MFMA Guide Specification for Sleeper and Sleeper with Plywood Floor Systems

Similar documents
SECTION WOOD GYMNASIUM FLOORING

WOOD ATHLETIC FLOORING

CONNOR PERMAFLEX & PERMAFLEX II Page 1 of 5

ActionCush I Floating Resilient Floor System

ActionCush II Floating Resilient Floor System

SECTION WOOD AND ATHLETIC FLOORING. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

CHAMPAIGN CENTRAL HIGH SCHOOL COMBES GYM FLOOR REPAIR. A. Submittals: Product Data, Specification Sheets, Samples and Manufacturer Warranty.

HARO SPORTS FLOOR C.S.I. GUIDE SPECIFICATION Helsinki-Gymnasium Floor System 10/2010 SECTION WOOD ATHLETIC FLOORING

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.

INSTRUCTIONS FOR EDITING AND COORDINATION SECTION WOOD FLOORING - ATHLETIC

SECTION ARCHITECTURAL SPECIFICATIONS FOR INDOOR WOOD ATHLETIC FLOORING

Section II Subfloor Guidelines & Specifications Page Chapter 4 Wood Subfloor Guidelines 23 Chapter 5 Concrete Subfloor Guidelines 26 Chapter 6

1. Division 09 Section "Rough Carpentry."

COMPOSITE (WPC) ENGINEERED VINYL FLOORING INSTALLATION

ENGINEERED WATERPROOF FLOORING GENERAL INSTALLATION INSTRUCTIONS FOR VÄLINGE 2G LOCKING FLOORING

LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR LOCKING FLOORING

ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE

PLYWOOD FLOATING FLOOR

ENGINEERED LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

A. Drawings and general provisions of the Contract apply to this Section including all documentation provided in RFP#

1. The subfloor must be structurally sound and able to withstand live and dead loads with a deflection limitation of L/360.

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING

DO-IT-YOURSELF SELF ADHESIVE PLANK INSTALLATION

Section III Installation Guidelines & Methods Page Chapter 7 Parquet Installation 30 Chapter 8 Engineered Wood Flooring Installation 34 Chapter 9

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Signature Sports Flooring Installation Instructions. For SignaDeck Premium Rubber Tiles

WATER TUFF VINYL FLOORING ATTENTION! READ BEFORE INSTALLING! Angle-Tap Installation Instructions

Installation Instructions for SuperFast Hurricane

GUIDE SPECIFICATION

INSTALLATION INSTRUCTIONS

Floor Insulation Underlayment Section Sound Control Matting

INSTALLATION GUIDELINES PREFINISHED SOLID & ENGINEERED WOOD

Scuba Seal Installation / Floor Care Instructions With Video Link

B. Store products in dry spaces protected from the weather, with ambient temperatures maintained between 50 and 90 deg F (10 and 32 deg C).

RESILIENT FLOORING: Hot and Heavy - Secoya

Page 1 of 5 PART 1 GENERAL

Chapter 2. Basic practices. Topics. 7 Basic practices. Notes. 2.5 Existing flooring and adhesive residue Job site conditions 8

ENKASONIC FLOOR UNDERLAYMENT 9110

ATTENTION! READ BEFORE INSTALLING!

ATTENTION! READ BEFORE INSTALLING!

J.J. Haines & Co., Inc.

SECTION RESILIENT SHEET FLOORING

GUIDE SPECIFICATION

CONTRACT NUMBER: W912DQ-08-C % CORRECTED DESIGN 28 JULY 2008

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

SUBFLOOR AND INSTALLATION PREPARATION INSTRUCTIONS

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

INSTALLATION GUIDELINES Signature Naturals PureForm Solid Strip Bamboo Flooring

Installation Guidelines for EcoDomo Echelon Collection RECYCLED LEATHER TILES AND SHEETS GLUE-DOWN METHOD WITH WATER BASED CONTACT CEMENT

BLUE FOREST Flooring Installation Instructions

RESILIENT FLOORING: Select Step Wood

Table R (1) Allowable Spans and Loads for Wood Structural Panels for Roof and Subfloor. Sheathing and Combination Subfloor Underlayment

SECTION RESILIENT SHEET FLOORING

ROOFING APPLICATION STANDARD (TAS) No. 102(A)-95

LOOSE LAY INSTALLATION GUIDE PAGE 1 of 6

Premium Glueless Luxury Vinyl with Interlocking Joints Installation Instructions

ANTIQUED SOLID / SOLID HARDWOOD

Installation Guide LVP Glue Down

INSTALLATION INSTRUCTIONS LAMINATE

RADIANT PANEL SYSTEM PLANNING & INSTALLATION. Roth Radiant Heating Systems

PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700

Standard specification for the application of Danosa Two-Layer waterproof roofing membrane to plywood & concrete surfaces.

SECTION GYPSUM BOARD

Bid: Seventy-First High School Gym Floor Refinishing

SECTION IMPACT RESISTANT WALL PROTECTION

Floors. Allwood Floors 5/8" & 9/16" Floating Floors For Staple-Down or Glue-Down Installations. Installer/Owner Responsibility

DIVISION: FINISHES SECTION: ACOUSTIC TREATMENT REPORT HOLDER: ECORE INTERNATIONAL, INC.

