes resulting from the proposed development could be compared. The proposed development site is situated within a landscape conservation area. However, the landscape conservation area to the north and -west of Hempsted has been heavily modified and degraded by recent land use including the land fill operation and commercial and industrial uses. The significance of visual change as a result of the proposed development is considered to be moderately adverse from views in the near distance (under 1 km). Visual impacts in the long distance (3-15 km) and middle distance (1-3 km) are considered to be neutral. The significance of landscape change as a result of the proposed development was considered for both the local landscape and the wider landscape. Overall impact on the local landscape MWH NTS Page 6 DH06/RT242

7 character is considered to be a moderate to minor adverse impact, whereas the impact on the wider landscape is considered to be neutral to minor adverse. During construction, it is proposed that hoarding may be used to screen the construction site and mitigate against minor to moderate visual impacts. Following construction, both Newark House and residential properties to the south and south east of the site would experience an adverse visual impact. In order to mitigate against this, the existing fence and vegetation, plus new planting of a species that would grow to a maximum height of 10m, will be used to screen the southern and south eastern boundary. Figures 4 and 5: Views of the site Traffic and Transport An assessment of the transport issues associated with the development has been undertaken. The proposed access arrangements and pedestrian/cycle routes are considered. The traffic generated by the development, the effect on the surrounding road network, the accessibility of the site to facilitate use by non-car means of transport and the suitability of those are assessed. The impact on the road network, road users and pedestrians will be minimal during both construction and operation. It is concluded that there would be no residual impacts upon sensitive receptors and pedestrian amenity, a positive residual impact on pedestrians and no material impact on the safety conditions following the proposed development. Good working practices and traffic management measures would be identified in a construction Traffic Management Plan. The applicant would be willing to make a financial contribution towards the Highway Authority future improvement work at Monk Meadow roundabout junction. As part of the Travel Plan the developer would provide Personalised Travel Planning to all new residents of the site. These packs would include relevant information available on walking, cycling and public transport opportunities in the area. The development would also make suitable connections with the existing pedestrian and cycle network. Noise and Vibration The main residential areas, and hence nearest sensitive receivers to the proposed application, are to the south and south-east of the application site. There is the potential for these residences to be disturbed by noise from the proposed development during construction and to a lesser degree once the proposed development has been built. MWH NTS Page 7 DH06/RT242

8 The closest existing residential properties to the proposed development site are numbers 28 and 33 Honeythorn Close, which are located approximately 10m from where the dwelling units will be constructed. No commercial premises with potential to be disturbed by noise are located in the proximity of the proposed development, and no particularly sensitive receivers (e.g. Schools) are located in the proximity of the proposed development. Existing dominant noise sources at the site include: Road traffic along Hempsted Lane and the Secunda Way interchange, which runs parallel to the eastern site boundary and carry s a large volume of traffic; The landfill site to the north, operated by Cory Environmental, which receives a steady stream of traffic throughout the day, ranging from container lorries and refuse lorries to cars. In addition, a distinct humming and whirring sound can be heard emanating from the site; and Industrial estates to the north-east and east, including a haulage depot to the immediate north-east, which is in 24-hour operation, and a vehicle dismantler s yard to the east, which produces noise from the machinery used to crush and move vehicles. An assessment of the development site has been undertaken to determine the noise and vibration impacts arising from construction and operation of the proposed development on existing and proposed noise sensitive receivers, i.e. the future inhabitants. Mitigation measures proposed for the control of noise during construction include a variety of best practice techniques, including the shutting down of plant machinery when not in use, the use of silencers (where possible), the careful siting of stationary plant to minimised noise nuisance, the erection of site hoarding and the scheduling and unloading of deliveries to minimise noise. The application of the principle of Best Practicable Means, as defined in Section 72 of the Control of Pollution Act 1974, will also be encouraged. With respect to construction activities, it is predicted that with mitigation measures in place, (including the erection of site hoarding and consideration of Best Practicable Means) impacts will be of Moderate Adverse significance, and temporary in nature. However, in certain locations and despite the implementation of the above mitigation measures, the impacts are considered to remain considerable, i.e. Substantial Adverse, but of a highly localised and temporary nature The results of the noise assessment indicate that the proposed residences adjacent to the Secunda Way / Hempsted Lane roundabout will fall within Noise Exposure Category (NEC) B during both the day and night-time periods, meaning that an adequate level of protection against noise is required within these properties. In this location, the noise climate is dominated by road traffic, and it is proposed that mitigation measures with either include the provision of thermal double glazing with trickle vents or passive through-wall ventilators, or the detailed design of the internal layouts of these properties will locate the habitable rooms, such as living rooms and bedrooms, along the opposite façade which is screened from the noise source. The remainder of the site and the majority of the development area will fall within NEC A during both day and night-time periods, indicating that noise need not be considered as a determining factor in granting planning permission. The operational noise from the development itself has been assessed as negligible. With the mitigation measures described for the design of the development, noise impacts from the MWH NTS Page 8 DH06/RT242

