Sample Questions for Paper 4 Building Services & Environmental Controls

Similar documents
2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

INTRODUCTION TO GREEN PROPERTY MANAGEMENT PRACTICES

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

Acoustic Design Criteria

Building Codes and Ordinances ARC 227

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

Green Building Guideline of Jordan

Definition of Wall. A continuous, vertical structure Thin relatively to its length and height

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

Construction Technology Revision Guide

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

ADEC S SUSTAINABLE FUTURE SCHOOLS PROGRAM

Client: The Hong Kong Polytechnic University. Project Manager: Campus Development Office, The Hong Kong Polytechnic University

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc.

PALM TREE RESIDENTIAL AREA / Hanoi, Vietnam

Achieving Zero Carbon for Buildings in a Densely Populated City and a Subtropical Climate. Guiyi LI Construction Industry Council

Green Building Guideline of Jordan

Culver City Building Safety Division Mandatory Green Building Program

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

STRUCTURAL ENGINEERING FOR SUSTAINABLE BUILDINGS

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

team a 5-schematic refinement and design development

Compactness ratio : 1.2. Openings ratio : 26% (thermic envelope / inhabitable area) Smaller is better 1.9 = bad < 0.8 = good

APPENDIX B CONSTRUCTION WASTE MANAGEMENT SAMPLE SPECIFICATION

Leased Space Environmental and Energy Efficiency Attributes Tenant Instructions

HELLA Sonnen - und Wetterschutztechnik GmbH. Contribution within the framework of BREEAM certification. Management. Date:

BUILDING PERMIT APPLICATION

ArcelorMittal Europe - Long Products Sections and Merchant Bars. Office Building ArcelorMittal in Esch Alzette

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

PASSIVE FIRE PROTECTION Specialists for the construction, infrastructure, transport, energy, industrial and commercial sectors.

SOUTH LANARKSHIRE COLLEGE LOW CARBON TEACHING BUILDING TECHNICAL CASE STUDY

UMWELT 75 YORK ST TERALBA. Australian Institute of Energy - Peter Jamieson. April 2014

Complying Development Checklist for Alterations (not Additions) to Dwellings & Ancillary Development. under the NSW Housing Alterations Code

LEED REQUIREMENTS. Source reference: Supplemental Guidance to the Minimum Program Requirements (MPR), Rev. 2, 9/1/2011

PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL

Asset Energy Calculator Guidance

65% Waste Output. 12% Water Use. 70% Electricity Consumption. What is the size of your footprint? Concrete Masonry Sustainable Construction

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II

GLADYS VALLEY HALL. Materials & Resources Innovation & Design Process

BBA 001 Documents included under the scope of BBA s ISO UKAS accreditation

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

INTERIOR ENVIRONMENT

Italcementi Center for Research and Innovation

B. System Design and Performance Requirements

ELECTRICAL SYSTEMS. TEST YOURSELF QUESTIONS: Answer Key. CHAPTER 1: Sustainability in Electrical Systems

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

9.3.9 Industry uses code

Land Reclamation Site Siting and Application Guidelines

PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT. Construction requirements for LOWER LEVEL DEVELOPMENT. in residential dwellings

REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

ANNEXURE B SECTION 1

Varennes Net-Zero Library City of Varennes

Schedule T5. Tender Documents. This tender is for: Tender Documents: The documents issued for this tender include the following: Tender Schedules

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

Design Guidelines. 1. INTRODUCTION 2. SECTION SPECIFICATIONS 3. HOUSE DESIGN RULES

ARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord.

This guide only applies for sewer assets up to and including 225mm diameter.

CB04. Outback House. Case Study. Creative Spaces Australia. by Casey Brown Architecture

3.1 Noise Overlay District

Garage Conversions. Technical Issues

City of Rohnert Park When Permits are Required

Project Design Overview

Container Home Presentation Book 4

RESIDENTIAL BUILDING REQUIREMENTS

tall buildings sustainable & practical design approach case study: 20 fenchurch street cibse regional seminar birmingham 8 february 2012

SAMPLE. Slab On Ground Construction. Carpentry - Residential Construction. Product Code: 5597

Stage 6 & 7 Design Guidelines

2010 National Building Code Adoption and Associated Process Changes

Building regulations now in force

LEED v4 Building Design and Construction Quiz #8 EQ

LEED 2009 for New Construction and Major Renovations

MATERIAL ALLOWANCES AND UNIT PRICES

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

STATE UNIVERSITY CONSTRUCTION FUND

FACILITIES MAINTENANCE WORKER

LEED Application Guide for Multiple Buildings and On Campus Building Projects

IMPORTANT (Please read this before using the checklist).