3001 E. 12th Street, Unit A Los Angeles, California Telephone: Installation Guide

TESTING APPLICATION STANDARD (TAS) No TEST PROCEDURE FOR STATIC UPLIFT RESISTANCE OF MORTAR OR ADHESIVE SET TILE SYSTEMS

INSTALLATION INSTRUCTIONS

Carpet Tile & Plank Direct Glue Down

ComforTech Cushioned Rubber Sheet Flooring

INSULATION RETROFIT DESIGN ENERGY SOLUTIONS CENTRE YUKON GOVERNMENT

1. CONCRETE SUBFLOORS.SECTION a. Slab Depression: Equal to thickness of selected flooring (6, 8,10,12,13 or 14mm).

RESILIENT TILE FLOORING

FiberFloor Glueless and Full Spread Installation Instructions

Click Refresh with In*Step Locking System

SECTION GYPSUM BOARD ASSEMBLIES

Kolorines Glass Mosaic Tiles Project Specification

4 EXTREME FOUNDATION PANELS

A. Meet at Project site <insert number> days before starting installation.

UNDERLAYMENT INSTALLATION INSTRUCTIONS

Gold Bond BRAND Gypsum Sheathing

RESILIENT CORK TILE 3 PART SPECIFICATION #Z 624

Installation Guide and Safety Manual Resilient Sound Isolation Clips (SIC Clips)

Luxury Vinyl Plank Installation Manual 2017

Suggested Specification for Tri-Patch Versatile Concrete Patching Compound

CONNOR Control XT Page 1

HAND-SCRAPED FLOORING INSTALLATION INSTRUCTIONS

safari installation instructions

Wideboard Overlay. Installation recommendations

KINETICS INSTALLATION GUIDELINES ISOLayment QT-F (FLAT)

WOODLOC 5G FLOAT-IN INSTALLATION INSTRUCTIONS

A. Section includes hydraulic-cement-based, polymer-modified, self-leveling underlayment for application below interior floor coverings.

ATTENTION INSTALLERS

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

ECOfusion Flooring Installation Guide 1/2 & 9/16 Prefinished Solid Strandwoven Bamboo Flooring

PinkWood Ltd. Revised September 29, 2017

Transcription:

Sleeper and Sleeper with Plywood Floor Systems Purpose This Guide Specification is designed to assist in the production of actual architectural specifications for maple athletic flooring installations. It is hoped that this Guide will be of particular value to those who do not have a detailed knowledge of the construction of athletic floors and that it will aid in maintaining high construction standards. Maple Flooring Manufacturers Association, Inc. (MFMA), its members and employees, do not warrant the information contained herein as proper under all conditions. The MEMA reserves the right to revise these Guide Specifications as necessary. Questions concerning information contained in this Guide should be directed to MFMA, attention Technical Director. Part 1- General 1.1 Description A. This document specifies a wood strip gymnasium floor system consisting, in general, of maple flooring, wood subflooring, vapor barrier, sanding, sealers, finishes, game lines and wall base. B. The general contractor shall provide a concrete slab, troweled smooth and level to a tolerance of 1/8 in a 10 radius, subject to the approval of the flooring contractor. Sleeper System Sleeper with Plywood System F-Numbers are not applicable for gymnasium slab applications. Labor and materials necessary to put the concrete slab in acceptable condition (high areas ground down and low areas filled with appropriate leveling compounds) shall be the responsibility of the general contractor. Installation shall not proceed until the concrete slab is in acceptable condition. 1. The general contractor shall provide slab depressions as follows: a. Sleeper System: 2-5/8 for 25/32, 2-7/8 for 33/32 thick flooring. b. Sleeper with Plywood System: 3-1/8 for 25/32, 3-3/8 for 33/32 thick flooring. 2. Concrete subfloors shall have an adequate moisture barrier beneath and at the perimeter of the slab. C. The flooring contractor shall provide all tools and services to furnish, deliver, and install a complete wood floor system from the surface vaporproofing of the slab, when required, through the sanding and finishing, plus the installation of perimeter base moldings and thresholds. 1.2 Quality Assurance A. The wood flooring shall be MFMA maple. B. The flooring contractor shall be a firm experienced in installing maple flooring systems. C. Flooring shall be delivered to the premises a minimum of seven days before installation commences, or as required for acclimation. D. All flooring bundles should be broken and loosely piled to acclimate the flooring to environmental conditions in the building. 1.3 Working Conditions A. The floor system shall not be delivered or installed until all masonry, plastering/drywalling, tile work and overhead mechanical trades are complete. The building must be enclosed and weathertight. B. Permanent heat, light and ventilation shall be installed and operating during and after installation, maintaining a temperature range of 55 degrees to 75 degrees and a relative humidity range of 35 percent to 50 percent (no more than a 15 percent difference between high and low humidity levels). 1.4 Warranty A. The flooring contractor shall warrant the floor for a period of one year, and shall furnish a warranty from the flooring B. Refer to individual flooring manufacturers warranty for specific provisions and exclusions.