9 existing environment are likely to have a negligible effect upon the new residents of the proposed development. It has been determined that the site is suitable for residential development, including the area of the site in the vicinity of the Hempsted Lane / Secunda Way roundabout with the implementation of the proposed mitigation. Figure 6: Noise Monitoring Locations Emissions There will be several major sources of emissions arising from the construction, commissioning and operational phases of the project. During construction emissions include: dust and exhaust emissions, mud, sewage and waste water, solid wastes and light emissions. The completed development will largely produce solid waste and liquid effluent. All wastes from construction activities will be appropriately recycled or disposed of in accordance with the Waste Management: the Duty of care A Code of Practice (1996) or the Hazardous Waste Regulations (2005). Therefore, it is anticipated that there should be no residual impacts from the construction of the project. A Site Waste Management Plan will be produced which will identify potential wastes as well as appropriate handling and disposal methods. For the completed development, a Waste Minimisation Strategy, a requirement of the Gloucestershire County Council Supplementary Planning Document on Waste Minimisation in Development Projects, will set out how waste arising during the occupation of the development is to be minimised and managed, and how recycling during the occupational life of the development will be incorporated. With regard to the site itself, future residents are anticipated not to be affected by impacts of lighting or air emissions arising from existing sources, although intermittent odours from the existing landfill site may be experienced. Socio-economic The Westgate area and the areas surrounding the proposed development are predominantly comprised of mature families living in suburban semi-detached housing. Family incomes and levels of education are around the national average, with the majority of people employed in office or clerical jobs. MWH NTS Page 9 DH06/RT242

10 The proposed housing site is located within an area of mixed development, comprising residential housing, agricultural land, an operational landfill and commercial industrial properties. The construction phase of the development has the potential to result in short-term beneficial impacts in terms of its anticipated employment generation. These impacts may be direct or indirect. Direct impacts relate to the number of full-time jobs generated and employed in the construction of the development itself, and indirect impacts relate to, for example, the local sourcing of supplies, materials etc. and other support services, and local spend by on-site construction workers. It is expected that there will be an average of 40 staff working on site on the construction of the project. Once occupied the housing development will have an impact on local facilities, suppliers and services, through increased use. This can have minor positive and negative benefits on the local economy and on community facilities which may already be over subscribed. There will potentially be an increase in demand for the use of health and education services in the area, such as Meadowside Primary School and Beaufort Community School, both located in close proximity to the proposed development. The development will include the provision for affordable housing which will help to create balanced communities in Gloucester. Project Environmental Management The production of this environmental statement forms one stage of the environmental assessment process. Environmental assessment will continue throughout the detailed design and construction phases. This will include undertaking a range of detailed environmental surveys, the need for which had been identified as a result of the ecological, archaeological and geotechnical surveys undertaken to date. This will help ensure that the environment is appropriately protected before, during and after the implementation of the project. During the course of this project the Contractor will continually assess the environmental implications, working within the framework of their own Environmental Management System. Training will be undertaken in order to achieve competency to fulfil specific environmental duties and responsibilities will be maintained throughout the project life cycle. Following on from the construction management plans, maintenance measures will be put in place to ensure the proposed mitigation measures remain effective in the long term. MWH NTS Page 10 DH06/RT242

Longbridge Town Centre Planning Application

Longbridge Town Centre Planning Application Longbridge Town Centre Planning Application Non-Technical Summary of the Environmental Statement January 2011 Introduction An application for Planning Permission has been submitted to Birmingham City Council

More information

A1 JUNCTION IMPROVEMENTS DROMORE ROAD, HILLSBOROUGH

A1 JUNCTION IMPROVEMENTS DROMORE ROAD, HILLSBOROUGH A1 JUNCTION IMPROVEMENTS DROMORE ROAD, HILLSBOROUGH DRD ROADS SERVICE, SOUTHERN DIVISION Environmental Statement, Volume 1 November 2005 Non Technical Summary i Introduction The Department for Regional

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary Environmental Impact Assessment Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 September 2013 Page Left Intentionally Blank 2 INTRODUCTION This Non Technical

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13

More information

Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref:

Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref: Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell Volume 2 NON TECHNICAL SUMMARY December 2012 SLR Ref: 419.00034.00473 INTRODUCTION 1. This Non Technical Summary (NTS) has been produced by

More information

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories: 5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION The scope of the EIA falls under three broad categories: technical scope; spatial scope; and temporal scope. The scoping process for the

More information

Non-Technical Summary

Non-Technical Summary Non-Technical Summary i. Introduction and background Introduction The Environment Agency (generally referred to in this non-technical summary as we or us ) has prepared an Environmental Statement (ES)

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13

More information

CONCLUSIONS 14 CONTENTS

CONCLUSIONS 14 CONTENTS CONTENTS Introduction... 14-1 Traffic... 14-1 Air Quality... 14-1 Noise and Vibration... 14-2 Geology and Hydrology... 14-2 Landscape and Visual... 14-3 Ecology... 14-4 Cultural Heritage... 14-4 Population

More information

Environmental Statement Non-Technical Summary Rectory Farm, Hounslow

Environmental Statement Non-Technical Summary Rectory Farm, Hounslow Environmental Statement Non-Technical Summary Rectory Farm, Hounslow Introduction This document is the Non-Technical Summary (NTS) of the Environmental Statement (ES) for a proposed development at the

