Neptune Cargill Overpass Extension

Similar documents
Vancouver Wharves Diesel Handling Facility Expansion Project

Teck s Coal Export Ports. Brad Johnston General Manager, Marketing & Logistics, Coal

KIEWIT LEDCOR TMEP PARTNERSHIP 2115 Commissioner Street Site 1 - PER Application, Category C. August 17, Vancouver Fraser Port Authority

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

Pattullo Bridge Replacement Project. Cost Report

Ironton Russell Bridge Project

THIS IS NOT A BUILDING PERMIT

Constructability Guidelines

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

Ironton Russell Bridge Project

Ironton Russell Bridge Project

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway

407 TRANSITWAY. Planning & Preliminary Design

HUDSON TUNNEL PROJECT

Update on the S11D project

Baseline Document Change Announcement

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY

Scott Hockly. Environmental Management of an Inner City Roading Project

Growing Our Business. Potash Handling Facility. Input Consideration Memo

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

Chapter 4 Bridge Program Drawings

Ironton Russell Bridge Project

Code of Construction Practice Part B: Site Specific Requirements

Improvements to Florida s Rail Network. CSX Transportation, Inc. AMEC Environment & Infrastructure, Inc.

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

I-91 Viaduct Public Information Briefing

UPCOMING DESIGN & CONSTRUCTION PROJECTS 2 nd Quarter 2018 (Project & Construction Management)

Structural - Engineering Review Checklist

RESOLUTION NO

Agenda. PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

REINFORCED EARTH. Risk Mitigation

I-91 Viaduct Public Information Briefing

Proposed G3 Terminal Vancouver Project Update. Presented to North Shore Waterfront Liaison Committee January 14, 2016

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

Developing Tools for Hydromodification Management and Assessment

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

G2-0 LIST OF ACTIVE MTODs

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Welcome! Contact Information

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Appendix H Balfour Beatty Independent Surveyor s Report

LA 1 Bridge Project Status Update Feb. 12, 2007 WSA/DOTD A Partnership

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects

Brighton & Sussex University Hospital

Grade-Separated Trail Crossings How Do We Get Over There?

Operations Mine Site, Tote Road and Railway

Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE INFORMATION

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

TEXAS PORTS STRATEGIC MISSION PLAN & PORT CAPITAL PROGRAM. November 16, 2016 November Transportation Commission Workshop November 16, 2016

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018

A. INTRODUCTION OVERVIEW

Request For Proposal (RFP) Millennium Bulk Terminals Longview, LLC Project. NEPA/SEPA Environmental Impact Statement Development

Major Capital Investments

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan

BHPBilliton Iron Ore Port Sweating the assets. September 2003

Concrete Waste Management

I-94/I-69 Interchange Bridge Construction

Maine Turnpike Authority

Appendix D. Stormwater Pollution Prevention Plan

MATERIAL QUANTITIES FOR BALANCED CANTILEVER BRIDGES. FANI ANTONIOU Egnatia Odos A.E., 6th km Thessaloniki - Thermi, GREECE

6.0 CONSTRUCTION PROGRAMME

Whittier Bridge/I-95 Improvement Project. Public Information Meeting

Presentation to RCCAO: Excess Soil Management: A Guide for Best Management Practices. Central Region Operations Division.

TECHNICAL MEMORANDUM

Predicting Highway Construction Impacts on a Community

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

SITE DESIGN ENGINEER'S STATEMENT:

King of Prussia Rail Project Valley Forge Homes Backyard Visits. Summary of Activities

Bridge pier movements induced by micropile installations

1. Urban Design. Current Land Uses

MSE Walls Problems and Solutions

by Dr. Mark A. Ketchum, OPAC Consulting Engineers for the EERI 100 th Anniversary Earthquake Conference, April 17, 2006

The State of Ohio Bridges

Environmental and Social Review Summary. Dakar Port, DP World Container Terminal Modernization and Operation

ADDENDUM NO. 1. Description of BID 7664: Fossil Creek Trail Underpass at Trilby Road

SR 710 North Study. Technical Advisory Committee Meeting No. 16 August 13, 2014 Stakeholder Outreach Advisory Committee Meeting No. 12 August 14, 2014

3.6 Construction Methods

ORDER NO. An Order of the Board of Harbor Commissioners of the City of Los Angeles amending the Port of Los Angeles Tariff No. 4.