Sleeper and Sleeper with Plywood Floor Systems Part 2-Products 2.1 Materials A. Flooring shall be MFMA-RL Northern Hard Maple or MFMA-FJ Northern Hard Maple; 33/32 or 25/32 thick x 2-1/4 or 1-1/2 wide; First Grade, Second and Better, Third and Better, Third Grade or Utility Grade: T & G and EM; grade marked and stamped as produced by an MFMA member B. Flooring shall be treated with WOODLIFE 3 preservative or equal if so specified. C. Vapor barrier shall be 6 mil. polyethylene. D. Cushioned Sleepers shall be 2 x 3 x 4 nominal KD Hemlock, Spruce, Pine or Fir as supplied by flooring manufacturer; dip treated with WOODLIFE 3 preservative; with pads 3/8 x 2-1/4 x 3 long or 5/8 x 2-1/4 x 3 supplied by flooring manufacturer; pads attached 12 o.c. E. Sleeper with plywood subfloor shall be 15/32 x 4 x 8 APA Rated Sheathing, Exposure 1, minimum 4 ply. F. Flooring fasteners shall be 2 barbed cleats or 15 gauge coated staples, unless otherwise specified by flooring G. Wall base shall be 3 x 4 x 4 heavy duty molded, vented, rubber or vinyl cove base with premolded outside corners as supplied by flooring H. Finish materials shall be selected from the most recent listing of MFMA certified products, and shall be applied according to finish manufacturer s instructions. Part 3-Execution 3.1 Inspection A. Inspect concrete subfloors for proper tolerance and dryness, and report any discrepancies in writing to the general contractor for correction. B. The concrete slab shall be cleaned of all debris by general contractor so flooring contractor will have adequate access to work surface. 3.2 Installation A. Cover entire concrete slab with 6 mil. polyethylene, lapping joints a minimum of 4. B. Sleeper System: 1. Install sleepers end to end at right angles to the direction of the finished flooring with end joints staggered a minimum of 24. The sleepers shall be spaced 12 o.c. for 33/32 flooring and 9 o.c. for 25/32 flooring. When Third and Better or Third Grade flooring is specified, sleepers should be spaced 8 o.c. for both 33/32 and 25/32 flooring. Maintain a 2 expansion void at the walls and other permanent obstructions. 2. Install plywood over sleepers at 45 degree or 90 degree angle to direction of finished flooring, 1/4 spacing all edges and breaking joints 4. Attach with nails or staples 12 o.c. C. Sleeper with Plywood System 1. Install sleepers end to end at right angles to the direction of the finished flooring with end joints staggered a minimum of 24. The sleepers shall be spaced 12 o.c. Maintain a 2 expansion void at the walls and other permanent obstructions. 2. Install plywood over sleepers at 45 degree or 90 degree angle to direction of finished flooring, 1/4 spacing all edges and breaking joints 4. Attach with nails or staples 12 o.c. D. Install maple flooring parallel with the main playing court by nailing or stapling approximately 12 o.c. 1. Space joints between flooring strips to allow for intermediate expansion, in accordance with local humidity conditions. 2. Provide 2 expansion voids at the perimeter and at all vertical obstructions. 3.3 Flooring Sanding A. Machine sand with coarse, medium and fine paper to a smooth, even, uniform surface. B. Remove sanding dust from entire surface by tack or vacuum. 3.4 Finishing A. Inspect entire area of floor to insure that surface is acceptable for finishing, completely free from sanding dust and perfectly clean. B. Apply seal and finish per finish manufacturer s instructions. C. Buff and clean floor between each coat. D. Paint game lines as shown on drawings, between seal and first coat of finish. Game line paint shall be compatible with finish. 3.5 Base Installation A. Install vent cove base by anchoring to walls with base cement, screws or anchors. Miter all joints at 45 degree angles. B. Miter inside corners, and use premolded outside corners. C. Install thresholds as required, anchoring firmly in concrete floor beyond limits of wood flooring. 3.6 Maintenance A. Upon completion of floor installation, the owners, attendants or individuals in charge are responsible for the upkeep of the building and are to see that the care and maintenance instruction of the MFMA and the flooring manufacturer are followed.