SITE ANALYSIS, DESIGN BRIEF AND CASE STUDY

ARCHITECTURAL DRAWINGS

Modelling Analysis of Thermal Performance of Internal Shading Devices for a Commercial Atrium Building in Tropical Climates

Building Systems and Design Elements included in SliDeRulE

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION

VOLUME 4 DIVISION SPECIFICATIONS

Cheldelin Middle School

Compliance to the IgCC. September 29, 2011

General Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours

Pocono Builders Association 2014 Building Awards Environmental/Energy Efficiency

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI

City of High Point Airport Overlay District Noise Level Reduction Design Standards

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

GREEN STAR NZ - Education 2009 MANAGEMENT CATEGORY WEIGHTING: 10% No. of Points Available

Zero energy highrise. Dream Comes True? Zero Carbon Building Conference 2015

Carbon-Smart Buildings. Tackling Energy Efficiency in Hong Kong s Commercial Buildings

TECHNICAL SPECIFICATION

Typical Finished Basement Details

APPLICATION AND CERTIFICATE FOR PAYMENT

NEW FOUR STORY MIXED USE RESTAURANT, RETAIL, LODGING, AND OFFICE BUILDING OWNER S PROJECT REQUIREMENTS

Transcription:

Basic Principle 1. Which of the following is fundamental in preventing the spread of legionnaires disease in building services installations? A. Using CFC refrigerants for chiller plants B. Using single-stack drainage system to avoid cross contamination C. Using water strainers to filter the incoming water at the supply mains D. Carrying out regular inspection and maintenance to the water-cooled air-conditioning plants Ans : D 2. Which of the following can only generate sensible heat (rather than latent heat ) inside a building? A. Coffee maker B. Taking a shower C. Heat generated by light bulb D. Body heat generated by occupants Ans. : C 3. What does the unit W /m²k in respect of the performance of building materials refer to? A. Shading coefficient B. Energy efficiency ratio C. Thermal transmittance D. Life cycle assessment analysis Ans. : C Sustainable Design & Environmental Issues 4. Which of the following is not an assessment criteria for green assessment system BEAM Plus? A. Cost effectiveness B. Barrier-free access C. Life Cycle Assessment D. Nature Outlook Assessment

5. Which of the following is least effective to reduce heat island effects in designing an open air car parking lot? Ans : A A. Using natural asphalt for paving B. Planting trees to provide shading C. Providing a roof cover of high solar reflectance D. Laying a lawn with traffickable open-grid paving 6. The glazing that gives the lowest OTTV is A. skylight with double glazing. B. west facing single glazed window C. east facing single glazed window D. south facing single glazed window 7. Which of the following statements is incorrect in respect of Air Ventilation Assessment (AVA) Studies for a new building development? A. Computational fluid dynamics analysis can check the wind permeabilities at difference levels. B. Wind tunnel test must be carried out on a scaled model in order to get a more accurate result. C. Pedestrian comfort is the main objective of the AVA study. D. Landscaping is not taken into account normally. 8. Which of the following is not a benchmark for environmental performance assessment? A. LEED B. BEAM C. GBTools D. Gini coefficient

9. Which of the following are the underlying criteria for achieving a carbon neutral building? (1) limiting energy consumption. (2) stopping any carbon emissions. (3) adopting a renewable energy source. (4) keeping its carbon footprint within a pre-set limit. A. (1) and (3) only. B. (1) and (4) only. C. (2) and (3) only. D. (2) and (4) only Ventilating Air Conditioning & Heat 10. Which of the following is true for underfloor air conditioning system? A. It uses more fan power. B. It is not suitable for winter heating. C. The circulated comfort zone covers the finished floor to the false ceiling. D. It is more effective than the conventional air conditioning system when used in a computer data centre. 11. The heat rejection capacity of the cooling tower system of a hotel is estimated to be 600 TR. What is the optimum choice for the cooling tower? A. 1 no. of 600 TR package cooling tower B. 1 no. of 900 TR package cooling tower C. 2 nos. of 450 TR package cooling tower D. 3 nos. of 300 TR package cooling tower 12. Which of the following actions may best help maintain human comfort even in an increased indoor temperature? Ans : A A. Lowering the humidity B. Re-circulating the air supply C. Lowering the lighting intensity D. Increasing the ventilation rate

