National Energy Code for Buildings 2011

Similar documents
National Building Code Part 9 Energy Efficiency: Focus Paper to Assist in the Review of Proposed Changes

Manitoba Energy Code for Buildings. Part 3 Building Envelope

Ontario s Building Code

Module number 6 provides an on-line, self-paced training seminar on energy efficiency and energy conservation for residential buildings.

Energy Conservation Amendments to the Ontario Building Code

1. When using the REScheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is.

Energy Trigger (A Existing Building Upgrade Mechanism Model)

2010 National Building Code Adoption and Associated Process Changes

2015 Michigan Residential Code Energy Worksheet for New Single-family Residential Building

Michigan Energy Code Training and Implementation Program

ADMINISTRATION CHAPTER 1

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

Accounting for Thermal Bridging at Interface Details. A Methodology for De-Rating Prescriptive Opaque Envelope Requirements in Energy Codes

A LOOK INTO THE 2015 IECC RESIDENTIAL PROVISIONS. Presented by: Shaunna Mozingo, Colorado Code Consulting

Understanding the National Energy Code of Canada for Buildings, 2011

Chapter 2: Foundation

Instructions for the Residential Building Data Collection Checklist 2009 International Energy Conservation Code with 2011 Georgia Amendments

Energy Simulation Tool Approval Technical Assistance Manual 2017 Florida Building Code, Energy Conservation

Fenestration Energy Performance:

Michigan Energy Code Training and Implementation Program

IECC Commercial Significant Changes Summary Tier I

ENERGY STAR Qualifying Criteria for Residential Windows, Doors, and Skylights Sold in Canada Version 3.0 October 1, 2010

Clarifying the Fenestration Energy Performance requirement in the Ontario Building Code Supplementary Standard SB12

Boulder City NV Prepared by (Print Name) Signature Date

Phase Two Change Proposal for the Next Edition of the Building Code: 2-CC-B POTENTIAL CHANGE TO ONTARIO S BUILDING CODE:

Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal

Building Codes and Ordinances ARC 227

Prescriptive Checklist for the 2015 Washington State Energy Code

Green Building Guideline of Jordan

Green Building Guideline of Jordan

How do you install yours?

Energy efficiency in housing and small buildings performance path

Feature Zone IECC 2009 IECC

Presentation Overview: NC Energy Code RESNET Standards HERS Index HERS Verification Process

Energy & Cost Savings Analysis of 2009 IECC Efficiency Improvements

Architectural Testing, Inc. 849 Western Avenue North Saint Paul, Minnesota Dan Johnson, Director - Regional Operations

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT

Spray Polyurethane Foam. Insulation and Air Barrier Requirements of the 2012 I-Codes. Spray Foam Coalition

Chapter 1: Compliance

Interpretation Variables and Common Areas of Confusion. Of the 2009 IECC

This page has been left blank intentionally.

INSIDE RESCheck / COMCheck

4. Number of drawings required: ( ) Locations of nearest streets

Energy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort

2012 IECC Residential with State Adopted Changes

Truss Heel Heights and Energy Code Requirements. Overview Revised 2/17/2017

Energy modeling in IDA ICE according to ASHRAE , app. G

Training Certification Categories

Why test a system that has already been tested? Typical Manufacturers information for window to wall interface and basis for reported test results.

EXETER TOWNSHIP HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS

Compliance Certificate

A. GENERAL INFORMATION

Single Family Residence Building Permits

Fenestration Components: Mechanical Summary. Water heater energy factor: Ef Fuel type: Gas Electric Other

EIFS The cladding with the lowest carbon footprint

Great Ocean Rd Ice Creamery

ASHRAE 90.2 Kuwait What Can be Learned From It?

IRC 2012 Key Changes

Energy Code Basics for Residential Buildings. Presented by Newport Ventures NEWPORT VENTURES

Oregon High Performance Home Requirements

Building & Ductwork Airtightness Standards

SBRA Modular Program Guide

Massachusetts Electric and Gas Program Administrators

Inspection of New One- and Two- Family Dwellings

Errata Sheet. LEED for Schools Reference Guide First Edition for the document titled:

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST

Michigan Energy and Cost Savings

Subject: Energy Subcode Compliance. Reference: N.J.A.C. 5: (f)1.vi, 2.18(b) and 3.18

Examining the case for adopting the National Energy Code for Buildings:

Zero Carbon Building Energy Modelling Guidelines. October 31, 2017

COST AND BENEFIT ANALYSIS OF PROPOSED CHANGES FOR ENERGY EFFICIENCY IN HOUSING AND SMALL BUILDING IN THE NATIONAL BUILDING CODE

BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL PRACTICE

VELUX America Inc. SPECIFICATION FOR MODEL QPF SELF-FLASHED FIXED SKYLIGHT SECTION UNIT SKYLIGHTS

National Energy Code of Canada for Buildings (NECB)

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION SECTION: WATER-RESISTIVE BARRIERS/WEATHER BARRIERS

Plan Check & Field Inspection Guide

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES

Thermal Bridging in Residential Construction

SUPPLEMENT FOR EDGE USER GUIDES V.2.0. Date of Publication: Refer to the EDGE website for the most recently published supplement

