Water Budget III: Stream Flow P = Q + ET + G + ΔS

Similar documents
Methods of Streamflow Analysis

Hydrology for Drainage Design. Design Considerations Use appropriate design tools for the job at hand:

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire

Definitions 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology

Watersheds and the Hydrologic Cycle

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY

Hydrology 101. Impacts of the Urban Environment. Nokomis Knolls Pond Summer June 2008

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

EART 204. Water. Dr. Slawek Tulaczyk. Earth Sciences, UCSC

What is runoff? Runoff. Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream

Grass Channel STORMWATER MANAGEMENT SUITABILITY KEY CONSIDERATIONS

Hydrologic Calibration:

iswm TM Technical Manual Hydrology:

Runoff Volume: The Importance of Land Cover

Runoff Processes. Daene C. McKinney

Runoff Hydrographs. The Unit Hydrograph Approach

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

CONSISTENCY BETWEEN CUHP AND RATIONAL METHODS James C.Y. Guo, PhD, P.E., and Ben Urbonas, P.E., D.WRD 08/04/2008

1. Stream Network. The most common approach to quantitatively describing stream networks was postulated by Strahler (1952).

Module 10b: Gutter and Inlet Designs and Multiple Design Objectives

Norman Maclean Snowmelt Flow rate Storm flows fs (c flow m a tre S

BAEN 673 / February 18, 2016 Hydrologic Processes

HYDROLOGIC & HYDRAULIC ASPECTS of the Walnut Street Bridge over the Schuylkill River Philadelphia, PA

Continuous Simulation Modeling of Stormwater Ponds, Lakes, & Wetlands: A BUILT-IN APPLICATION OF PONDS 3.2

the 2001 season. Allison brought high winds and street flooding to Houston, after

CEE6400 Physical Hydrology

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

Review for Chapter 1 Introduction. 1. Sketch the hydrologic cycle and label the location and movement of water.

STORMWATER HYDROLOGY

Measuring discharge. Climatological and hydrological field work

Analysis of Runoff Reduction and Hydrologic Cycle Utilizing LID Concepts

Implementing Stormwater Management through Split-Flow Drainage Design

Stream Reaches and Hydrologic Units

Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area

Hydrologic cycle, runoff process

Western Washington Hydrology Model (WWHM) Software Introduction. Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington

Chapter 3 Dispersion BMPs

Effect of Land Surface on Runoff Generation

SPATIAL-TEMPORAL ADJUSTMENTS OF TIME OF CONCENTRATION

Grass Channel KEY CONSIDERATIONS STORMWATER MANAGEMENT SUITABILITY FEASIBILITY CONSIDERATIONS OTHER CONSIDERATIONS POLLUTANT REMOVAL

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

Hydrologic Engineering Center Hydrologic Modeling System (HEC-HMS) Sunil KUMAR Director, National Water Academy

Estimating Field-Scale Runoff and Sediment Delivery. Seth M. Dabney, USDA-ARS Dalmo A. N. Vieira, USDA-ARS Daniel C. Yoder, Univ.

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines

1 n. Flow direction Raster DEM. Spatial analyst slope DEM (%) slope DEM / 100 (actual slope) Flow accumulation

Natural and Engineered Wetlands for Stormwater Management

Introduction to Storm Sewer Design

CHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF

Chapter 3 Physical Factors Affecting Runoff

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA

1.6 Influence of Human Activities and Land use Changes on Hydrologic Cycle

WASTEWATER & STORM WATER COLLECTION AND REMOVAL

Sunset Circle Vegetated Swale and Infiltration Basin System Monitoring Report: Rainy Seasons and

Hydrologic Pathways: Precipitation, ET, Storage, Runoff & Recharge. Joe Magner, MPCA

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

5/11/2007. WinTR-55 for Plan Reviews Small Watershed Hydrology Overview

Index. Page numbers followed by f indicate figures.

Stormwater Local Design Manual For Houston County, Georgia

Vegetation Management and Water Yield: Silver Bullet or a Pipe Dream?

