ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Similar documents
SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

SUPPLEMENTAL ECMS ADVANCED INFORMATION APRIL 6, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10

Straight Line Diagram. Cameron 12. January 2018

Blueprint for One of the Nation s Largest SCM Maintenance Programs

$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

AUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PUB 336 (4-17)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Oil and Gas Management

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( )

General Permit WMGR116. Beneficial Use of Alternative Fuels for Circulating and Bubbling Fluidized Bed Boilers and Pulverized Coal-fired Boilers

Act 101 Section 902 Grants Round 53 Summary

Bridge Asset Management City of Battle Creek Planning and Projects

3.6 Construction Methods

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

Biosolids Quality. Enhancement Plan. For more information, visit keyword: Biosolids.

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Transportation Subcommittee Meeting July 18, 2014

I-91 Viaduct Public Information Briefing

Annual CSAH Needs Update for 2017

STANDARD CONDITIONS GENERAL PERMIT WMGM042

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

General Permit WMGR025 Residual and Municipal Waste Composting

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

COUNTY ROAD ASSOCIATION OF MICHIGAN

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

GENERAL PERMIT WMGR125 BENEFICIAL USE OF DRY FGD WASTE AND COAL ASH

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

G2-0 LIST OF ACTIVE MTODs

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

APPLICANT PROJECT REQUESTED RECOMMENDED COMMENTS

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017

SITE ASSESSMENT SAMPLING REQUIREMENTS AT REGULATED STORAGE TANK SYSTEM CLOSURES

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

REHABILITATION PACKAGE 4-a

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

2 State Profile. Pennsylvania 2018 State Hazard Mitigation Plan 7

G2-0 LIST OF ACTIVE MTODs

Pattullo Bridge Replacement Project. Cost Report

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Procedure No: (SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION PROCEDURE

G2-0 LIST OF ACTIVE MTODs

Engineering District 5-0

An Assessment of the Economic Impacts of the Pennsylvania Dairy Industry 1

I-91 Viaduct Public Information Briefing

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

2017 Highway Safety Improvement Program Call

JOINT PERMIT APPLICATION INSTRUCTIONS FOR A PENNSYLVANIA WATER OBSTRUCTION AND ENCROACHMENT PERMIT APPLICATION AND A

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

Scenarios. The following slides will present you with several Scenarios & Questions that address pollution prevention and good housekeeping.

Maryland Transportation Authority (MDTA)

CUY-IR MNT FY2018 Tree Removal PRUNING/OR TREE/BRUSH REMOVAL

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS

extent feasible. Per the and low constructability,

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

Metals Data. for. Pennsylvania Soils

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

Brad Hall Midstream & Marketing

Highway Construction Program

Highway Performance Monitoring System Quality Review

Maine Turnpike Authority

CHAPTER 11 PAVEMENT TYPE DETERMINATION

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND

PENNSYLVANIA WEEKLY FALL FOLIAGE REPORT

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Life Cycle Cost Analysis July 2011 Materials Division Page 1 TABLE OF CONTENTS V. ASPHALT PAVEMENT CONSTRUCTION/RECONSTRUCTION...

Full Depth Pavement Reclamation

B313-1 HOT MIX ASPHALT OPSS.PROV 313

Maintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT

Chapter 4 Bridge Program Drawings

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

Chapter URBAN & RURAL FREEWAY DESIGN

Overview of Maintenance and Construction Programs. Mike Holder, PE, Chief Engineer Jennifer Brandenburg, PE, State Asset Management Engineer

February Page 1

Final Recommendations Identification of Improvements, Strategies, and Solutions

Re: PW Appendix 3 - Part 8

BID ITEM WORKBOOK COSTARS-34 Theater (Auditorium) Furniture, Fixtures, Audio/Visual Equipment and Musical Instruments BIDDER/CONTRACTOR DATA

SHRP2 SOLUTONS. Innovative Bridge Designs for Rapid Renewal. Peer-to-Peer Exchange Workshop Atlanta, GA November 2015

STATE AID GUIDE FOR: Updated: December 16, 2005

Curtis Bouteillier, Proform Management Inc. Wayne Gustafson, The City of Red Deer

For Public Input Period

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

ESTIMATE OF QUANTITIES

Implementing a Pavement Management System PASER Based City of Omaha, NE

STRUCTURE AND BRIDGE DIVISION

Pavement Preservation: When, Where, and How?