More information

Ponds Farm, Environmental Statement Non-Technical Summary

Ponds Farm, Environmental Statement Non-Technical Summary Ponds Farm, Cogent Land LLP QUALITY MANAGEMENT Issue/revision Issue 1 Revision 1 Final Date 03/05/2012 04/05/2012 09/05/2012 Prepared by Matthew Shepherd Caroline Burn Caroline Burn Signature Checked by

More information

Central Park Mixed Use Development

Central Park Mixed Use Development Central Park Mixed Use Development Environmental Statement Non Technical Summary June 2012 Contents Section A Introduction Part 1 Part 2 Part 3 Background Environmental Assessment Site Description Section

More information

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until 2035 Non Technical Summary SLR Consulting Limited Project Ref: 403.00079.00474

More information

Crossrail. Environmental Statement. Volume 9c. Appendices. Westbourne Park Bus Garage Extension. Volume 2 Appendices

Crossrail. Environmental Statement. Volume 9c. Appendices. Westbourne Park Bus Garage Extension. Volume 2 Appendices Crossrail Environmental Statement Volume 9c Appendices Westbourne Park Bus Garage Extension Environmental Statement Volume 2 Appendices 9c If you would like information about Crossrail in your language,

More information

A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement. Non Technical Summary. Business and Environmental Services

A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement. Non Technical Summary. Business and Environmental Services A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement Non Technical Summary Business and Environmental Services A responsive County Council providing excellent and efficient local services

More information

MIXED ACTIVITY ZONE. Chapter 4. Mixed Activity Zone

MIXED ACTIVITY ZONE. Chapter 4. Mixed Activity Zone Chapter 4 Mixed Activity Zone 4. MIXED ACTIVITY ZONE 4.1 RESOURCE MANAGEMENT ISSUES 1. Activities adjoining main arterial roads can adversely affect the safety, sustainability and efficiency of the network.

More information

In-combination and Cumulative Effects Assessment

In-combination and Cumulative Effects Assessment P O R T I S H E A D B R A N C H L I N E P R E L I M I N A R Y ENV I R O N M E N T A L I N F O R M A T I O N R E P O R T V O L U M E 2 C H A P T E R 18 In-combination and Cumulative Effects Assessment Table

More information

VIRIDOR WASTE MANAGEMENT LTD

VIRIDOR WASTE MANAGEMENT LTD VIRIDOR WASTE MANAGEMENT LTD Proposed re-phasing of landfilling operations; amended restoration levels and aftercare scheme; and provision of a new waste reception building with associated site infrastructure

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Sizewell B Dry Fuel Store. Environmental Statement Non-Technical Summary

Sizewell B Dry Fuel Store. Environmental Statement Non-Technical Summary Sizewell B Dry Fuel Store Environmental Statement Non-Technical Summary NON TECHNICAL SUMMARY 1 INTRODUCTION This Non Technical Summary (NTS) is submitted as part of the application to extend the existing

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Proposed development at Stephenson Road, Northacre Trading Estate, Westbury, BA13 4WD Non-technical summary December 2014 Introduction Northacre Renewable Energy Ltd (a company

More information

NON TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT

NON TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT PLANNING APPLICATION TO REMOVE CONDITION 2 OF PLANNING PERMISSION REFERENCE TDC/94/065 TO EXTEND THE OPERATIONAL LIFE OF THE NON-HAZARDOUS AND HAZARDOUS

More information

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required

More information

Sustainability Statement

Sustainability Statement Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Sustainability Statement Doc Ref: 7.07 Appendix B.21 Greenwich Pumping Station

More information

Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary. Final. WNGLDC Environment Agency Title

Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary. Final. WNGLDC Environment Agency Title Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary Final WNGLDC Environment Agency Title We are The Environment Agency. It's our job to look after your environment and make it

More information

Squire and Partners. Homebase Site 195 Warwick Road, London W14. Non Technical Summary WSP Environment and Energy. On Behalf of St Edward Homes Ltd

Squire and Partners. Homebase Site 195 Warwick Road, London W14. Non Technical Summary WSP Environment and Energy. On Behalf of St Edward Homes Ltd Squire and Partners Homebase Site 195 Warwick Road, London W14 Non Technical Summary WSP Environment and Energy On Behalf of Ltd July 2010 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks

More information

Thorn Turn Waste. Non-Technical Summary. Central Bedfordshire Council. 10 May Central Bedfordshire Council

Thorn Turn Waste. Non-Technical Summary. Central Bedfordshire Council. 10 May Central Bedfordshire Council Thorn Turn Waste Park Non-Technical Summary Central Bedfordshire Council 10 May 2015 1 Notice This document and its contents have been prepared and are intended solely for Central Bedfordshire Council

More information

ENVIRONMENTAL APPRAISAL NON-TECHNICAL SUMMARY

ENVIRONMENTAL APPRAISAL NON-TECHNICAL SUMMARY ENVIRONMENTAL APPRAISAL NON-TECHNICAL SUMMARY Figure 1: Site Location 1. Introduction The Ministry of Defence (MoD) hereafter referred to as the Applicant is seeking detailed planning permission for a

More information

Table of Contents. O Devaney Gardens. Page i. Page Number. Section. 1 Introduction