Double Plywood Floor System Purpose This Guide Specification is designed to assist in the production of actual architectural specifications for maple athletic flooring installations. It is hoped that this Guide will be of particular value to those who do not have a detailed knowledge of the construction of athletic floors and that it will aid in maintaining high construction standards. Maple Flooring Manufacturers Association, Inc. (MFMA), its members and employees, do not warrant the information contained herein as proper under all conditions. The MFMA reserves the right to revise these Guide Specifications as necessary. Questions concerning information contained in this Guide should be directed to MFMA, attention Technical Director. Part 1-General 1.1 Description A. This document specifies a wood strip or parquet gymnasium floor system consisting, in general, of maple flooring, wood subflooring, vapor barrier, sanding, sealers, finishes, game lines and wall base. B. The general contractor shall provide a concrete slab, troweled smooth and level to a tolerance of 1/8 in a 10 radius, subject to the approval of the flooring contractor. Double Plywood System 1.2 Quality Assurance A. The wood flooring shall be MFMA maple. B. The flooring contractor shall be a firm experienced in installing maple flooring systems. C. Flooring shall be delivered to the premises a minimum of seven days before installation commences, or as required for acclimation. D. All flooring bundles should be broken and loosely piled to acclimate the flooring to environmental conditions in the building. 1.3 Working Conditions A. The floor system shall not be delivered or installed until all masonry, plastering/drywalling, tile work and overhead mechanical trades are complete. The building must be enclosed and weathertight. B. Permanent heat, light and ventilation shall be installed and operating during and after installation, maintaining a temperature range of 55 degrees to 75 degrees and a relative humidity range of 35 percent to 50 percent (no more than a 15 percent difference between high and low humidity levels). 1.4 Warranty A. The flooring contractor shall warrant the floor for a period of one year, and shall furnish a warranty from the flooring B. Refer to individual flooring manufacturers warranty for specific provisions and exclusions. F-Numbers are not applicable for gymnasium slab applications. Labor and materials necessary to put the concrete slab in acceptable condition (high areas ground down and low areas filled with appropriate leveling compounds) shall be the responsibility of the general contractor. Installation shall not proceed until the concrete slab is in acceptable condition. 1. The general contractor shall provide slab depressions as follows: 2-1/4 for 25/32 2-1/2 for 33/32 (Concrete slab depressions listed are for 3/8 pads. For 5/8 pads add 1/4.) 2. Concrete subfloors shall have an adequate moisture barrier beneath and at the perimeter of the slab. C. The flooring contractor shall provide all tools and services to furnish, deliver and install a complete wood floor system from the surface vaporproofing of the slab, when required, through the sanding and finishing, plus the installation of perimeter base moldings and thresholds. Part 2-Products 2.1 Materials A. Flooring shall be MFMA-RL Northern Hard Maple or MFMA-FJ Northern Hard Maple; 33/32 or 25/32 thick x 2-1/4 or 1-1/2 wide; First Grade, Second and Better, Third and Better, Third Grade or Utility Grade; T & G and EM; grade marked and stamped as produced by an MFMA member B. MFMA-PQ Northern Hard Maple, individual picket widths range from 3/4 to 1-1/8, and picket lengths range from 5 1/2 to 12. Minimum thickness of MFMA-PQ Northern Hard Maple flooring is 5/16 ; Second and Better, Third and Better or Third Grade; grade marked as produced by an MFMA member manufacturer C. Flooring shall be treated with WOODLIFE 3 preservative or equal if so specified. D. Vapor barrier shall be 6 mil. polyethylene. E. Subfloor shall be 15/32 x 4 x 8 APA Rated Sheathing, Exposure 1, minimum 4 ply. F. Cushion pads shall be 3/8 or 5/8 x 2-1/4 x 3 as supplied by flooring

Double Plywood Floor System G. Flooring fasteners shall be 2 barbed cleats or 15 gauge coated staples, unless otherwise specified by flooring H. Wall base shall be 4 x 3 x 4 heavy duty molded, vented, rubber or vinyl cove base with premolded outside corners as supplied by flooring I. Finish materials shall be selected from the most recent listing of MFMA certified products, and shall be applied according to finish manufacturer s instructions. Part 3-Execution 3.1 Inspection A. Inspect concrete slab for proper tolerance and dryness, and report any discrepancies in writing to the general contractor for correction. B. The concrete slab shall be cleaned of all debris by general contractor so flooring contractor will have adequate access to work surface. 3.2 Installation A. Cover entire concrete slab with 6 mil. polyethylene, lapping joints a minimum of 4. B. Install first layer of subfloor plywood opposite the direction of the maple flooring, 1/4 spacing all edges and breaking joints 4 - Provide 2 expansion voids at perimeter and all vertical obstructions. The underside of the first layer shall have 32 cushion pads per sheet attached 12 o.c. and 6 from edges of subfloor material on all sides. C. The second layer of subfloor material shall be laid diagonally (45 degrees) (option: Install both layers of plywood at 45 degree angles to finished flooring.) over the first layer 1/4 spacing all edges and breaking joints 4. Attach second layer of subfloor material with nails or staples 12 o.c. D. Install maple strip flooring parallel with main playing court by nailing or stapling approximately 12 o.c. 1. Space joints between flooring strips to allow for intermediate expansion in accordance with local humidity conditions 2. Provide 2 expansion voids at the perimeter and at all vertical obstructions. E. Install maple parquet flooring with flooring manufacturer s recommended adhesive and per adhesive manufacturer s recommended spread rate. 3.3 Floor Sanding A. Machine sand with coarse, medium and fine paper to a smooth, even and uniform surface. B. Remove sanding dust from entire surface by tack or vacuum. 3.4 Finishing A. Inspect entire area of floor to insure that surface is acceptable for finishing, completely free from sanding dust and perfectly clean. B. Apply seal and finish per finish manufacturer s instructions. C. Buff and clean floor between each coat. D. Paint game lines as shown on drawings, between seal and first coat of finish. Game line paint shall be compatible with finish. 3.5 Base Installation A. Install vent cove base by anchoring to walls with base cement, screws or anchors. Miter all joints at 45 degree angles. B. Miter inside corners, and use premolded outside corners. C. Install thresholds as required, anchoring firmly in concrete floor beyond limits of wood flooring. 3.6 Maintenance A. Upon completion of floor installation, the owners, attendants or individuals in charge are responsible for the upkeep of the building and are to see that the care and maintenance instructions of the MFMA and the flooring manufacturer are followed.