Fire Safety 13. Which of the following premises should be provided with smoke extraction system? A. Dangerous goods store B. Double-storey carpark basement C. Atrium with a compartment volume of 20,000m³ D. Hotel guest rooms common internal corridor with fixed windows 14. Which of the following does not affect the sizing of sprinkler water tanks in Hong Kong? A. Type of building B. Occupancy of building C. Direct fire link to fire station D. Number of water source or supply 15. Which of the following are valid benefits of FM200 system, which is commonly adopted as the fire-fighting provision for computer centres? Ans : A (1) Plant room is not a must. (2) Water is not necessary for fire fighting. (3) Easy to reinstate the system after false alarm. (4) Less expensive than pre-action sprinkler system. A. (1) and (2) only B. (1) and (4) only C. (2) and (3) only D. (3) and (4) only

Pipe & Drainage 16. Which of the following pipes without internal lining is not acceptable to the Water Authority for use as cold/hot/salt water inside service within a building? Ans : D A. upvc pipe B. Copper pipe C. Cast iron pipe D. Galvanized steel pipe 17. Which of the following is not correct according to the Water Authority s requirements on water flushing device? A. Valveless syphonic type is acceptable. B. Dual-flush may be provided by the valveless-type device. C. Valve-type is acceptable if the flushing volume is kept within 7.5 litres. D. It is possible to use valve-type flushing device triggered by infra-red sensor. 18. Which of the following plumbing installations is not acceptable to the Water Authority? A. Using cast iron pipe in a cold/salt water inside service. B. Drinking fountain connected to the mains water supply system. C. Branching of water supply pipe downstream of the water meter. D. Installation of water filter in the water tank at roof with non-return valve upstream of the filter. Electrical 19. Which of the following combinations reflects the commonly recommended lighting intensities in line with the design guide of the Chartered Institution of Building Services Engineers (CIBSE)? Offices Fire Escape Stairs A. 200 lux 30 lux B. 300 lux 50 lux C. 400 lux 80 lux D. 500 lux 100 lux

20. Which of the following are correct as an energy efficient measure on lighting installation? Ans : D (1) Replace thin fluorescent tube (T5 lamp) with fat tube (T8 lamp) (2) Replace incandescent lamp with compact fluorescent lamp (3) Replace conventional exit sign with LED exit sign (4) Use motion sensor as an on/off control A. (1) and (2) only B. (3) and (4) only C. (1), (2) and (3) only D. (2), (3) and (4) only 21. Which of the following services provision is not required for Main Switch Room? Ans. : C A. Mechanical ventilation B. Lighting C. Gas flooding protection D. Equipotential bonding Lifts & Escalators 22. A lift machine room shall be designed A. to be accessible from common area. B. with access complying with the minimum standard prescribed under Code of Practices for Means of Escape. C. with a minimum clear headroom of 2.3 m. D. to be protected by fire sprinklers. 23. What is the minimum clear headroom of escalator measured at the edge of steps to ceiling above? A. 2.0 m B. 2.1 m C. 2.3 m D. 2.5 m Ans. : C

24. Which of the following parameters does not affect the lift waiting time? A. Rated load B. Number of stops C. Door closing time D. Handling capacity Acoustics 25. The most effective design solution to mitigate traffic noise impact to a low rise residential development adjacent to a major highway is to provide A. a row of tall trees at the site boundary as noise barrier. B. a commercial podium as noise barrier with the residential development set back from the podium edge. C. balcony as noise barrier D. window sill as noise barrier 26. Which of the following is not conducive to enhancing the sound insulation property of a window? A. Increasing the U-value of the window assembly. B. Increasing the air gap width of double-glazed window. C. Increasing the glass thickness of single-glazed window. D. Using unequal glass thicknesses for the two glass panes of double-glazed window. 27. Which of the following is not considered as an effective way of reducing noise nuisance from construction activities? Ans : B A. Use of hydraulic crushers B. Adoption of percussive piling C. Disposal of rubble through plastic chutes D. Erection of acoustic barriers around the construction site

Miscellaneous 28. Which of the following represents the inverted cone of order of desirability as summarized by the Environmental Protection Department for managing construction and demolition wastes in Hong Kong? A. Avoid Minimise Recycle Treat Dispose B. Redesign Reuse Recycle Retreat Landfill C. Reduce Reuse Recycle Refill Redesign D. Reduce Reuse Rehabilitate Recycle Landfill 29. Given the same thickness of typical wall or roof construction, which of the following has the lowest value of transmission co-efficient (i.e. U value)? A. concrete with cement sand plaster B. brick with cement sand plaster C. timber panel D. metal panel with fibre glass 30. The main objective of producing combined building services drawing is to A. provide a useful tool for maintenance in the related inside services B. identify the problematic areas for services and structural co-ordination C. help finalise the schematic designs of all related building services trades D. show all related services elements on one drawing for ease of inspection