Table of Contents. O Devaney Gardens. Page i. Page Number. Section. 1 Introduction Section 1 Introduction Page Number 1.1 Introduction 2 1.2 Screening - Requirement for an EIA 5 1.3 Purpose of this EIA 6 1.4 Objectives of this EIA 6 1.5 Scoping 10 1.6 Format and Structure of this EIS

More information

introduction 1 On behalf of db symmetry we are pleased to welcome you to view our emerging plans for a new logistics park at Rugby.

introduction 1 On behalf of db symmetry we are pleased to welcome you to view our emerging plans for a new logistics park at Rugby. introduction 1 On behalf of db symmetry we are pleased to welcome you to view our emerging plans for a new logistics park at Rugby. The site comprises the employment element of the South West Rugby allocation

More information

Energy from Waste Facility Environmental Statement Volume 1: Non-Technical Summary. July 2016

Energy from Waste Facility Environmental Statement Volume 1: Non-Technical Summary. July 2016 Energy from Waste Facility Environmental Statement Volume 1: Non-Technical Summary July 2016 This Environmental Statement has been prepared by Turley Planning on behalf of This is Protos with contributions

More information

Recycling and Energy Recovery Facility (RERF)

Recycling and Energy Recovery Facility (RERF) Development of a Recycling and Energy Recovery Facility (RERF) for the treatment of Municipal, Commercial and Industrial Wastes together with ancillary infrastructure, including bulking/transfer facilities,

More information

Wellington Dock Planning Application, Liverpool. Non-Technical Summary for Environmental Statement

Wellington Dock Planning Application, Liverpool. Non-Technical Summary for Environmental Statement Wellington Dock Planning Application, Liverpool Non-Technical Summary for Environmental Statement INTRODUCTION United Utilities PLC (UU) has applied for planning permission for an extension to Liverpool

More information

Sainsbury s Supermarkets Ltd. New Sainsbury s Foodstore, London Road, Hook Environmental Statement Non-Technical Summary May 2013

Sainsbury s Supermarkets Ltd. New Sainsbury s Foodstore, London Road, Hook Environmental Statement Non-Technical Summary May 2013 Sainsbury s Supermarkets Ltd. New Sainsbury s Foodstore, London Road, Hook Environmental Statement Non-Technical Summary May 2013 Contents 1.0 Introduction... 3 1.1 Background... 3 1.2 Environmental Assessment...

More information

Preface. Gaia Power Ltd 71A High Street Yarm TS15 9BG. Tel: Web:

Preface. Gaia Power Ltd 71A High Street Yarm TS15 9BG. Tel: Web: Preface This document comprises the Environmental Statement and its Non- Technical Summary, which have been prepared in support of an application for planning consent for the construction of a biomass

More information

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION 6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION Cumulative and indirect effects result from the combined impacts of multiple projects / plans. Their consideration is important as the impacts

More information

Ironstone Quarry Wind Energy Project Environmental Statement

Ironstone Quarry Wind Energy Project Environmental Statement Ironstone Quarry Wind Energy Project Environmental Statement Non Technical Summary April 2011 Introduction Waste Recycling Group (WRG) Ltd is seeking permission to construct and operate a four turbine

More information

This Chapter contains rules managing land uses in the Main Rural Zone. The boundaries of this zone are shown on the Planning Maps.

This Chapter contains rules managing land uses in the Main Rural Zone. The boundaries of this zone are shown on the Planning Maps. Chapter 34 MAIN RURAL ZONE RULES INTRODUCTION This Chapter contains rules managing land uses in the. The boundaries of this zone are shown on the Planning Maps. All rules apply throughout the unless otherwise

More information

Thorn Turn Winter Maintenance and Highways Depot

Thorn Turn Winter Maintenance and Highways Depot Thorn Turn Winter Maintenance and Highways Depot Non-Technical Summary Central Bedfordshire Council 12 May 2015 1 Notice This document and its contents have been prepared and are intended solely for Central

More information

Harewood Whin Waste Transfer Station Environmental Statement

Harewood Whin Waste Transfer Station Environmental Statement Harewood Whin Waste Transfer Station Environmental Statement This document is the Environmental Statement for the proposed Waste Transfer Station at the site of the Harewood Whin Resource Recovery Facility,

More information

Non-Technical Summary

Non-Technical Summary Non-Technical Summary Introduction and Background The Environment Agency owns Rye Harbour Farm in East Sussex and has developed a scheme to enhance the nature conservation value of the Farm, which lies

More information

BARRASFORD QUARRY PERIODIC REVIEW. Environmental Statement - Non Technical Summary. October 2014

BARRASFORD QUARRY PERIODIC REVIEW. Environmental Statement - Non Technical Summary. October 2014 BARRASFORD QUARRY PERIODIC REVIEW Environmental Statement - Non Technical Summary October 2014 Environmental Statement - Non Technical Summary. October 2014 1 LAFARGETARMAC.COM Introduction This is a Non

More information

Environmental Statement Non Technical Summary. Anthony s Way Frindsbury June creative minds safe hands

Environmental Statement Non Technical Summary. Anthony s Way Frindsbury June creative minds safe hands Environmental Statement Non Technical Summary Anthony s Way Frindsbury June 2010 www.wyg.com creative minds safe hands Contents Section A Introduction Part 1 Background Part 2 Environmental Assessment