Innovating Continuous Exterior Insulation. Theresa A. Weston, PhD. 1

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

780 CMR: 9 th Edition Massachusetts State Building Code. Presented to: BSA Codes Committee. DATE: January 20, 2016

Energy Efficiency Programs

EUROPEAN ORGANISATION FOR TECHNICAL APPROVALS

1) For the purpose of this Section, the term common space shall mean all spaces required to

CHECKLIST Inspecting a Garage

General Commercial Energy Provisions

Title: Building Construction for the Fire Service. Time: 3 hours. Teaching Materials: White board Building Construction for the Fire Service (PDF)

2012 IPC Sections

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection

ARCH 5901 A02 Office Building Program FALL 2015

The Participants in this GreenON Rebates Program are homeowners and landlords.

WEST VIRGINIA UNIVERSITY ALUMNI CENTER Morgantown, West Virginia

Energy Proposed Code Modifications Including Comments This document created by the Florida Department of Business and Professional Regulation -

LEED v4 for Homes, Residential Project Summary and Checklist One and Two Family New Construction

2014 Commercial Plan Submittal Checklist

Is Your Envelope Effective? BCBEC Luncheon January 29, 2009

Transcription:

GUIDE TO COMPLETING Energy Code Supplement for Building Permit Application (NECB2011) Scope of NECB 2011 National Energy Code for Buildings (NECB) 2011, developed by Natural Resources Canada and the National Research Council to improve energy efficiency of buildings, is Alberta s new minimum construction standard for energy-consuming spaces and components in new buildings and additions. It offers three distinct compliance paths Prescriptive, Prescriptive with Trade-Offs, and Performance. Each path offers a level of design freedom that is mirrored by a commensurate level of permit application submission requirements and professional involvement. NECB applies to new Core and Shell projects and their subsequent tenant fit-up or build-out, as well as to complete buildings and additions. If the project under consideration is purely Part 9 residential or a relatively small commercial building (less than 300m² total floor area of office, retail or low-hazard industrial occupancies), Alberta Building Code 2014 (ABC 9.36) should be consulted as it offers simplified paths to energy efficiency compliance, that may be appropriate. Note that projects governed under Part 9 of the ABC include new buildings, additions and alterations to existing buildings. On the other hand, Part 9 new construction, additions or alterations beyond the limited scope of ABC 9.36 (e.g.: non-residential greater than 300m² of floor area, all F2 occupancies) must be constructed to NECB 2011. Finally, any new construction, addition or alteration within the scope of ABC 9.36 may be designed to NECB 2011, if so desired. The NECB 2011 User s Guide (published 2014) features extensive and excellent guidance on calculation approaches. Choosing a path PRESCRIPTIVE PATH to NECB 2011 compliance is through the strict construction of requirements prescribed or listed in NECB2011:B:3.2, 4.2, 5.2, 6.2 and 7.2. This path s simplicity affords the least flexibility from a design perspective. Size and occupancy of the project will govern in the first case whether the drawings must be authenticated per ABC2014:C:2.4.2.1. (3) - (5); where required, the NECB 2011 design must also be signed and sealed. TRADE-OFF PATH may be appropriate for designs that may not otherwise be practically or economically achievable through fulfilling all prescriptive path requirements for some building components. Trade-offs allow prescriptive component U-values (thermal performance levels) to be traded off against others, only within each of Parts 3 to 6 of NECB 2011. An acceptable trade-off will be one that, despite one or more 1

individual components falling short of prescribed values, is demonstrated to represent an equivalent or better level of efficiency than following the strictly prescriptive path. Key limitations and the calculations to be performed are found in NECB2011:B:3.3., 4.3., 5.3., and 6.3.; there is no trade-off path option in NECB 2011 Part 7. The Trade-Off Path may be exercised in simple or detailed fashion for NECB 2011 Part 3 (building envelope), but does not allow trade-offs between these assemblies and components and of other Parts of NECB 2011. Simple Trade-Off Path - Building Envelope (NECB2011 :B:3.3.3) deals ONLY with above-ground envelope assemblies and components, grouped into horizontal and vertical categories, allowing trading within: horizontal assemblies and components: roofs, floors and skylights vertical assemblies and components: walls, doors and windows, including adjustment to allowable Fenestration+Door to Wall Ratio (FDWR) if desired. Detailed Trade-Off Path - Building Envelope (NECB2011:B:3.3.4.) allows even greater building envelope design flexibility, allowing trading between: all assemblies and components: walls, doors and windows, including adjustment to allowable Fenestration+Door to Wall Ratio (FDWR) if desired. Detailed Trade-Off Path - Lighting, HVAC or Service Water Heating (NECB2011:B:4.3., 5.3., and 6.3.) Trade-off options are available within each of these Parts, but trading may not occur between Parts. Calculators for verification that proposed trade-offs conform to NECB 2011 are provided by NRCan. Other software resources may be employed, provided calculations supporting the trade-offs are available for review upon AHJ request. PERFORMANCE PATH is a whole-building energy simulation model of all building systems, with the goal of demonstrating through modeling that the proposed building would require no more energy to operate than a hypothetical, equivalent, prescriptively-designed building. While affording the most design flexibility, this path to NECB compliance requires professional involvement due to the complexity of rules and limitations in the exchange between all building systems. Drawings, details and documents building permit application submissions Professional Involvement Where the project requires professional involvement per ABC2014:C:2.4.2.1.(3),(4) and (5), then registered professionals shall be retained also for application of NECB 2011 as outlined on the A-1+ A-2, B-1+ B-2 and C-1+ C-2 schedules. 2