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

4.1 General Methodology and Data Base Development

Municipal Stadium Wetland

Ch 18. Hydrologic Cycle and streams. Tom Bean

Runoff and soil loss. (Quantification and modeling of watershed discharge and sediment yield) Kassa Tadele (Dr.Ing) Arba Minch University

MODEL Stormwater Local Design Manual. City of Centerville

NREM 407/507 WATERSHED MANAGEMENT Day 2

Chapter H. Introduction to Surface Water Hydrology and Drainage for Engineering Purposes

URBAN FLOODING: HEC-HMS

Green Infrastructure BMPs. Hydrologic Performance Small Storms

Green Infrastructure Flood Reduction Computations

2

M.L. Kavvas, Z. Q. Chen, M. Anderson, L. Liang, N. Ohara Hydrologic Research Laboratory, Civil and Environmental Engineering, UC Davis

Re-plumbing Roadside Ditch Networks

Introduction. Welcome to the Belgium Study Abroad Program. Courses:

Issue paper: Aquifer Water Balance

Paraprofessional Training Session 1

LID PLANTER BOX MODELING

Background Information on the. Peace River Basin

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

Cokato Lake (86-263) Wright County. Hydrologic Investigation

Hydrology and Flooding

Functional Uplift Based Stream Assessment & Restoration Design

DIVISION 5 STORM DRAINAGE CRITERIA

E. STORMWATER MANAGEMENT

Hydrologic Study Report for Single Lot Detention Basin Analysis

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

Constructed Wetland Pond T-8

Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future

Hydrologic evaluation of flood flows from a burned watershed

Peak discharge computation

Uncertainty in Hydrologic Modelling for PMF Estimation

Stormwater Management at. Park View Estates. Zach Bradley Riley Jones Grant Moore Derek West. November 18, 2016

TECHNICAL MEMORANDUM. SUBJECT: Determination of watershed historic peak flow rates as the basis for detention basin design

Water Balance Methodology

Appendix I OFFICE OF THE MORGAN COUNTY SURVEYOR STORMWATER DESIGN MANUAL 7/1/2008

Transcription:

Water Budget III: Stream Flow P = Q + ET + G + ΔS

Why Measure Streamflow? Water supply planning How much water can we take out (without harming ecosystems we want to protect) Flood protection How much water will come down the channel if X storm happens? Who ll be flooded? Water quality What are the fluxes (flow x concentration) of contaminants to a lake or estuary? What are the effects of land use change on water delivery to downstream systems?

Stream Flow Network (http://water.usgs.gov)

Extreme Low Flows Rainfall between Oct 1. 2010 and January 21, 2011 is 2.68 inches

Hydrograph- graph of flow over time

Flow Over Time Santa Fe River

Seasonality of Flow

Watersheds as Filters Rain falls Storages buffer the rainfall signal, letting water out slowly More storage = more buffering The result is that the rainfall signal looks stochastic, the flow looks more organized Watershed properties AND size affect the filtering effect

Rainfall Filtering Santa Fe River

Rainfall Filtering Finer View

Consider the Filter Effects of: Watersheds with steep vs. shallow slopes Watersheds with deep vs. shallow soils Watersheds with intense vs. extended rainfall Watersheds with forests vs. parking lots Watersheds with dams vs. not Big vs. little watersheds Watersheds with big shallow aquifers

Basin Filtering Creates Lags Hatchet Creek

Where is Stream Flow From? At any time, flow is a composite of water with different sources and residence times Some water is stored in the watershed for a very long time, some very short During low flow conditions, water is mostly old During storms, the contribution of new water increases How does an aquifer affect this?

2% 8% 23%

Flow and Rainfall Intensity If Rainfall Intensity > Infiltration Capacity then surface runoff occurs Stream flows are composites of Surface runoff Subsurface flows

Variable Source Area (Stormflow Generation in Florida)

Variable Source Area Makes Antecedent Rainfall IMPORTANT

Land Use (Cover) Affects Runoff Generation Impervious surfaces preclude infiltration Less infiltration means more runoff Runoff also MOVES faster Less filtering Compare land uses

More stormflow, higher peak flow, sooner.