More information

NON TECHNICAL SUMMARY

NON TECHNICAL SUMMARY NON TECHNICAL SUMMARY CONTENTS Introduction... 1 The Proposed Development... 1 Planning Policy and Need... 2 Landscape and Visual Impact... 3 Noise... 4 Ecology... 4 Hydrogeology... 5 Land Quality... 6

More information

Arcow Quarry, North Yorkshire

Arcow Quarry, North Yorkshire Arcow Quarry, North Yorkshire Non Technical Summary Planning applications for a railhead and associated development REVISION SCHEDULE Rev Date Details Prepared by Reviewed by Approved by 0 December 2013

More information

8 Geology, Hydrology & Hydrogeology

8 Geology, Hydrology & Hydrogeology Inverneill Wind Farm Scoping Report Page 42 8 Geology, Hydrology & Hydrogeology 8.1 Introduction The EIA will consider the potential issues arising from the construction, operation and decommissioning

More information

February /03/SPM

February /03/SPM Yew Tree Farm Burscough Environmental Statement Non-Technical Summary February 2015 41295/03/SPM Nathaniel Lichfield & Partners 3rd Floor One St James's Square Manchester M2 6DN nlpplanning.com This document

More information

Seaham North Pier Environmental Impact Assessment Volume 1: Non-Technical Summary January 2014

Seaham North Pier Environmental Impact Assessment Volume 1: Non-Technical Summary January 2014 Seaham North Pier Environmental Impact Assessment Volume 1: Non-Technical Summary January 2014 CONTENTS INTRODUCTION SEAHAM NORTH PIER THE ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL EFFECTS INTRODUCTION

More information

NON-TECHNICAL SUMMARY (NTS)

NON-TECHNICAL SUMMARY (NTS) NEW ALBION LANDFILL APPLICATION UNDER S73 OF THE TOWN AND COUNTRY PLANNING ACT 1990 TO DEVELOP LAND WITHOUT COMPLIANCE TO CONDITION 7 OF PLANNING PERMISSION 98/0569/7 DATED 26 TH MARCH 1999, AND SUBMISSION

More information

SHARPNESS DOCKS ESTATE Environmental Statement Volume 0: Non-Technical Summary MARCH 2017

SHARPNESS DOCKS ESTATE Environmental Statement Volume 0: Non-Technical Summary MARCH 2017 SHARPNESS DOCKS ESTATE Environmental Statement Volume 0: Non-Technical Summary MARCH 0 CONTACTS KATE TOMOS Principal EIA Consultant dd +44 (0) 90994 m +44 (0) 00583 e Kate.Tomos@arcadis.com Arcadis. Arcadis

More information

Network Rail Romford Rail Operating Centre and Maintenance Delivery Unit Volume I: Environmental Statement Non-Technical Summary

Network Rail Romford Rail Operating Centre and Maintenance Delivery Unit Volume I: Environmental Statement Non-Technical Summary Romford Rail Operating Centre and Maintenance Delivery Unit Volume I: Environmental Statement Non-Technical Summary Issue 22 August 2012 This report takes into account the particular instructions and requirements

More information

Environmental Statement Non-Technical Summary. company

Environmental Statement Non-Technical Summary. company Environmental Statement Non-Technical Summary company Non-Technical Summary 1.1 Introduction 1.1.1 This (NTS) forms part of an Environmental Statement (ES) which has been has been prepared by. The NTS

More information

RURAL LIVING AREAS Rural Living Areas Rural Lifestyle and Rural Residential 8.1 Issues, Objectives and Policies

RURAL LIVING AREAS Rural Living Areas Rural Lifestyle and Rural Residential 8.1 Issues, Objectives and Policies . Rural Living Areas Rural Lifestyle and Rural Residential.1 Issues, Objectives and Policies.1.1 Resource Management Issues Discussion of additional relevant issues is found in the following Parts of the

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

Replacement Environmental Statement Volume 0 Revised Non Technical Summary of the Environmental Statement

Replacement Environmental Statement Volume 0 Revised Non Technical Summary of the Environmental Statement Document 12 Lodge Hill Outline Planning Application Replacement Environmental Statement Volume 0 Revised Non Technical Summary of the Environmental Statement February 2014 Lodge Hill Outline Planning

More information

DELEGATED REPORT. Reason To ensure that any impermeable areas created during the filming process does not have a permanent impact on the site runoff.

DELEGATED REPORT. Reason To ensure that any impermeable areas created during the filming process does not have a permanent impact on the site runoff. DELEGATED REPORT APPLICATION NO. 16/03324/PRIOR LOCATION Hartland Park Bramshot Lane Fleet Hampshire PROPOSAL Notification for Prior Approval for the Temporary Use of Building or Land for the Purpose of

More information

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables Highway 400 Improvements from 1 km South of Highway 89 to the Junction of Highway 11 Appendix C - Highway 400 Widening and Interchange Tables Prepared for: Ontario Ministry of Transportation Four General

More information

Planning, Taxi Licensing and Rights of Way Committee Report. Application No: P/2018/0067 Grid Ref:

Planning, Taxi Licensing and Rights of Way Committee Report. Application No: P/2018/0067 Grid Ref: Planning, Taxi Licensing and Rights of Way Committee Report Application No: P/2018/0067 Grid Ref: 296632.9 267941.51 Community Council: Newtown Valid Date: 28/09/2015 Officer: Robin Wynne Williams Applicant:

More information

Sheringham Shoal Offshore Wind Farm Onshore Substation Reapplication Environmental Statement Addendum Non-Technical Summary

Sheringham Shoal Offshore Wind Farm Onshore Substation Reapplication Environmental Statement Addendum Non-Technical Summary Sheringham Shoal Offshore Wind Farm Onshore Substation Reapplication Environmental Statement Addendum Non-Technical Summary Scira Offshore Energy Limited 9 April 2009 9R8482 SHERINGHAM SHOAL OFFSHORE WIND

More information

SUBURBAN RESIDENTIAL. QLDC PROPOSED DISTRICT PLAN [PART THREE] DECISIONS VERSION 7 lower density SUBURBAN residential

SUBURBAN RESIDENTIAL. QLDC PROPOSED DISTRICT PLAN [PART THREE] DECISIONS VERSION 7 lower density SUBURBAN residential 7 LOWER DENSITY SUBURBAN RESIDENTIAL 7.1 Zone Purpose The Lower Density Suburban Residential Zone is the largest residential zone in the District. The District Plan includes such zoning that is within

More information

Business and Industrial Areas Queenstown, Frankton, Arrowtown and Wanaka 11.1 Issues, Objectives and Policies

Business and Industrial Areas Queenstown, Frankton, Arrowtown and Wanaka 11.1 Issues, Objectives and Policies . Business and Industrial Areas Queenstown, Frankton, Arrowtown and Wanaka.1 Issues, Objectives and.1.1 Resources, Activities and Values Business activities occur throughout the commercial, service and

More information

Royal Edinburgh Hospital Masterplan

Royal Edinburgh Hospital Masterplan Royal Edinburgh Hospital Masterplan ENVIRONMENTAL STATEMENT VOLUME 1 (OF 4): NON TECHNICAL SUMMARY October 2013 ENVIRONMENTAL STATEMENT VOLUME 1 (OF 4): NON TECHNICAL SUMMARY October 2013 Sinclair Knight

More information

Tees Valley Renewable Energy Facility

Tees Valley Renewable Energy Facility Renewable Energy Facility The Environmental Statement: Volume 3 Non-Technical Summary Air Products PLC Hersham Place Technology Park Molesey Road Hersham Surrey KT12 4RZ Tel 020 3170 8465 tell me more

More information

Management Plan: Hazardous Materials Removal & Demolition

Management Plan: Hazardous Materials Removal & Demolition Management Plan: Hazardous Materials Removal & Demolition Kingswood School (Upper Site), Corby 1.0 Introduction 1.1 Background Lambert Smith Hampton has been instructed by Northamptonshire County Council

More information

WELCOME. Redevelopment of land at Merrylees Industrial Estate, Desford LE9 9FE. This Public Exhibition. About Flogas

WELCOME. Redevelopment of land at Merrylees Industrial Estate, Desford LE9 9FE. This Public Exhibition. About Flogas WELCOME Thank you for taking the time to come along and view our proposals for Merrylees Industrial Estate. About Flogas We re a leading LPG (Liquefied Petroleum Gas) supplier with more than 30 years experience

More information

determine the effect of the Proposed Development together with the other planned changes within defined areas of influence;

determine the effect of the Proposed Development together with the other planned changes within defined areas of influence; 14 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 14.1 INTRODUCTION Cumulative and indirect effects result from the combined impacts of multiple projects / plans. Their consideration is important as the impacts

More information

Seven Sisters Road

Seven Sisters Road April 2013 Environmental Statement Volume 3 Non-Technical Summary National Grid Substation with Residential and Commercial Development Contents Page 1 Introduction 1 2 The Environmental Impact Assessment

More information

GlaxoSmithKline Wind Project Environmental Statement Non-Technical Summary

GlaxoSmithKline Wind Project Environmental Statement Non-Technical Summary GlaxoSmithKline Wind Project Environmental Statement Non-Technical Summary 22871-G8.indd greec01 Dec 2009 December 2009 Based upon the Ordnance Survey Map with the permission of the Controller of Her Majesty

More information

Proposed Residential Development at Land to the South of Pepper Lane. Environmental Statement: Non-Technical Summary

Proposed Residential Development at Land to the South of Pepper Lane. Environmental Statement: Non-Technical Summary Proposed Residential Development at Land to the South of Pepper Lane Environmental Statement: Non-Technical Summary Peter Brett Associates September 217 61 Oxford Street, Manchester, M1 6EQ T: +44 ()161

More information

Division 8 Intensive Animal Husbandry Code

Division 8 Intensive Animal Husbandry Code Division 8 Intensive Animal Husbry Code 12.8.1 Intensive Animal Husbry Code (1) The provisions in this division comprise the Intensive Animal Husbry Code. (2) They are compliance with the Intensive Animal

More information

PROPOSED MIXED USE DEVELOPMENT

PROPOSED MIXED USE DEVELOPMENT J Routledge & Sons PROPOSED MIXED USE DEVELOPMENT Land at Tanhouse Lane, Widnes Environmental Statement: Non-Technical Summary Planning Application: 05/00057/OUTEIA Tanhouse Lane Environmental Statement