Where professional involvement is not required in relation to 2.4.2.1.(3), (4) and (5), NECB-related design will nevertheless require professional involvement for projects incorporating: Prescriptive with Trade-Off Path - except for Part 3 (Building Envelope) Simple Trade-Off Path Performance Path A proposal sufficiently complex that plans examination cannot readily confirm compliance. Each professional is responsible for field reviews for their scope of work as it relates to NECB 2011, as is the case for Alberta Building Code (ABC). When the performance path is selected, such field reviews will typically be performed by the registered professionals of record for each discipline in lieu of field reviews by the Building Energy Modeler, to ensure NECB 2011 energy compliance is met. The submitted schedule letters of professional responsibility shall be completed in order to ensure clarity around who is responsible for reviews. Drawings, Details and Documents NECB Pre-Build Project Compliance Summary shall be submitted, outlining the elected path to compliance and appropriate NECB 2011 checklist submittals to accompany the application. PRESCRIPTIVE PATH NECB 2011 application includes drawings, details and documents that demonstrate the minimum prescriptive requirements are being met: U-value overall thermal transmittance of all above-ground opaque building assemblies and assemblies in contact with the ground; provide assembly details and U-values in wall/floor/roof schedules on drawings U-value overall thermal transmittance of all fenestration and doors: provide in window schedule. Centre of glass value unacceptable; provide overall heat transfer for entire unit considering frame, glass edge and centre of glass Air Leakage: detail air barrier sequence, joints and penetrations Lighting Power Density (LPD) Requirements (interior and exterior); indicate space-by-space or building area method Exterior lighting power for fixture Lighting Controls: show controls in drawings with symbols for interior and exterior spaces HVAC Equipment and Efficiency; list in equipment schedules, including any Economizers Service Hot Water Equipment and Efficiency; list in equipment schedules Piping Insulation, to be included in drawings for HVAC and SHW details Generally these will be the details required to be on the drawings in any event in order that it can be constructed according to plan. While not required to be submitted at the time of Building Permit application, supporting calculations for lighting power densities and fan power shall be available for review upon AHJ request. Recall that calculations necessarily derived for prescriptive compliance are used as basis for establishing the reference building in support of other compliance paths. 3

TRADE-OFF PATH NECB 2011 application includes the above and: Simple Trade-Off Path - Building Envelope calculations summaries, authenticated (signed and sealed) by a registered professional where the project itself requires professional involvement under ABC. Some simple envelope trade-offs may be performed by hand, in which case all work should be shown and attached to the NECB 2011 Pre-Build Project Compliance Summary. AND/OR Detailed Trade-Off Path - Building Envelope, Lighting, HVAC, or Service Water Heating are each sufficiently complex that the trade-off calculation submissions shall be authenticated by a registered professional, and duly-signed schedules of professional involvement provided, whether the building itself requires professional involvement or not. Supporting calculations shall be available for review upon AHJ request. PERFORMANCE PATH NECB 2011 application shall include the Part 8 Summary Page, NRCan checklist, consultant summary report and all necessary calculations, drawings, and tables required by NECB2011:.C: 2.2.2.8. that are additional to that provided above. Modeling report submission shall illustrate thermal blocks used in the reference and proposed buildings (floor plans and sections as applicable) as well as verification of input data, such as effective thermal transmittance of assemblies, equipment efficiencies, and verification of prescriptive performance levels for omitted systems such as exterior lighting. The performance model report shall be authenticated by a registered professional of record. Pre-occupancy submissions The NECB 2011 As-Built Project Summary for any chosen compliance path shall be submitted in conjunction with a request for final building inspection for occupancy. This is in addition to requirements for ABC 9.36 documentation, though C-schedules that may be required may pertain to both ABC and NECB. If overall professional involvement is NOT required for the project per ABC, provide a Letter of Assurance of Compliance signed by both constructor and owner assuring that PRESCRIPTIVE PATH and/or Simple Trade-Off Path - Building Envelope requirements have been met. For Detailed Trade-Off Path - Building Envelope, Lighting, HVAC, or Service Water Heating OR PERFORMANCE PATH, provide applicable C-Schedule(s) of Assurance from the registered professional(s) responsible for the design. If overall professional involvement is required for the project per ABC, the required C-Schedules of Assurance shall pertain to both ABC and NECB compliance. 4

For PERFORMANCE PATH submissions, the following documents are required with all permit applications: Part 8 Summary Form Performance Model Energy Consumption Report Performance Model Energy Model Compliance checklist 5