Transcription:

ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated May 4, 2018 FULTON COUNTY SR 0000(FMC) #109343 PROPOSAL:$21.36 PLANS:$9.02 12X18:$11.07 24X36:$159.90 X-SEC:$7.48 12X18:$9.18 24X36:$132.60 This project involves the construction of a township road and storm water management facilities around the Fulton County Medical Center. The township road will start at an existing access roadway that extends to T-516 (Peach Orchard Road). The roadway will continue around the medical center facilities and will end at the intersection of SR 1004 (Lincoln Way West). Also, part of the project will be the addition of a right turn lane from SR 1004 onto the township road and other miscellaneous construction, as indicated on the approved drawings included in the bid package in FULTON COUNTY, TODD TOWNSHIP. This project is located just west of McConnellsburg Borough and east of the intersection of T-516 (Peach Orchard Road) and SR 1004 (Lincoln Way West). SULLIVAN COUNTY SR 154(084) #110612 PROPOSAL:$21.36 PLANS:$5.28 12X18:$6.48 24X36:$93.60 Ex St:$0.66 12x18:$0.81 24x36:$11.70 Bridge rehabilitation including removal of existing timber bridge deck, replacement of steel I-beam fascia beam of structure over Elk Creek, removal of portion of existing bridge, rehabilitation of a single span steel thru truss bridge over Little Loyalsock Creek, base and wearing courses, guide rail, pavement markings, reinforced soil slope, temporary support and protection system, and other related work as indicated on approved drawings for STATE ROUTE 154, SECTION 084, from approximately 2.41 miles west of the intersection with State Route 4008 at Segment 0290 Offset 1552 to approximately 0.07 mile north of the intersection with State Route 4001 at Segment 0300 Offset 0000 in ELKLAND TOWNSHIP, SULLIVAN COUNTY and for STATE ROUTE 87, SECTION 135, from approximately 0.03 mile east of the intersection with State Route 154 at Segment 0270 Offset 0000 to approximately 1.44 miles southwest of the intersection with State Route 4011 at Segment 0280 Offset 0065 in FORKSVILLE BOROUGH, SULLIVAN COUNTY. ERIE COUNTY SR 90(CMB) #110094 PROPOSAL:$13.20 PLANS 8.5x11:$1.32 The description and location of the project is as follows: For the Installation of Cable Median Barrier and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0090, SECTION CMB, in ERIE COUNTY, NORTH EAST, GREENFIELD & HARBORCREEK TOWNSHIP from segment 0330 offset 1462 to segment 0454 offset 1715. CRAWFORD COUNTY SR 408(182) #98601 PROPOSAL:$17.40 PLANS 8.5x11:$4.20 For the construction or improvement of a certain section of STATE HIGHWAYS in CRAWFORD COUNTY, BLOOMFIELD, STEUBEN, AND TROY TOWNSHIPS, Commonwealth of Pennsylvania, STATE ROUTE 0408 SECTION 182. This project being situated as follows, SR. 0008 - approximately 182 feet south of the intersection with SR. 1020 at Segment 0170 Offset 0184 then north to approximately 184 feet north of the intersection with SR. 0077 at Segment 0310 Offset 1439. SR. 0408 - From Approximately 100 feet west from the intersection with SR. 1018 at Segment 0320 Offset 3286 then east and south to approximately 145 feet west of the intersection with SR. 0428 at Segment 0400 Offset 0145. For the bituminous milling and overlay with Warm Mix Superpave Asphalt Mixture Designs 22' to 24' in width, also for drainage, ADA curb ramps, guide rail, and pavement markings all within a project length of 9.58 miles as indicated on the approved drawings. BERKS COUNTY SR 0000(---) #111029 PROPOSAL:$13.44 This is a two year Maintenance Contract for the repair and/or replacement of accident damaged guide rail, metal median barrier, end treatments, and right-of-way fencing. This is also for the updating of low cost tort liability reduction sites as directed, on various STATE ROUTES in various MUNICIPALITIES in BERKS, LEHIGH AND NORTHAMPTON COUNTIES, Commonwealth of Pennsylvania. 1

