The MOJ Story. BIM 2 AIM and the Digital Lifecycle Cost Toolkit. Andrew Green Director of Faithful+Gould 16 th November 2016, London

Similar documents
BUILDING INFORMATION MODELLING BOUYGUES UK THE USE OF BIM TO IMPROVE PROJECT PERFORMANCE

UK BIM programme Munich Nick Tune Director BuildingSMARTUK & International

CIBSE Guide M. Guide M Overview Jo Harris Chair Maintenance Task Group/Guide M Update CIBSE Facilities Management

BIM 2016 and the NEC. Simon Rawlinson, 20 April 2015

The BIM Toolkit. Sarah Delany February 2015 v2.0

Employer s information requirements (EIR) An overview of facilities management requirements

Process mapping Ministry of Justice Jaimie Johnston BIM Task Group, Delivery & Productivity. Bryden Wood Technology Limited 2017

BIDDING FOR BIM. CIF Bidding for BIM. September

Autodesk and the UK BIM Level 2 Mandate

Cookham Wood and BIM: Practical Lessons Learnt Fiona Moore Cirrus Consultant Services 10 July 2014

Building Information Modelling UK Experience & International View. BIM Task Group Briefing Presentation. Adam Matthews, UK BIM Task Group

CIBSE Guide M. Guide M Update Jo Harris. Manager in BSRIA s Sustainable Construction Group. Chair CIBSE Maintenance Task Group

Promoting better business outcomes through the use of BIM and digital technologies.

Preparing for BIM. Construction Scotland Conference. Adrian Shilliday. Technical Director & BIM Lead, Galliford Try BIM Region Scotland

BLOCKCHAINS IN CONSTRUCTION & INFRASTRUCTURE HELIUM ALLIANCE

BIM objects: what manufacturers and specialist contactors need to know. Ben Councell

Session 2: A methodology for measuring embodied carbon. Sean Lockie, Director, Faithful and Gould

Building Information Modelling (BIM) Implementation Plan September 2015

WHOLE LIFECYCLE INFORMATION FLOW UNDERPINNED BY BIM: TECHNOLOGY, PROCESS, POLICY AND PEOPLE

COBie and the Demanding Client

Building Information Modelling in the European Union: The case of the UK, France and the Netherlands

BIM: WHAT CLIENTS REALLY THINK

BIM for infrastructure, Paul King Bentley Systems 2016 Bentley Systems, Incorporated

Data Requirements for the Construction and Management of Buildings

Building Information Modelling and collaborative construction. Taking the next steps

BUILDING INFORMATION MODEL (BIM) PROTOCOL

The National BIM Library. Drew Wiggett Head of Product Information

PAS 1192 Part 3. p40 GSL Survey Results Update. p36 International BIM Survey. p10 Spotlight on: Emily Spink. 38th Edition

EcoDomus, Inc

Government Soft Landings

Procurement of FM Services

Role of CAFM: How to make the right investment 16:30 17:15

BIM (incl. GSL) from an FM Perspective. Mike Packham, BIFM

CIF BIM Guide Standards & Policies August 2017

November Introduction. What was your role with the company? Has your business awareness and use of BIM advanced in the last twelve months?

HS2 s approach to BIM and Beyond

Improve Asset Management through Asset-Centric Information Management

ICT in BUILDING ABPL90331 Dr Dominik Holzer, Semester 2, 2017

Experience at Hinkley Point C: building Information Modelling (bim) and Enterprise Lifecycle Management Solutions Presented By: Sue Hewish & Jason

Implementation of the German Road Map for Digital Design and Construction Prof. Dr.-Ing. Markus König. Milano, 9 marzo 2017

