BUILDING PERMIT VALUATION FEES TOTAL VALUATION FEE $1.00 to $500.00 $23.50 $501.00 to $2000.00 $23.50 for the first $500.00 plus $3.05 for each additional $100.00 or fraction thereof, to and including $2000.00. $2001. 00 to $25,000.00 $69.25 for the first $2000.00 plus $14.00 for each additional $1000.00, or fraction thereof, to and including $25,000.00. $25,001. 00 to $50,000.00 $391.75 for the first $25,000.00 plus $10.10 for each additional $1000.00, or fraction thereof, to and including $50,000.00. $50,001. 00 to $100,000.00 $643.75 for the first $50,000.00 plus $7.00 for each including $100,000.00. $100,001.00 to $500,000.00 $993.75 for the first $100,000.00 plus $5.60 for each including $500,000.00. $500,001.00 to $1,000,000.00 $3,333.75 for the first $500,000.00 plus $4.75 for each including $1,000,000.00. $1 000 001 00 and up... $5608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereof. OTHER INSPECTION FEES: $49.50 per hr. Special Request Inspections (minimum charge-two hrs.) $49.50 per hr. Reinspection fees assessed under provisions of Section 305.8. $49.50 per hr. Inspections for which no fee is specifically indicated (minimum charge-one half-hour) $49. 50 per hr. Additional plan review required by changes, additions, or revisions to plans. Actual Cost For use of outside consultants for plan checking and inspections, or both.
Building Valuation Data Fee Per Sq. Ft. (Used to determine value from square footage in order to assign permit fees) Apartment Houses 1. Masonry per story $57.00/sq. ft. Garages Attached/Detached $ 17,00/sq. ft. 2. Wood Frame per story $50.00/sq. ft, Garages Attached/Detached $15.00/sq. ft. Basement Finished/Unfinished Additions to Existing Structures Building rate per sq. ft. valuation 1. Masonry $57.00/sq. ft. 2. Wood Frame $50.00/sq. ft. Plus Trade Fees 1. Electrical 2. Mechanical 3. Plumbing Private Garages 1. Masonry $17.00/sq. ft. 2. Wood Frame $ 15.00/sq. ft. 3. Car Ports $12.00/sq. ft. Decks/Sheds Commercial 1. Masonry 2. Wood Frame 3. Steel Frame (Based on valuation: applicants provide cost) (Applicant provides cost estimate for all commercial work) Pole Building Unfinished Pole Building Finished Steel Building Unfinished Steel Building Finished $ 10.00/sq. ft. $12.00/sq. ft. $ 15.00/sq. ft. S17.00/sq. ft. Plus Trade Fees: 1. Electrical 2.Mechanical 3. Plumbing All General contractors and trades must be registered with the Village of Waterloo and show proof of Liability Insurance.
FEE SCHEDULE ELECTRICAL PERMITS Commercial and Multi-Family& Upgrades New Service fee 1-100 Amp Fee $13.00 101-200 Amp Fee $18.00 201-300 Amp fee $30.00 301-400 Amp Fee $42.00 401-500 Amp fee $55.00 501-600 Amp Fee $67.00 601-700 Amp Fee $80.00 701-800 Amp Fee $92.00 801-900 Amp Fee 105.00 901-1000 Amp Fee 117.00 If over 1000 amp, first 1000 amp $117.00- each additional 100 amps $13.00 Commercial and Multi- family and All Upgrades: + Circuit Total # of Circuits x $ 2.75 Amp fee New Residential (finished area and attached garage) Single and Two Family Dwellings - Square ft. x.050 ex. 1200 sq. ft. x.050 = $60.00 Remodeling and Additions: Receptacle/Switch outlet fixtures x $.75 Residential and Commercial Appliances # Fixed Outlets x $3.00 Power Apparatus (220 volts) # Apparatus x $ 3.00 Upgrade Existing Residential Service $ 30.00 Temporary Service $15.00 Fire Alarm System $ 15.00 Signs $ 15.00 Miscellaneous $ 10.00 Issuance Fee for all permits $ 15.00
FEE SCHEDULE As per 1997 Uniform Administrative Code Mechanical Permit Issuance Fee... $15.00 Forced air furnaces and duct work up to 100,000 BTU $ 15.00 Over 100,000 $18.00 Relocation or replacement of any appliance vent $ 7.25 Any heating or cooling addition or change out $13.70 For each air handling unit $10.75 Boilers, Compressors or Absorption Up to 3 horsepower $14.70 Over 3hp up to 15 horsepower $27.15 Over 15hp up to 30hp $37.25 Over 30 hp refer to 97 UAC Evaporative coolers $10.65 Each Ventilation fan $ 7.25 Special Request Inspections $49.50 Re-inspection fee $49.50 Miscellaneous $ 7.50
FEE SCHEDULE PLUMBING 1997 U.P.C. Issuance Fee $15.00 For each fixture trap $ 7.80 For each building sewer $20.00 For repair or alteration of drainage or Vent piping, each fixture $4.75 Replace existing Water heater and water heater vent $20.00 For installation, alteration, or repair of Water piping, each fixture $ 2.75 For each gas piping system up to five outlets $ 6.25 For each additional gas over 5 $ 1.50 Lawn sprinkler systems $ 20.00 Each backflow device $ 12.50 Private Swimming Pool $ 60.00 Private Spa $25.00 Commercial backflow devices $25.00 Re-inspection Fee $ 49.50 Special Request Inspections $ 49.50 Miscellaneous items $ 5.00