SCHUYLKILL COUNTY SR 0000(---) #111030 PROPOSAL:$12.12 This is a two year Maintenance Contract for the repair and/or replacement of accident damaged guide rail, metal median barrier, end treatments, and right-of-way fencing, also for the updating of low cost tort liability reduction sites as directed, on VARIOUS STATE ROUTES in VARIOUS MUNICIPALITIES in CARBON, MONROE AND SCHUYLKILL COUNTIES, Commonwealth of Pennsylvania. DAUPHIN COUNTY SR 22(080) #110970 PROPOSAL:$15.60 PLANS:$3.30 12X18:$4.05 24X36:$58.50 This is a pavement preservation project that includes bituminous overlay, accelerated concrete pavement patching, pavement reconstruction, drainage updates, signing, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0022, SECTION 080, in DAUPHIN COUNTY, MIDDLE PAXTON & SUSQUEHANNA TOWNSHIPS and DAUPHIN BOROUGH, from west of PA 325 at Segment 0080/0081 Offset 2471/2137 to east of PA 225 at Segment 0174 Offset 2550 eastbound and to east of PA 39 at Segment 0261 Offset 1052 westbound, for an overall project length of 8.50 miles. INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated April 27, 2018 MONTGOMERY COUNTY SR 0000(APM) #110244 PROPOSAL:$10.92 The description and location of the project is as follows: Furnishing and Installation of snow plowable raised pavement markers having one/two way holder with reflector of the type indicated, at various site locations on Highways and Ramps in Bucks, Chester, Delaware, Montgomery and Philadelphia counties in Various CITY/BOROUGH/TOWNSHIP/MUNICIPALITY. BEDFORD COUNTY SR 0000(---) #109917 PROPOSAL:$9.96 The description and location of the project is as follows: and end treatments that have been damaged by traffic accidents along VARIOUS STATE ROUTES in BEDFORD, BLAIR, CAMBRIA, FULTON, HUNTINGDON & SOMERSET COUNTIES, Commonwealth of Pennsylvania. FULTON COUNTY SR 30(009) #108195 PROPOSAL:$16.20 PLANS:$3.30 12X18:$4.05 24X36:$58.10 X-SEC:$3.08 12X18:$3.78 24X36:$54.60 This project is for the resurfacing of approximately 1.750 miles of bituminous roadway and includes drainage, guiderail & pavement markings and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 0030, SECTION 009, in FULTON COUNTY, AYR & TODD TOWNSHIPS at the approximate location: SR 0030, Segment 0400, Offset 0504 to Segment 0450, Offset 2330 2

FULTON COUNTY SR 522(015) #92619 PROPOSAL:$28.32 PLANS:$15.62 12X18:$19.17 24X36:$276.90 X-SEC:$15.84 12X18:$19.44 24X36:$28.80 This project is for the resurfacing of approximately 5.979 miles of bituminous roadway on SR 0522 in Fulton County and includes mill and overlay, shoulder widening and cross slope modification, drainage & guide rail upgrades, sidewalks including design and construction of ADA ramps and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 0522, SECTION 015, in FULTON COUNTY, AYR TOWNSHIP, MCCONNELLSBURG BOROUGH at the approximate location: Station 938+17.00 to Station 1256+50.00 Segment 0290, Offset 1570 to Segment 0410, Offset 0485 LEBANON COUNTY SR 1003(022) #100278 PROPOSAL:$24.12 PLANS:$6.82 12X18:$8.37 24X36:$120.90 X-SEC:$2.86 12X18:$3.51 24X36:$50.70 Ex St:$0.44 12x18:$0.54 24x36:$7.80 This is a Design Build Project. Work will consist of the complete replacement of the old structure over the Little Swatara Creek with two 11' lanes and a 8' wide shoulder on the northbound side and a 6' wide shoulder on the southbound side. Roadway work includes an overlay, full depth approach construction, new guiderail, minor drainage work, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 1003, SECTION 022, in LEBANON COUNTY, SWATARA TOWNSHIP and JONESTOWN BOROUGH, from Segment 0120 Offset 0465 to Segment 0120 Offset 1260, for an overall project length of 682.62 linear feet (0.129 mile). BUCKS COUNTY SR 4021(099) #110904 PROPOSAL:$16.32 The milling and resurfacing with bituminous material, general maintenance of various state roadways in Bucks County, Engineering District 6-0, Commonwealth of Pennsylvania. VENANGO COUNTY SR 38(B02) #90028 PROPOSAL:$17.16 PLANS:$5.94 12X18:$7.29 24X36:$105.30 X-SEC:$1.54 12X18:$1.89 24X36:$27.30 For the construction of a certain sections of STATE HIGHWAY in VENANGO COUNTY, RICHLAND TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0038, SECTION B02. This project situated as follows, From approximately 0.2 mile north of the intersection with SR. 2003 at Segment 0100 Offset 1455 (Station 334+40.00) then north to approximately 0.6 mile south of the intersection with SR. 2001 at Segment 0110 Offset 0268 (Station 340+02.00). For the construction of a Precast Reinforced Concrete Box Culvert over Richey Run having an overall span length of 12'-0", Also for construction of bridge structure removal, new roadway approaches using Superpave Asphalt Mixture Designs, guiderail, drainage, paved shoulders, signs, pavement markings and other miscellaneous work all within a project length of 362.00 feet (0.069 mile) as indicated on the approved drawings. SOMERSET COUNTY SR 2017(003) #111137 PROPOSAL:$14.28 PLANS:$1.32 12X18:$1.62 24X36:$23.40 This project is to preform Full Depth Reclamation of approximately 8.35 miles of bituminous roadway on SR 2017 as indicated on the approved drawings included in the bid package for STATE ROUTE 2017, SECTION 003, in SOMERSET COUNTY, NORTHAMPTON & ALLEGHENY TOWNSHIPS at the approximate location. Segment 0120, Offset 0000 to Segment 0290, Offset 2241 3