Nail-in-Channel Floor System Purpose This Guide Specification is designed to assist in the production of actual architectural specifications for maple athletic flooring installations. It is hoped that this Guide will be of particular value to those who do not have a detailed knowledge of the construction of athletic floors and that it will aid in maintaining high construction standards. Maple Flooring Manufacturers Association, Inc. (MFMA), its members and employees, do not warrant the information contained herein as proper under all conditions. The MFMA reserves the right to revise these Guide Specifications as necessary. Questions concerning information contained in this Guide should be directed to MFMA, attention Technical Director. Part 1-General 1.1 Description A. This document specifies a wood strip gymnasium floor system consisting, in general, of maple flooring, steel channels, clips, drive pins, resilient underlayment, sanding, sealers, finishes, game lines and wall base. Nail-in-channel System B. The general contractor shall provide a concrete slab troweled smooth and level to a tolerance of 1/8 in a 10 radius, subject to the approval of the flooring contractor F-Numbers are not applicable for gymnasium slab applications. Labor and materials necessary to put the concrete slab in acceptable condition (high areas ground down and low areas filled with appropriate leveling compounds) shall be the responsibility of the general contractor. Installation shall not proceed until the concrete slab is in acceptable condition. 1. The general contractor shall provide slab depressions of 1-1/4 if 25/32 flooring is used and 1-1/2 when 33/32 is specified. 2. Concrete subfloors shall have an adequate moisture barrier beneath and at the perimeter of the slab. 3. No pea gravel, river gravel or slag aggregate shall be allowed in the concrete. The concrete strength range at the time of wood flooring installation shall be between 3,000 PSI. and 3,500 PSI. C. The flooring contractor shall provide all tools and services to furnish, deliver, and install a complete wood floor system from the surface vaporproofing of the slab, when required, through the sanding and finishing, plus the installation of perimeter base moldings and thresholds. 1.2 Quality Assurance A. The wood flooring shall be MFMA maple. B. The flooring contractor shall be a firm experienced in installing maple flooring systems. C. Flooring shall be delivered to the premises a minimum of seven days before installation commences, or as required for acclimation. D. All flooring bundles should be broken and loosely piled to acclimate the flooring to environmental conditions in the building. 1.3 Working Conditions A. The floor system shall not be delivered or installed until all masonry, plastering/drywalling, tile work and overhead mechanical trades are complete. The building must be enclosed and weathertight. B. Permanent heat, light and ventilation shall be installed and operating during and after installation, maintaining a temperature range of 55 degrees to 75 degrees and a relative humidity range of 35 percent to 50 percent (no more than a 15 percent difference between high and low humidity levels). 1.4 Warranty A. The flooring contractor shall warrant the floor for a period of one year, and shall furnish a warranty from the flooring B. Refer to individual flooring manufacturers warranty for specific provisions and exclusions. Part 2-Products 2.1. Materials A. Flooring shall be MFMA-RL Northern Hard Maple or MFMA-FJ Northern Hard Maple; 33/32, or 25/32 thick x 2-1/4, or 1-1/2 wide; First Grade, Second and Better, Third and Better, Third Grade or Utility Grade, T & G and EM; grade marked and stamped as produced by an MFMA member B. Flooring shall be treated with WOODLIFE 3 preservative or equal if so specified. C. Vapor barrier shall be 6 mil. polyethylene. D. Resilient underlayment shall be 1/2 or 5/8 x 2 x 8 nominal sheets of impregnated fiberboard with factory-machined channel grooves, 12 o.c. (Specifier s option: multicellular, closed cell polyethylene foam with a density of 2 PCF nominal. Foam shall be 1/2 or 5/8 x 4, pregrooved, 12 o.c.) E. Nailing channels shall be 16, 22 and/or 30 gauge rolled formed steel with plywood or hardwood core nailing strips.

Nail-in-Channel Floor System F. Channel anchors shall be modified steel drive pins, minimum 5/16 head diameter, as recommended by pin manufacturer to achieve minimum 900 lbs. pull-out strength. G. Floor fasteners shall be 2 barbed cleats or 15 gauge coated staples, unless otherwise specified by flooring H. Wall base shall be 4 x 3 x 4 heavy duty molded, vented, vinyl or rubber cove base with premolded outside corners as supplied by flooring I. Finish materials shall be selected from the most recent listing of MFMA certified products, and shall be applied according to finish manufacturer s instructions. Part 3-Execution 3.1 Inspection A. Inspect concrete subfloor for proper tolerance and dryness, and report any discrepancies in writing to the general contractor for correction. B. The concrete slab shall be cleaned of all debris by general contractor so flooring contractor will have adequate access to work surface. 3.2 Installation A. Cover entire concrete slab with 6 mil. polyethylene, lapping joints a minimum of 4. B. Install impregnated fiberboard or foam at right angles to the direction of the maple flooring on the main playing court, staggering end joints in adjacent rows. C. Insert nailing channels in machined grooves with ends staggered in adjacent rows. Offset channel ends with ends of fiberboard a minimum of 1 D. Anchor channels to concrete with drive pins 14 o.c. with additional pins at ends of channels, using low velocity powder-actuated or pneumatic tools. E. Install maple flooring at right angles to channels by nailing or stapling. 1. Space joints between flooring strips to allow for intermediate expansion, in accordance with local humidity conditions. 2. Provide 1-1/2 expansion voids at the perimeter and at all vertical obstructions. 3.3 Floor Sanding A. Machine sand with coarse, medium and fine paper to a smooth, even and uniform surface. B. Remove sanding dust from entire surface by tack or vacuum. 3.4 Finishing A. Inspect entire area of the floor to insure that surface is acceptable for finishing, completely free from sanding dust and perfectly clean. B. Apply seal and finish per finish manufacturer s instructions. C. Buff and clean floor between each coat. D. Paint game lines as shown on drawings, between seal and first coat of finish. Game line paint shall be compatible with finish. 3.5 Base Installation A. Install vent cove base by anchoring to walls with base cement, screws or anchors. Miter all joints at 45 degree angles. B. Miter inside corners, and use premolded outside corners. C. Install thresholds as required, anchoring firmly in concrete floor beyond limits of wood flooring. 3.6 Maintenance E. Upon completion of floor installation, the owners, attendants, or individuals in charge and responsible for the upkeep of the building are to see that the care and maintenance instructions of the MFMA and flooring manufacturer are followed.