Base Metal and Iron Ore Mining

.2 The scales and automated system for each of the three (3) scales shall be supplied from a single manufacturer.

Pond Closures: Solving a Complicated Puzzle

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work

The safety measures against deformation of the track

CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS

May 2004 Construction Forms A-i. Table of Contents APPENDIX A CONSTRUCTION FORMS... A-1. SCDOT Construction Form Description Table...

URBAN MOBILITY. Metros, Light Rail & Bus Rapid Transit systems

Major Capital Improvements

Environmental Management System

Reason for Acceptance or Rejection

BAGGAGE HANDLING SYSTEM RECAPITALIZATION & OPTIMIZATION

Wharf structures and Quay Deck landing areas, will be built in stages to accommodate the following transport fleet:

APPENDIX 2. Nova Scotia Department of Environment and Labour Environmental Assessment Terms and Conditions for Environmental Assessment Approval

Environment Protection (Water Quality) Policy 2015, stormwater pollution prevention & dewatering guidance

Environment Protection Licence

District of North Vancouver Construction Traffic Management Plan Guidelines

Transcription:

Project Environmental Review UPDATE November 23, 2017 Northshore Waterfront Liaison Committee Teck

Agenda Project Objectives Project Description Project Discussion VFPA PER process Project Review Status

Project Objectives Create free-flowing traffic access into the Neptune Terminal for trucks and construction equipment from Low Level Road off existing Overpass Access for upgrade works terminal coal updates (Allison project: new rail dumper, new conveyors, replacement shiploader, new track 0) Mitigate reduced access for emergency and large vehicles related to G3 Terminal construction and changes Enhance firetruck access Eliminate the use for the existing height restricted underpass Create an opportunity for track straightening at dumper area and reducing risk of train derailment

Project Description Components Construction from the existing two-span steel bridge using a new curved steel 66 m bridge length (824 m 2 ) above grade over the eastern terminal rail lines (Track 0 through Track 8) Curved bridge components, supported by 2 abutments and 1 pier on pile foundation over the span over the tracks Approach ramp will be 230 m in length (2,197 m 2 ), 6% grade from eastern coal stockpile area up to new bridge span Ramp will be constructed using light weight fill Overpass extension connected to existing surface drainage and stormwater pollution prevention and capacity Low impact construction on the existing facility operations, allow for consistent turning traffic movement Security Gate off Low Level Overpass

Location North Vancouver Existing Neptune Terminal VFPA lands

Location Connection to existing low-level road overpass Access into existing terminal developed site Create free flowing traffic access to Neptune site Mitigate reduced access

Existing Neptune Cargill Overpass

Visualization of Overpass Extension

Overpass Extension Seismic and geotechnical studies Archaeological assessment, and monitoring Pile supported bridge deck design consistent with existing overpass Light weight fill for ramp No preload Limited surface soil disturbance

Overpass Extension Construction Environmental Management Plan Traffic dust control - wheel wash Erosion and sediment control, air, noise, light management Traffic management

Project Schedule Project Environmental Review submission - Aug 30, 2017 Requested revisions Oct 2, 2017 Information Requests Oct, Nov 2017 Stormwater / Drainage, Security Gate, Construction Traffic Management Geotechnical investigative studies and Archaeological monitoring completed July 2017 Detailed design end of November 2017 VFPA PER Permit anticipated Dec 2017 -Jan 2018 Construction January 2018 to September 2018.

Project Construction and Operations Effects / Issues Construction related air emissions, traffic, light and noise Water collected through existing water treatment system Geotechnical investigations monitored through environmental management plan and chance find protocol during drilling Construction environmental management plan to mitigate construction issues related to air, soils, noise, light and traffic Archaeological Overview Assessment conducted across entire Neptune terminal

Next Steps PER information requests and responses Detailed designs VFPA project permit, including conditions Retain Construction Contractor Ongoing communication with VFPA / NSWLC

Questions?