BIM Development in the Middle East

Building information modeling and intelligent green buildings

OSIsoft PI System: A Vessel for Change in Synergy

BIM s value proposition for building owners

Xavier University s Facility Management BIM Integration A Case Study

HOW CAN YOU ENSURE SUCCESSFUL BUSINESS TRANSFORMATION? By Suzanne Costella

Communicating an Evidence Based Asset Management Program By Daryush Esmaili

URL: < /ijplm >

Integrated Property Management Solution

ORGANISATIONAL INFORMATION REQUIREMENTS

NZ INFRASTRUCTURE FORUM: SESSION 14 INFRASTRUCTURE ASSET MANAGEMENT INFRASTRUCTURE ASSET MANAGEMENT: CHALLENGES TO BETTER PERFORMANCE INTRODUCTION

Big Data to Benchmarking Enjoy the Journey! Laurie Gilmer, PE, CFM, SFP, LEED AP, CxA Facility Engineering Associates

BRE ACADEMY BIM TRAINING AND ACCREDITATION FOR RIAI MEMBERS AND RIAI PRACTICES

IPSec Professional Risk Victorian Protective Data Security Standards Compliance Services Overview in Brief

Connecting the parts Developing an integrated IDMP strategy

Operational Improvement Consulting. SDL Language Solutions

SmartPlant Materials Handling

Translate stakeholder needs into strategy. Governance is about negotiating and deciding amongst different stakeholders value interests.

Collaborative working in supply chain & procurement

ISO Collaborative Business Relationship Management Your implementation guide

Building a Customer Journey Mapping (CJM) Capability

Building Information Modelling IFC (buildingsmart)

BIM for Civil and Structural Engineers. Tom Bartley, Senior Engineer, WSP

SmartPlant 3D Materials Handling. Taylor D. Cole Vice President, Intergraph Global Metals & Mining Industry

Introduction Quality and performance should be the priority for the building industry. It is crucial that professionals strive to question whether a p

Pre-contract Building Information Modelling (BIM) Execution Plan (BEP)

5D BIM: Creating Cost Certainty and Better Buildings

Integrated Reporting Thinking. New Zealand Post Group: New Zealand Post Limited.

groupbc.com BC Enterprise Key features and benefits

IT Strategic Plan

What does it mean for you?

ESTATES SERVICES. Soft Landings An Introduction

Real-time and tactical planning: A PPF discussion document

Implementing of Building Information Modelling in Public Works Projects in Ireland - Presentation

Making cities smarter

Benchmarking.it is much more than just a bunch of numbers! Teena Shouse, CFM, IFMA Fellow Facility Engineering Associates

Joined-up Requirements: Business Goals to System Tests

Leading Enterprise Change by Developing & Leveraging HR Business Partners

SOLVING THE MYSTERY OF SDN & NFV SOLUTIONS EVALUATION SYTEL REPLY S VADVISOR TOOL WILL HELP YOU.

The Agile Enterprise May 2012

A holistic approach to insurance automation

Geo BIM 2015 Salah Al Dilimi Dubai - August 2015

Need a system to deliver consistent, efficient and reliable IT services? Use an ISO/IEC compliant management system.

ASSET MANAGEMENT SERVICES

6 STEPS TO A COMPLETE BUSINESS CASE. Business Case Development Framework

The Accenture/ Siemens PLM Software Alliance

Moving from ISO 14001:2004 to ISO 14001:2015 Transition Guide

Fuel Cell Distributed Generation Commercialisation Study. Mirela Atanasiu Project Manager. Preliminary pending publication

BIM and the Consultant / Client s Quantity Surveyor

BIM in Infrastructure

Enabling Siemens PLM Software for the AEC Industry. Lake Constance 5D-Conference 2013 Constance, 28th-29th of October

Asset Risk Management Journey Plan

DOCUMENTS AND RECORDS MANAGEMENT COMPLIANCE

Assessment of the Viability of Carbon Emission Targets for New Builds Main Report

VIRTUAL DESIGN & CONSTRUCTION, THE NEXT LEVEL OF COLLABORATION AND INTEGRATION 2016 Airport Construction Strategy Summit. Special Thanks To:

Circular Advantage: 4 key values 1 silver bullet...and Minority report. Tomas Haglund Flemström Copenhagen

BS EN ISO Implementation and Case Studies. Charles Barker Key Expert EUCTP II

Operational Readiness Launching Capital Projects Successfully in Local Government

CREATE AN API PROGRAM TO DRIVE DIGITAL TRANSFORMATION

Transcription:

The MOJ Story BIM 2 AIM and the Digital Lifecycle Cost Toolkit Andrew Green Director of Faithful+Gould 16 th November 2016, London

AIM of BIM Level 2 and beyond Efficiency agenda - key drivers: On 3 rd October 2016 all central government departments were mandated to be compliant to level 2 BIM which is fundamental about gathering and using project information data in a digital 3D environment in the right format 5D 6D whilst significantly reducing life cycle costs and carbon emissions!

BIM 2 AIM Think of the End before Beginning! Employers Information Requirements Define and Capture Client Requirements 1192 part 2 Pre-Contract BIM Execution Plan Suppliers respond through tender process Post - Contract BIM Execution Plan PIM Suppliers define how they will coordinate their use of BIM Project Information Model Model developed iteratively through design and construction Asset Information Model As-Built Model AIM Asset Data &WLC Costs 5D WLC Costs 1192 part 3 6D O&M Regimes

Handover Old World Design and Build Operate and Maintain

Soft Landings Design and Build Operate and Maintain

Soft Landings - BIM 2 AIM Asset Information Model Design and Build Operate and Maintain BIM 2 AIM

BIM 2 AIM! Is FM in danger of falling of the BIM Cliff? Do AM & FM s really get the benefits of BIM? It s all about the I in BIM

BIM - i Overload

MOJ BIM 2 AIM Level 2 and beyond

MOJ BIM2AIM Document Suite The below weblink includes reflections on MOJ BIM2AIM journey so far. https://prezi.com/b73gw4x6duec/moj-bim-story-bim-prospects-2016/

Asset Information Model - BIM Data Standards Requirements Models PAS 1192 Part 3 Operation PAS 1192 Part 2 Construction http://shop.bsigroup.com/forms/pass/pas-1192-3/ BSI Standards Ltd

BIM 2 AIM Data Classification Systems Information Purposes Concept cost information Detailed cost information Concept design information Developed design information Production information Installation information As constructed information (handover data) In use design information Classification Approach / Part NRM 1, CSEMM NRM 1, CESMM Uniclass / Entities, spaces, elements tables Uniclass / Elements, systems tables Uniclass / Systems, work results, product tables Uniclass / Products tables Uniclass / Systems, products tables Uniclass / Systems, work results, product tables Maintenance cost information NRM 3 Source PAS 1192-2

NRM 3 Bridging the Capital and Revenue Divide C O M R E Source - NRM 3 /SFG20 / CIBSE data structure

NRM 3 - Alignment with NBS and UNICLASS coding 5 Services 5.5 Heat Source 5.5.1 Heat Source Maintain (M) & M&R NRM Code Renewal ( R) descriptor UOM Uniclass Code Uniclass Description 5.5.1.1 Boiler - biomass Nr Pr_60_60_08_80 Solid fuel cast iron boilers Nr Pr_60_60_08_81 Solid fuel steel shell boilers 5.5.1.2 Boiler - gas/oil Nr Pr_60_60_08_33 Gas fired boilers Nr Pr_60_60_08_35 Gas fired cast iron boilers Nr Pr_60_60_08_34 Gas fired condensing boilers Nr Pr_60_60_08_34 Gas fired condensing boilers Nr Pr_60_60_08_33 Gas fired boilers Nr Pr_60_60_08_34 Gas fired condensing boilers Nr Pr_60_60_08_58 Oil fired cast iron boilers Nr Pr_60_60_08_36 Gas fired steel shell boilers Nr Pr_60_60_08_37 Gas fired water tube boilers Nr Pr_60_60_08_59 Oil fired steel shell boilers Nr Pr_60_60_08_60 Oil fired water tube boilers Nr Pr_60_60_08_36 Gas fired steel shell boilers Nr Pr_60_60_08_37 Gas fired water tube boilers Nr Pr_60_60_08_59 Oil fired steel shell boilers Nr Pr_60_60_08_60 Oil fired water tube boilers Nr Pr_70_60_37_36 Ground source heat pumps 5.5.1.3 Boiler - coal fired Nr Pr_60_60_83_81 Solid fuel handling equipment Nr Pr_60_50_85_01 Above ground storage containers for solid fuel Nr Pr_60_50_85_07 Below ground storage containers for solid fuel Source - NRM 3 /SFG20 / CIBSE aligned to UNICLASS (extract)