MFMA Guide Specifications for Channel and Clip Floor System Purpose This Guide Specification is designed to assist in the production of actual architectural specifications for maple athletic flooring installations. It is hoped that this Guide will be of particular value to those who do not have a detailed knowledge of the construction of athletic floors and that it will aid in maintaining high construction standards. Maple Flooring Manufacturers Association, Inc. (MFMA), its members and employees, do not warrant the information contained herein as proper under all conditions. The MFMA reserves the right to revise these Guide Specifications as necessary. Questions concerning information contained in this Guide should be directed to MFMA, attention Technical Director, Clip Over Tongue Backwards-Clip (Available in 27/32 x 2-1/4 only) Clip Under Tongue (Available in 33/32 x 2-1/4 only) Part 1-General 1.1 Description A. This document specifies a wood strip gymnasium floor system consisting, in general, of maple flooring, steel channels, clips, drive pins, resilient underlayment, sanding, sealers, finishes, game lines and wall base. B. The general contractor shall provide a concrete slab, troweled smooth and level to a tolerance of 1/8 in a 10 radius, subject to the approval of the flooring contractor. F-Numbers are not applicable for gymnasium slab applications. Labor and materials necessary to put the concrete slab in acceptable condition (high areas ground down and low areas filled with appropriate leveling compounds) shall be the responsibility of the general contractor. Installation shall not proceed until the concrete slab is in acceptable condition. 1. The concrete slab depression for 33/32 thick flooring shall be 1-1/2 and shall be 1-1/4 for 25/32 thick flooring. 2. Concrete subfloors shall have an adequate moisture barrier beneath and at the perimeter of the slab. 3. No pea gravel, river gravel or slag aggregate shall be allowed in the concrete. The concrete strength range at the time of wood flooring installation shall be between 3,000 PSI. and 3,500 PSI. C. The flooring contractor shall provide all tools and services to furnish, deliver, and install a complete wood floor system from the surface vaporproofing of the slab, when required, through the sanding and finishing, plus the installation of perimeter base moldings and thresholds. 1.2 Quality Assurance A. The wood flooring shall be MFMA maple. B. The flooring contractor shall be a firm experienced in installing maple flooring systems. C. Flooring shall be delivered to the premises a minimum of seven days before installation commences, or as required for acclimation. D. All flooring bundles should be broken and loosely piled to acclimate the flooring to environmental conditions in the building. 1.3 Working Conditions F. The floor system shall not be delivered or installed until all masonry, plastering/drywalling, tile work and overhead mechanical trades are complete. The building must be enclosed and weathertight.