BERKS COUNTY SR 176(POC) #110835 PROPOSAL:$20.40 PLANS 8.5x11:$1.68 SR176 (4 lanes of traffic and shoulders), SR222 ( 3 lanes of traffic and shoulders):base repair, Micro surfacing, milling, replace all pavement markings, replace rumble strips, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 176/222, SECTION POC, in BERKS COUNTY, CUMRU AND ROBESON/MAXXTAWNY TOWNSHIP. SR176 segment 35 offset 1498 to segment 95 offset 0240, and segment 40 offset 0183 to segment 94 offset 1708, include SR9402 and SR9404. SR222 segment 620 offset 0000 to segment 680 offset 3631, and segment 611 offset 2169 to segment 611 offset 2274. All work is within the existing ROW. WAYNE COUNTY SR 652(IMP) #107484 PROPOSAL:$13.80 PLANS 8.5x11:$1.20 This project is for the construction of full depth bituminous shoulders, milled shoulder rumble strips and line painting as indicated on the approved drawings included in the bid package for STATE ROUTE 652, SECTION IMP, in WAYNE COUNTY, for an overall length of 21,000 linear feet (3.98 miles). BERKS COUNTY SR 222(0) #108948 PROPOSAL:$27.72 PLANS:$7.26 12X18:$8.91 24X36:$128.70 Ex St:$14.30 12x18:$17.55 24x36:$253.50 Bridge repairs on SR 222 in Wyomissing Hills, including but not limited to structural steel repairs, concrete deck repairs, concrete substructure repairs, bearing repairs, joint repairs, zone painting, median barrier, along with other miscellaneous construction as indicated on the attached details included in the Bid Package. ALLEGHENY COUNTY SR 376(A64) #110594 PROPOSAL:$31.68 PLANS:$35.20 12X18:$43.20 24X36:$624.00 Ex St:$38.06 12x18:$46.71 24x36:$674.70 The description and location of the project is as follows: For the milling and resurfacing, concrete pavement rehabilitation, drainage, guide rail, signing and pavement marking, bridge preservation, and other miscellaneous construction, all within a length of 34,228 linear feet (6.49 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 0376 SECTION A64 (Penn Lincoln Parkway), in ALLEGHENY COUNTY, CITY OF PITTSBURGH, SWISSVALE AND EDGEWOOD BOROUGHS, Commonwealth of Pennsylvania. This project being situated as follows: From a point approximately 175 feet west of the north end of the Fort Pitt Bridge at Segment 0694/0695 Offset 1505/1472 (Station 1095+68/1090+05) to the dual structures over SR 8010 Ramp B at Segment 0764/0765 Offset 0121/0100 (Station 965+45). ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated April 23, 2018 DELAWARE COUNTY SR 7023(186) #47993 PROPOSAL:$25.32 PLANS:$18.70 12X18:$22.95 24X36:$331.50 X-SEC:$1.54 12X18:$1.89 24X36:$27.30 Ex St:$0.88 12x18:$1.08 24x36:$15.60 The description and location of the project is as follows: This project is the replacement of the West Seventh Street Bridge over Chester Cresk and other miscellaneous construction, all as indicated on the drawings approved November 13, 2017 for STATE ROUTE 7023, SECTION 186, in DELAWARE COUNTY, CITY of CHESTER from approximately Penn Street to Sproul Street. The new bridge is a single span composite steel multi-girder bridge with a total length of 148 feet 0 inches. Bituminous paving is included on the approaches. 4