More information

Marine Industries Production Campus

Marine Industries Production Campus Photograph Ministry of Defence Environmental Statement Volume 3: Non-Technical Summary Prepared for: +City Deal, Plymouth City Council Economic Development Department Marine Industries Production Campus

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Site visit made on 15 December 2017 by S M Holden BSc MSc CEng MICE TPP FCIHT MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date:

More information

New U.S. Embassy, Nine Elms Lane ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

New U.S. Embassy, Nine Elms Lane ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction The Government of the United States of America (specifically the Unites States Department of State - hereafter referred to as the Applicant ) is seeking to build a new Embassy in London

More information

FIS001: Land to the east of Lindis Road, Boston Sustainability Objective

FIS001: Land to the east of Lindis Road, Boston Sustainability Objective FIS001: Land to the east of Lindis Road, Boston Sustainability Objective Indicative development scenario: Total site area: 7.46ha Potential open space: 0.75ha Development area: 6.71ha Potential no of dwellings:

More information

MANAGEMENT OF DEMOLITION PROJECTS GUIDANCE FOR CLIENTS & ADMINISTRATORS CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2015

MANAGEMENT OF DEMOLITION PROJECTS GUIDANCE FOR CLIENTS & ADMINISTRATORS CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2015 The Institute of Demolition Engineers MANAGEMENT OF DEMOLITION PROJECTS GUIDANCE FOR CLIENTS & ADMINISTRATORS CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2015 This document has been produced to guide

More information

Portbury Dock Renewable Energy Plant. Cumulative Impact Assessment Non-Technical Summary September 2009

Portbury Dock Renewable Energy Plant. Cumulative Impact Assessment Non-Technical Summary September 2009 Portbury Dock Renewable Energy Plant Cumulative Impact Assessment Non-Technical Summary September 2009 INTRODUCTION On 28 th August 2009 E.ON Climate & Renewables UK Developments Limited (EC&R) submitted

More information

Wytch Farm Pipeline Refurbishment Project. Environmental Statement. Non-Technical Summary. November 2007

Wytch Farm Pipeline Refurbishment Project. Environmental Statement. Non-Technical Summary. November 2007 Wytch Farm Pipeline Refurbishment Project Environmental Statement Non-Technical Summary November 2007 Location map 0 1 2 3 4 5 kilometres Development area Introduction BP Exploration Operating Company

More information

Filey FAS. Presentation to Planners. Stewart Rowe

Filey FAS. Presentation to Planners. Stewart Rowe Filey FAS Presentation to Planners Stewart Rowe 15.2.2016 History of Flooding There is a long history of flooding in Filey caused by extreme rainfall events. These rainfall events have resulted in widespread

More information

5. ENVIRONMENTAL IMPACT ASSESSMENT

5. ENVIRONMENTAL IMPACT ASSESSMENT 5. ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION Environmental Impact Assessment (EIA) is a process that considers how a proposed development will change existing environmental conditions, and what

More information

Viridor Energy from Waste Facility. Environmental Statement Non-Technical Summary

Viridor Energy from Waste Facility. Environmental Statement Non-Technical Summary Viridor Energy from Waste Facility Environmental Statement Non-Technical Summary September 2012 Viridor Energy from Waste Facility Environmental Statement Non-Technical Summary Introduction Viridor has

More information

Comparative Evaluation Option #1 & Option #2

Comparative Evaluation Option #1 & Option #2 Comparative Evaluation Option #1 & Option #2 Option #1 Existing Landfill Approx. 47 metres/14 stories Proposed Layout Approx. 31 metres/9.5 stories Option #2 Existing Landfill Approx. 47 metres/14 stories

More information

LOSTOCK SUSTAINABLE ENERGY PLANT VARIATION OF CONSENT UNDER SECTION 36C OF THE ELECTRICITY ACT 1989

LOSTOCK SUSTAINABLE ENERGY PLANT VARIATION OF CONSENT UNDER SECTION 36C OF THE ELECTRICITY ACT 1989 DOCUMENT 8b LOSTOCK SUSTAINABLE ENERGY PLANT VARIATION OF CONSENT UNDER SECTION 36C OF THE ELECTRICITY ACT 1989 DIRECTION UNDER SECTION 90(2ZA) OF THE TOWN AND COUNTRY PLANNING ACT 1990 TO VARY THE CONDITIONS

More information

Division 19 Limited Development (Constrained) Zone: Assessment Criteria and Assessment Tables

Division 19 Limited Development (Constrained) Zone: Assessment Criteria and Assessment Tables Division 19 Limited Development (Constrained) Zone: Assessment Criteria and Assessment Tables 4.19.1 Limited Development (Constrained) Zone The provisions in this division relate to the Limited Development

More information

2 ENVIRONMENTAL IMPACT ASSESSMENT

2 ENVIRONMENTAL IMPACT ASSESSMENT 2 ENVIRONMENTAL IMPACT ASSESSMENT Introduction 2.1 Environmental Impact Assessment (EIA) is required for certain categories of projects and involves a process of drawing together, in a systematic way,