BIM 2 AIM COBIE / NRM 3 Data Alignment Source BS 8544

NRM 3 - Integrated Asset Information Model Renewals Construct Renewal Operate Maintain CORE CORE ASSET DATA Capital Asset Investment Planning End of life (energy) Environment Energy Maintain Operate (CAFM) Operation & Maintenance Planning

NRM 3 Digital Life Cycle Cost Toolkit

MOJ Pilot of the Digital Life Cycle Cost Toolkit DLCC Digital Life Cycle Costing Toolkit + SFG20 xbim Data Exchange + COBie data exchange into MOJ s AIM and CDE In collaboration with: Project led by Andy Green Faithful & Gould

MOJ Pilot BIM 2 AIM and DLCC Toolkit DATA TRANSFER BETWEEN PROJECTS and AIM at new plan of works focus on stage 6 and 7 in use 1 Robust basis to transfer project data into AIM 2 Generate the annualised asset maintenance plan and costings using the NRM maintain template 3 Generate the asset renewal plan or life cycle costs using the NRM renewal template 4 Define the building operation and maintenance information (as CIBSE building logbook)

Zoom into assets at a detailed level

Key Benefits Realised 1. Demystify and simplify how to do life cycle costing 2. Make project data transferable to use and reuse in asset information management systems and CAFM 3. Unlocking robust cost analysis and benchmarking to use in future projects 4. Feeding relevant operation and maintenance, renewal costs and asset data back into projects 5. Making better decisions at key stages and informing trade offs between options 6. Using the common data classification to enable 3D visualisation of project BIM to work with AIM data

3D BIM - linked to a Asset Information Model (AIM) and Life Cycle Cost (5D) and O&M + Carbon Data (6D) BIM asset information in the Common Data Environment linked to related documents (in NRM 3 data structure)

Common Data Environment + NRM/COBie Sharepoint Documents Available

The How for BIM in FM is still an issue Training and readiness of the FM supply chain Knowledge and understanding of BIM for client specific purposes Agreed standardised processes and documents (eg PAS1192.3 BS8536-1) - Common language (NRM/SFG20/CIBSE/UNiclass) Integration with existing CAFM and BMS systems (CoBIE, IFC) Collaborative processes (open discussion, information exchange) Early involvement and EIR requirements to ensure project and FM requirements in terms of data received, is sufficient and in the right format to develop the AIM and do digital life cycle costing FM needs to be in a position to validate and receive asset data FM slow to take up should not be the weak link in the chain!

Is FM and Asset Management ready for BIM? Not yet we are still learning through implementation and pilots Breaking down the silos both internally and externally still work to do, but Government Soft Landings moves us to a better place Level 2 BIM still being understood by industry and clients some more advanced than others not fully collaborating Level 3 BIM more around the principles of whole life data /cost

RICS Construction Journal Nov/Dec 2016

BIM 2 AIM + GSL = Better Outcomes To champion better outcomes for our built assets during the design & construction stages through Government Soft Landings (GSL) powered by a Building Information Model (BIM) to ensure value is achieved in the operational lifecycle of an asset. For more information contact andy.green@fgould.com

ANY QUESTIONS? THANK YOU