CUMBERLAND COUNTY SR 83(083) #106497 PROPOSAL:$18.36 PLANS:$6.16 12X18:$7.56 24X36:$109.20 This project consists of concrete patching, replacing center median barrier, milling & resurfacing, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0083, SECTION 083, in CUMBERLAND COUNTY, LOWER ALLEN TOWNSHIP and NEW CUMBERLAND & LEMOYNE BOROUGHS, from the Yellow Breeches Creek at the York County line Segment 0396/0397 Offset 0186/0186 to the Susquehanna River at Segment 0420/0421 Offset 0052/0076, for an overall project length of 6,881.00 linear feet (1.30 miles). WESTMORELAND COUNTY SR 31(000) #76084 PROPOSAL:$17.40 PLANS:$3.96 12X18:$4.86 24X36:$70.20 Ex St:$0.44 12x18:$0.54 24x36:$7.80 The description and location of the project is as follows. This is a Bridge Rehabilitation project for the structure on SR 0031-09M a Reinforced Concrete Tee-Beam bridge carrying SR 31 over Brush Run. This project is the removal of the existing asphalt and placement of a membrane and new overlay, replacement of existing barrier, minor substructure work and other miscellaneous construction, as indicated on the approved structure drawings S-37855, as indicated on the approved drawings included in the bid package for STATE ROUTE 0031 SECTION 09M, in WESTMORELAND COUNTY MT. PLEASANT TOWNSHIP from approximately segment 0310 offset 1251 to approximately segment 0310 offset 1824. WASHINGTON COUNTY SR 1002(0) #98344 PROPOSAL:$17.28 PLANS:$6.82 12X18:$8.37 24X36:$120.90 Paving West McMurray Road and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 1002, SECTION 03R, in WASHINGTON COUNTY PETERS TOWNSHIP from SR 19 at segment 0050 offset 0000 to the Washington/Allegheny county line at segment 0130 offset 2299. LEHIGH COUNTY SR 0000(---) #110436 PROPOSAL:$10.80 This project is a Districtwide bi-annual maintenance contract for the installation of major guide signs and other miscellaneous construction on VARIOUS STATE ROUTES in VARIOUS MUNICIPALITIES in BERKS, CARBON, LEHIGH, MONROE, NORTHAMPTON, AND SCHUYLKILL COUNTIES. INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION ASSOCIATED PENNSYLVANIA CONSTRUCTORS NORTHUMBERLAND COUNTY SR 61(125) #99183 PROPOSAL:$26.16 PLANS:$2.42 12X18:$2.97 24X36:$42.90 Milling and resurfacing of existing roadway, including flexible base replacement, Superpave Asphalt Mixture scratch and wearing courses, pavement markings, design and construction of ADA curb ramps, and other miscellaneous construction within a length of 6,326.00 linear feet (1.20 mile) as indicated on approved drawings for STATE ROUTE 61, SECTION 125 from approximately 0.25 mile west of the intersection with State Route 4009 at Segment 0500 Offset 1292 to approximately 0.10 mile east of the intersection with State Route 4004 at Segment 0500 Offset 0768 in the CITY OF SUNBURY and UPPER AUGUSTA TOWNSHIP, NORTHUMBERLAND COUNTY. 5

MERCER COUNTY SR 58(STU) #106754 PROPOSAL:$18.72 PLANS:$4.40 12X18:$5.40 24X36:$78.00 The description and location of the project is as follows: For the Design Build of Highway Lighting. Also for the construction of Cement Concrete Sidewalk, Plain Cement Concrete Curb, Curb Ramps, landscaping improvements, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for SOUTH DIAMOND STREET STREETSCAPE, in MERCER COUNTY, MERCER BOROUGH from segment 0550 offset 0016 to segment 0550 offset 0546. LYCOMING COUNTY SR 0000(---) #106152 PROPOSAL:$7.92 PLANS:$4.84 12X18:$5.94 24X36:$85.80 For the furnishing and application of white and yellow waterborne pavement markings along various state highways within Engineering District 3-0, various municipalities, Commonwealth of Pennsylvania, as indicated on the approved drawings included in the Bid Package. INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION 6