Forest Ag Urban

The importance of storage the basis of filtering Same total flow (area under the curve), lower peak flow.

Water Storage in the Forest

Wetland Hydrological Services Depressions and vegetation (swamps) slow runoff. Upper watershed wetland storage delays runoff and reduces peak flows. Wetland flood plain has a dominant influence on downstream peak flow and solute transport.

Why Does Storage Matter? 200,000 m 3 of Stormwater Runoff; Channel Peak Flow capacity of 1m 3 /s All in one day Peak Flow =2.3 m 3 /s Spread over 3 days Peak Flow = 0.8m 3 /s

How Big a Flood Can We Expect? The size of the flood is inversely proportional to it s frequency Big event happen rarely Big events shape the landscape Medium events maintain the landscape Small events control the biology How would we predict the size of a flood that happens roughly once in 25 years? Think back to the rainfall lab

Rainfall Recurrence Series

Flow (Santa Fe River Station 3)

Daily Flow Recurrence Series

The 100-yr Floodzone Map

How Do We Measure Streamflow? Funny you should ask basis of Lab #4. Basis is to estimate: Cross-sectional area (A; through which water flows) Water flow velocity (V) Q = A * V

Measuring Surface Flow

Typical stream velocity profile

Where to measure mean velocity? Float Velocity * 0.8 for natural channels Float Velocity * 0.9 for concrete channels

Velocity Instruments $2k Turn-cup 0.500 ft/s $4k Electromagnetic 0.050 ft/s $7k Sonic Doppler 0.005 ft/s

Sect Width (m) Depth (m) Vel@.6 m/s Flow (m 3 /s) 1 1 0.7 0.20 0.14 2 1 2.0 0.25 0.50 3 1 1.3 0.15 0.20 Total 0.84m 3 /s

Discharge is HARD to Measure We want: Daily (or sub-daily) measurements Multiple stations per river Real time updating (detect changes in flow as they are happening)

Rating equations (stage vs. discharge) allow continuous flow monitoring

Stage-Discharge Relation Water stage (elevation) is EASY to measure Stage is related to dischage via a mathematical relationship Applying that relationship to measured stage gives estimates of discharge H H Q t Q t Stage Hydrograph Stage-Discharge Curve or Rating Curve Discharge Hydrograph

Stage-Discharge Relation Typical relationship: Q = a(h +b) c The relationship between H & Q has to be calibrated locally for different stations

Discahrge Stage Discharge Relationship for the Ichetucknee River At low stage, positive relationship between stage and discharge At high stage, negative relationship Why? Stage

Stage Measurements Float-pulley Staff gage Pressure Ultrasonic

Weirs

Flumes

Weir vs Flume Type The Good The Bad Weir Low cost Easy installation Won t work on low gradient streams Upstream flooding Clogs Changes WQ Wildlife barrier Flume Works ok in low gradient streams Better for WQ and wildlife Self cleaning High cost Difficult to install

What if there s no rating curve? New watershed, new conditions Areas where it s hard to develop rating curves For example, the Everglades

Manning s Equation - Flow Estimation without a rating equation Q= 1/n * A * r 2/3 * s 1/2 Q = estimated flow m 3 /s n = Manning s roughness number (0.02 smooth to 0.15 rough or weedy, 0.5 dense vegetation) A = cross sectional area (m 2 ) r = Hydraulic Radius (wetted perimeter = WD/(W + 2D) W > 10D, R D) s = Hydraulic Gradient ΔH/L

Predicting Flow in the Everglades Dense vegetation channel (n = 0.4) Shallow slope (s = 3 cm per km = 0.00003) Wide channel (100 m wide, 0.3 m deep, A = 30 m 2, r = 30 m 2 / 100.6 m = 0.3 m) What is Q? What is flow velocity (u)? Q = (1/n) * A * r 0.67 * s 0.5 V = Q / A Q = (1/0.4) * 30 m 2 * 0.3 m 0.67 * 0.00003 0.5 = 0.183 m 3 /s V = 0.183 m 3 /s / 30 m 2 = 0.006 m/s = 0.6 cm/s

Groundwater Next Time