More information

HOW YOU NEED TO PLAN AND PREPARE FOR A SUCCESSFUL DEMOLITION PROJECT

HOW YOU NEED TO PLAN AND PREPARE FOR A SUCCESSFUL DEMOLITION PROJECT HOW YOU NEED TO PLAN AND PREPARE FOR A SUCCESSFUL DEMOLITION PROJECT GUIDANCE BRIEF FOR CLIENTS & ADMINSTRATORS CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2007 This document has been produced to guide

More information

GIS data classes used within the November 2013 Environmental Statement Environmental Maps

GIS data classes used within the November 2013 Environmental Statement Environmental Maps LWM-HS2-EV-DAT-000-000006 P01 22 January 2014 GIS data classes used within the November 2013 Environmental Statement Environmental Maps Document No.:LWM-HS2-EV-DAT-000-000006 Revision Author Checked by

More information

RMB Chivenor Flood Defence Scheme. Non-Technical Summary FINAL. Version 3.0

RMB Chivenor Flood Defence Scheme. Non-Technical Summary FINAL. Version 3.0 RMB Chivenor Flood Defence Scheme Non-Technical Summary FINAL Version 3.0 RMB CHIVENOR FLOOD DEFENCE SCHEME ENVIRONMENTAL STATEMENT CONTENTS 1 INTRODUCTION AND BACKGROUND II 2 THE PROPOSED PROJECT III

More information

Deborah Gas Storage Project

Deborah Gas Storage Project Deborah Gas Storage Project Environmental Statement Non-Technical Summary June 2010 Eni Hewett Limited Deborah Gas Storage Project 268240 EVT EMS 11 A 25 June 2010 Environmental Statement Non-Technical

More information

FORMER BAYER CROPSCIENCE LTD SITE, HAUXTON, CAMBRIDGESHIRE

FORMER BAYER CROPSCIENCE LTD SITE, HAUXTON, CAMBRIDGESHIRE FORMER BAYER CROPSCIENCE LTD SITE, HAUXTON, CAMBRIDGESHIRE Remediation Non-Technical Summary November 2008 GVA Grimley Ltd 10 Stratton Street London W1J 8JR 08449 02 0304 www.gvagrimley.co.uk Former Bayer

More information

This report assesses the outward noise and vibration impact of the proposed development on its surrounding environment.

This report assesses the outward noise and vibration impact of the proposed development on its surrounding environment. 8. NOISE AND VIBRATION 8.1 Introduction This report has been prepared by AWN to form part of an EIAR for the proposed residential development at Wonderful Barn, Barnhall, Leixlip. The chapter assesses

More information

Appraisal Summary Table (AST)

Appraisal Summary Table (AST) Appraisal Summary Table (AST) TAG Reference Guidance for the Senior Responible Officer, Guidance for the Technical Project Manager Version Control Date Description Jan14 Definitive release 17/10/2013 Release

More information

Demolition of the 3 Cooling Towers and Chimney at the former Richborough Power Station. Environmental Statement. Non-Technical Summary

Demolition of the 3 Cooling Towers and Chimney at the former Richborough Power Station. Environmental Statement. Non-Technical Summary Demolition of the 3 Cooling Towers and Chimney at the former Environmental Statement Non-Technical Summary Prepared for August 2011 Project Title: Report Title: Demolition of the 3 Cooling Towers and Chimney

More information

M6 Junctions 16 to 19 Smart Motorway. Environmental Assessment Report Non-Technical Summary. FINAL, Rev.0. October 2014

M6 Junctions 16 to 19 Smart Motorway. Environmental Assessment Report Non-Technical Summary. FINAL, Rev.0. October 2014 M6 Junctions 16 to 19 Smart Motorway Environmental Assessment Report FINAL, Rev.0 October 2014 CONTENTS 1 INTRODUCTION... 1 1.1 PROJECT OVERVIEW... 1 1.2 NEED FOR THIS ENVIRONMENTAL ASSESSMENT REPORT...

More information

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER OLD LEAKE (JUNE 2016)

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER OLD LEAKE (JUNE 2016) SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER OLD LEAKE (JUNE 2016) 1 OLD LEAKE S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation

More information

Transport for the North

Transport for the North Transport for the North Strategic Transport Plan Integrated Sustainability Appraisal (ISA) Overview 1. Introduction: ISA Purpose, Scope and Process 2. Review of Plans, Policies and Programmes & Baseline

More information

RECOMMENDED Outline Application - Approval recommended. That Planning Permission be granted subject to completing a S106 agreement the following:

RECOMMENDED Outline Application - Approval recommended. That Planning Permission be granted subject to completing a S106 agreement the following: Item No. 10 APPLICATION NUMBER CB/16/03885/OUT LOCATION Land at East Lodge, Hitchin Road, Stotfold, Hitchin, SG5 4AA PROPOSAL Outline Application: 18 No. 2 storey family houses on area of open land, former

More information

H3. Residential Single House Zone

H3. Residential Single House Zone H3. Residential Single House Zone H3.1. Zone description The purpose of the Residential Single House Zone is to maintain and enhance the amenity values of established residential neighbourhoods in number

More information

06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards

06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards 06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards THE APPLICATION Planning permission is sought for the construction of a noise attenuation

More information