MFMA Guide Specifications for Channel and Clip Floor System G. Permanent heat, light and ventilation shall be installed and operating during and after installation, maintaining a temperature range of 55 degrees to 75 degrees and a relative humidity range of 35 percent to 50 percent (no more than a 15 percent difference between high and low humidity levels). 1.4 Warranty A. The flooring contractor shall warrant the floor for a period of one year, and shall furnish a warranty from the flooring B. Refer to individual flooring manufacturers warranty for specific provisions and exclusions. Part 2-Products 2.1 Materials H. Flooring shall be MFMA-RL Northern Hard Maple or MFMA-FJ Northern Hard Maple; 33/32, or 25/32 thick x 2-1/4 or 1-1/2 wide; First Grade, Second and Better, Third and Better, Third Grade or Utility Grade, T & G and EM; grade marked and stamped as produced by an MFMA member B. Flooring shall be treated with WOODLIFE 3 preservative or equal if so specified. C. Vapor barrier shall be 6 mil. polyethylene. D. Resilient underlayment shall be 1/2 x 2 x 8 sheets of impregnated fiberboard with factory-machined channel grooves 5/16 deep x 1-1/8 wide, 12 o.c. (Specifier s option: multicellular, closed cell polyethylene foam with a density of 2 PCF nominal. Foam shall be 1/2 x 4, pregrooved, 12 o.c.) E. Channels shall be 16 gauge zinc-treated steel. F. Channel anchors shall be modified steel drive pins, minimum 5/16 head diameter, as recommended by pin manufacturer to achieve minimum 900 lbs. pull-out strength. G. Clips shall be 16 or 20 gauge steel. H. Wall base shall be 1 x 2 maple base or standard molded, vented rubber or vinyl cove base, as supplied by flooring I. Finish materials shall be selected from the most recent listing of MFMA certified products, and shall be applied according to finish manufacturer s instructions. Part 3-Execution 3.1 Inspection A. Inspect concrete slab for proper tolerance and dryness, and report any discrepancies in writing to the general contractor for correction. I. The concrete slab shall be cleaned of all debris by general contractor so flooring contractor will have adequate access to work surface. 3.2 Installation A. Cover entire concrete slab with 6 mil polyethylene, lapping joints a minimum of 4. B. Install impregnated fiberboard at right angles to the direction of the maple flooring on the main playing court, staggering end joints in adjacent rows. C. Insert steel channels in machined grooves with ends staggered in adjacent rows. Offset channel ends with end of impregnated fiberboard a minimum of 1. D. Anchor channels to concrete with drive pins 14 o.c. with additional pins at ends of channels, using low velocity powder-actuated or pneumatic tools. E. Install maple flooring at right angles to channels, inserting steel clips at every channel intersection. Drive flooring up firmly and securely to all vertical obstructions, blocking insides of boards at the wall line. F. Moisture content of flooring shall not exceed 8 percent during installation. (In regions of constant high humidity, a higher moisture content may be required.) 3.3 Floor Sanding A. Machine sand with course, medium and fine paper to a smooth, even and uniform surface. B. Remove sanding dust from entire surface by tack or vacuum. 3.4 Finishing A. Inspect entire area of floor to insure that surface is acceptable for finishing, completely free from sanding dust, and perfectly clean. B. Apply seal and finish per finish manufacturer s instructions. C. Buff and clean floor between each coat. D. Paint game lines as shown on drawings, between seal and first coat of finish. Game line paint shall be compatible with finish. 3.5 Base Installation A. Install maple or vent cove base by anchoring to walls with base cement, screws or anchors. Miter all joints at 45 degree angles. Nail securely into blocking or last board. B. Miter inside corners, and if installing rubber or vinyl base, use premolded outside corners. Double nail corners carefully. C. Install thresholds as required, anchoring firmly in concrete floor beyond limits of wood flooring. 3.6 Maintenance A. Upon completion of floor installation, the owners, attendants or individuals in charge and responsible for the upkeep of the building are to see that the care and maintenance instructions of the MFMA and flooring manufacturer are followed.

Basket Weave Floor Systems Purpose This Guide Specification is designed to assist in the production of actual architectural specifications for maple athletic flooring installations. It is hoped that this Guide will be of particular value to those who do not have a detailed knowledge of the construction of athletic floors and that it will aid in maintaining high construction standards. Maple Flooring Manufacturers Association, Inc. (MFMA), its members and employees, do not warrant the information contained herein as proper under all conditions. The MFMA reserves the right to revise these Guide Specifications as necessary. Questions concerning information contained in this Guide should be directed to MFMA, attention Technical Director. Part 1- General 1.1 Description A. This document specifies a wood strip gymnasium floor system consisting, in general, of maple flooring, wood subflooring, vapor barrier, sanding, sealers, finishes, game lines and wall base. B. The general contractor shall provide a concrete slab, troweled smooth and level to a tolerance of 1/8 in a 10 radius, subject to the approval of the flooring contractor. Basket Weave System Basket Weave with Pads System F-Numbers are not applicable for gymnasium slab applications. Labor and materials necessary to put the concrete slab in acceptable condition (high areas ground down and low areas filled with appropriate leveling compounds) shall be the responsibility of the general contractor. Installation shall not proceed until the concrete slab is in acceptable condition. 1. The general contractor shall provide slab depressions as follows: a. Basket Weave System: 2-1/2 for 25/32 with 1/4 foam underlayment, 2-3/4 for 33/32 thick flooring with 1/4 foam underlayment. b. Basket Weave with Pads System: 2-3/4 for 25/32 thick flooring with 7/16 pad, 3 for 33/32 thick flooring with 3/4 pad. 2. Concrete subfloors shall have an adequate moisture barrier beneath and at the perimeter of the slab. C. The flooring contractor shall provide all tools and services to furnish, deliver, and install a complete wood floor system from the surface vaporproofing of the slab, when required, through the sanding and finishing, plus the installation of perimeter base moldings and thresholds. 1.2 Quality Assurance A. The wood flooring shall be MFMA maple. B. The flooring contractor shall be a firm experienced in installing maple flooring systems. C. Flooring shall be delivered to the premises a minimum of seven days before installation commences, or as required for acclimation. D. All flooring bundles should be broken and loosely piled to acclimate the flooring to environmental conditions in the building. 1.3 Working Conditions A. The floor system shall not be delivered or installed until all masonry, plastering/drywalling, tile work and overhead mechanical trades are complete. The building must be enclosed and weathertight. B. Permanent heat, light and ventilation shall be installed and operating during and after installation, maintaining a temperature range of 55 degrees to 75 degrees and a relative humidity range of 35 percent to 50 percent (no more than a 15 percent difference between high and low humidity levels. 1.4 Warranty A. The flooring contractor shall warrant the floor for a period of one year, and shall furnish a warranty from the flooring B. Refer to individual flooring manufacturers warranty for specific provisions and exclusions.

Basket Weave Floor Systems Part 2-Products 2.1 Materials A. Flooring shall be MFMA-RL Northern Hard Maple or MFMA-FJ Northern Hard Maple; 33/32 or 25/32 thick x 2-1/4 or 1-1/2 wide; First, Second and Better, Third and Better, Third Grade or Utility Grade: T & G and EM; grade marked and stamped as produced by an MFMA member B. Flooring shall be treated with WOODLIFE 3 preservative or equal if so specified. C. Vapor barrier shall be 6 mil. Polyethylene. (Specifier s option: For extra vapor protection or when installing padded system, cover entire concrete slab with 6 mil polyethylene, sealing joints a minimum of 4.) D. Subfloor 1. Basket Weave: Wooden subfloor shall be 1 x 6 nominal KD Hemlock, Gym Grade Spruce, Pine or Fir, S2S or S4S as supplied by flooring manufacturer; OPTIONAL: dip treated with WOODLIFE 3 preservative; with 1/4 multi-cellular closed-cell foam with a density of 1.7-2.3 PCF, as supplied by flooring 2. Basket Weave with Pads: Wooden subfloor shall be 1 x 6 nominal KD Hemlock, Gym Grade Spruce, Pine or Fir, S2S or S4S as supplied by flooring manufacturer; OPTIONAL: dip treated with WOODLIFE 3 preservative; with 7/16 pads or 3/4 pads supplied by flooring manufacturer; attached per manufacturer s instructions. E. Flooring fasteners shall be 2 barbed cleats or 15 gauge coated staples, unless otherwise specified by flooring G. Wall base shall be 3 x 4 x 4 heavy duty molded, vented, rubber or vinyl cove base with premolded outside corners as supplied by flooring H. Finish materials shall be selected from the most recent listing of MFMA certified products, and shall be applied according to finish manufacturer s instructions. Part 3-Execution 3.1 Inspection A. Inspect concrete subfloors for proper tolerance and dryness, and report any discrepancies in writing to the general contractor for correction. B. The concrete slab shall be cleaned of all debris by general contractor so flooring contractor will have adequate access to work surface. 3.2 Installation A. Moisture Protection 1. Cover entire concrete slab with 1/4 multi-cellular closed-cell foam with a density of 1.7-2.3 PCF sealing joints with 2 duct tape, as supplied by flooring 2. Option: for extra vapor protection cover entire concrete slab with 6 mil. polyethylene, lapping joints a minimum of 4. B. Basket Weave System: 1. Install 1 x 6 subfloor diagonally to the long dimension of the room at a 25 degree angle or 45 degree angle. The ends of the 1 x 6 shall be butted or spaced per manufacturer s instructions and side spacing 2 or 6 between adjoining 1 x 6. Maintain a 2 expansion void at the walls and other permanent obstructions. 2. The top layer of 1 x 6 subfloor shall be laid in the opposite direction to the first layer, at a 25 degree or 45 degree angle to the long dimension of the room so that no end joints fall over any end joints of the first layer. The ends of the second layer of 1 x 6 shall be butted or spaced per manufacturer s instructions and side spacing 2 between adjoining 1 x 6. Secure the two layers at each intersection using nails or staples. Maintain a 2 expansion void at the walls and other permanent obstructions. C. Basket Weave with Pads System 1. Install 1 x 6 subfloor diagonally to the long dimension of the room at a 25 degree angle or 45 degree angle. The ends of the 1 x 6 shall be butted or spaced per manufacturer s instructions and side spacing 2 or 6 between adjoining 1 x 6 with pads stapled and spaced per manufacturer s instructions. Maintain a 2 expansion void at the walls and other permanent obstructions. 2. The top layer of 1 x 6 subfloor shall be laid in the opposite direction to the first layer, at a 25 degree or 45 degree angle to the long dimension of the room so that no end joints fall over any end joints of the first layer. The ends of the second layer of 1 x 6 shall be butted or spaced per manufacturer s instructions and side spacing 2 between adjoining 1 x 6. Secure the two layers at each intersection using nails or staples. Maintain a 2 expansion void at the walls and other permanent obstructions. D. Install maple flooring parallel with the main playing court by nailing or stapling approximately 12 o.c. 1. Space joints between flooring strips to allow for intermediate expansion, in accordance with local humidity conditions. 2. Provide 2 expansion voids at the perimeter and at all vertical obstructions. 3.3 Flooring Sanding A. Machine sand with coarse, medium and fine paper to a smooth, even, uniform surface. B. Remove sanding dust from entire surface by tack or vacuum. 3.4 Finishing A. Inspect entire area of floor to insure that surface is acceptable for finishing, completely free from sanding dust and perfectly clean. B. Apply seal and finish per finish manufacturer s instructions. C. Buff and clean floor between each coat. D. Paint game lines as shown on drawings, between seal and first coat of finish. Game line paint shall be compatible with finish. 3.5 Base Installation A. Install vent cove base by anchoring to walls with base cement, screws or anchors. Miter all joints at 45 degree angles. B. Miter inside corners, and use premolded outside corners. C. Install thresholds as required, anchoring firmly in concrete floor beyond limits of wood flooring. 3.6 Maintenance A. Upon completion of floor installation, the owners, attendants or individuals in charge are responsible for the upkeep of the building and are to see that the care and maintenance instruction of the MFMA and the flooring manufacturer are followed.